STANDARD FORM 330 (6/2004) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jamie Margulies AIA RIBA Architect 13. ROLE IN THIS CONTRACT Principal- Architect of Record- Prime 14. YEARS EXPERIENCE a. TOTAL 25 b. WITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) Jamie Margulies AIA RIBA Architect- Lead Planning Administrator- CCSD 16. EDUCATION (DEGREE AND SPECIALIZATION) Master of Architecture/1992 UCLA-CALIFORNIA 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) License Nevada #: 3542-ARCHITECTURE American Institute of Architects,NCARB, RIBA 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Council for Educational Facility Planners, International; American Institute of Architects, Royal Institute of Architects, USGBC LEED™AP 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) CCSD Kindergarten Prototype Clark County School District, Las Vegas, NV (2) YEAR COMPLETED PROFESSIONAL SERVICES 2004-2008 CONSTRUCTION (If applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies under Dale Scheidemann designed and let a team on the proposed new Kindergarten prototype. The design was presented to CCSD former superintendent Garcia for review and future consideration b. (1) TITLE AND LOCATION (City and State) Ed Center Office/Maintenance Rehabilitation In-house Project Clark County School District, Las Vegas, NV (2) YEAR COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies under Dale Scheidemann worked on the construction documents as the lead Project Manager/Job Captain . The construction documents were prepared to reach bid stage and be mobilized for construction under Ken Baker of Construction Managememt at CCSD. c. (1) TITLE AND LOCATION (City and State) Administration Center- CCSD Facilities Master Plan Studies Kindergarten Studies-to existing ES prototypes under Dale Scheideman (2) YEAR COMPLETED PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies –Coordinator of CCSD new Design Manual under Dale Scheideman C (1) TITLE AND LOCATION (City and State) Virgil and Commonweath ES Rehabilitation & Expansion- For Seigel Diamond Architects-LA, CA Project Manager-CM (2) YEAR COMPLETED PROFESSIONAL SERVICES 1989 CONSTRUCTION (If applicable) 1990 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies’ role as CM/Project Manager included tasks as answering RFI’s , reviewing Shop Drawings, Field Observation And answering quarterly reports to LAUD and Office of the State Architect. e. (1) TITLE AND LOCATION (City and State) Interpretive Community Center, San Pedro , California- For Tanaka Architects- Project Architect LA Central Library Rehabilitation and Expansion+West Lawn Urban Park for Obrein-Kreitzberg –LA, CA. CM/Field Architect. (2) YEAR COMPLETED PROFESSIONAL SERVICES 1994 1990 CONSTRUCTION (If applicable) 1995 1992 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies’ role as Project Architect in developing construction documents and representing Tanaka Architects with The WORLDPORT in San Pedro.

Upload: jaime-a-margulies

Post on 10-Apr-2015

101 views

Category:

Documents


0 download

DESCRIPTION

past projects

TRANSCRIPT

Page 1: Sg5 SF330 Jm Education Projects

STANDARD FORM 330 (6/2004)

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.)

12. NAME Jamie Margulies AIA RIBA Architect

13. ROLE IN THIS CONTRACT Principal- Architect of Record- Prime

14. YEARS EXPERIENCE a. TOTAL

25 b. WITH CURRENT FIRM

6 15. FIRM NAME AND LOCATION (City and State) Jamie Margulies AIA RIBA Architect- Lead Planning Administrator- CCSD 16. EDUCATION (DEGREE AND SPECIALIZATION) Master of Architecture/1992 UCLA-CALIFORNIA

17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) License Nevada #: 3542-ARCHITECTURE American Institute of Architects,NCARB, RIBA

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Council for Educational Facility Planners, International; American Institute of Architects, Royal Institute of Architects, USGBC LEED™AP

19. RELEVANT PROJECTS

a.

(1) TITLE AND LOCATION (City and State) CCSD Kindergarten Prototype Clark County School District, Las Vegas, NV

(2) YEAR COMPLETED

PROFESSIONAL SERVICES

2004-2008 CONSTRUCTION (If applicable)

NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies under Dale Scheidemann designed and let a team on the proposed new Kindergarten prototype. The design was presented to CCSD former superintendent Garcia for review and future consideration

b.

(1) TITLE AND LOCATION (City and State) Ed Center Office/Maintenance Rehabilitation In-house Project Clark County School District, Las Vegas, NV

(2) YEAR COMPLETED

PROFESSIONAL SERVICES 2004

CONSTRUCTION (If applicable)

NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies under Dale Scheidemann worked on the construction documents as the lead Project Manager/Job Captain . The construction documents were prepared to reach bid stage and be mobilized for construction under Ken Baker of Construction Managememt at CCSD.

c.

