Shift2Rail
Contributing to the achievement of the Single European Railway Area (SERA)
-
Departure terminal
Diesel shunting loco
Maine line Trip 1 Marshalling Maine line Trip 2 Destination terminal
Loading Shunting Shunting UnloadingTrain Prep&
Dispatching
Driving Driver change
Driving Driving Driver change
DrivingMarshalling/ shunting
E-Loco
• Video gate
• Digital Terminalmanagemt
• Last mile• DAC
• Last mile propulsion
• Automatic coupling
• Video Gate
• Digital terminal managemt.
• Video gate• Intelligent
wagon• Automatic
coupling
• DAS • ATO• Net • CBM• IW
• ATO • Yard Managnt• Video gate• DAC• ATO• Intelligent wagn
• DAS • ATO• Net • CBM• IW
S2R Freight
Trip speed
End to End Speed
Will help reduce process times making rail more competitive and rendering higher CAPEX capitalization
• DAS • ATO• Net • CBM• IW
• ATO • DAS • ATO• Net • CBM• IW
IP5 innovation Focus Areas
-
DIGITAL AUTOMATIC COUPLERKey element for better and optimized convoy formation, gateway for comprehensive automation and digitalization of rail freight transport.
System developed and Manufactured will be tested by summer 2020 during field tests. It will have a second field test campaign to test winter operational conditions in Sweden
FREIGHT ATO Automatic Train Operation GOA2, Incorporating specific Freight Functions
Operational Tests End of 2020
Intelligent Video Gate Intelligent Video Gate for multi modal dispatching & operational aid for CBM and train formation
Working Proof of concept developed, to be implemented and integrated in Freight Intermodal Terminal by 2021
eco-DriveDriver Aid Systems with RearView/Farsight traffic Information to adjust speed & release the need2go top-speed
Will be Tested by Q3 2020 in Germany
Freight Propulsion systems Distributed Traction Systems for long trains
PS Tested up to 3 different Locomotives Convoy
What to expect from current IP5
-
Technology, Operations and Standardisation
Technical Development
Definition of technical DAC open design
specifications (on use-cases considerations)
• Functional requirements for the coupling
• Standardized solution regarding power
supply and data communication
Follow up Development process
Evaluation of testing results of WP2 +
technology impact from WP7
A wide approach for compatibility to allow
cost optimization for efficient operations (on
full assembly group basis, e.g. draftgears
technical harmonization) and maintenance
Harmonisation &
Standardisation
(TSI WA Focus
Appendix C/ TSI OPE)
Support to ERA TWG
Freight (providing head
mechanical and
geometric characteristic
of the coupler)
Input to European
Standardisation
Organisations
Creation of guidelines,
intermediate promoters
solutions pre-standard
Operations
Requireme
nts and
Concepts
Harmonizat
ion of
operational
concept
Definition
of
European
production
processes
WP 1
Evaluation of past/current DAC tests and demonstrator
trains
Definition of formal and baselined Product Acceptance
Test Specifications
Development and deployment of further test concept in
two phases in close alignment with WP1:
Primarily technical testing of DAC functionalities
and requirements of different coupler-types and
producers/developers
Demonstrator trains for evaluation & Testing of
future operation concepts and production
processes
Testing & Demonstrators & Pilot ProjectsWP 2
-
Evaluation of potentials to increase system
capacities based on ECTS L3/moving block in
Europe
Scenario-based analysis of potential increase
of rail model share due to higher capacities
and lower cost
Calculation of potential contributions to the
European Green deal due to traffic shifts to
rail
Rail System Capacity and Green DealWP 4
Coordinated European traffic and wagon fleet analyses
(incl. traffic flows, network modelling), starting from the
outputs of the results of available DAC migration
strategies (e.g. BMVI study on migration strategy
published in June 2020)
Definition of a sequential migration plan according to
transport operations and wagon categories with regard to
• Production capacities of DAC manufacturers
• Workshop capacities (incl. retrofit)
• Conversion plans
• Wagon Producers
• New Build production
MigrationWP 3
Calculation of a pan-European
business case, incl. type 5 (and
of the resulting national ones),
integrated for
RUs & Wagon keepers
(efficiency gains)
Infrastructure (capacity)
Socio Economic aspects
/Green Deal (CO2)
Definition of funding and
financing concepts in
consideration of national
business cases
Costs, Business Cases
and FinancingWP 5
-
Technology scouting (DAC as enabler)
Definition of minimum features and equipment (sensors) of the future “intelligent freight train”
Harmonization of communication protocols in close collaboration with WP1
Outcome of S2R innovative solutions resulting from R&I to be consider for a delivery to the
market via specific activities
Further innovation for the “Intelligent Freight Train”WP 7
Coordination of all national and
international political activities
Shareholder/Stakeholder
Management
Campaign and definition of a
consistent storyline, information
material etc.
Communication and
Dissemination WP 6