This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
FIRE-RESISTANCE TEST ON A NON-LOADBEARING VERTICAL SEPARATING ELEMENT Report number FSV 1530A CSIRO job number SV3542 Date of issue 4 MAY 2012 This report supersedes issue FSV 1530 dated 16 March 2012.
Client M PANEL PTY LTDSOOVEE (H.K.) LIMITED
Commercial-in-confidence
“Copyright CSIRO 2012 ©” Copying or alteration of this report without written authorisation from CSIRO is forbidden.
CSIRO – MATERIALS SCIENCE AND ENGINEERING
14 Julius Avenue, Riverside Corporate Park, North Ryde NSW 2113 Ph: 02 9490 5444 Fax: 02 9490 5528
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 2 of 24
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
Use of this Report
Use of Reports – Testing This report is subject to binding obligations under which it was prepared. In particular, the Report must not be used:
• as a means of endorsement; or • in a company prospectus or notification to a Stock Exchange document for capital raising,
without the prior written consent of CSIRO.
The Report may be published verbatim and in full, provided that a statement is included on the publication that it is a copy of the Report issued by CSIRO. Excerpts of the Report may not be published. Use of Reports – Consultancy This report is subject to binding obligations under which it was prepared. In particular, the Report may only be used for the following purposes:
• the information in the Report may be used by the party that commissioned the Report for its internal business operations (but not licensing to third parties);
• the report may be copied for distribution within the organisation that commissioned the Report;
• copies of the Report (or extracts of the Report) may be distributed to contractors and agents of the organisation that commissioned the Report who have a need for the Report for its internal business operations. Any extracts of the Report distributed for this purpose must clearly note that the extract is part of a larger Report held by the organisation that commissioned the Report and which has been prepared by CSIRO.
The name, trade mark or logo of the CSIRO must not be used without the prior written consent of CSIRO. The Report must not be used as a means of endorsement without the prior written consent of CSIRO.
Copyright and Disclaimer
© 2012 CSIRO To the extent permitted by law, all rights are reserved and no part of this publication covered by copyright may be reproduced or copied in any form or by any means except with the written permission of CSIRO.
Important Disclaimer
CSIRO advises that the information contained in this publication comprises general statements based on scientific research. The reader is advised and needs to be aware that such information may be incomplete or unable to be used in any specific situation. No reliance or actions must therefore be made on that information without seeking prior expert professional, scientific and technical advice. To the extent permitted by law, CSIRO (including its employees and consultants) excludes all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses and any other compensation, arising directly or indirectly from using this publication (in part or in whole) and any information or material contained in it.
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 3 of 24
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
Table of Contents
SUMMARY....................................................................................................................................................5 IDENTIFICATION OF SPECIMEN: ..........................................................................................................5 SPONSOR: ..................................................................................................................................................5 MANUFACTURER: ....................................................................................................................................5 TEST STANDARD:......................................................................................................................................5 TEST NUMBER: .........................................................................................................................................5 TEST DATE:................................................................................................................................................5 DESCRIPTION OF SPECIMEN:................................................................................................................5
GENERAL..............................................................................................................................................5 PANELS .................................................................................................................................................5 INSTALLATION ...................................................................................................................................6 ORIENTATION .....................................................................................................................................6 DIMENSIONS........................................................................................................................................6 RESTRAINTS ........................................................................................................................................6 CONDITIONING ...................................................................................................................................6
DOCUMENTATION: ..................................................................................................................................6 EQUIPMENT:.............................................................................................................................................6 AMBIENT TEMPERATURE: ......................................................................................................................7 DEPARTURE FROM STANDARD:............................................................................................................7 TERMINATION OF TEST: .........................................................................................................................7 TEST RESULTS: .........................................................................................................................................8
