Service Safety Quality Innovation Assessment of Corrosion under Insulation and Engineered Composite Wraps using Pulsed Eddy Current Techniques.

Upload: others

Post on 05-Sep-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

Service Safety Quality Innovation

Assessment of Corrosion under Insulation

and Engineered Composite Wraps using

Pulsed Eddy Current Techniques.

Page 2: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

• Introductions

• Brief overview of TRAC Oil & Gas Ltd.

• Factors affecting Probability of Detection - Review

• Perceived current challenges

• NDT methods to be verified – Overview and work

carried out to date:

• Radiography,

• Pulsed Eddy-Current (PEC)

Presentation Outline

Page 3: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

Established in 1999:

Incorporated in Scotland,

based initially in Aberdeen.

10 years of growth & diversification.

2009 creation of group & subsidiary companies.

Group turnover circa £50m.

Steady state and controlled growth for initial 10

years, accelerated growth following 2009

reorganisation.

TRAC Oil & Gas:

Turnover circa £15m

Page 4: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

Rope Access

Engineering Support

Inspection & Testing

Remote Inspection

Marine Class Survey

& Repair

Mechanical &

Electrical Trades

Rigging & Lifting

Fabric Maintenance

Fire Protection

Systems

Training

Services

Page 5: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Accreditations & Approvals

ISO 9001: 2008 ISO 14001: 2004 ISO 18001: 2007 ISO 17020:2012

Full Member

Accreditations

Memberships & Affiliations

Class Approvals & Hull Thickness Measurement Approvals

402a 402b

Page 6: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Perceived Current Challenges

In-Service Inspection relative to:

• Corrosion Under Insulation (CUI)

• Evaluation of Remaining Wall Thickness

under Blisters/Surface Scabs

• Inspection of and through Composite

Engineered Wraps

Page 7: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017 7

Competency of the Company & Personnel

Well developed and verified procedures

Appropriate Acceptance Criteria

Effective scanning of the component -

• Area of the reflecting surface

Orientation of the defect

Shape of the defect

Factors Affecting Probability

of Detection (POD)

Page 8: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

The Owner / End User is the responsible party irrespective of

any construction / maintenance / consultancy contracts etc. that

might be in force)

The Owner / End User verifies that the NDT Contractor

(Employer) is competent to carry out the contractual

requirements.

The Employer is responsible for ensuring Inspection Personnel

meet the competency requirements of the contract.

Who Decides What to Use?

Compliance Responsibility - Roles &

Responsibilities

Page 9: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

The inspection body should demonstrate that it has management

control over the following stages in order to demonstrate that it

has the personnel necessary to undertake the range of inspection

activities covered by its scope of accreditation:

Identify the range of inspection activities,

Identify the competence required for each activity,

Train & assess against the competence criteria,

Authorise persons for activities under appropriate supervision,

Monitor performance of persons to re-assess competence

Inspection Bodies

Companies accredited in accordance with:

ISO/IEC 17020:2012

Page 10: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

What are we looking for &

how do we know we will find it?

This is the pre-requisite for all Inspection /

NDT activities.

Identify what the degradation process is likely to be and apply

the most appropriate method/technique to find and quantify it.

Verify the procedure under site conditions – coating / surface

condition, real degradation – not artificial flaws or verify that

the artificial flaws truly represent the expected degradation.

NDT personnel competent to carry out the activities?

Certification is not a measure of competence

Page 11: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

Project consists of:

• Market survey and evaluation of Pulsed Eddy-Current

equipment available.

• Source relevant in-service samples with typical and varied

degradation

• In-House research to be verified by competent Third Parties

• Research and source suitable additional and/or alternatives

to Pulsed Eddy-current techniques

• Research and trial suggested innovative methods

Project Outline

Page 12: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

Market survey and evaluation of Pulsed

Eddy-Current equipment available.

In total three (3) Pulsed Eddy-Current systems were

evaluated.

Two systems were found to be relevant to our project.

