SHAYLOR GROUP BUILDING A BETTER FUTURE
FIT OUT EXPERIENCE
SHAYLOR GROUP BUILDING A BETTER FUTURE
INTRODUCTION
Shaylor Group Head Office
On the following pages we have provided information that demonstrates Shaylor’s capability in the Fit out Sector and projects undertaken specifically in the London area.With a dedicated interiors division within Shaylor Group, we have extensive experience in delivering high end fit out projects for a number of private and public sector clients. With specialist knowledge retained within the company, Shaylor is extemely well placed to undertake a variety of fit out and refurbishment works.
The fit-out market for commercial, retail and leisurehas remained consistent and we anticipate furthergrowth in these markets to be led from the South.
Having a national presence, and with a regional office based in London, Shaylor has undertaken numerous projects within the London and Greater London regions.
A number of these have been undertaken within a Framework arena, as you will see from the case studies detailed overleaf.
SHAYLOR GROUP BUILDING A BETTER FUTURE | BUILD | INTERIORS | REPAIR AND MAINTAIN
SHAYLOR GROUP BUILDING A BETTER FUTURE
Project Description
Following our successful delivery of the Crown Office Refurbishment Programme (CORP) in 2008 / 2009, we were appointed to the Crown Transformation Programme in 2013. To ensure the Post Office becomes a sustainable and self-supporting business, one element of the programme is the refurbishment of the Crown branches. There are currently 370 Crown Offices nationwide and these are the largest and busiest branches which are owned and directly managed by the Post Office. These are usually open 6 days a week, Monday to Saturday 9.00am until 5.30pm. The branches vary from 5 to 18 counter positions with ground floor areas varying from 40 to 800sqm. The contractor fit out works are split into 4 regions; Northern Ireland, The North,
Midlands and the South West and London and the South East of which we were appointed to all UK mainland.
Scope of Works
• Revised internal customer areas
• Removal of fortress counters and introduction of open plan working
• Creation of private consultation rooms
• Introduction of new posting, ATM and identity technology
• Creation of dedicated mails areas, including retail and posting facilities
• General redecoration, new flooring, etc.
SHAYLOR GROUP BUILDING A BETTER FUTURE
POST OFFICE, CROWN TRANSFORMATION PROGRAMME
Project Details
Client: Post Office
Turnover: Forecast £12m per annum
Length of Agreement: 2 years
Location: Mainland UK (excluding Northern Ireland)
Procurement Route: JCT Minor works without Quants and JCT Intermediate without Quants
Completion Date: On-going
Refurbishment of Crown Branches, Shaylor is the only SME appointed to this framework and is delivering projects across the whole of the UK Mainland.
SHAYLOR GROUP BUILDING A BETTER FUTURE
POST OFFICE, CROWN TRANSFORMATION PROGRAMME
• New Point Of Sale and internal signage/graphics
• Upgraded customer area lighting
• New style branch customer entrances
New shopfittings, including writing desks, retail bays, counters, etc.
All works are undertaken on a phased and/ or out of hours basis
with all branches remaining trading during the project.
Achievements
• Phase 1 commenced on site 30th September during which 8 branches were successfully handed over on time with zero snags to complete client satisfaction.
• Phase 2 will include 32 branches with a 3 month period.
• Phase 3 to include 30 branches.
• Phase 4 to include 35 branches.
Collaboration
We have attended workshops with the client, professional team and the other 5 appointed contractors to share best practice and lessons learnt from Phase 1 projects. This also included the nominated suppliers.
Supplier led examples
We attend every ‘second visit’ site meeting to discuss buildability and logistics. We address the design requirements and highlight any conflicts in detail whilst advising on programme. These meetings take place prior to final sign off the design before work commences.
London Projects completed to date.
SHAYLOR GROUP BUILDING A BETTER FUTURE
MOUNT PLEASANT POST OFFICE REFURBISHMENT, LONDON
Project Details
Client: The Post Office Ltd - Crown Transformation Programme
Value: £690,000
Duration: 16 Weeks
Location: London
Reference Details:
Mr Steve Bates, Post Office Ltd
Email: [email protected]
Completion Date: June 2014
The interior refurbishment of the Post Office’s flagship site in Central London as part of the Crown Transformation Programme.