CRITICAL OBSERVATIONS...............................................................................................................8 FURNACE TEMPERATURE................................................................................................................8 FURNACE PRESSURE .........................................................................................................................8 SPECIMEN TEMPERATURE...............................................................................................................8 SPECIMEN DEFLECTION ...................................................................................................................8 PERFORMANCE...................................................................................................................................9
FIRE-RESISTANCE LEVEL (FRL): ...........................................................................................................9 APPLICATION OF TEST RESULTS: .........................................................................................................9
APPENDICES..............................................................................................................................................10 APPENDIX 1.............................................................................................................................................10
Photograph 1 - Exposed face of the specimen prior to testing..............................................................10 Photograph 2 - Unexposed face of the specimen prior to testing..........................................................10 Photograph 3 - Specimen at 60 minutes into the test ............................................................................11 Photograph 4 - Specimen at 120 minutes into the test ..........................................................................11 Photograph 5 - Specimen at the completion of testing..........................................................................12 Photograph 6 - Specimen after the completion of testing .....................................................................12
APPENDIX 2.............................................................................................................................................13 Figure 1 - Furnace temperature.............................................................................................................13 Figure 2 - Furnace pressure...................................................................................................................14 Figure 3 - Specimen temperature - Unexposed face of the specimen ...................................................15 Figure 4 - Specimen temperature - Over joints .....................................................................................16 Figure 5 - Specimen temperature - Around the perimeter of the wall...................................................17 Figure 6 - Specimen deflection .............................................................................................................18
APPENDIX 3.............................................................................................................................................19 Drawing titled “M Panel detail 2”, dated 27 February 2012, by Boss design Pty Ltd ..........................19
APPENDIX 4.............................................................................................................................................20
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 4 of 24
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
Copy of Certificate of Test - No.2369 ..................................................................................................20 APPENDIX 5.............................................................................................................................................21
Assessment Number FCO-2916 (page 1) on likely performance of wall system with different head profile detail to tested prototype ...........................................................................................................21 Assessment Number FCO-2916 (page 2) on likely performance of wall system with different head profile detail to tested prototype ...........................................................................................................22 Assessment Number FCO-2916 (page 3) on likely performance of wall system with different head profile detail to tested prototype ...........................................................................................................23 Assessment Number FCO-2916 (page 4) on likely performance of wall system with different head profile detail to tested prototype ...........................................................................................................24 Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 5 of 24
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
SPONSORED INVESTIGATION No. FSV 1530A FIRE-RESISTANCE TEST ON A NON-LOADBEARING
VERTICAL SEPARATING ELEMENT
SUMMARY IDENTIFICATION OF SPECIMEN:
The sponsor identified the specimen as a non-load-bearing 75-mm thick Sigma Panel(M Panel) Wall System.
SPONSOR: M PANEL PTY LTD C301/3 Avenue of Europe Newington NSW MANUFACTURER: SOOVEE (H.K.) LIMITED
Hongmao, Sanshe Village, Guankou Town, jimmied District Xiamen China
TEST STANDARD: Australian Standard 1530, Methods for fire tests on building
materials, components and structures, Part 4-2005, Fire-resistance tests of elements of construction.
TEST NUMBER: FS 4277/3542 TEST DATE: The fire-resistance test was conducted on 16 February 2012. DESCRIPTION OF SPECIMEN:
GENERAL
The specimen consisted of a panel wall system of overall nominal dimensions 3000-mm high x 3000-mm wide x 75-mm thick. The wall consisted of 3000-mm high x 900-mm wide x 75-mm thick vertical orientated panels, fixed on top and bottom by 1.5-mm thick steel channels through bolted at nominal 600-mm centres along the top and bottom. PANELS
The M Panel consisted of a 900-mm wide x 63-mm thick expanded polystyrene core (core density of 17.73 kg/m3), lined on both faces with a single layer of 6-mm thick magnesium oxide board (board density 179.2-kg/m3), glued to the core with Tian Ma Xing 601# glue. Each panel comprised tongue and groove profile joints along its vertical edges as shown in drawing titled “M Panel detail 2”, dated 27 February 2012, by Boss Design Pty Ltd.
