1
PELINDO IIIPORT DEVELOPMENT
1DJARWO SURJANTO – President Director
KUMAI, Pangkalan Bun, Sukamara, Bumiharjo;SAMPIT, KualaPembuang, Samuda, Pagatan-Mendawai, Bagendang, Kuala Kapuas, Bahaur .
1. CENTRAL KALIMANTAN : 2. SOUTH KALIMANTAN :
BANJARMASIN , Basirih, Pulang Pisau;KOTABARU, Pagatan, Gunung Bt Besar, Batulicin,Satui, Stagen, Mekar Putih.
6. EAST NUSA TENGGARA :
TENAU/KUPANG,Kalabahi, Waingapu,MAUMERE, Ende,Ippi
5. WEST NUSA TENGGARA :
LEMBAR,BIMA, Badas
BENOA,CELUKAN BAWANG.
7. BALI :
3. CENTRAL JAWA :
TG. EMAS,TG.INTAN,TEGAL
4. EAST JAWA :
TG. PERAK,GRESIK, Kalianget,TG. WANGI, Banyuwangi,TG. TEMBAGA, Pasuruan, Panarukan
PORTS UNDER MANAGEMENTOF PELINDOIII (SURABAYA HQ)
PORT IMPROVEMENT STRATEGY
MAJOR PORTSReconfiguration toDedicated Terminal(cargo segmented)Ex : Tg Perak, Tg Emas,Banjarmasin
MINOR/ MARGINAL PORTSDeploy small/medium equipmentstrengthening infra structureEx : Lembar, Maumere
BERLIAN TERMINAL DEVELOPMENT
![Page 2: Session2 mr djarwo surjanto pelindo iii](https://reader030.vdocuments.site/reader030/viewer/2022020105/5564a1b5d8b42afd4f8b50c5/html5/thumbnails/2.jpg)
11-10-2011
2
JAMRUD TERMINAL DEVELOPMENT
WAREHOUSEDEMOLITION
TANJUNG PERAK RECONFIGURATION
MAUMERE AND LEMBAR PORTBENOA MARINA PORT
![Page 3: Session2 mr djarwo surjanto pelindo iii](https://reader030.vdocuments.site/reader030/viewer/2022020105/5564a1b5d8b42afd4f8b50c5/html5/thumbnails/3.jpg)
11-10-2011
3
PORT EXPANSION ANDSTRATEGIC LOCATION FOR NEW PORT
FOR EXAMPLE :Low-density : Samarinda to Palaran , Balikpapan (Semayang to Kariangau) , Sampit to
Bagendang, Sorong, Jayapura, AmbonHigh-density : Lamong Bay
Alongriverside
(in central city)
Seaside/Waterfront
Island Port(Open Sea)
SAMARINDA RELOCATION
SAMARINDA VICINITYSAMPIT DEVELOPMENT
TO BAGENDANG
Bagendang
Sampit
![Page 4: Session2 mr djarwo surjanto pelindo iii](https://reader030.vdocuments.site/reader030/viewer/2022020105/5564a1b5d8b42afd4f8b50c5/html5/thumbnails/4.jpg)
11-10-2011
4
CONTAINER TERMINALKARIANGAU
KAMPUNG BARU
PELABUHAN SEMAYANGBALIKPAPAN
BALIKPAPAN RELOCATIONPORT EXPANSION
LAMONG BAY (ISLAND PORT)
WHARFPhase I 500x50 m2,Phase II 500x50 m2,ultimate dev. (1.280 x 80m2)
CONTAINER YARDPhase I 20 ha,Phase II : 50 ha,Ultimate Dev : 200 Ha
THROUGHPUTPhase I : 500 .000 Teu’s,Phase II : 1 millionTeu’s,Ultimate Dev 3 million Teu’s
DRY BULK, LIQUID BULKINDUSTRIALBUFFER SPACE300 ha at Ultimate Dev.
DEPTHMinimal -14 LWS to -16 LWS
PILING WHARF (PACKAGE A) JULI 2011
Gresik View
OVERVIEW ERECTION SLAB & CASTING SEPTEMBER 2011
![Page 5: Session2 mr djarwo surjanto pelindo iii](https://reader030.vdocuments.site/reader030/viewer/2022020105/5564a1b5d8b42afd4f8b50c5/html5/thumbnails/5.jpg)
11-10-2011
5
LAMONG BAY DEVELOPMENT
SURABAYA WEST ACCESSCHANNEL (SWAC)
- DEPTH : -14 m LWS.
- WIDTH : 200 m
(two way traffic).
- Ship size : > 50.000 DWT
(Post Panamax).