Project Description
As part of the Crown Transformation Programme the Post Office instructed Shaylor Group to deliver the full refurbishment of their flagship Post Office at the famous Mount Pleasant site in Central London. The Project was divided into two parts.
The first part of the project was to deliver the enabling works which comprised of creating a temporary mobile Post Office on another part of the Mount Pleasant site, removing the existing railings and creating temporary access. We then erected an enclosed hoarding to accommodate temporary welfare facilities at the back of the mobile Post Office. We also had to install a temporary water, power and drainage supply to the unit. The basement had to be propped during
this process to allow for the enabling works to go ahead safely. Once the initial works had been completed the site was subject to full asbestos removal.
The second part of the programme was the Crown Office Refit which was completed after all the asbestos had been removed. The short seven week programme entailed a complete M&E overhaul which included the installation of a new mains supply back to the board. We created a new Managers Room, Post Room and new welfare facilities. We installed new counters, glass partitioning to create a meeting room, ATM machines and secure metal doors in the Giro rooms as well as complete new flooring and ceilings.
SHAYLOR GROUP BUILDING A BETTER FUTURE SHAYLOR GROUP BUILDING A BETTER FUTURE
Furthermore, we completed external stone works to stall risers under the shop-front windows which included the application of a specialist waterproof render to match the original building.
Once the Crown Office Refit was completed, all the temporary facilities were removed, including the mobile Post Office.
Achievements
• Additional works were added whilst the project was on site such as the reconfiguration of the toilets which included some contractor design. All the extra works were added to the programme which was completed on time.
• The Post Office at Mount Pleasant is part of a much larger Crown Estate site in central London which was not only still occupied but is also undergoing a much larger refurbishment and transformation programme. This meant the team were working in a live environment and there had to be constant clear communication between all parties to ensure a smooth delivery.
• The client was very happy with the project delivery and Shaylor Group received 84% in our Customer Satisfaction Survey.
MOUNT PLEASANT POST OFFICE REFURBISHMENT, LONDON
SHAYLOR GROUP BUILDING A BETTER FUTURE
VODAFONE, WALTHAMSTOW
Project Description
The ground floor consists of a retail shop and a back of house managers office and on the first floor a Kitchen and Canteen area.
Achievements
This project was a new Vodafone concept with new suppliers, we managed the process and completed the project on time within budget and to a very high standard of workmanship.
Project Details
Client: Vodafone
Value: £185k
Duration: 4 weeks
Location: Greater London
Reference Details:
Mr Keith Burton
Tel: 07768835344
Mr: Ray Girling
Tel: 07880340686
Completion Date: May 2014
To form a new Vodafone retail unit within The Mall.
SHAYLOR GROUP BUILDING A BETTER FUTURE
BANK HOUSE
Project Details
Client: Omaha Nominees A Limited and Omaha Nominees B Limited and c/o F & C Reit Asset Management
Value: £1.73m
Duration: 16 weeks
Location: Birmingham
Reference Details:
Ken Lewis Tel: 0121 236 1702 Email: [email protected]
Completion Date: April 2013
Refurbishment and improvement works to various floors of iconic central Birmingham offices Bank House. Project Description
The complete refurbishment of the entrance foyer, 3 floors, common areas and construction of a new structural glazed entrance area carried out within the occupied high profile, city centre building.
The works comprised of the refurbishment of the 15th, 16th & 17th floors together with associated toilets, construction of basement shower facilities and lift refurbishments. The ground floor reception area works included extending the floor area and constructing a new 2 story cubed glazed entrance structure to interface with existing podium offices.
The entrance area works were phased to enable active use of the reception area and desk and at least one main entrance door at one time. Only one lift could be taken out of commission at any one time which was dealt with through planned
sequencing in close collaboration with the building occupants. To ensure access / egress was maintained at all time sections of work were completed outside of normal office working hours.
Achievements
• Minimal disruption to tenants through careful phasing, clear signage and regular newsletters.
• Complicated logistical issues due to constrained city centre location.
• Local authority interface for road and pavement closures.
• 8m high Armourcoat ‘Travertine’ and sculptural ‘Perlata’ feature walls.
