Sewerage System in Hyderabad maintained by HMWSSB

HYDERABAD METROPOLITAN WATER SUPPLY &SEWERAGE BOARD

Page 2: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

2

SERVICE AREA

Erstwhile MCH area 169.30 Sq.KmsPeripheral & adj. Municipal areas 518.90 Sq.Kms

Total (GHMC) 688.20 Sq.Kms

MCH & Peripheral Areas

WATER SUPPLY

� Length of Distribution Network : 6780 Km� Installed Capacity of

Treatment System : 340 MGD

� No of Connections : 7.92 Lakhs

� Monthly Revenue : Rs.62 Crores

� Population Served : 90.00 Lakh

� Bore Wells (Power) : 1078 Nos

� Bore Wells (Hand Pumps) : 6098 Nos.

� Public Stand Posts : 6599 Nos.

HMWSSB

SNAP SHOT DETAILS OF WATER SUPPLY

Page 3: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

� Length of 600 mm dia and above : 572 Kms.

� Length of Laterals and Sub Mains : 3500 Kms. ( Excluding all surrounding municipalities )

� No. of Sewer Manholes : 1.72 Lakh

� Sewerage treatment facility : 750 MLD

(Including GHMC, HMDA & Board)

� Estimated Sewerage generated : 1250 MLD

SNAP SHOT DETAILS OF SEWER SYSTEMHMWSSB

3

Page 4: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

4

Year and Capacity augmentation in Phases

25 15 1530 37 38

90 90

0

20

40

60

80

100

1920

1927

1965

1981

1991

1993

2004

2007Year

Cap

acity

in M

GD

• Total Installed Capacity –340 MGD.• Sources becoming less reliable – Osmansagar (25Mgd) & Himayathsagar (15Mgd)

dependability has gone below 40%

Osmansagar Himayathsagar Manjeera Singur Krishna

Page 5: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

Sources of Water Supply:� The HMWSSB supplies potable Drinking Water to the citizens of

Hyderabad & Secunderabad City and provides Bulk water suppl y to theSurrounding Municipalities, Cantonment Board, Osmania Un iversity, MES,Railways, Industrial units etc.,

� Presently, HMWSSB is drawing water from the following five s ourceswhose normal drawls and present drawls are shown below:

Sl. No.

SourceYear

Commissioned

Normal drawls

(in MGD)

Present drawls

(in MGD)

1 Osmansagar 1920 25 23

2 Himayathsagar 1927 15 17

3Manjira Barrage (Phase I & II)

1965 & 1981 45 45

4 Singur Dam (Phase III & IV) 1991 & 1993 75 75

5 Krishna Project 2004 & 2006 90 & 90 180

Total from all sources 340 340

5

Page 6: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

6

Back Ground :

A beginning was made in the year 1931, for development of seweragesystem in Hyd & Sec’bad, covering an area of 54 Sqkm. for a population of4,68,000

Later Developments :Old City:‘A’ & H&L mains laid with laterals, (sewage is carried through a siphon atChadarghat and outfall sewer to Amberpet Treatment Plant).

New City & Sec’bad:K&S trunk sewer from IDPL to Amberpet, and Kalasiguda Main fromSec’bad Station to Hussainsagar surplus nala to join K&S main.

Page 7: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

7

Remodeling Sewerage Scheme (1984-1992):

Old City: Cap (Mld) Length (Km)Duplicate ‘A’ main fromKandhikal Gate to Kamal Talkies 62 4.93

Extension of H&L main 53 1.95

New City&Sec’bad: (Sew&Ind Effl). Cap (Mld) Length (Km)Duplicate K&S trunk sewerfrom IDPL to Amberpet 362 18.50

Dup.Kalasiguda Main fromSec’bad Stn to Nallaguttato join Dup. K&S Main 30 5.00

Upgradation of Amberpet STPto Primary Treatment - 113 Mld cap

Duplicate outfall sewer - From Chadarghat to Amberpet Treatment Plant.