These were Eddyfi Lyft and Maxwell PECT

Page 13: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Eddyfi LYFT Instrument

• Materials:

Carbon steel

• Lift-off range:

up to 300mm (12”)

• Wall thickness:

up to 100mm (4”)

• Weather jackets:

Aluminium, stainless steel, galvanised steel

• Probe:

PEC-089-G2-HT05S

Footprint 95.2 mm

Circumferential Footprint 124.5mm

Page 14: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

MAXWELL PECT Instrument

• Materials:

Carbon steel and low-alloyed steel

• Lift-off range:

0 – 250 mm (0-10”)

• Wall thickness range:

3 – 50 mm (0.12”-2”)

• Insulation covers:

Non metal, aluminium and stainless insulation covers; limited galvanised weather sheeting

Page 15: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Due to our positive experiences offshore using

radiographic techniques we introduced this method

to the project. Examples below:

Radiography

Page 16: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Radiography

Page 17: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Radiography

Initial trials with Sentinel QSA Global Open Vision

equipment.

Unsuccessful due to Safety issues

Page 18: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Radiography

Two Digital Detector Array (DDA) systems were evaluated

Little or no difference in technical performance

Page 19: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

The project continued combining Pulsed

Eddy-Current & Digital Radiography

Page 20: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

PEC Probe

Phase 3 The reception phase during which magnetic sensors measure the decay of

the eddy currents as they diffuse into the material thickness

Phase 2 The cut-off phase which induces strong eddy currents into the component When

the magnetic field emission is stopped abruptly

Phase 1 The emission phase (the pulse) during which the probe injects magnetic fields

that penetrate and stabilize in the component thickness

Principles PEC

Page 21: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Footprint Definition

• The footprint is the sensitivity area of the probe on the inspected component.

• The size of the footprint is affected by:

• The probe size and configuration

• The coating\insulation thickness

• The jacket material

• The WT of the component

Page 22: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

PEC v UT

Page 23: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

PEC v UT

• Averaging Effect

• Point 1 a Dip

• Point 2 A Peak

• Point 3 PEC Averaging

1

2

3

Page 24: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Initial Work

Sample : Pipe OD 323mm

Thickness: 8.3mm

Length 1200mm

Engineered Composite Wrap 9mm

• Sample inspected after being removed

from service (picture 1)

• After inspection a section of pipe was

cut and the ID exposed to reveal a

large scabbed area after initial

cleaning. (picture 2)

(Pic 1)

(Pic 2)

Page 25: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Initial Work

• The Pipe was sent for cleaning and on return reviled the sever corrosion on the ID at

what was the 6 O’clock position (picture 3)

(Pic 3)

Page 26: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Initial Work – Anomaly Report

• The original anomaly report identified two areas

• Area of anomaly A 80mm x 30mm 6 o’clock position 5.2mm minimum

• Area of anomaly B 20mm x 30mm 6 o’clock position 4.9mm minimum

Page 27: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Initial Work – PEC Results

• PEC Results show large area of general wall loss containing deep pitting along the

length. The minimum reading recorded by the PEC 4.2mm.

(picture 3)

0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 170.0 180.0 190.0 200.0 210.0 220.0 230.0 240.0 250.0 260.0 270.0 280.0 290.0 300.0 310.0 320.0 330.0 340.0 350.0 360.0 370.0 380.0 390.0 400.0 410.0 420.0 430.0 440.0 450.0 460.0 470.0 480.0 490.0 500.0 510.0 520.0 530.0 540.0 550.0 560.0 570.0 580.0 590.0 600.0 610.0 620.0 630.0 640.0 650.0 660.0 670.0 680.0 690.0 700.0 710.0 720.0 730.0 740.0 750.0 760.0 770.0 780.0 790.0 800.0 810.0 820.0 830.0 840.0 850.0 860.0 870.0 880.0 890.0 900.0

0.0 7.2 7.8 7.3 7.4 7.8 8.1 7.9 8.2 8.1 8.1 8.3 7.7 7.9 7.8 8.2 7.8 8.0 8.2 8.3 7.6 7.6 7.5 7.5 7.8 7.8 7.8 7.6 7.5 7.6 7.7 7.6 7.7 7.9 7.9 7.6 7.6 7.7 7.6 7.8 7.7 7.8 7.7 7.7 7.7 7.7 7.5 7.8 7.9 8.0 8.1 8.0 7.9 8.0 7.9 7.9 8.0 8.0 8.0 8.2 7.9 7.8 7.7 7.8 8.2 8.1 7.9 7.7 7.8 7.9 7.6 7.9 7.5 8.1 8.0 8.3 7.1 7.7 7.3 7.5 7.4 8.1 7.9 7.7 7.4 7.5 7.4 8.0 8.0 7.9 7.6

