STANDARD FORM 330 (6/2004)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.)
12. NAME Jamie Margulies AIA RIBA Architect
13. ROLE IN THIS CONTRACT Principal- Architect of Record- Prime
14. YEARS EXPERIENCE a. TOTAL
25 b. WITH CURRENT FIRM
6 15. FIRM NAME AND LOCATION (City and State) Jamie Margulies AIA RIBA Architect- Lead Planning Administrator- CCSD 16. EDUCATION (DEGREE AND SPECIALIZATION) Master of Architecture/1992 UCLA-CALIFORNIA
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) License Nevada #: 3542-ARCHITECTURE American Institute of Architects,NCARB, RIBA
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Council for Educational Facility Planners, International; American Institute of Architects, Royal Institute of Architects, USGBC LEED™AP
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) CCSD Kindergarten Prototype Clark County School District, Las Vegas, NV
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2004-2008 CONSTRUCTION (If applicable)
NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies under Dale Scheidemann designed and let a team on the proposed new Kindergarten prototype. The design was presented to CCSD former superintendent Garcia for review and future consideration
b.
(1) TITLE AND LOCATION (City and State) Ed Center Office/Maintenance Rehabilitation In-house Project Clark County School District, Las Vegas, NV
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2004
CONSTRUCTION (If applicable)
NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies under Dale Scheidemann worked on the construction documents as the lead Project Manager/Job Captain . The construction documents were prepared to reach bid stage and be mobilized for construction under Ken Baker of Construction Managememt at CCSD.
c.
(1) TITLE AND LOCATION (City and State) Administration Center- CCSD Facilities Master Plan Studies Kindergarten Studies-to existing ES prototypes under Dale Scheideman
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2005 CONSTRUCTION (If applicable)
NA
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies –Coordinator of CCSD new Design Manual under Dale Scheideman
C
(1) TITLE AND LOCATION (City and State) Virgil and Commonweath ES Rehabilitation & Expansion- For Seigel Diamond Architects-LA, CA Project Manager-CM
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
1989 CONSTRUCTION (If applicable)
1990 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies’ role as CM/Project Manager included tasks as answering RFI’s , reviewing Shop Drawings, Field Observation And answering quarterly reports to LAUD and Office of the State Architect.
e.
(1) TITLE AND LOCATION (City and State) Interpretive Community Center, San Pedro , California- For Tanaka Architects- Project Architect LA Central Library Rehabilitation and Expansion+West Lawn Urban Park for Obrein-Kreitzberg –LA, CA. CM/Field Architect.
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
1994 1990
CONSTRUCTION (If applicable)
1995 1992
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jamie Margulies’ role as Project Architect in developing construction documents and representing Tanaka Architects with The WORLDPORT in San Pedro.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT
JAMIE MARGULIES AIA
20. EXAMPLE PROJECT KEY NUMBER
1
21. TITLE AND LOCATION (City and State)
Clark County School District CCSD KINDERGARTEN PROTOTYPE,LAS VEGAS NEVADA.
22. YEAR COMPLETED PROFESSIONAL SERVICES
2005 CONSTRUCTION (If applicable)
NA
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Clark County School District b. POINT OF CONTACT NAME
D.Broxterman-Facilities- CCSD c. POINT OF CONTACT TELEPHONE NUMBER
702-799-7604 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Clark County School District, New Kindergarten Prototype Facility. 64,500 sq.ft- $325/sq.ft. New Facility Center for CCSD- “finger Scheme” includes “K” and Pre-“K”, Services provided:Concept Designs, Master Plan. Services provided: Project Deisgner/Architect/Planner
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
Continued….
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
25. CONSULTANTS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) CONSULATNT NAME
JAMIE MARGULIES AIA (2) LOCATION (City and State)
LAS VEGAS,NEVADA (3) ROLE
Project Architect/Designer
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT
0. EXAMPLE PROJECT KEY NUMBER
2
21. TITLE AND LOCATION (City and State)
ED CENTER OFFICE/MAINTENANCE REHABILITATION-IN HOUSE PROJECT –CCSD , LAS VEGAS,NEVADA.
22. YEAR COMPLETED PROFESSIONAL SERVICES
2004 CONSTRUCTION (If applicable)
NA
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
CCSD
b. POINT OF CONTACT NAME
DALE SCHEIDEMAN-DIR.NEW FACILITIES c. POINT OF CONTACT TELEPHONE NUMBER
702-699-6450
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) ED CENTER REHABILITATION AND MODERNIZATION. 21,000 sq.ft. $250/sq.ft. Rehabilitation of existing Office Building and Maintenance Facility at the CCSD Ed Center site. Services Provided: Construction Documents…see graphic on next page……
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
25. CONULTANT FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) CONSULTANT NAME
JAMIE MARGULIES (2) LOCATION (City and State)
LAS VEGAS, NEVADA (3) ROLE
PROJECT ARCHITECT
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT
20. EXAMPLE PROJECT KEY NUMBER
3
21. TITLE AND LOCATION (City and State)
Clark County School District a.ADMINISTRATION CENTER MASTER PLANS b.KINDERGARTEN STUDIES-TO EXISTING ES PROTOTYPES
22. YEAR COMPLETED PROFESSIONAL SERVICES
2005 CONSTRUCTION (If applicable)
NA
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Clark County School District b. POINT OF CONTACT NAME
DALE SCHEIDEMAN-DIR.NEW FACILITIES c. POINT OF CONTACT TELEPHONE NUMBER
702-699-6450 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
a. 1,015,354 sq.ft phase I, 1,215,354 sq.ft. final phase. $325/sq.ft. Four schemes developed….next 3 pages… Grouping of all CCSD Administration in one central site with future expansion…..