Page 8: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

8

Construction of Nalas� Afzal Sagar Nala� Balkapur Channel� Premnagar Drain� Ameerpet Nala� Amberpet Tank & Nagamaiah Kunta Nala� Hussainsagar Nala� Murki Nala� Panja Gutta Nala� Surplus course of Panjagutta Nala� Yousufguda Nala

�Hyderabad Water Supply & Sanitation Project (WB Aid ed): {Cost Rs.42.00 Cr - Commissioned during-98}

Sewer mains, Dup ‘A’& K51 mains

- Diversion of sewage from Yousufguda &Banjara Nalas, Balkapur channel, Somajiguda,Madarsa Maktha to the sew.main.

STP (20 Mld) atNecklace Rd.

- To treat part of sewage from Dup. ‘A’ main anddisposal in the lake to maintain the hydrology ofthe lake.

I&D structures - Constructed at six places on the incomingnalas for diverting the raw sewage into sewermains.

Page 9: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

9

Jeedimetla Sewer Main:{Cost Rs.3.13 Cr - Commissioned during-1998}Jeedimetla Effluent Treatment Plant to Duplicate K&S main.

Length - 10.08 Kms.Capacity - 23.35 Mld

1st Megacity Project:� Under this project, Saidabad to Moosarambagh, Kanchanbagh to

Singareni Colony, K-51/28 sewers, and Habsiguda sewer networkhave been completed.

Laying of local sewers in slums (MCH area): (2001-03)G.O.Ms.No:441, MA&UD (W2) Deptt., dt:28.9.01 (Rs.54.00 Cr.Proj)No.of slums - 408Length of sewer mains - 240 Kms. (Ph-I & II)

CompletedPETL Sewer Main upto Dup.K&S main, Balanagar (2003-04)Cost - Rs.11.50 Cr.Work completed - 100%Total length - 22.3 Kms.Laid length - 22.3 Kms.

Page 10: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

10

Strengthening & Improvement of sewerage system in MCH area .(G.O.Ms.No:519, MA&UD (W2) Deptt., dt:14-11-2003 – Rs.150.00 Cr.)Sewer mains - 17 Nos.,Total Length - 72.50 KmsLength of sewers laid - 33.21 Kms Mains

16.00 Kms LateralsNRCD Project (2005-2008): (Cost Rs.339.00 Cr.)4 STPs - 592 Mld cap.

339 Mld STP at Amberpet172 Mld STP at Nagole &30 Mld STP at Nallacheruvu51 Mld STP at Attapur

Sewer mains - 33 Kms.,Interception & Diversion structures

on incoming nalas in to Musi - 16 Nos.

Page 11: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

11

� Musi River flows through midst of the Hyderabad Citybifurcating city as South of Musi and North of Musi.

� The entire sewage flows to River Musi throughvarious open nalas from South & North parts.

� To contain such dry weather flows in the nalas and inthe Musi River, the Ministry of Environment & Forests,GoI, has approved a project under National RiverConservation Plan of NRCD for laying suitableConveying Mains, construction of Interception &Diversion Structures on Nalas and Sewage TreatmentPlants for treatment and disposal of sewage.

Abatement of pollution to river Musi

Page 12: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

12Pollution concentration at Amberpet Causeway

Page 13: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

13

Pollution concentration in Surplus Naladownstream of H.S.Lake.

Page 14: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

14

Pollution levels in Muriki Nala near Chaderghat

Page 15: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

15

Musi River near Chaderghat Area Showing Gas Bubbles indicating Septic Conditions

Page 16: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

16

Musi River at Chaderghat Lower Bridge

Page 17: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

17River Musi Flowing at the Back side of Imlibun Bus Station

Page 18: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

18River Musi Flowing at Nagole Bridge

Page 19: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

19Polluted Musi at Nagole Village

Page 20: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

20Musi River Pollution near Salarjung Bridge

Page 21: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

21

Implementation of NRCD Project

� Administrative approval given by Ministry of E&F, GoI.

i) GoI Share (70%) - Rs.234.958 Crii) GoAP Share (30%) - Rs.100.697 Cr

-------------------Total - Rs.335.655 Cr

-------------------

� Commencement of the Project - Sep’2004

� Completion of the Project - 2009(except Attapur STP due to land dispute)

� Probable completion cost of project - Rs.400.28 Cr.