• Stone clad reception desk and flooring
SHAYLOR GROUP BUILDING A BETTER FUTURE
H.M.P. WANDSWORTH ROTUNDA ROOF REFURBISHMENT
The complete Re-roofing of the Rotunda and Lantern Light Roofs including any structural timber repairs.
Project Description
HMP Wandsworth was originally constructed in 1851. Because of it age and constraints to it aesthetical appearance, a sympathetic and thoughtful approach was undertaken during the Rotundas re-roofing and refurbishment works.
Works involved the complete re-roofing of the Rotunda and Lantern Light Roofs including any structural timber repairs. The old slate roof was replaced by composite insulation boards with a Terne Coated Stainless Steel sheet covering giving a thermally efficient, maintenance free roof with an expected 50 year life span.
Cast iron single glazed windows were replaced by powered coated steel double glazed units giving better thermal and light ingress qualities.
Achievements
• Bespoke scaffolding design which was suspended and unsupported from the floor
• Worked within a secure environment where we had limited time slots and noise and dust constraints
• Maintained a close and proactive working relationship with the client and the Establishments security team.
• The project was running whilst a security audit was carried out with no issues were found relating to our works.
• Conducted weekly planning meeting with Security Liaison Officer.
Project Details
Client: Ministry of Justice
Value: £1,249,564
Duration: 36 weeks
Location: Wandsworth
Form of Contract: PPC2000
Sector: Custodial
Completion Date: Nov 2013
SHAYLOR GROUP BUILDING A BETTER FUTURE
ROYAL BANK OF SCOTLAND MINOR WORKS FRAMEWORK
Royal Bank of Scotland (RBS) Cyclical Asset Framework programme.The first rollout of the CAI Programme covers RBS Bank branches in the West Midlands and the site specific work that has been allocated to R&M, includes repairs, refurbishment and alterations.
Project Details
Client: Royal Bank of Scotland
Value: Project value ranges between £5000 - £1,000,000
Duration: 3 years with the option to extend by a further 2 years
Location: Midlands, South and Wales
Reference Details:
Mr Nicholas Ganderton
Email: [email protected]
Tel: 0121 483 5483
Completion: On-going
Framework Description
The RBS Framework was awarded in January 2012 for the supply of construction services across the UK including all offshore locations for both retail and office environments. Shaylor is one of eight suppliers on this framework.
The projects consist of refurbishment and repair work. These projects are awarded on a regional basis, with some works subject to mini tenders between successful framework contractors.
The framework is managed and delivered through RBS Property Services Project Delivery team, this encompasses three key programme delivery streams, including Cyclical Asset
Investment (the repair and/or replacement of key building service and fabric property assets), Emergency Investment (of a reactive nature in order to maintain and resolve Health & Safety or Business Operation risks) and Client Driven Minor Works Programmes.
A dedicated team has been established within Shaylor to ensure that the service delivery to RBS is always of an excellent standard.
Work packages are fast track and range from out of hours, single visits to a three-week programme to provide high security ballistic doors to high risk branches. Works also include the replacement of specialist flooring, windows and roof works to listed properties.
SHAYLOR GROUP BUILDING A BETTER FUTURE
ROYAL BANK OF SCOTLAND MINOR WORKS FRAMEWORK
Performance
In all instances so far schemes have fallen within budget. All costs were agreed on a contemporaneous basis.
South East Project information to date
Location Description
Feltham Windows and Fire Escape
Tunbridge Wells Roofing and Facade
London Brentford Windows and Facade
Stamford Hill Windows and Decorations
Crawley Flat Roof
Illford Roofing
Ashford Internal decorations and branding
26 Queensway, Stevenage Roof repairs.
Benefits
Shaylor have utilised our extensive framework of suppliers to deliver these projects nationwide.
Work packages are fast track. Working alongside branch managers we have effectively worked out of hours single visits, as not to affect bank operation.
Lessons Learnt
Through our previous framework experience, a dedicated team has been established within Shaylor to ensure that the service delivery to RBS is always of an excellent standard.
We have learnt to be flexible in terms of communication. Each branch manager prefers a different method of communication and initial meetings determine the prefered method.