25.3 6.9 7.5 7.7 7.8 7.8 7.6 7.7 7.9 8.0 8.1 8.4 8.3 7.1 7.8 7.5 7.8 7.5 7.8 7.6 7.6 7.4 7.4 7.2 7.6 7.1 7.5 7.7 8.2 7.8 7.5 7.2 6.9 7.9 7.6 8.1 7.6 7.6 7.3 7.7 7.1 7.6 7.7 7.8 7.7 7.4 7.6 7.5 7.8 7.7 8.0 8.3 7.9 8.2 7.7 7.8 7.7 7.9 8.2 7.8 8.4 8.1 7.9 7.7 8.2 8.0 8.1 8.0 8.1 7.6 7.6 7.7 7.6 7.5 7.9 7.5 7.9 7.7 7.5 7.4 7.5 7.5 7.7 7.9 7.8 7.6 7.4 7.3 7.6 7.7

50.7 7.7 6.7 7.5 7.2 7.6 7.6 7.7 7.9 7.8 7.7 7.1 7.1 6.9 7.5 7.2 7.3 7.5 6.8 6.6 6.9 7.1 7.8 7.0 7.4 7.0 6.7 6.9 6.9 7.4 7.0 7.6 7.5 7.6 7.5 7.2 7.2 7.1 7.3 7.5 7.4 7.5 7.1 7.4 7.0 7.1 7.7 7.7 7.7 7.8 7.8 7.3 7.7 7.4 7.7 8.0 7.8 7.9 7.9 7.5 7.6 7.5 8.0 8.0 7.9 7.9 7.7 7.5 7.6 7.6 7.7 7.7 7.9 7.6 7.7 7.5 7.7 7.4 7.6 7.3 7.7 7.5 7.5 7.4 7.4 7.0 7.6 7.5 7.9

76.0 6.9 6.8 7.5 6.8 7.1 6.6 6.7 6.7 6.8 7.1 7.5 7.1 6.7 6.7 6.4 6.5 6.9 6.4 7.2 7.1 7.0 6.1 5.9 6.8 6.8 6.7 6.7 6.0 6.6 6.2 6.4 6.5 7.0 6.9 7.2 6.7 7.0 6.7 6.2 6.6 6.8 6.7 6.9 7.2 6.8 6.8 6.5 7.1 7.1 7.4 7.3 7.5 7.0 7.1 6.8 7.2 7.0 7.3 7.2 7.7 7.4 7.2 7.2 7.2 7.3 7.4 7.3 7.6 7.5 7.0 7.3 7.1 7.1 7.9 7.4 7.5 7.3 6.9 7.0 7.1 7.3 7.1 7.7 7.0 7.4 7.4 7.2 7.6

101.4 6.6 5.9 6.2 5.9 6.5 6.5 6.7 6.7 6.7 5.8 6.4 5.5 5.9 6.2 6.2 6.3 6.7 6.2 5.6 5.6 5.9 6.2 6.1 6.0 6.1 5.9 6.5 6.1 6.3 6.6 6.5 7.1 7.0 6.4 6.5 6.6 6.0 6.1 6.5 6.1 6.6 5.7 6.1 6.1 6.2 6.4 6.6 7.0 6.9 7.0 6.8 6.7 6.8 6.5 7.0 7.1 6.7 7.0 6.7 6.7 6.8 7.2 7.2 7.2 6.8 6.8 7.0 6.9 7.0 6.9 7.2 7.2 7.1 6.9 6.4 6.5 6.9 6.9 7.0 7.1 7.1 7.3 6.7 7.0 7.1 6.8 7.2 7.1 6.9 7.0

126.7 5.6 5.8 6.2 6.1 5.9 5.9 6.0 6.4 6.4 6.7 6.0 5.8 5.3 5.3 5.2 5.9 6.0 5.9 6.1 5.3 5.0 5.2 5.2 5.7 5.6 5.7 5.9 5.0 5.9 5.9 6.1 5.0 5.8 6.2 5.8 5.2 5.9 5.3 5.0 5.2 5.7 5.9 6.0 6.1 5.1 5.8 5.4 4.8 5.7 5.9 5.8 6.1 6.3 5.7 5.9 5.7 6.3 5.9 5.9 6.2 5.5 6.1 6.3 6.5 6.4 6.3 6.5 6.5 6.4 6.1 6.3 6.6 6.1 6.5 6.1 6.7 6.0 5.9 5.6 6.1 6.5 6.5 7.0 6.0 6.2 6.2 6.1 6.6 6.3 7.1