Page 22: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

22

� Construction of 16 Interception & Diversion(I&D) Structures

� Laying of Conveying Mains to nearby STPs –35.36 Km

� Constructions of 4 STPs of 592 Mld Capacity

KEY COMPONENTS OF THE PROJECT:

Page 23: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

23

NALLACHERUVUSTP

AMBERPET STP

MUSI RIVER

NANDIMUSALAIGUDA

ZIAGUDA

ATTAPUR STP

NAGOLE STP

STPs LOCATIONS

Page 24: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

24

MUSI RIVER

INTERCEPTION & DIVERSION STRUCTURES LOCATIONS

1

2

3

4

5

67

8

9

11

1213

14

15

1601. BAPUGHAT NULLAH

02. MUGHALKA NULLAH

03. PURANAPUL NULLAH ( PS )

04. PURANAPUL NULLAH (NORTH)05. AFZAL SAGAR NULLAH

06. SURPLUS NULLAH

07. GOLNAKA NULLAH

08. PATEL NAGAR NULLAH09. RAMANTHAPUR NULLAH

10. PURANAPOOL – PART-II (South)

12. PURANAPUL NULLAH(SOUTH)

13. HIGH COURT NULLAH

14. MUSLIMGANJ NULLAH

15. MURKI NULLAH

11. BAHADURPUR NULLAH

16. SAROOR NAGAR NULLAH

10

Page 25: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

25

NALLACHERUVUSTP

AMBERPET

STP

MUSI RIVER

NANDIMUSALAIGUDA

ZIAGUDA

ATTAPUR STP

NAGOLE STP

PLAN SHOWING THE LOCATION OF STPs AND

INTERCEPTION & DIVERSION STRUCTURES

1

2

3

4

5

67

8

9

1011

13

1214

15

1601. BAPUGHAT NULLAH

02. MUGHALKA NULLAH

03. PURANAPUL NULLAH ( PS )

04. PURANAPUL NULLAH (NORTH)

05. AFZAL SAGAR NULLAH

06. SURPLUS NULLAH

07. GOLNAKA NULLAH

08. PATEL NAGAR NULLAH

09. RAMANTHAPUR NULLAH

10. PURANAPOOL – PART-II (South)11. BAHADURPUR NULLAH

15. MURKI NULLAH

16. SAROOR NAGAR NULLAH

14. MUSLIMGANJ NULLAH

13. HIGH COURT NULLAH

12. PURANAPUL NULLAH(SOUTH)

DUP NIS MAIN (4.0Km)

EXT. OUTFALL SEWER

RAMANTAPUR MAIN(8.0Km)

DUP SIS MAIN (13.20Km)

Page 26: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

26

STPs STATUS:

Sl.No.

STP Location Capacity Status

1 Amberpet 339 Mld Completed & Commissioned

2 Nagole 172 Mld Completed & Commissioned

3 Nallacheruvu 30 Mld Completed & Commissioned

4 Attapur 51 Mld Almost completed, expected to be commissioned by Sep’2012

COMPONENT WISE STATUS

Page 27: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

27

STATUS OF CONVEYING MAINS:

Sl.No.

Conveying Main Size Length Status

1 NIS Main 1800 mm 4.00 Km Completed

2 SIS Main 2000 mm 13.51 Km Completed

3 Ramanthapur Main 1000 mm 8.00 Km Completed

4 Bahadurpura Main 1000 mm 5.36 Km Completed

Page 28: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

28

STATUS OF I & D STRUCTURES:

Sl.No.

Location of I & DCapacity

(Mld)Type Status

1 Puranapool Pumping Stn.

4.00 Pumping Completed

2 Puranapool 15.00 Gravity Completed

3 Afzal Sagar 20.00 Pumping Completed

4 Patel Nagar 8.47 Gravity Completed

5 Puranapool South 5.00 Gravity Completed

6 Puranapool Part-II 5.00 Gravity Completed

7 Muslimjung 5.00 Gravity Completed

8 High Court 10.00 Gravity Completed

Page 29: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

29

STATUS OF I & D STRUCTURES (Contd….):

Sl.No.