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 6 of 24
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
INSTALLATION
The wall panels were fitted to the top and bottom steel channel as shown in drawing titled “M Panel detail 2”, dated 27 February 2012, by Boss design Pty Ltd. The first panel was fixed to the vertical edge with Vicoustic Flexi Glue. Subsequent panels as well as the first panel, were restrained along the top using steel channels, a 77-mm wide x 30-mm high x 1.5-mm thick channel along the head and a 65-mm wide x 1.5-mm thick along the bottom. The channels were bolted to the specimen containing frame at 600-mm centres. The 5-mm tongue and groove joints between panels were sealed with Vicoustic Flexi Glue. The resulting gaps along restrained edge, head and bottom of the wall were sealed flush on both sides with Vicoustic Flexi Glue. The resulting gap of 20-mm between the unrestrained edge of the wall and specimen containing frame was filled with ceramic fibre. ORIENTATION
The wall panel system was of symmetrical construction. DIMENSIONS
The wall specimen was nominally 3000-mm wide x 3000-mm high x 75-mm thick. All dimensions are nominal. RESTRAINTS
The specimen was unrestrained along one of the vertical edges. CONDITIONING
The specimen wall was left to cure for a period of 9 days.
DOCUMENTATION:
The following documents were supplied by the sponsor as a complete description of the specimen and should be read in conjunction with this report:
Drawing titled “M Panel detail 2”, dated 27 February 2012, by Boss Design Pty Ltd.
Confidential information about the test specimen has been submitted
and is retained at CSIRO Materials Science and Engineering. EQUIPMENT:
FURNACE
The furnace had a nominal opening of 3000-mm x 3000-mm for attachment of vertical specimens.
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 7 of 24
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
The furnace was lined with refractory bricks and materials with the thermal properties as specified in AS 1530.4-2005 and was heated by combustion of a mixture of natural gas and air.
TEMPERATURE
The temperature in the furnace chamber was measured by eight type K, 3-mm diameter, 310 stainless steel Mineral Insulated Metal Sheathed (MIMS) thermocouples. Each thermocouple was housed in high-nickel steel tubes opened at the exposed end.
The temperatures of the specimen were measured by glass-fibre
insulated and sheathed K-type thermocouples with a wire diameter of 0.5-mm.
Location of the thermocouples on the unexposed face of the specimen is shown in photograph 2.
PRESSURE
The furnace pressure was measured by a differential low-pressure transducer with a range of ± 50 Pa.
The pressure probe was located approximately 1000-mm above the sill of the furnace. MEASUREMENT SYSTEM
The primary measurement system comprised of multiple-channel data loggers, scanning at one minute intervals during the test.
AMBIENT TEMPERATURE:
The temperature of the test area was 22°C at the commencement of the test.
DEPARTURE FROM STANDARD:
There were no departures from the requirements of AS 1530.4-2005. TERMINATION OF TEST:
The test was terminated at 132 minutes by the agreement with the sponsor.
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 8 of 24
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
TEST RESULTS:
CRITICAL OBSERVATIONS
The following observations were made during the fire-resistance test:
5 minutes - Small amount of steam is being emitted from the head of the wall.
17 minutes - Cracks have developed along the joints.
Moisture is collecting along the joints.
30 minutes - Glue on the channel along the head of the wall is starting to fall off.
61 minutes - Insulation Failure – maximum temperature rise limit of 180K is exceeded by the thermocouple on the head of the specimen.
74 minutes - Joints are getting wider.
112 minutes - Moisture along the joints is drying out.
132 minutes - Integrity Failure – a gap wider than 6-mm and longer than 150-mm has developed along the left joint (photograph 5).
Test terminated.
FURNACE TEMPERATURE
Figure 1 shows the standard curves of temperature versus time for heating the furnace chamber and the actual curves of average and maximum temperature versus time recorded during the heating period.
FURNACE PRESSURE
Figure 2 shows the curve of average pressure versus time inside the furnace chamber recorded during the heating period.
SPECIMEN TEMPERATURE
Figure 3 shows the curves of average and maximum temperature versus time on the unexposed face of the wall.
Figure 4 shows the curve of maximum temperature versus time
recorded on the panel joints. Figure 5 shows the curve of maximum temperature versus time
recorded around the perimeter of the wall.
SPECIMEN DEFLECTION
Figure 6 shows the curves of maximum deflection versus time recorded at the centre and the unrestrained edge of the wall.
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 9 of 24
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
PERFORMANCE
Performance observed in respect of the following AS 1530.4-2005 criteria:
Structural adequacy - not applicable Integrity - 132 minutes. Insulation - 61 minutes.