152.1 5.3 5.2 5.1 5.7 5.9 5.7 6.1 5.8 6.0 5.3 5.0 5.4 5.1 4.8 5.0 5.6 5.5 5.7 4.7 4.9 5.1 5.4 5.4 5.4 5.7 5.6 4.9 5.1 5.2 5.7 6.1 6.2 6.1 5.8 5.7 5.4 4.9 4.7 4.8 5.3 5.3 5.2 5.5 5.4 5.5 5.1 5.5 5.8 5.5 5.6 5.8 5.3 6.0 5.7 5.8 5.6 5.7 5.3 5.4 5.4 5.8 5.9 6.0 6.0 5.8 5.7 5.7 5.2 5.7 5.7 5.7 5.6 5.7 5.4 5.2 5.1 5.2 5.3 5.7 5.8 6.1 6.4 6.0 5.6 6.0 6.0 5.3 6.3 6.0 6.0 6.1

177.4 4.8 4.9 5.2 4.2 4.7 5.0 5.1 5.3 5.5 5.4 5.0 5.4 5.3 5.3 5.2 4.3 5.0 5.4 5.1 5.1 5.0 4.2 4.4 4.7 5.3 5.7 5.6 4.9 4.9 5.5 5.4 5.9 5.7 5.6 6.1 5.8 5.3 5.3 5.3 5.6 4.8 5.4 5.6 5.1 5.2 5.2 5.1 5.1 5.3 5.5 5.0 5.7 5.5 4.8 5.3 5.4 5.3 5.5 5.2 4.8 5.8 5.6 5.4 5.2 5.3 5.5 5.5 5.7 5.1 5.5 5.7 5.6 5.3 5.2 5.3 5.2 4.9 4.7 4.9 4.8 5.3 5.9 6.2 6.2 6.4 5.8 6.0 6.1 5.9 5.7

202.8 5.6 4.1 4.6 4.8 5.3 4.9 5.5 5.5 5.5 5.2 5.0 5.2 5.4 4.6 5.6 5.3 5.6 4.8 4.9 4.3 5.1 5.5 5.1 5.5 5.7 5.1 5.3 5.1 5.4 5.0 5.8 5.6 5.8 4.6 5.4 5.1 5.5 5.7 5.6 5.4 5.7 5.1 5.4 5.3 5.3 5.6 5.2 5.5 5.1 4.9 4.9 5.1 5.2 5.6 5.4 5.2 4.9 5.2 5.1 5.2 5.3 5.3 4.7 5.4 5.4 5.3 5.2 5.4 5.1 5.4 5.5 5.3 5.3 4.9 4.5 4.7 4.9 5.3 5.8 6.1 6.2 6.3 5.6 5.7 6.7 6.4 6.7 6.3 6.3

228.1 5.4 5.4 5.0 4.9 5.3 5.2 5.1 5.3 4.8 5.4 5.4 5.4 5.3 5.3 5.7 4.6 5.6 6.0 5.8 5.9 5.3 4.8 4.9 5.4 5.0 5.7 6.2 5.9 5.4 5.3 4.9 5.8 5.9 5.7 6.4 5.7 5.8 5.4 5.2 6.2 5.9 5.9 6.2 5.5 5.6 5.3 5.3 5.2 5.5 5.4 5.5 5.4 5.4 5.2 5.1 5.5 5.7 5.6 5.5 5.2 5.3 5.1 5.1 5.5 5.3 5.4 5.6 5.3 5.8 5.2 5.2 5.5 5.4 5.5 5.3 5.1 5.2 5.0 5.5 5.2 6.2 6.4 6.7 6.4 6.7 6.8 6.5 6.8 6.8

253.5 6.2 3.3 6.1 5.4 5.9 5.5 6.1 5.9 5.8 5.3 5.4 5.1 6.5 6.2 6.7 6.5 6.5 6.0 4.7 5.2 5.5 5.1 6.1 5.8 5.8 5.9 6.0 5.3 5.8 5.9 6.2 6.0 6.1 5.2 6.3 5.7 5.4 5.9 6.1 6.4 6.3 6.0 6.1 6.0 5.5 6.6 5.7 6.2 5.5 6.2 4.7 5.7 5.5 5.8 5.6 5.7 6.1 4.6 5.8 5.1 5.2 5.4 5.8 5.7 5.7 5.5 5.2 5.3 5.6 5.7 6.0 6.2 6.2 5.7 5.7 5.8 5.4 6.1 6.7 6.7 6.7 6.6 6.7 6.5 6.9 7.1 7.0 7.5

