si tracker september run

6
Tech Board mtg 23 July 2014 Si Tracker September Run

Upload: kaelem

Post on 06-Jan-2016

32 views

Category:

Documents


7 download

DESCRIPTION

Si Tracker September Run. Silicon Tracker Vessel & Support Frame. Silicon Tracker Vessel Vacuum Tests. Silicon Tracker Assembly. Pictures and assembly work courtesy of Dave Seddon Liverpool. Temporary Target Mechanism. Mechanism available at GSI - Daniel. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Si Tracker September Run

Tech Board mtg 23 July 2014

Si TrackerSeptember Run

Page 2: Si Tracker September Run

Silicon Tracker Vessel & Support Frame

Tech Board Mtg 23/7/14 Alan Grant 2

Page 3: Si Tracker September Run

Silicon Tracker Vessel Vacuum Tests

Tech Board Mtg 23/7/14 Alan Grant 3

Page 4: Si Tracker September Run

Silicon Tracker Assembly

Tech Board Mtg 23/7/14 Alan Grant 4

Pictures and assembly work courtesy of Dave Seddon Liverpool

Page 5: Si Tracker September Run

Temporary Target Mechanism

Tech Board Mtg 23/7/14 Alan Grant 5

Mechanism available at GSI - Daniel

Page 6: Si Tracker September Run

Temporary Target Mechanism Proposal

Tech Board Mtg 23/7/14 Alan Grant 6