Page 1: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

XTAX table repair

1

• 12 tables repaired

• 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

Page 2: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

Story-board (I)

2

1 Bunker assembly 2 shielding roof removal 3 service disconnection

4 table handling (see beam

tracks )

Page 3: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

Story-board (II)

3

5 spring removal

6 old motor removal

7 new motor installation

8 table back handling

Page 4: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

New hardware implemented on this worksite

1. PR537 crane made remotely controlled

2. Vision system deployed (10 cameras)

3. New remote controlled lifting jigs (1 and 2 hooks)

4. Inspection & Remote RP survey tool

5. On-line dosimetry

6. Improved communication means (headsets, audio conference during repair)

4

2

54 3

Page 5: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012 5

XTAX table routing in TCC2

Dry run with dummy table routing accurately defined (X,Y,Z) and tested

T2

T4

T6

Page 6: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

Encountered challenging situations

Date début

Date fin Difficulté Solution

Ven 02/03 Ven 16/03 Personnel FSU et Altead pas conforme dosimétrie

Formation PCR et commande dosimètre en urgence

Lun 12/03 Ven 16/03 Vanne départ flexible cooling pas étanches

Pose de nouvelles vannes supplémentaires étanches + aspiration eau répandue au sol et stockage dans container 1m3

Mar 13/03   Palonnier automatique : 1 axe se coince lors de l’engagement ou lors du dégagement de façon aléatoire

Remplacement de deux boites d’axe automatique + tests concluants

Mer 11/04 Mer 11/04 Retrait moteur et accouplement compliqué sur table avale XTAX 042020

Chauffer au chalumeau l’accouplement et utilisation de vérin

Jeudi 12/04

Jeudi 12/04 Casse embouts vis pression clavette au remontage moteur

Pose pas de problème au démontage futur car retrait demi-coquille enlève toute pression sur clavette : laissé comme cela

Jeudi 12/04

Vendredi 13/04

Mauvais positionnement table T4 amont P0

Repositionnement coupelle voir doc recovery action

Jeudi 12/04

Vendredi 13/04

Vis interface grille cassée. Morceau coincé dans taraudage

Clamp ad hoc

Lundi 16/04

Mercredi 25/04

Depuis remise en eau XTAX T2 et T4 : fuite sur aimant MSN ligne H4 downstream XTAX

Isolement, décapotage aimant, remplacement joint défectueux

Mer 18/04 Mer 18/04 Retrait moteur et accouplement compliqué sur table avale XTAX 06

Arrache poulie utilisé

6

Page 7: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

Recovery action on 13/04/2012

‣During its removal, one cup housing the downstream right foot of the 043018 table felt down and must be repositioned.

‣Once re-installed, the table 043018 turned out to be misaligned by 4 cm at the level of the positioning grid system

‣Investigation on spare parts confirm our feeling of a wrong repositioning of the cup.

‣Decide an inspection on site

‣Dose rate estimate around 20 mSv/h shielding required

‣Shielding installation ( L shape 4 cm thick lead dose rate reduced to 2.3 – 2.7 mSv/h)

‣Removal of the felt down cup + 3 rollers & inspection of the 2 other cups

‣Replacement by spare parts

7

Page 8: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

Quality Assurance plan

‣One slip by repaired table

‣Who did what, when, how,…

‣Motor test report

‣Test in laboratory (motor only)

‣Test in the bunker (motor + gearbox)

‣Final test in place (motor + load, full range tested)

8

Operation Operateur Date Commentaire

Préparation électrique moteur

EN-STI J. Lendaro

Courant à vide : 4.2 Amesure par le variateur de fréquence avec câble de 250m

Montage accouplement moteur

EN-MEFA. Ebn RhamounS. Girod

Montage moteurEN-MEFA. Ebn RhamounS. Girod

23/03/2012Couple serrage Vis accouplement 25NmCouple serrage Vis fixation moteur 40 Nm

GraissageEN-MEFS. Evrard

23/03/2012 Capuchons absents

Test fonctionnel en place

EN-STIJ. Lendaro

26/03/2012

Test courant en chargeMontée : 4.5 ADescente : 4.2 AMesuré par le variateur de fréquence au BA80

Deconnexion hydraulique

S. Evrard EN-MEF 12/03/2012

Deconnexion electrique (Grille + moteurs)

J. Lendaro EN-STIM. Donze EN-STI

12/03/2012

Reconnexion hydraulique

S. Evrard EN-MEF 30/03/2012

Reconnexion electrique (Grille + moteurs)

C. Mitifiot EN-STIM. Donze EN-STI

29/03/2012

Photo accouplement :

H2 aval 021025

Page 9: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

Dosimetry stats

9

Page 10: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

Dosimetry stats

10

Page 11: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

Dosimetry stats

11

Motor repair procedure very well studied and optimised real dose <<<< estimates

Proximity intervention less optimised real doses = estimatesWays of improvement : cold cell or new connection design

Page 12: S.Evrard - EN-MEF 23.05.2012 XTAX table repair 1 12 tables repaired 8 initially foreseen (T2+T4) + 4 repaired in addition (T6)

S.Evrard - EN-MEF 23.05.2012

Dosimetry stats

12

Self-commitment of max 600 uSv/ person under control