Lantern: Philips Iridium SGS254 - PTLantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10m Stepped Tubular SteelLamp: 100W Son-T+Control: Telensa
Quantity22
Lantern: Philips Iridium SGS253Lantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10.0m Stepped Tubular SteelBracket: 1.0mLamp: 100W Son-T+Control: Telensa
Quantity13
10I
Lantern: Philips Iridium SGS253Lantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10.0m Stepped Tubular SteelBracket: 1.0mLamp: 150W Son-T+Control: Telensa
Quantity72
10J
Lantern: Philips Iridium SGS254 - PTLantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10m Stepped Tubular SteelLamp: 150W Son-T+Control: Telensa
Quantity30
10J
DTC Column & Lantern to remain(recent installed scheme)
Lantern: Philips Iridium SGS253Lantern Optic: n/a Tilt: 5 DegreesColumn: 10.0m Stepped Tubular SteelBracket: 1.5mLamp: n/aControl: Telensa
Quantity25
DTC Column & Lantern to remain(recent installed scheme)
Lantern: Philips Iridium SGS253 - PTLantern Optic: n/a Tilt: 5 DegreesColumn: 10.0m Stepped Tubular SteelLamp: n/aControl: Telensa
Bollard: Non-Illuminated ReflectiveFace: Plain/OpalQuantity
6
P
DTC solar powered bollard to remainQuantity
14
B
Solar Powered BollardFace: Keep LeftQuantity
15
L
DTC Lantern Swap OnlyIlluminated Centre Island BeaconColumn: 4.0m Stepped Tubular SteelLantern: Moducic White 24VLamp: LED
Quantity1
Lantern: Philips Mini Iridium SGS451 - PTLantern Optic: FG OC IT1 P1 Tilt: 10 DegreesColumn: 6.0m Stepped Tubular SteelLamp: 45W CPO-TWControl: Telensa
Quantity1
6C
~ Sheet 5 of 5
7200-1425-V21
06/11/14DM 1:500 @ A2NB
Hills Road,Milestone 7Sheet 5 of 5
COPYRIGHT RESERVED BALFOUR BEATTY LIVING PLACES IS THE OWNER OFTHE COPYRIGHT SUBSISTING IN THESE DRAWINGS, PLANS, DESIGNS ANDSPECIFICATIONS. THEY MUST NOT BE USED, REPRODUCED OR COPIED, INWHOLE OR IN PART, NOR MAY THE INFORMATION, IDEAS AND CONCEPTSTHEREIN CONTAINED (WHICH ARE CONFIDENTIAL TO BALFOUR BEATTYLIVING PLACES) BE DISCLOSED TO ANY PERSON WITHOUT THE PRIORSPECIFIC WRITTEN CONSENT OF BALFOUR BEATTY LIVING PLACES.
Drawing no.
Designer Date of issue
Checked
Issue Revision
Scheme Name and Ward:
Sheet Size ScaleAuthorised
Streets on drawing:
WARNING - THERE ARE BURIED SERVICES WITHIN THISSCHEME. REFER TO DIG PACK PRIOR TO REMOVAL /INSTALL AND ENSURE DIG PACK CONTAINS ALL THEINFORMATION
Notes
PRELIMINARY ORIG.
PTA2
DIMMING REGIMEx TRAFFIC ROUTE TWO STEP DIMMING- 20:00 TO 24:00 DIM TO ONE LIGHTING CLASS; to 75%- 24:00 TO 06:00 DIM TO TWO LIGHTING CLASSES to 50%
All lighting column positionsmarked on site are indicative only
Cambridge 1425,Cambridge
Lantern: Philips Iridium SGS254 - PTLantern Optic: GB OR P2 Tilt: 5 DegreesColumn: 10m Stepped Tubular SteelLamp: 100W Son-T+Control: Telensa
Quantity8
DTC solar powered bollard to remainQuantity
3
B
D Disconnection of DNO SupplyN New Connection of DNO Supply
T Transfer of DNO Supply
ET Extra Transfer of DNO Supply
Tree
Design Notes
1. ME2/ME3a (Traffic Route) Lighting Design
Spacing CalculationRoad Calculation 1Road Width (13m) MaxOpposites 42.5mSet back (3.0m)
Road Calculation 3Road Width (11m) MaxOpposites 42.0mSet back (1.5m)See Area Calculation: Addenbrooks RAB displaced, Hills Rd JuncLong Rd, Hills Rd Rail Bridge, Hills Road Cherry Junc, Hills RoadEast Cherry Trans, Hills Road Nth from Stn Rd & Hills Road Sthfrom Stn Rd
Spacing CalculationRoad Calculation 2Road Width (13m) MaxOpposites 43.0mSet back (0.8m)
10I
Existing Non DTC Lighting Column To Be Removed ForRecycling
Quantity9
Existing Bollard to Remain and Does Not Form Part ofThis Design
Sheets 1-5 Materials totals
40.0m 6.0mm² 3c Cu XLPE/SWA/PVCNew LA Cable tobe Installed in Orange Duct
LA LA
40.0m 6.0mm² 3c Cu XLPE/SWA/PVCNew LA Cable tobe Installed in Orange Duct
LA LA
Quantity6
C:\D
ocum
ents
and
Set
tings
\pet
er.te
arse
\My
Doc
umen
ts\M
y P
ictu
res\
Exi
st S
ched
142
5 2.
bmp
C:\D
ocum
ents
and
Set
tings
\pet
er.te
arse
\My
Doc
umen
ts\M
y P
ictu
res\
prop
osed
sch
ed 1
425
3.bm
p