SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
PRESENTATION BY KEN FROISE
1. Introduction
2. Transnet / Ethekwini Municipality Shared Vision
3. Economic perspective
4. Ship repair & Vessel construction industries
5. Boat building
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
INTRODUCTION
Objectives of Transnet’s NIP & other strategic initiative w.r.t. ship repair and boatbuilding industries in Durban Harbour
Socio-economic impacts of vessel construction & ship repair
Current waterside, land and infrastructure requirements for vessel construction,ship repair and boat building
Medium and long term plans and future requirements for vessel construction, ship repair and boat building
PROCESS- Desktop analysis- Consultation- Site analysis
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
TRANSNET / ETHEKWINI MUNICIPALITY SHARED VISION
Two thirds of South Africa’s containers move through Durban, as well as a majorityof liquid fuel and automotive cargoes. In addition, Durban handles significant breakbulk, dry bulk and chemical cargoes, and provides facilities for cruise liners, theSA Navy, and for fishing, service and recreational craft.
The Shared Vision is a framework for the long term development of Durban asSouth Africa’s premier port city, providing for the maritime transportation needs ofthe greater Southern African economy; and describes a program of infrastructuralexpansions, land use plans and inland transport connections.
DURBAN DEMAND FORECAST2009 NIP
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
TRANSNET / ETHEKWINI MUNICIPALITY SHARED VISION
CONTAINER GROWTH
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
TRANSNET / ETHEKWINI MUNICIPALITY SHARED VISION
HARBOUR EXPANSION : PHASING
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
TRANSNET / ETHEKWINI MUNICIPALITY SHARED VISION
HARBOUR EXPANSION : CURRENT
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
TRANSNET / ETHEKWINI MUNICIPALITY SHARED VISION
HARBOUR EXPANSION : PHASE 1 (2015 – 19)
Extension of Pier 1 container terminal
Ongoing upgrades to Island View
New container terminal at Maydon Wharf
Deepened berths
Relocation of cruise liner facilities
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
TRANSNET / ETHEKWINI MUNICIPALITY SHARED VISION
HARBOUR EXPANSION : PHASE 2 (2019 – 37)
12 deepwater container berths
Deepwater liquid bulk berths alongside SAPREF
New car terminal adjacent Toyota factory
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
TRANSNET / ETHEKWINI MUNICIPALITY SHARED VISION
HARBOUR EXPANSION : PHASE 3 (2037 +)
Ten additional deepwater berths
Channel widening & deepening
Reconfiguration of back-of-port facilities incl ship repair
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
ECONOMIC PERSPECTIVE OF THE DURBAN PORT EXPANSION
Shipbuilding activities provide a potentially rich source of employment andexpenditure, but the industry is a cyclically unstable one, and spendingbenefits are far outweighed by those associated with cargo handling
Ship repair activities also provide a potentially rich source of employment andexpenditure, and the industry is a more stable one in the long term. Ship repairactivities should be retained as an integral part of a diversified terminal port
“Engagements with the ship repair industry are proceeding with a view todetermining their long term plans, and to ensure that provision is made foraccommodating the needs of this vital maritime service industry” – 2050 Vision
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
POINT
ESPLANADE
MAYDON WHARF
BLUFF
ISLAND VIEW
BAYHEAD
WILSONSWHARF
SHIP REPAIR & VESSEL CONSTRUCTIONCURRENT LOCATION
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
SOUTH AFRICANSHIPYARDS
ELGIN BROWNAND HAMER
EBH
DORMAC
CURRENT SPACE ALLOCATION
NPANPAEBH
NPANATIONALPORTS AUTHORITY
SHIP REPAIR & VESSEL CONSTRUCTION SA Shipyards 110000m²
Elgin Brown Hamer 37000m²
Dormac 47000m²
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
SOUTH AFRICANSHIPYARDS
CURRENT SPACE USEDNATIONALPORTS AUTHORITY
NPAEBH
NPA
DORMAC ELGIN BROWNAND HAMER
EBH
SHIP REPAIR & VESSEL CONSTRUCTION
SA Shipyards 77000m² 220m
Elgin Brown Hamer 37000m² 165m
Dormac 47000m² 365m
LANDSIDE KEY
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
FUTURE REQUIREMENTS – based on 12mTEU’s by 2030
SHIP REPAIR & VESSEL CONSTRUCTION
Existing graving dock 352m x 33m wide2 new dry docks 300m x 50m wideExisting floating dock (EB&H) 8 500 tons2 new floating docks 12 000 tons eachRig repair boothSynchroliftMinimum total of 6 docking spaces 1900mLandside : 60000m² / enterprise 240 000m²
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
POINT
ESPLANADE
MAYDON WHARF
BLUFF
ISLAND VIEW
WILSONSWHARF
IMPACT OF EXPANSION PLANS
BAYHEAD DIG OUT
BAYHEADCHANNELREPOSITIONING
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
FUTURE REQUIREMENTS
BAYHEAD DIG OUT
NATIONAL PORTSAUTHORITY
SOUTH AFRICANSHIP BUILDING
EB
H
EB
H
EB
H
ELGIN BROWNAND HAMMER
DORMACSHORTFALLS
Keyside short by 750m
Landside short by 15000m²
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
SHIP REPAIR & VESSEL CONSTRUCTIONPOSSIBLE LOCATIONS
As part of the new dig-out port
Reconfigured at current location
As part of the Point waterfront
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
BOAT BUILDING
GOLD COAST CITY MARINA
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
BOAT BUILDING
GOLD COAST CITY MARINA
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
POINT
MAYDON WHARF
BLUFF
ISLAND VIEW
BAYHEAD
ESPLANADEWILSONSWHARF
CURRENT BOATING
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
BOAT BUILDING
WILSON’S WHARF BOAT YARD
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
BOAT BUILDING
WILSON’S WHARF BOAT YARD
WILSON’S WHARF
FISHING VESSEL WHARF
MOORINGS
HARDSTANDBOAT BUILDING BAYS
SHOWROOM
SHIPLIFT
SHIP REPAIR, VESSEL CONSTRUCTION &BOAT BUILDING IN DURBAN HARBOUR
AUGUST 2010 SUMMIT
WAY FORWARD
Test various scenarios with stakeholders incl:•Ship repairers & builders•Boat builders•Transnet•Ethekwini Municipality•Others
Develop and finalise proposals for incorporation in:•Transnet / Ethekwini Municipality Shared Vision•Transnet’s National Infrastructure Plan