shovel ready industrial sites

21
Webster City, Iowa Shovel Ready Industrial Sites March 2012

Upload: webster-city-economic-development

Post on 11-Nov-2014

433 views

Category:

Real Estate


0 download

DESCRIPTION

A short presentation on three shovel ready industrial sites in Webster City, Iowa. Includes site information, workforce data, permit information, utility capacities and cost estimates, incentives, and even a link to a virtual building tour.

TRANSCRIPT

Page 1: Shovel Ready Industrial Sites

Webster City, Iowa

Shovel Ready Industrial Sites

March 2012

Page 2: Shovel Ready Industrial Sites

Contact Us

David Toyer Economic Developer

Webster City Economic Development

PO Box 217

Webster City, Iowa 50595

515-832-9151 (o)

425-344-1523 (c)

[email protected]

Table of Contents

Page 3: Shovel Ready Industrial Sites

Table of Contents

• Contact Us

• Shovel Ready Sites Map

• Utilities Map

• Site Information

• Zoning & Permitting

• Transportation

• Taxes

• Workforce & Employment

• Utilities

• Electric

• Water

• Sewer

• Natural Gas

• Incentives

Special Features • Virtual Industrial Building

Page 4: Shovel Ready Industrial Sites

Shovel Ready Industrial Sites

Contact Us Table of Contents Lot 2: Virtual Building

Page 5: Shovel Ready Industrial Sites

Served by Municipal Utilities

Contact Us Table of Contents Lot 2: Virtual Building

Page 6: Shovel Ready Industrial Sites

Site Information, Part 1

Site Name(s) SE Development Park Lot 1 SE Development Park Lot 2 SE Development Park Lot 5

Site Address Commerce Drive/E. Commerce Drive

General Site Description Shovel ready lots located in an industrial park that fronts a four lane divided highway (Highway 20)

Site Owner City of Webster City, Iowa

Price Per Acre $10,000

Acres Lot 1 2.11 acres Lot 2 4.72 acres Lot 3 3.86 acres

Contact Us Table of Contents

Page 7: Shovel Ready Industrial Sites

Site Information, Part 2

Total Land Price Lot 1 $21,100 Lot 2 $47,200 Lot 5 $38,600

Approximate Lot Dimensions Lot 1 231’ x 398’ Lot 2 419’ x 512’ Lot 5 240’ x 700’

Topography Lot 1 flat Lot 2 3% slope Lot 5 1-3% slopes

Phase I Environmental Completed No

Within 100 Year Flood Plain No

Contact Us Table of Contents

Page 8: Shovel Ready Industrial Sites

Site Information, Part 3

Easements or Impediments None that we are aware of at this time

History of Hazardous Materials or Contaminants on Site?

We have no knowledge of any

Liquefaction Zone No

Existing Structures on Site(s) No

Covenants, Codes or Restrictions Yes. We can make available upon request

Current Use Vacant Lot

Previous Use Farmland

Surrounding Uses Plastics manufacturing, rare breed bird hatchery, machine shop, RV sales, concrete plant, self storage, hotel

Contact Us Table of Contents

Page 9: Shovel Ready Industrial Sites

Zoning & Permitting Current Zoning M1 – Light Industrial

Allowable Uses (abbreviated list) Assembly plant, warehousing, manufacturing (wood, tools, metal, food)

Estimated Time for Zoning Changes Not applicable if use is consistent with the M1 zone

Site Plan Review Plans typically reviewed in 7 to 10 business days

Building, Mechanical, Electrical & Plumbing Plans & Permits

Permits typically issued within 5-7 business days

Existing Codes 2011 National Electric Code, 2009 Building Code, 2009 Mechanical Code, 2009 Plumbing Code

Contact Us Table of Contents

Page 10: Shovel Ready Industrial Sites

Transportation

Access Road(s) Commerce Drive

Closest Interstate (Name & Distance) Interstate 35 13 miles

Closest Divided Four Lane Highway (Name & Distance)

Highway 20 0.75 miles

Commercial Air Service Fort Dodge Regional Airport 26 miles West of Webster City Daily Flights to Minneapolis

Rail Access None

Anticipated Developer Road Costs None

Contact Us Table of Contents

Page 11: Shovel Ready Industrial Sites

Taxes

Income Tax Rates First $25,000 of income – 6% $25,001 - $100,000 – 8% $100,001 – 250,000 – 10% Over $250,000 of income – 12%

Income Tax Apportionment Single factor, non-unitary formula based solely on profits from Iowa sales. No throwbacks.