(1) TITLE AND LOCATION (City and State) Administration Center- CCSD Facilities Master Plan Studies Kindergarten Studies-to existing ES prototypes under Dale Scheideman

(2) YEAR COMPLETED

PROFESSIONAL SERVICES

2005 CONSTRUCTION (If applicable)

NA

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies –Coordinator of CCSD new Design Manual under Dale Scheideman

C

(1) TITLE AND LOCATION (City and State) Virgil and Commonweath ES Rehabilitation & Expansion- For Seigel Diamond Architects-LA, CA Project Manager-CM

(2) YEAR COMPLETED

PROFESSIONAL SERVICES

1989 CONSTRUCTION (If applicable)

1990 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies’ role as CM/Project Manager included tasks as answering RFI’s , reviewing Shop Drawings, Field Observation And answering quarterly reports to LAUD and Office of the State Architect.

e.

(1) TITLE AND LOCATION (City and State) Interpretive Community Center, San Pedro , California- For Tanaka Architects- Project Architect LA Central Library Rehabilitation and Expansion+West Lawn Urban Park for Obrein-Kreitzberg –LA, CA. CM/Field Architect.

(2) YEAR COMPLETED

PROFESSIONAL SERVICES

1994 1990

CONSTRUCTION (If applicable)

1995 1992

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies’ role as Project Architect in developing construction documents and representing Tanaka Architects with The WORLDPORT in San Pedro.

Page 2: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT

JAMIE MARGULIES AIA

20. EXAMPLE PROJECT KEY NUMBER

1

21. TITLE AND LOCATION (City and State)

Clark County School District CCSD KINDERGARTEN PROTOTYPE,LAS VEGAS NEVADA.

22. YEAR COMPLETED PROFESSIONAL SERVICES

2005 CONSTRUCTION (If applicable)

NA

23. PROJECT OWNER'S INFORMATION

a. PROJECT OWNER

Clark County School District b. POINT OF CONTACT NAME

D.Broxterman-Facilities- CCSD c. POINT OF CONTACT TELEPHONE NUMBER

702-799-7604 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Clark County School District, New Kindergarten Prototype Facility. 64,500 sq.ft- $325/sq.ft. New Facility Center for CCSD- “finger Scheme” includes “K” and Pre-“K”, Services provided:Concept Designs, Master Plan. Services provided: Project Deisgner/Architect/Planner

Page 3: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

Continued….

Page 4: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

25. CONSULTANTS FROM SECTION C INVOLVED WITH THIS PROJECT

a. (1) CONSULATNT NAME

JAMIE MARGULIES AIA (2) LOCATION (City and State)

LAS VEGAS,NEVADA (3) ROLE

Project Architect/Designer

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT

0. EXAMPLE PROJECT KEY NUMBER

2

21. TITLE AND LOCATION (City and State)

ED CENTER OFFICE/MAINTENANCE REHABILITATION-IN HOUSE PROJECT –CCSD , LAS VEGAS,NEVADA.

22. YEAR COMPLETED PROFESSIONAL SERVICES

2004 CONSTRUCTION (If applicable)

NA

23. PROJECT OWNER'S INFORMATION

a. PROJECT OWNER

CCSD

b. POINT OF CONTACT NAME

DALE SCHEIDEMAN-DIR.NEW FACILITIES c. POINT OF CONTACT TELEPHONE NUMBER

702-699-6450

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) ED CENTER REHABILITATION AND MODERNIZATION. 21,000 sq.ft. $250/sq.ft. Rehabilitation of existing Office Building and Maintenance Facility at the CCSD Ed Center site. Services Provided: Construction Documents…see graphic on next page……

Page 5: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

25. CONULTANT FROM SECTION C INVOLVED WITH THIS PROJECT

a. (1) CONSULTANT NAME

JAMIE MARGULIES (2) LOCATION (City and State)

LAS VEGAS, NEVADA (3) ROLE

PROJECT ARCHITECT

Page 6: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT

20. EXAMPLE PROJECT KEY NUMBER

3

21. TITLE AND LOCATION (City and State)

Clark County School District a.ADMINISTRATION CENTER MASTER PLANS b.KINDERGARTEN STUDIES-TO EXISTING ES PROTOTYPES

22. YEAR COMPLETED PROFESSIONAL SERVICES

2005 CONSTRUCTION (If applicable)

NA

23. PROJECT OWNER'S INFORMATION

a. PROJECT OWNER

Clark County School District b. POINT OF CONTACT NAME

DALE SCHEIDEMAN-DIR.NEW FACILITIES c. POINT OF CONTACT TELEPHONE NUMBER

702-699-6450 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

a. 1,015,354 sq.ft phase I, 1,215,354 sq.ft. final phase. $325/sq.ft. Four schemes developed….next 3 pages… Grouping of all CCSD Administration in one central site with future expansion…..

Page 7: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

Page 8: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

Page 9: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

Page 10: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

b. 7,600 sq.ft adds to existing Elementary Prototypes. $325/sq.ft Services Provided: Project Architect, Master Planner

a.