Location of I&DCapacity

(Mld)Type Status

9 Saroornagr 30.00 Gravity Completed

10 Murki Nala 45.00 Gravity Completed

11 Ramanthapur 10.00 Gravity Completed

12 Surplus Nala 80.00 Pumping Completed

13 Bapughat 30.20 Gravity Completed

14 Mughalkanala 16.70 Pumping Completed

15 Bahadurpura 37.60 Pumping Completed

16 Golnaka 6.15 Pumping Completed

Page 30: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

30

OUTCOMES OF THE NRCD Ph-I PROJECT:

• A total of 592 Mld sewage treatment facilities developedi) Amberpet- 339 Mldii) Nagole - 172 Mldiii) Nallacheruvu - 30 Mldiv) Attaupr - 51 Mld

• The sewage is treated to river disposable standards and being let intoriver musi, thereby improvement in the river hydrology and environs

• The sewage entering into musi through 16 open nalas have beenintercepted and being conveyed to the STP of respective catchment'sarea.

• Trunk conveying mains of 1200 mm - 2000 mm dia have been laid for theabove purpose

• Improved sanitation facility through Phase-I is achieved to the citizens ofHyderabad, thereby maintaining hygienic conditions in the habitation andimproved hydrology in the river

Page 31: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

31

EXHIBITS OF COMPLETED COMPONENTS OF THE PROJECT

Page 32: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

32

339 Mld STP at Amberpet

Inlet works – Coarse Screen Inlet works - Fine Screen

Inlet works – Conveyor Main Pumping Station Wet Well

Page 33: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

33

Distribution Box & UASB Reactors

339 Mld STP at Amberpet

Effluent Channel from Reactor to FAL FAL - Aerator

Page 34: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

34

Weir Connecting FAL to Polishing Pond

339 Mld STP at Amberpet

Connecting channel from Polishing Pond to CMT

Chlorine Mixing Tank Effluent Outlet Channel

Page 35: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

35

172 Mld STP at Nagole

UASB Reactors Distribution Boxes

Polishing Pond Panel Board in MPSFAL

STP commissioned and inaugurated on 13th Dec’2008

Page 36: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

36

30 Mld STP at Nallacheruvu

STP commissioned and inaugurated on 25th Feb’2009

Page 37: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

37

I & DS – North of Musi – Amberpet Catchment

Puranapool Pumping Station Puranapool

Afzalsagar Patelnagar

Page 38: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

38High Court Nala

I &DS– South of Musi – Nagole Catchment

Puranapool Puranapool Part-II

Muslimjung

Page 39: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

39

CONVEYING MAINS

NIS Conveying Main

Page 40: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

40

SIS Conveying Main

Page 41: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

41

PROPOSEDNRCD PROJECT PHASE-II

(Abatement of Pollution of River Musi)

Page 42: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

42

NRCD Project Ph-II

• At the time of preparation of first project proposals, the dryweather flows in the project area was considered for 363.3Sqkm drainage basin area i.e. the area of erstwhile MCH forthe flows of 2005 horizon year for 592 Mld.

• Due to rapid urbanization, further water supply sourceaugmentation was implemented to meet the water supplydemands of Hyderabad City.

• Resulting additional sewage flows are being generated inMusi catchment area requiring additional conveying mains andtreatment facilities.

• Accordingly, as per the guidance of MoEF, GoI, the HMWSSBprepared and submitted the Detailed Project Report for Ph-IIproject under NRCD.

Page 43: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

43

SALIENT FEATURES - NRCD PROJECT Ph-II

� Total catchment basin area considered under the project is 574.59Sqkm covering the entire GHMC area draining to Musi river. (MCHwas expanded as GHMC)

� The project area on South of Musi is - 158.43 Sqkm i.e. 27.56%

� The project area on North of Musi is - 416.11 Sqkm i.e. 72.44%

� As per the population projections, the expected sewage flow:For South of Musi – 2024 - 412 Mld

- 2044 - 503 Mld

For North of Musi – 2024 - 926 Mld- 2044 - 1324 Mld

Page 44: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

44

� The length of the river considered for pollutionprevention is 28 Km under this project as againstthe earlier length of 14 Km in the first project.

� Now the quantity of sewage flows considered forthe treatment is 610 Mld in addition to the 592 Mldtaken up in the first project and 120 Mld capacitysmaller STPs taken up by HMDA under the LakeConservation programme.

Page 45: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

45

The Quantity of sewage flowing in the river Musi asper the dry weather flow measurements:

� At chainage 1.0 Km - 9.7 Mld(considered at Hydershah Court)

� At chainage 4.5 Km - 96.4Mld

� At chainage 12 Km - 472.8 Mld

� At chainage 15 Km - 716.2 Mld

� At chainage 28 Km - 949.54 Mld(end of GHMC limits, Nallacheruvu)

Page 46: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

46

Major Project Components:

� Construction of STPs.