In addition to this, we have learnt to be flexible on site. Each branch has a security branding which limits what can be done on site and when.
Relevance
This case study showcases our ability to be flexible in our approach to projects in accordance with the client. The differing sites required a varied approach taylored to suit each individual branch of which, we have so far been successful.
SHAYLOR GROUP BUILDING A BETTER FUTURE SHAYLOR GROUP BUILDING A BETTER FUTURE
HILLINGDON LIBRARIES, GREATER LONDON
Project Description
Shaylor group delivered a total of 7 library refurbishments out of a roll out of 17 libraries for the London Borough of Hillingdon. The libraries were typically single storey buildings in need of updating and refurbishment.
Yiewsley LibraryThe works entailed the installation of new shop front glazing and secondary glazing. Extensive electrical rewiring was added to the scope of works later in the programme and was completed within the original contract duration. Furthermore, the joinery package was extensively redesigned during the contract and completed within original timescales.
Ickenham LibraryWe facilitated a new incoming electrical mains supply to upgrade the library to a commercial 3 phase electrical system. A new heating system, hard landscaping, roof repairs and Velux windows were all added to the scope of works after the programme had begun without hindering the original timescales.
Kingshill LibraryOnce the works had begun at Kingshill library, extensive asbestos contamination was found throughout the whole library and resulted in the removal of the ceilings, partitions and perimeter paneling which left the library as a shell. A new clerestory glazing was also added to the scope of works and all of these changes were completed with only a very short delay to the library opening.
Project Details
Client: London Borough of Hill-ingdon
Value: £1,346,000 (overall)
Duration: Contract lengths between 3 weeks & 14 weeks
Location: Greater London
Reference Details:Mohammed Bhimani London Borough of Hillingdon, Civic Centre, High Street, Uxbridge Middlesex, UB8 1UWTel: 01895 250111 Fax: 01895 273636 Email: [email protected]
Completion Date: Subsequent phases - on-going
Refurbishment of seven single storey libraries.
SHAYLOR GROUP BUILDING A BETTER FUTURE
Oaklands Gate LibraryThe works included extensive external redecorations, new double glazed windows and additional joinery items were all added to the scope of works as well as a flat roofing overhaul. All these additional works were completed within the original contract period and the library was delivered on time.
Hayes End LibraryWe delivered the fit out of a new build purpose made library with residential flats above. The works included the installation of a new reception desk, people counters, bespoke furniture which included A-Z cut-out ‘fiction’ and ‘nonfiction’ signs and new audio-visuals. Furthermore, new flooring was installed, purpose made joinery, window films and electrical works were included in the programme. A specialist Buggy Store and Starbucks Coffee Station was installed.
South Ruislip LibraryWe delivered the fit out of an existing library in South Ruislip that was in need of a facelift. The works included the installation of new blinds, full redecorations including a feature wall, new electricals and purpose made joinery.
Yeading LibraryYeading Library was one of the largest refurbishment programmes in the roll out and consisted of two new entrance extensions and associated ground works to form a disabled access. The formation of the new disabled access included the fitting of new glazed screens, ramps, hand rails and paving to comply with DDA regulations. The internal fit out works included structural alterations to accommodate the new entrances including new M&E installations, decorations, floor covering, internal doors and joinery items.
HILLINGDON LIBRARIES, GREATER LONDON
SHAYLOR GROUP BUILDING A BETTER FUTURE SHAYLOR GROUP BUILDING A BETTER FUTURE
PADDINGTON STATION, LONDON
Project Description
Works required structural alterations to dividing blockwork wall and the installation of two sets of stair flights to overcome varying floor levels.
Data and communication upgrades were undertaken while maintaining full service as normal with no disruption to building users.
Achievements
The project was completed 1 week early with no impact to building occupants or station users.
The works have provided a modern facility and achieved all the intended project criteria.
Project Details
Client: First Great Western
Value: £123k
Duration: 5 weeks
Location: London
Reference Details: Sarah McManus First Great Western Tel: 01324 602271
Completion Date: Subsequent phases - on-going
Refurbishment and extension of existing trains crew accommodation adjacent to Platform 1 creating a larger office space and upgraded IT and data services in a 2 phase programme.