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT

a. (1) CONSULTANT NAME

JAMIE MARGULIES AIA RIBA ARCHITECT

(2) LOCATION (City and State)

LAS VEGAS, NEVADA (3) ROLE

PROJECT ARCHITECT

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT

20. EXAMPLE PROJECT KEY NUMBER

4

21. TITLE AND LOCATION (City and State)

LOS ANGELES UNIFIED SCHOOL DISTRICT VIRGIL AND COMMENWEALTH ES REHABILITATION AND EXPANSION

22. YEAR COMPLETED PROFESSIONAL SERVICES

1990 CONSTRUCTION (If applicable)

23. PROJECT OWNER'S INFORMATION

a. PROJECT OWNER

LOS ANGELES UNIFIED DISTRICT b. POINT OF CONTACT NAME

SEIGEL DIAMOND ARCHITECTS c. POINT OF CONTACT TELEPHONE NUMBER

213.627.7170 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

45,000 sq.ft. $190/sq.ft- rehabilitation of the existing classroom building and expansion of new common spaces and additional classrooms. See graphic next page…..

Page 11: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

Services Provided: Project Management-CM

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT

a. (1) FIRM NAME

SEIGEL DIAMOND ARCHITECTS (2) FIRM LOCATION (City and State)

LOS ANGELES,CA. (3) ROLE

PROJECT MANAGER

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT

20. EXAMPLE PROJECT KEY NUMBER

5

21. TITLE AND LOCATION (City and State)

INTERPRETIVE COMMUNITY CENTER SAN PEDRO, CALIFORNIA

22. YEAR COMPLETED PROFESSIONAL SERVICES

1994 CONSTRUCTION (If applicable)

1995

23. PROJECT OWNER'S INFORMATION

a. PROJECT OWNER

WORLDPORT ,LA b. POINT OF CONTACT NAME

TANAKA ARCHITECTS c. POINT OF CONTACT TELEPHONE NUMBER

310-732.7678,310.484.1800 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

INTERPRETIVE CENTER, COMMUNITY FACILITY ON SLIP 5 IN SAN PEDRO,CA. Services Provided: Project Architect 21,000 sq.ft. $190/sq/ft.. see #3 graphic next two pages…

Page 12: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

Page 13: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

25. CONSULTANTS FROM SECTION C INVOLVED WITH THIS PROJECT

a. (1) CONSULATNT NAME

JAMIE MARGULIES AIA-TANAKA ARCHITECTS

(2) LOCATION (City and State)

LOS ANGELES,CA. (3) ROLE

Project Architect

Page 14: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT

20. EXAMPLE PROJECT KEY NUMBER

6

21. TITLE AND LOCATION (City and State)

LA CENTRAL LIBRARY REHABILITATION & EXPANSION+WEST LAWN LOS ANGELES,CA.

22. YEAR COMPLETED PROFESSIONAL SERVICES

1990 CONSTRUCTION (If applicable)

1992

23. PROJECT OWNER'S INFORMATION

a. PROJECT OWNER

CITY OF LOS ANGELES

b. POINT OF CONTACT NAME

BILL HOLLAND-CITY ARCHITECT-OBREIN-KRETIZBERG

c. POINT OF CONTACT TELEPHONE NUMBER

818.907.6666

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) LOS ANGELES CENTRAL LIBRARY REHABILITATION AND EXPANSION+WEST LAWN-URBAN PARK Services Provided: Field Architect and Project Manager during Construction. Quality Assurance Architect.. See Photo below….GoodHue Building Rehabilitation………..Seismic upgrade and Interior modernization……

25. CONULTANT FROM SECTION C INVOLVED WITH THIS PROJECT

a. (1) FIRM NAME

OBREIN-KREIZTBERG (2) LOCATION (City and State)

LOS ANGELES , CALIFORNIA (3) ROLE

CM-PROJECT MANAGER

Page 15: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004

. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS

26. NAMES OF KEY PERSONNEL

(From Section E, Block 12)

27. ROLE IN THIS CONTRACT

(From Section E, Block 13)

28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing

table. Place "X" under project key number for participation in same or similar role.)

1 2 3 4 5 6 7 8 9 10 JAMIE MARGULIES ARCHITECT X X X X X X

29. EXAMPLE PROJECTS KEY

NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)

1 CCSD KINDERGARTEN PROTOTYPE 5 INTERPRETIVE COMMUNITY CENTER

2 CCSD ED CENTER REHAB. /MODERNIZATION 6 LA CENTRAL LIBRARY REHABILITATION AND EXPANSION- (+ WEST LAWN-URBAN PARK)

3 CCSD ADMINISTRATION MASTER PLAN STUDIES KINDERGARTEN MODERNOZATION STUDIES TO EXISTING PROTOTYPES

4 VIRGIL AND COMMONWEALTH ELEMENTARY SCHOOL

Page 16: Sg5 SF330 Jm Education Projects

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004