� Laying conveying mains to STPs.

� Construction of I&D’s at Nalas to divert the sewageinto conveying mains.

Page 47: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

47

Proposals of STPs:� The entire Musi river catchment in the limits of GHMC has been

divided into 10 sub-catchments locating the STPs for easycollection of sewage, treatment and disposal.

� The total quantity of sewage proposed to be treated at alllocations is 610 Mld.

� The details of proposed location of STPs & capacities.

Location of STP Capacity in MldAmberpet - 142Nagole - 140Nallacheruvu - 80Hydershakote - 30Attapur - 70Miralam - 6Fathenagar - 30IDPL Township - 59Nagaram (Kapra) - 29Kuntlur (Hayathnagar) - 24

Page 48: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

48

Proposals of Conveying Mains:� The conveying mains are proposed on either side of river to intercept the

flows from the Nalas to convey upto the proposed STPs.� The total length of conveying mains proposed to STPs is 74.7 Km.� The details of proposed conveying mains, location & its sizes:

Sl.No. Name of conveying main

Location LengthIn Km

Size(in mm)From To

1 Triplicate SIS Saroornagar I&D STP Nagole 4.64 1600 – 2200

2 (a) Triplicate K & S Budha Bhavan Fever Hospital

4.03 1600

(b) Triplicate K & S Fever Hospital Surplus Nala 1.40 2.5 x 2.5 MDuct

3 Triplicate NIS Bapughat Nallacheruvu 23.30 2.0 x 2.0 M2.5 x 2.5 M3.0 x 3.0 M

Duct

4 Fathenagar & Bharatnagar Main

Kukatpally Y Junction

Fatehnagar 8.35 600 – 1100

5 Balanagar Extension Main IDL, Kukatpally Balanagar 10.50 800- 1400

6 IDPL Mains Qutubullapur IDPL Colony 12.76 600 - 1400

7 Nagaram Main Kapra Cheruvu Nagaram STP 8.00 800 – 1100

8 Nacharam Main Nacharam Nallacheruvu STP

1.72 1000

Page 49: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

49

Proposals of Interception & Diversion Structures:

� The additional units of I&D’s are proposed adjacent ot theexisting I&Ds for diversion of excess sewage into proposedconveying mains.

� Total 8 I&D’s are proposed on either side of river to diver thesewage into new conveying mains.

Page 50: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

50

Sl.No

ComponentsTentativeDPR Cost(in Crores)

1 Land Acquisition 18.00

2Construction of I&DS for diversion of sewage into conveying mains

3.22

3(a) Construction of Main Pumping Stations of STP 84.43

3(b) Construction of 610 capacity STPs 474.83

4 Laying of conveying mains 263.38

Sub-total 843.86

5 Centages (@3% of project cost) 24.77

6 O&M Costs for 3 years 54.34

TOTAL COST 922.97

TOTAL PROJECT COST

Page 51: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

51

� HMWSSB, constantly making efforts from the inceptionto strengthen the sewerage system of Hyderabad Cityin order to control the pollution levels caused due toincreased sewage flows generated in Hyderabad cityon account of rapid urbanization.

� The measures includes; laying of suitable sewercollection network consisting laterals, branch mains,trunk mains and large conveying mains & constructionof STPs for treatment of sewage to the riverdisposable standards.

Page 52: Sewerage System in Hyderabad maintained by HMWSSBcdn.cseindia.org/userfiles/HMWSSB_presentation.pdf · (Including GHMC, HMDA & Board) Estimated Sewerage generated : 1250 MLD SNAP

52

� On implementation of NRCD Project Phase-I, thesewage pollution levels in the Musi River have comedown to the significantly with treatment of sewage tothe extent of 650 Mld through various sewagetreatment plants.

� Further Improved sanitation facility through NRCDPhase-II would be achieved to the citizens ofHyderabad, thereby maintaining hygienic conditions inthe habitation and improved hydrology in the river.

� Sewage treated to river disposable standards to be letinto river Musi facilitates further prevention of pollutionin the downstream of Musi river.