SHAYLOR GROUP BUILDING A BETTER FUTURE
WH SMITH
Project Details
Client: WH Smith PLC
Value: £1m
Duration: 16 weeks
Location: Nationwide
Reference Details:
Paul Mead, APM Retail
Email: [email protected]
Tel: 01225 302023
Completion Date: On-going
Shaylor Group is appointed to undertake part refurbishment and upgrade works to 36 WH Smith stores nationwide to accommodate new Post Office facilities.Project Description The works will involve the preparation of the area, including stripping out the WH Smith fitting and finishes, reconfiguring the remainder of the store and the fit-out of the vacated area to form the new Post Office concession.
In addition to this, new Financial Services rooms will be formed by stripping out some of the original store area or reducing the number of Post Office counter positions.
Scope of Works:
• Revised internal customer areas;
• Creation of dedicated mail areas, including retail and posting facilities;
• General redecoration and new flooring;
• Upgraded customer area lighting;
• New Point of Sale and internal signage/graphics;
• New shop fittings.
All works will be undertaken out of hours (late evenings and nights) as all stores will remain fully functional during construction works.
My thanks and appreciation to Shaylors for their excellent work. Steve Draper Post Office
SHAYLOR GROUP BUILDING A BETTER FUTURE
MAPELEY STEPS FRAMEWORK
Fit-out of Offices, working across the HMRC and Valuation Office Agency portfolio, Shaylor provides a fully supplier led delivery model.
Project Details
Client: Mapeley
Turnover: £2.5m p.a
Length of Agreement: 4 years
Location: UK – south of Liverpool
Procurement Route: JCT Intermediate Form 1998
Reference Details:
Dan Jourdan, Mapeley Estates Ltd
Email: [email protected]
Tel: 020 7788 1712
Completion Date: On-going
Project Description
Mapeley own and operate the HMRC Estate nationally. Their STEPS Framework is split into two lots and we are the single contractor working on Lot 2 covering all UK sites south Liverpool.
Projects are contractor-led and involve scoping and pricing projects against an agreed Schedule of Rates, and subsequently delivering them to an agreed programme.
Our outputs are measured and Performance Indicators are used to benchmark against the Lot 1 (Northern UK) contractor.
Projects are mainly interiors based, and typically require us to present solutions to issues arising from:
• Space planning linked to change of building use
• Upgrades to offices and amendments to ensure compliance with Building Regulations
• Accommodation of office churn
We have also been involved in works to provide new mezzanines in storage areas, new Comms Rooms and Secure Server Rooms.
Works are carried out within occupied premises in most instances and our teams and supply chain are Mapeley Security Cleared.
Projects generally range from small teapoint and toilet refurbishments through to full office refit programmes and have a value range from £10,000 to £200,000. We have secured works at higher values than this through further competitive tenders, or by working on an open book basis with the client.
SHAYLOR GROUP BUILDING A BETTER FUTURE
MAPELEY STEPS FRAMEWORK
Our largest project for this client is currently £750,000.
Works are carried out across the regions, and have included projects in East Anglia, Wales, Devon and Cornwall, Yorkshire, the Midlands and London.
Since inception of the framework in April 2013 we have worked on 11 projects in London and have also worked on a further 12 projects near to London (located in Southend, Worthing, Brighton, Reading, Gravesend, Romford and Maidstone).
Achievements
• We have delivered all projects within the agreed budget and programme and have been able to offer back savings where we have achieved betterment during the delivery process. These savings have largely been used to enhance projects.
• The framework has been collaborative throughout and we share information and best practice with our client and our counterpart contractor for the North and Scotland. We hold regular monthly conference calls and have held two Lessons Learned workshops, one at the Client offices and the most recent at our Birmingham Office. These have enabled us to pinpoint and improve delivery processes and standardise systems, reducing workload and expediting pre-contract phase.
Example Projects:
• Victory House, London – Installation of two new Comms Rooms within operational Central; London office buildings (shut-downs and changeovers out of hours), refurbishment of First Floor office area and repositioning of floor boxes
• Customs House, London – Refit works in secure establishment for Border Force.