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
b. 7,600 sq.ft adds to existing Elementary Prototypes. $325/sq.ft Services Provided: Project Architect, Master Planner
a.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) CONSULTANT NAME
JAMIE MARGULIES AIA RIBA ARCHITECT
(2) LOCATION (City and State)
LAS VEGAS, NEVADA (3) ROLE
PROJECT ARCHITECT
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT
20. EXAMPLE PROJECT KEY NUMBER
4
21. TITLE AND LOCATION (City and State)
LOS ANGELES UNIFIED SCHOOL DISTRICT VIRGIL AND COMMENWEALTH ES REHABILITATION AND EXPANSION
22. YEAR COMPLETED PROFESSIONAL SERVICES
1990 CONSTRUCTION (If applicable)
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
LOS ANGELES UNIFIED DISTRICT b. POINT OF CONTACT NAME
SEIGEL DIAMOND ARCHITECTS c. POINT OF CONTACT TELEPHONE NUMBER
213.627.7170 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
45,000 sq.ft. $190/sq.ft- rehabilitation of the existing classroom building and expansion of new common spaces and additional classrooms. See graphic next page…..
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
Services Provided: Project Management-CM
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) FIRM NAME
SEIGEL DIAMOND ARCHITECTS (2) FIRM LOCATION (City and State)
LOS ANGELES,CA. (3) ROLE
PROJECT MANAGER
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT
20. EXAMPLE PROJECT KEY NUMBER
5
21. TITLE AND LOCATION (City and State)
INTERPRETIVE COMMUNITY CENTER SAN PEDRO, CALIFORNIA
22. YEAR COMPLETED PROFESSIONAL SERVICES
1994 CONSTRUCTION (If applicable)
1995
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
WORLDPORT ,LA b. POINT OF CONTACT NAME
TANAKA ARCHITECTS c. POINT OF CONTACT TELEPHONE NUMBER
310-732.7678,310.484.1800 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
INTERPRETIVE CENTER, COMMUNITY FACILITY ON SLIP 5 IN SAN PEDRO,CA. Services Provided: Project Architect 21,000 sq.ft. $190/sq/ft.. see #3 graphic next two pages…
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
25. CONSULTANTS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) CONSULATNT NAME
JAMIE MARGULIES AIA-TANAKA ARCHITECTS
(2) LOCATION (City and State)
LOS ANGELES,CA. (3) ROLE
Project Architect
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT
20. EXAMPLE PROJECT KEY NUMBER
6
21. TITLE AND LOCATION (City and State)
LA CENTRAL LIBRARY REHABILITATION & EXPANSION+WEST LAWN LOS ANGELES,CA.
22. YEAR COMPLETED PROFESSIONAL SERVICES
1990 CONSTRUCTION (If applicable)
1992
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
CITY OF LOS ANGELES
b. POINT OF CONTACT NAME
BILL HOLLAND-CITY ARCHITECT-OBREIN-KRETIZBERG
c. POINT OF CONTACT TELEPHONE NUMBER
818.907.6666
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) LOS ANGELES CENTRAL LIBRARY REHABILITATION AND EXPANSION+WEST LAWN-URBAN PARK Services Provided: Field Architect and Project Manager during Construction. Quality Assurance Architect.. See Photo below….GoodHue Building Rehabilitation………..Seismic upgrade and Interior modernization……
25. CONULTANT FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) FIRM NAME
OBREIN-KREIZTBERG (2) LOCATION (City and State)
LOS ANGELES , CALIFORNIA (3) ROLE
CM-PROJECT MANAGER
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004
. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY PERSONNEL
(From Section E, Block 12)
27. ROLE IN THIS CONTRACT
(From Section E, Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing
table. Place "X" under project key number for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10 JAMIE MARGULIES ARCHITECT X X X X X X
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 CCSD KINDERGARTEN PROTOTYPE 5 INTERPRETIVE COMMUNITY CENTER
2 CCSD ED CENTER REHAB. /MODERNIZATION 6 LA CENTRAL LIBRARY REHABILITATION AND EXPANSION- (+ WEST LAWN-URBAN PARK)
3 CCSD ADMINISTRATION MASTER PLAN STUDIES KINDERGARTEN MODERNOZATION STUDIES TO EXISTING PROTOTYPES
4 VIRGIL AND COMMONWEALTH ELEMENTARY SCHOOL
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) MANDATORY USE DATE OF FORM 6/2004