Sales and Service Taxes State – 6% Local Option – 1% *Sales tax on utilities used for the purpose of manufacturing may be exemptable

Inventory Tax None. Raw goods, saleable goods and good in process are not taxed

Contact Us Table of Contents

Page 12: Shovel Ready Industrial Sites

Taxes, Part 2

Equipment Property Tax No personal property tax in Iowa. Industrial machinery, equipment and computers are considered personal property and are specifically exempt

Corporate Excise Tax None

Local Payroll Tax None. Any state personal income taxes are withheld from a company’s payroll, as is the case with federal personal income tax withholding

Unemployment Insurance Tax For 2012, the new employer unemployment insurance tax is 1.5% on the first $25,300 in wages

Contact Us Table of Contents

Page 13: Shovel Ready Industrial Sites

Taxes, Part 3

Sales and Use Tax Rate – Construction If your project qualifies for either the Enterprise Zone or State High Quality Jobs Program, you’d be eligible for a rebate of the 6% state sales tax on construction of improvements to your site

Real Property Tax Rate 39.50148 per $1000 in assessed value

Personal Property Tax Rate None

Franchise Tax This applies solely to financial institutions

Contact Us Table of Contents

Page 14: Shovel Ready Industrial Sites

Workforce & Employment Potential Laborforce 84,654

Population Within 60 Minute Drive +200,000

Unemployment Rate (County) 9.5% (December 2011)

Number of Workers with Transferable Skills & Experience

Advanced Manufacturing – 20,903 Plastics Manufacturing – 14,128 Distribution/Logistics – 11,479

Average Wages Please click on labor characteristics reports (below) for details on workforce, wages and proximity

Labor Characteristic Reports (Links) Advanced Manufacturing Plastic Manufacturing Logistics and Distribution

Contact Us Table of Contents

Page 15: Shovel Ready Industrial Sites

Electric Utility

Provider Webster City Municipal

Current Available Load at Location 11 megawatts (MW)

System Expandable Yes

Existing Service Available 13.2 kV underground with 3 phase

Basic Detail City has three 20 MW substations and a 20MW backup generator for emergencies

Generation Make Up 68.8% - coal 8.3% - natural gas 1.7% - nuclear 2.6% - oil, diesel or jet fuel 1.1% - recovered energy 16.5% - wind

Contact Us Table of Contents

Page 16: Shovel Ready Industrial Sites

Electric Utility, Part 2

Electric Rates Depending on monthly usage, your project is likely to fall under either the General Service Rate or Industrial Rate.

Estimated Cents Per kWh $0.079

Business Development Programs Energy Efficiency Rebate Program Energy Efficiency Loan Program

Business Services Annual Thermography Efficiency Reviews Audits & Demand Analysis

Contact David Toyer, Economic Developer 515-832-9151 [email protected]

Contact Us Table of Contents

Page 17: Shovel Ready Industrial Sites

Water Utility

Provider Webster City Municipal

Water Line & Distance from Site 8” main in north frontage

Approximate Water Pressure Hydrant 439 has static pressure of 70 psi and can supply water at 1300 gpm

Water Cost (per 1000 gallons) $6.96

Water Rate Structure Base monthly charge and volume charges based on three tiers of usage.

Contact Us Table of Contents

Page 18: Shovel Ready Industrial Sites

Water Utility, Part 2

Water Connection Fee Yes. Based on 8” service line (required if building is sprinkled) would cost $37,968.75.

Estimated System Capacity Available 2 million gallons per day

Local Contact David Toyer, Economic Developer 515-832-9151 [email protected]

Contact Us Table of Contents

Page 19: Shovel Ready Industrial Sites

Sewer Utility Provider Webster City Municipal

Sewer Main Size & Distance from Site 12” main located in south frontage of Commerce Drive

Cost Per (1000 gallons) $4.59

Rate Structure Base monthly charge and usage charges by volume of water used

Connection Charge Yes, it’s included as part of water connection fee

Estimated System Capacity Available 1.5 million gallons per day

Local Contact David Toyer, Economic Developer 515-832-9151 [email protected]

Contact Us Table of Contents

Page 20: Shovel Ready Industrial Sites

Natural Gas Provider Black Hills Energy

Line Size & Distance to Site Located nearby and could be extended

Pressure 75 PSI

Cost Estimate We will work with Black Hills Energy to develop a cost estimate based on the usage information you provide

Local Contact Justin Jones 515-832-1975 Extension 4 [email protected]

Contact Us Table of Contents

Page 21: Shovel Ready Industrial Sites

Incentives Incentives We will work with you to evaluate

available incentives, including but not limited to: • Loans • Forgivable loans • Job training funds • Tax credits

More Information Visit Our Financial Incentives Page

Contact Us Table of Contents