• Heliting House, London - Internal and External redecoration of building, including additional works internally such as lighting and carpets.
• Tolworth Tower, Surbiton – Replacement of Kitchens on 15th and 16th Floors of operational tower block offices. Required careful co-ordination to ensure that kitchen facilities were always available for staff during working hours.
London Projects completed to date.
SHAYLOR GROUP BUILDING A BETTER FUTURE SHAYLOR GROUP BUILDING A BETTER FUTURE
BULL WHARF
Project Details
Client: Scottish Widows Unit
Funds Limited
Value: £1.24m
Duration: 28 weeks
Location: Bristol
Reference Details:
Jonathan James
DTZ, Rivergate House, 70 Redcliff Street, Bristol BS1 6AL,
Tel: 0117 910 6669
Email: [email protected]
Completion Date: March 2012
Strip out and refurbishment of an existing 30,000 square foot office building.Project Description
The strip out and refurbishment of an existing 30,000 square foot office building including landlords common areas (lobbies, stairwells, WC accommodation, main reception, plant and store rooms and car parks) and two separate floor plates on floors 1 to 4.
Common areas including lift lobbies and toilets were refurbished on the 4th and 5th floors.
Both passenger lifts were replaced and a new electrical transformer was installed.
Achievements
• Noise levels were kept to a minimum so as to prevent any disturbance to the day to day running of the business.
• A temporary reception was constructed while the new entrance and reception works were carried out.
• Existing tenants were in occupation throughout the complete refurbishment.
SHAYLOR GROUP BUILDING A BETTER FUTURE
WINSTON CHURCHILL HALL, LONDON BOROUGH OF HILLINGDON
Project Details
Client: London Borough of Hillingdon
Value: £267,309
Duration: 14 weeks
Location: Ruislip, Middlesex
Reference Details: Mohammed Bhimani London Borough of Hillingdon, Civic Centre, High Street, Uxbridge Middlesex, UB8 1UW Tel: 01895 250111 Fax: 01895 273636 Email: [email protected]
Completion Date: July 2012
Internal fit out works and structural alterations including M&E installation to the Winston Churchill Hall.Project Description
The Winston Churchill Hall serves as a theatre, lecture hall and conference room so the internal fit out works and structural alterations needed to support a number of differing purposes.
An initial strip out and corresponding preparation works were needed to prepare the hall before undertaking the main body of fit out works.
The works included re-siting of the existing platform lift and creating a new entrance door to accompany the new lobby/foyer area. Structural alterations were necessary to allow new toilet facilities to be installed and minor external cosmetic works were needed to the roof and entrance canopy.
New windows and doors were installed to compliment the new decor and floor finishes.
Achievements
• The project was completed on time within a live, functioning theatre,even with substantial additional works.
• The project team were able to overcome issues caused by undertaking the structural changes required on such an impressive old building - e.g. when excavating trial holes internally to establish concrete slab and foundation depths for the structural engineer, the site team were in excess of 6ft down and still not find the bottom of the footings.
• The client required large amounts of structural steel to prop up the existing solid walls and subsequently was very time consuming to demolish but did not affect the project programme.
SHAYLOR GROUP BUILDING A BETTER FUTURE SHAYLOR GROUP BUILDING A BETTER FUTURE
LIGHTFOOT HALL STUDENT ACCOMMODATION, LONDON
Project Details
Client: The Mansion Group
Value: £2.6m
Duration: 11 weeks
Location: Chelsea
Reference Details:
Mr Darren Simmons, The Mansion Group
Email: [email protected]
Tel: 0161 828 0580
Completion Date: Sept 2012
Project Description
The project consisted of the refurbishment of a 10 storey existing student accommodation building in the heart of Chelsea’s Kings Rd. The building required a full M&E overall in addition to the full refurbishment to 230 rooms and 23 kitchens.
The only means of goods in/ goods out was via 2 internal staircase’s and 2 lifts. Lifts were fully protected to save having to refit them once the students moved back in.
To ensure we ran to programme we implemeted daily contractors meetings with ‘live’ programming.
We operated a split shift on site, again to maintain programme.
