Page 1: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery
Page 2: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Shri. M. Prasada RaoIRSEE

Senior Divisional Electrical Engineer

Secunderabad Division

South Central Railway

Page 3: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Brief introduction

The Passenger Reservation complex located at Secunderabad was built in the year1989, PRS houses important servers where the disaster recovery servers areinstalled for replicating of online information of the entire ticketing system onIndian Railway.

The PRS Application CONCERT (Country-wide Network of Computerized EnhancedReservation and Ticketing) is the world’s largest online reservation application,developed and maintained by CRIS.

PRS provides reservation services to nearly 1.5 to 2.2 million passengers a day onover 2500 trains running throughout the country.

Page 4: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

The system currently operates from 5 Data centres located at New Delhi, Kolkata, Mumbai, Chennai & Secunderabad.

The server clusters are connected together by a core network that enables universal terminals across country, through which the travelling public can reserve a berth on any train, between any pair of station for any date and class

Brief introduction

Page 5: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

10

12

14

16

18

20

22

Consumption(KWH)

20

.80

18

.8

14

.1

x La

kh

2017-18

2018-19

2019-20

Consumption has reduced by 32.16% from 2017-18 to 2019-20

Energy Scenario

Page 6: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

530.6

478.8

359.8

0

100

200

300

400

500

6002580

2498

1943

1800

1900

2000

2100

2200

2300

2400

2500

2600

2700

SEC (KWH/KW) EPI(KWH/Sq. Mtrs)

SEC has been reduced by

24.67% from 2017-18 to

2019-20.

SEC (KWH/KW)

SEC has been reduced by

32.16% from 2017-18 to

2019-20

EPI(KWH/Sq. Mtrs)

Energy Parameters of Hyderabad Railway station building

17-18 18-19 19-20 17-18 18-19 19-20

Page 7: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Direct Competitors & National Benchmarking :

1.6

1.5

1.31

1

1.1

1.2

1.3

1.4

1.5

1.6

1.7

Ctrl S Data center,Gachibowli

Ctrl S Data center, Mumbai PRS Secunderabad

PUE (Power Usage Effectiveness)

Information on Competitors/National Benchmarking

Page 8: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Road Map to achieve Global Bench Marking

Adoption of smart energy monitoring & control.

Optimum utilization of HVAC system.

Periodical Energy auditing and Management.

Certification of building by prominent institutionsLike Bureau of Energy Efficiency.

Page 9: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Short Term Targets/Major En.Con projects planned FY2020-21

Replacement of 2 x 104 Ton fixed speed chiller plant with energy efficient 2 x 80 Ton VFD driven chiller plants .

Sl

NoProject Description

Savings in

kWh/AnnumInvestment in Rs. Savings in Rs.

Payback

period in years

1 2 x 80 Ton Chiller plant 47000 ₹ 60.00 Lakhs ₹ 3.90 Lakhs 15

Long Term Targets/Action plan

All the Major loads ( HVAC plants, AHU, Pumps, etc.) will be monitoredonline for early identification and rectification for avoiding equipment failures therebypromoting effective utilization of assets.

Installation of suitable On grid solar power plant (On site/off site).

Page 10: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

• Reducing the Energy consumption by Focussing on Energy efficient

alternatives, latest advance technology for energy monitoring & optimization

of consumption.

Major En.con projects implemented in 2017-18

Sl

NoProject Description

Savings in

kWh/Annum

Investment in

Rs.

Savings in

Rs./Annum

Payback

period in

years

1 Provision of VFD drive

for AHUs 22294 ₹ 0.65 Lakh ₹ 1.82 Lakh 0.4

2 Provision of energy

efficient LED lighting

inplace of T5 fittings

8577 ₹ 0.88 Lakh ₹ 0.7 Lakh 1.3

3 Provision of VFD drive

for condenser pumps

of Chiller Plant

65350 ₹ 1.95 Lakh ₹ 5.35 Lakh 0.4

Energy Saving Projects implemented in last 3 years

4 Selection of right sizing

capacity of pumps for

cooling tower

13070 ₹ 0.20 Lakh ₹ 1.07 Lakh 0.2

5 Provision of timers &

temperature setting

4928 ₹ 0.22 Lakh ₹ 0.40 Lakh 0.5

6 Controlling of HVAC

temperature & voltage

range

108500 Nil ₹ 8.89 Lakh 0

Page 11: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Major En.con projects implemented in 2018-19

Energy Saving Projects implemented in last 3 years

Sl

NoProject Description

Savings in

kWh/Annum

Investment in

Rs.

Savings in

Rs./Annum

Payback

period in

years

1 Implementing preventive

maintenance schedules

15990 Nil ₹ 1.32 Lakh 0

2 Reset of chilled water &

condenser water

temperature of chiller plant

33800 Nil ₹ 2.80 Lakh 0

3 Reduction of conversion

losses (AC/DC) by

installing 3 sets of modern

energy efficient 2 x 30

KVA UPS in place of

overaged & inefficient

UPS

39600 ₹ 45 lakh ₹ 3.28 Lakh 13.7

4 Provision of APFC panel 47970 ₹ 1.1 Lakh ₹ 3.98 Lakh 0.27

Page 12: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Sl

NoProject Description

Savings in

kWh/Annum

Investment in

Rs.

Savings in

Rs.

