1. ON THE DRAWING BOARD— No matter how complex your piping assembly design may be, all partsvalves, fit- tings, and pipeare supplied by Crane. One source of supplyone order covers everything. Shop-Fabricated Assemblies . . A Complete Service from CRANE 2. IN THE FABRICATING SHOP — All designs are completely fabricated by Crane. Proper selection of all parts is assured by the complete Crane line. One respon- sibility covers all materials and workmanship. S HOP-FABRICATION typifies Crane complete service in the highest degree. Your blueprint in Crane Pipe Shofps means delivery to your installation of a unit meeting ev^xy intent of design. For at Crane, no job is too small—noene too large or complex—and absolute adherence to specifica- tions is a matter of pride. As the world's leading supplier of valves, fittings, amd fabricated piping, Crane Co. produces all types of header*^ assemblies of valves and fittings. Completely shop-welded, stress-relieved and tested, and conforming fully to code ac- quirements, such Crane-built units—whether for power or processing systems, high or low pressure—stand out as die finest combinations of materials and workmanship. The same rigid control applied in making Crane valwes and fittings marks every pipe shop operation. From raw materials to finished assemblies, one high standard of qiaal- ity is maintained by the most elaborate facilities in the indkus· try. Your complete satisfaction with every job is assusred by Crane Co.'s 89-year leadership in «he piping equipment field. Crane Co., General Offices: 836 S. Michi- gan Ave., Chicago 5, 111. Branches cstttd Wholesalers Serving All Industrial Areas· 3. ON THE JOB—With Crane materials *tnd Crane craftsmanship in every part, one standZard of quality guards the entire assembly. Shou*n is the completed 12 χ 8 χ 4 in. header assembly o] 600-pound cast steel motor-operated gate voelvei and fittings, installed in a central station. VALVES · FITTINGS · PIPE PLUMBING HEATING · PUMtPS 1236' CHEMICAL AND ENGINEERING NEWS-

Upload: nguyenkhanh

Post on 08-Feb-2017

212 views

Category:

Documents


0 download

TRANSCRIPT

1 . O N THE DRAWING BOARD— No matter how complex your piping assembly design may be, all parts—valves, fit­tings, and pipe—are supplied by Crane. One source of supply—one order covers everything.

Shop-Fabricated Assemblies . . A Complete

Service f rom CRANE

2 . IN THE FABRICATING SHOP — All designs are completely fabricated by Crane. Proper selection of all parts is assured by the complete Crane line. One respon­sibility covers all materials and workmanship.

SHOP-FABRICATION typifies Crane complete service in the highest degree. Your blueprint in Crane Pipe Shofps

means delivery to your installation of a unit meeting ev^xy intent of design. For at Crane, no job is too small—noene too large or complex—and absolute adherence to specifica­tions is a matter of pride.

As the world's leading supplier of valves, fittings, amd fabricated piping, Crane Co. produces all types of header*^ assemblies of valves and fittings. Completely shop-welded, stress-relieved and tested, and conforming fully to code ac­quirements, such Crane-built units—whether for power or processing systems, high or low pressure—stand out as d i e finest combinations of materials and workmanship.

The same rigid control applied in making Crane valwes and fittings marks every pipe shop operation. From raw materials to finished assemblies, one high standard of qiaal-ity is maintained by the most elaborate facilities in the indkus· try. Your complete satisfaction with every job is assusred

by Crane Co.'s 89-year leadership in «he piping equipment field.

Crane Co., General Offices: 8 3 6 S. Michi­gan Ave., Chicago 5, 111. Branches cstttd Wholesalers Serving All Industrial Areas·

3 . ON THE JOB—With Crane materials *tnd Crane craftsmanship in every part, one standZard of quality guards the entire assembly. Shou*n is the completed 12 χ 8 χ 4 in. header assembly o] 600-pound cast steel motor-operated gate vœlvei and fittings, installed in a central station.