Challenges & Achievements
• The building is in Kings Road next door to a private school. There was absolutely no parking on the job or nearby, so all deliveries were timed and pre-booked. All contractors delivered their kit to site and parked outside London. All deliveries and contractors arrival times on site were extremely sensitive.
• Noisy works were conducted outside of school / retail hours and we ensured the site was secure at all times.
• We handed over completed show flats after week 3 on site (ensuring that the show flats could be viewed by potential students at agreed times).
Fast track refurbishment of existing student accommodation over 10 floors.
SHAYLOR GROUP BUILDING A BETTER FUTURE
UST GLOBAL
Project Details
Client: UST Global, India
Value: £365,896
Duration: 10 weeks
Location: London
Reference Details:
Krishna Sudheendra, UST Global Private Ltd, Vectra House, Ground Floor, 36 Paradise Road, Richmond Surrey, TW9 1SE. Tel: 0208 948 6653
Completion Date: Sept 2011
Commercial fit-out of the 5th floor offices for UST Global in central London.Project Description
This project comprised the Category ‘B’ fit-out of the 5th floor of a commercial building, including mechanical and electrical installations.
The fit-out of the office building included:
•Walnut wooden floor and door installation throughout with walnut feature paneling to the boardroom.
•Solid and glazed partitioning.
•Reconfiguration of existing ceiling panels to accommodate new mechanical grille locations and light fittings.
•Complete kitchen installation.
•Full decoration.
•Mechanical and electrical installations throughout.
Achievements
•The Shaylor Interiors team travelled to India to value engineer the project from £700,000 down to £360,000 with the client and the architect.
•Design advice was provided to the Indian based architectural team.
•This building was occupied therefore strict restrictions on noise levels were maintained.
•Access hours to the fifth floor were limited.
•The project was carried out in a confined area of the building. Therefore ‘just in time’ delivery procedures were implemented.
SHAYLOR GROUP BUILDING A BETTER FUTURE
ROYAL MAIL, CROWN OFFICE REFURBISHMENT PROGRAMME
Project Details
Client: Royal Mail Group Property Limited
Value: £5.76m
Duration: 9 months
Location: London & South East
Reference Details:
John Marshall, Royal Mail Group Property Ltd, Programme Office, 1st Floor, 148 Old Street, London, EC1V 9HQ
Email: [email protected].
Tel: 07702 639651
Completion Date: March 2010
The refurbishment of 108 Post Office branches in London and the South East to provide ‘new look and feel’ facilities in a modern banking style. Works were performed outside of normal working hours with branches fully operational during normal trading hours throughout.Project Description
Awarded on a framework agreement, Shaylor assembled a dedicated project team and supply chain to deliver the projects and drive continuous improvement. It also integrated with Royal Mail specialist suppliers to overcome the challenges associated with fast-track refurbishment, establishing an offsite logistics warehouse to stock long delivery items.
Works comprised strip out, minor mechanical and electrical installations, counter upgrades, new financial services fittings, flooring, signage and point of sale equipment.
Due to the high level of risk attached to working alongside live environments in use by both Royal Mail staff and the public, visual displays were used extensively to advise works in progress, updated daily, and full liaison was maintained
each day with Post Office Managers.
A full complaints procedure was established, but it was a credit to the entire team that only one complaint was recorded which was closed out within one hour of notification.
Achievements
• 100% of projects handed over on time.
•100%ofprojectshandedoveronbudget.
•24%reductioninprogrammeperiodsacrosstheframework, through adoption of lean principles.
•Noreportableaccidentsacrosstheentireframework.
•15%averagereductioninprojectcosts.
•WinnerofForumforConstructingExcellenceSupply Chain Award 2009.
•KPIperformanceimprovedacrossthe roll out.
SHAYLOR GROUP BUILDING A BETTER FUTURE
SHAYLOR GROUP BUILDING A BETTER FUTURE SHAYLOR GROUP BUILDING A BETTER FUTURE
RAIL GOURMET, PADDINGTON STATION
Project Details
Client: Rail Gourmet
Value: £420,000
Duration: 19 weeks
Location: London
Reference Details:
Darren Owen, Lambert Smith Hampton
Tel: 0121 237 2319
Completion Date: March 2010
Complete refurbishment of the Rail Gourmet accommodation within Macmillan House adjacent to Platform One of Paddington main line station. Work was undertaken in 2 phases to allow continuous use of the office and catering facilities together with toilets and baby changing.
