Page 1: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

SETUP IMPROVEMENT

Page 2: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Setup: Definition

• The setup includes everything, all elements and time from the last good piece of the previous job until the first good piece of the next job.

• In essence, Setup considers the ACTIVITES and TIME SPAN from GOOD PIECE (A) to GOOD Piece (B)

Page 3: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

What setup reduction is not

• Not to reduce set-up people– A 50% reduction in setup time will not lead to a

50% reduction in setup people. Typically no reduction in setup people.

• Not to produce more product– (except when capacity is a issue)

Page 4: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

WHY Reduce Setup times?

• Key reason is to Reduce Lot Sizes

• Reduced WIP

• Reduce Lead Time

• Better Quality

• Flexibility

Page 5: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Work Content Breakdown Ex.

• Preparation, after-process returns, and checking of raw material, blades, dies, jigs, gauges, etc.

• Mounting and removing blades, fixtures, chucks, etc.

• Centering, dimensioning, & setting of other conditions

• Trial run & Adjustments

• 30%

• 5%

• 15%

• 50%

Page 6: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Two Kinds of Setup Activity

• Internal – Can be performed only when the machine is

shut down, or process is not producing.

• External – Can be performed while the machine is

running, or process is producing.

Page 7: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Fundamental Rule

• If an ACTIVITY can be done with the process is running (externally), then it should be done while process is running.

Page 8: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Where to Start

• Bottlenecks

• Short Lead-time

• Customer Complaints

• Delivery

Page 9: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Guidelines & Tips• Review and Document current layout &

process– Data Collection

• The complexity of the job change will determine how many observations needed

• View complete change over whenever possible

• Simulate change over when feasible

• Video Record

• Process Map

• Fishbone

Page 10: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Guidelines & Tips

• Evaluate process, look for possible enhancements. Incorporate the operator, supervisor, processor, setup person, etc. in the evaluation.

• Separate internal and external activities

• Reduce internal activities by doing more work externally

• Brainstorm for improvements

Page 11: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Guidelines & Tips

• Reduce/improve both internal and external activities – Internal

• Standardize Fixtures

• Locating Pins

• Standardize die heights

• Predetermined X-Y coordinates in CNC machines

• Standardize & improve clamping methods

• Reduce the number of bolts

Page 12: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Guidelines & Tips

• Standardize bolt heads

• Cut off unnecessary threads

• U-Washers

• SPC - Pre-control charts

• T-slot and U-slots in base plates

– External• Eliminate adjustments - potential 40% to 50%

• Maintenance of tools, gages & fixtures

Page 13: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Guidelines & Tips• Preset tools and position dies• Assign additional people to setup when feasible• Pre-stage all items - Die carts, tool boards

– get tooling, fixtures, dies, and molds

• Dismantle and repair items• Clean up• Return tooling• What paperwork/necessary computer information

• Reduce internal activities by doing more work externally

Page 14: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Guidelines & Tips

• Coordinate and plan external work– Create a Setup Chart– Color code fixtures and tool– Code location and description of dies– Locate storage as close as possible– Start preparation before the last part is run– Plan for extra manpower

Page 15: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

Guidelines & Tips

• KEEP AN OPEN MIND, ASK “ WHAT IF”

• Test ideas and measure results

• Implement improvements

• Document the new process

Page 16: SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first

In Conclusion

• Quick reaction to the DEMANDS of the market is critical. The ability to give your customers WHAT, WHEN & HOW MUCH they want is essential. Efficiently changing from one job to another job is a MUST.