Payback

period in

years

1 Provision of Occupancy

sensors

37230 ₹ 0.8 Lakh ₹ 3.98 Lakh 0.2

2 Provision of Precision AC 300000 ₹ 40 Lakh ₹ 25.2 Lakh 1.6

3 Energy savers for AC

units

23652 ₹ 2.72 Lakh ₹ 1.98 Lakh 1.4

4 Energy efficient star rated

AC units

39420 ₹ 7.2 Lakh ₹ 3.31 Lakh 2.2

5 Energy efficient LED

lighting

65700 ₹ 3.50 Lakh ₹ 5.51 Lakh 0.7

Major En.con projects implemented in 2019-20

Energy Saving Projects implemented in last 3 years

Page 13: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

To Conserve Energy

To increase the use of Renewable energy

To reduce the energy losses.

Energy Objectives

Page 14: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Precision Air Conditioners

4 Nos of 10 tonPrecision AC unitsprovided instead ofSwitching ON of 104 TonChiller plant. Energy Conserved:

3.0 Lakh kWH/Annum

Energy efficient AC units

All the 18 NosAC units at areenergy efficientInverter type .

Energy Conserved:0.4LakhkWH/Annum

APFC Panels

75 KVAR APFCpanel provided formaintaining of 0.99PF. Energy Conserved0.48 lakh/Annum

Reduction of conversion

losses (AC/DC):

Modern energy efficient 2 x 30 KVA UPS in place of overaged & inefficient UPS.

Energy Conserved 0.4 lakh/Annum

Benefits achieved by implementing of

Page 15: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

100% LED Lighting

This station hasbeen providedwith 100% LEDluminaries.

EnergyConserved:0.73LakhkWH/Annum

Provision of VFD drive for AHU

Variable frequency drive provided for AHUs to reduce the motor load as per demand requirements Energy

Conserved:0.22LakhkWH/Annum

Provision of Occupancy

sensors

Occupancy sensors provided in officers chambers for switching of lighting load & AC units as per occupancy.

Selection of right sizing capacity of

pumps for cooling tower

Replacement ofold cooling tower5 HP pump with 3HP pump.. Energy

Conserved:0.13LakhkWH/Annum

Benefits achieved by implementing of

Page 16: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Innovation Project - 1

Provision of Precision AC unit

Commissioning of Precision Air-Conditioners instead off switching on of 104 Ton

Comfort Air-Conditioner( water Based) during Night Time( Except Summer) .

Description of parameter Unit Value

Average consumption of 104 ton chiller plant per day kWh 1213

Average consumption of 2 x 10 Ton precision AC per day kWh 384

Average Difference consumption per day kWh 829

Percentage of savings % 68

Average monetary savings per annumRs in

Lakhs25.2

Innovative Projects Implemented

Page 17: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Innovation Project - 2

Reduction of conversion losses (AC/DC):

By providing 1 sets of modern energy efficient 2 x 30 KVA UPS in place of over aged & inefficient UPS. Resulting in saving of 25% of conversion losses

Description of parameter Unit Value

Average Conversion Losses of existing UPS per day kWh 192

Average Conversion Losses of modern energy efficient UPS

per daykWh 79.2

Average Difference consumption per day kWh 112.8

Percentage of savings % 58

Average monetary savings per annumRs in

Lakhs3.28

Innovative Projects Implemented

Page 18: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Energy Policy & Salient features

• Promoting and increasing use of Renewable energyPromoting

• Conducting energy audits and implementing allimprovement measures

Conducting

• Monitoring and review of energy performances Monitoring

• Sharing our experiences on energy conservationwith other Divisions & Zones over Indian Railways

Sharing

• Creating awareness on energy conservationamongst all employees

Awareness

Page 19: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Energy Policy & Salient features

Page 20: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

GHG emissions reduced by over 30% in a period of 4 years.

GHG Mitigation

1867

1686

1267

0

200

400

600

800

1000

1200

1400

1600

1800

2000

GHG Emmisions

GHG Mitigation Trend during (2017-2020)

2017-18 2018-19 2019-20

Page 21: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Green Supply Chain

Use of Renewable Energy Sources

Use of Energy efficient luminaries

Use of Super Energy efficient fans

Use of Solar power for Hot Water

Use of Energy efficient Pumps

Use of sun light pipes

Page 22: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Performance Review Meeting regarding Energy Conservation, Posters on energy conservation

Pledge taken by employees on Energy conservation amongst staff

Team Work & Employee Involvement

Page 23: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

We believe in adaption of Green Concepts in consultation with IGBC /CII in our

premises to significantly contribute for environmental sustainability & enhancement

of passengers experience.

Long term vision on Energy Efficiency

We are custodians of

earth by reducing carbon

emissions by implementing

Utilization of Solar Power

more and more.

Energy Efficient

appliances

By implementi

ng eco smart systems

Educating and

sensitizing the people

Page 24: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Awards

Passenger Reservation System complex is the only

building that bagged first prize in office building

category in National Energy conservation Awards in

two alternative years 2016 & 2018 by Ministry of

Power, Govt. of India

Awards & Achievements

Receiving first prize for the year 2018 by Hon’ble Lok sabha speaker Smt. Sumithra Mahajan

Receiving First prize fro the year 2016 by Hon’ble Minister of State, Ministry of Power, Gov. of India

Page 25: Shri. M. Prasada Rao · Brief introduction The Passenger Reservation complex located at Secunderabad was built in the year 1989, PRS houses important servers where the disaster recovery

Passenger Reservation Complex/ Secunderabad of SC division

has been selected for Telangana State Energy Conservation

Awards 2018 – GOLD AWARD (1st prize) presented by Hon’ble

Governor of Telangana on 20.12.2018.

Awards

Receiving First Prize(Gold) in office building category for the year 2018 from Telangana State