Project Description
Access was co-ordinated with the building and station occupants and the key driver was to ensure uninterrupted passenger movement to Platform 1.
The project driver was to create an open plan workspace and new modern catering and welfare facilities.
Achievements
• The project completed on programme and to budget and provided an exceptionally high quality working and catering facility.
• No disruption was caused to the main platform area and the general public were unaware of the works being undertaken. All project criteria was surpassed.
SHAYLOR GROUP BUILDING A BETTER FUTURE
WILKINSON
Project Details
Client: Wilkinson Group of Companies
Value: £720,000
Duration: 10 weeks
Location: East Ham, London
Reference Details:
Robin Pearson,
Wilkinsons Group of Companies, PO Box 20, Roebuck Way, Manton Wood, Worksop, Nottingham, S80 3EY.
Tel: 01909 505505
Completion Date: March 2010
Fit-out of Wilkinsons store in East Ham, London
Project Description
Fit out of retail store within existing shell building.
Achievements
• Customer Satisfaction Survey commended quality of product and service, management of client preferred contractors and achievement of fast track programme whilst incorporating variations.
• We established and controlled potential 24 hour working to achieve programme whilst respecting the sensitivity of the surrounding local community of private housing.
SHAYLOR GROUP BUILDING A BETTER FUTURE
WEMBLEY POINT, LONDON
Project Details
Client: Target Follow
Value: £3.10m
Duration: 30 weeks
Location: London
Reference Details:
Mr. Jon Moore, Riverside House, 11-12 Riverside Road, Norwich, NR1 1SQ Tel: 01603 767616
Completion Date: Sept 2009
Strip out of an existing 1960s multi storey office block followed by fit out of three floors.Project Description
The fit out of the three floors created new offices, common areas, restaurant areas, recep-tion and conference suites.
Works were carried out in two phases as part of a progressive refurbishment of the building to provide Landlord’s facilities on 21st floor and Cat A office fit outs for tenants.
Achievements
•Successful project and programme management in an occupied building with extensive out of hours working to avoid disruption to tenants.
•Production of Client’s show piece suite to demonstrate their branding for future fit outs with high quality meeting rooms, restaurant and breakout areas.
•Successful installation of electrical works on a floor occupied by five mobile telephone providers without any disruption or loss of power (existing cable routes were uncharted).
•We successfully redesigned the M&E services to overcome the problem of installing new access floors and suspended ceilings into low ceiling heights in the existing structure.
SHAYLOR GROUP BUILDING A BETTER FUTURE
EAST ROAD & VESTRY STREET, LONDON
Project Details
Client: Bradfield Wentworth
Value: £2m
Duration: 20 weeks
Location: London
Reference Details:
Completion Date: Dec 2009
Refurbishment of a full building including internal demolitions and removal of a major spiral staircase.
Project Description
This building refurbishment project involved a full building strip out, including internal demolitions and removal of a major spiral staircase.
Internally the refurbishment works comprised extensive structural works and floor infill’s; glazed & solid partitions; M&E installations; lift refurbishment and new disabled platform lift; raised access flooring & suspended ceilings; new WCs, showers and tea points; a new electronically controlled external doorset; decorations & floor coverings throughout.
External works included reroofing and roof mounted structural steelwork to support mechanical plant.
Achievements
• Initially we carried out a successful value engineering exercise with our client to bring the project into budget.
• Unexpected structural and demolition problems were successfully resolved by the project team and delays were avoided.
• The site location, with limited vehicular access for waste removal & deliveries, was successfully managed by the project team, with special arrangements agreed with the supply chain.
• A weekend road closure was arranged to lift structural steelwork and mechanical plant to roof level.
SHAYLOR GROUP BUILDING A BETTER FUTURE
SHAYLOR GROUP BUILDING A BETTER FUTURE | BUILD | INTERIORS | REPAIR AND MAINTAIN
For futher information please contact:
Stephen Shaylor07827 890 960
Martin Chambers07920 276 844
www.shaylorgroup.com