shooting plan day 3
TRANSCRIPT
SHOOTING PLAN: DAY 3HTR Productions
GENERAL Date: Wednesday 30th September 2015 Start time: 16:30pm Shooting crew: Rikhel Trivedi – Director, Hassan Shahid - Cameraman
Cast crew: Jonathan Gardner, Gurpreet Deol, Thuvaaragan Kuruparan
Transport: walking Equipment: Camera, Tripod, SD card, Batteries, wheelchair
PRE-SHOOTING PLAN Pick up camera from school, call sheet has already been filled in and booked for the Wednesday.
Before we leave we must make sure that the battery is fully charged and that I have a spare battery as well as the charger.
Once all the equipment is gathered, I check if all the equipment is running smoothly and is ready to film the same day.
Pick up wheelchair Make sure all our actors are wearing the right costume and that we have the right props.
ONCE SHOOTINGCouple scene: This scene must be filmed so that the audience can feel sorry for the protagonist. We use close up and mid-shots of our protagonist watching the happy couple.
Make sure our actors use the right facial expressions, which suit the atmosphere of the scene.
We have to make sure we have a phone that we can call with and get the timing right so we get the phone going off in-sync with the scene while filming.