This report details methods of construction, the test conditions and the results obtained when specific element of construction described herein was tested following the procedure outlined in this standard. Any significant variation with respect to size, constructional details, loads, stresses, edge or end conditions, other than those allowed under the field of direct application in the relevant test method, is not covered by this report.
Because of the nature of fire resistance testing and the consequent difficulty in quantifying the uncertainty of measurement of fire resistance, it is not possible to provide a stated degree of accuracy of the result.
FIRE-RESISTANCE LEVEL (FRL):
For the purpose of building regulations in Australia, the FRL of the test specimen was -/120/60.
The fire-resistance level of the wall system is applicable when the
system is exposed to fire from either direction.
For the purposes of AS 1530.4-2005 the results of these fire tests may be used to directly assess fire hazard, but it should be recognised that a single test method will not provide a full assessment of fire hazard under all fire conditions.
APPLICATION OF TEST RESULTS: The results of the fire test contained in this test report are directly applicable, without reference to the testing authority, to similar constructions where one or more changes listed in Clause 3.8 of AS1530.4-2005, have been made provided no individual component is removed or reduced.
TESTED BY: Mario Lara Garry E Collins Testing Officer Manager, Fire Testing and Assessments 4 May 2012
This report supersedes issue FSV 1530 dated 16 March 2012
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 10 of 24
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
APPENDICES APPENDIX 1
Photograph 1 - Exposed face of the specimen prior to testing
Photograph 2 - Unexposed face of the specimen prior to testing
1 2
5
3 4
10 11
12 13
6
7 8
9
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 11 of 20
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
Photograph 3 - Specimen at 60 minutes into the test
Photograph 4 - Specimen at 120 minutes into the test
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 12 of 20
This document is issued in accordance with NATA’s accreditation requirements.
Accreditation No. 165 – Corporate Site No. 3625
Photograph 5 - Specimen at the completion of testing
Photograph 6 - Specimen after the completion of testing
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 13 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
APPENDIX 2
Figure 1 - Furnace temperature
0
100
200
300
400
500
600
700
800
900
1000
1100
025
5075
100
125
Temperature (Deg C)
Tim
e (m
in)
Ave
rage
Max
imum
Sta
ndar
d
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 14 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
Figure 2 - Furnace pressure
0123456
025
5075
100
125
Pressure (Pa)
Tim
e (m
in)
PR
ES
SU
RE
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 15 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
Figure 3 - Specimen temperature - Unexposed face of the specimen
020406080100
120
140
160
025
5075
100
125
Temperature (deg C)
Tim
e (m
in)
Aver
age
Max
imum
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 16 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
Figure 4 - Specimen temperature - Over joints
020406080100
025
5075
100
125
Temperature (deg C)
Tim
e (m
in)
Max
imum
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 17 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
Figure 5 - Specimen temperature - Around the perimeter of the wall
050100
150
200
250
300
025
5075
100
125
Temperature (deg C)
Tim
e (m
in)
Max
imum
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 18 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
Figure 6 - Specimen deflection
020406080100
025
5075
100
125
Deflection (mm)
Tim
e (m
in)
Cen
treE
dge
+ve
-def
lect
ion
into
the
furn
ace
-ve
-def
lect
ion
away
from
the
furn
ace
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 19 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
APPENDIX 3
Drawing titled “M Panel detail 2”, dated 27 February 2012, by Boss design Pty Ltd
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 20 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
APPENDIX 4
Copy of Certificate of Test - No.2369
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 21 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
APPENDIX 5
Assessment Number FCO-2916 (page 1) on likely performance of wall system with different head profile detail to tested prototype
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 22 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
Assessment Number FCO-2916 (page 2) on likely performance of wall system with different head profile detail to tested prototype
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 23 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
Assessment Number FCO-2916 (page 3) on likely performance of wall system with different head profile detail to tested prototype
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au
REPORT No. FSV 1530A Page 24 of 24
This document is issued in accordance with NATA’s accreditation requirements. Accreditation No. 165 – Corporate Site No. 3625
Assessment Number FCO-2916 (page 4) on likely performance of wall system with different head profile detail to tested prototype
Sigma Panel (M Panel)
www.soovee.cn
www.mpanel.com.au