278.8 5.6 6.5 6.8 6.9 5.8 6.5 6.1 5.9 6.4 6.6 6.9 6.2 6.3 6.1 6.3 5.5 6.7 6.9 7.0 6.8 5.8 5.7 5.8 6.1 6.5 6.9 7.0 6.9 5.8 6.8 6.1 7.0 5.8 6.9 7.5 7.3 6.5 6.4 6.5 6.5 6.4 7.5 7.3 6.4 7.1 6.6 6.6 7.1 6.3 6.7 6.3 6.4 6.2 6.3 6.3 6.1 6.3 6.4 6.4 6.8 6.2 5.7 5.8 5.9 6.1 6.4 6.5 6.1 6.0 5.8 6.3 6.6 6.7 6.6 6.7 6.6 6.7 6.7 6.2 6.5 6.8 7.1 7.7 7.7 7.6 7.6 7.4 7.5

304.2 6.7 6.3 6.6 7.2 6.7 7.0 7.3 7.7 7.1 7.3 6.7 6.9 6.8 7.1 7.1 7.3 7.2 7.2 7.0 5.8 5.6 6.4 7.2 7.1 7.9 7.7 6.3 7.1 6.6 7.0 7.4 7.2 7.5 7.5 7.0 7.4 6.9 7.1 6.9 7.6 7.9 7.8 6.6 7.2 7.0 7.0 7.2 7.6 7.3 7.4 7.3 7.3 6.7 6.5 6.7 6.7 7.0 7.0 6.9 6.0 6.5 6.5 6.0 6.9 7.0 6.6 6.7 6.4 6.3 6.2 6.4 6.8 7.1 7.0 6.8 6.7 6.6 6.8 6.8 7.1 7.3 7.7 8.2 7.1 7.0 7.2 7.6 8.5 8.2

329.5 6.8 7.5 6.5 7.4 7.5 6.7 7.2 7.7 7.7 7.7 7.0 7.8 6.7 6.8 7.5 6.5 7.5 7.4 7.5 7.0 7.4 6.8 6.8 7.1 7.6 7.7 8.1 7.3 7.2 7.2 7.1 6.9 7.7 7.9 8.2 7.4 7.5 7.4 7.3 7.2 8.0 8.6 8.1 8.3 7.7 7.7 7.4 7.7 8.1 8.1 7.8 8.0 7.4 7.1 7.0 6.9 7.1 7.2 7.4 6.7 6.2 6.4 6.2 6.6 6.1 6.5 6.7 6.4 6.7 6.2 6.4 6.6 6.5 6.8 6.9 7.1 7.4 7.0 7.0 7.2 6.8 7.8 8.3 7.7 7.6 7.8 7.6 7.5

354.9 7.6 7.2 7.6 6.7 7.1 7.6 7.4 8.1 7.6 7.1 7.5 6.7 7.5 6.9 7.6 7.8 7.5 7.8 7.0 7.4 6.7 7.2 7.7 7.7 8.1 8.2 7.7 6.6 6.9 7.2 7.4 8.2 8.2 7.9 7.8 8.1 7.6 7.3 7.9 8.0 7.8 8.0 7.3 8.5 7.6 7.4 8.4 7.6 7.8 7.7 7.4 7.4 6.9 7.0 7.2 6.7 7.2 6.8 6.4 6.2 6.3 6.1 6.1 6.7 6.3 6.2 6.1 6.2 5.9 6.4 6.4 6.7 6.9 7.2 7.0 7.0 6.8 7.2 7.3 7.4 7.6 7.8 7.9 7.8 7.6 7.8 8.0 8.0 8.4 8.2

3 O’clock

6 O’clock

9 O’clock

Page 28: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Inspection carried out on off-shore facility

Sample : Pipe OD 798mm

Thickness: 6.35mm

Length 750mm

Engineered Composite Wrap 9mm

• Sample inspected off shore still in service.

(picture 1)

(picture 1)

Example 1

Page 29: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

• The original anomaly report identified many areas of wall loss

• All anomaly's predominantly between 3-9 O’clock positions

• Minimum reading Location 1 3.8mm

• Minimum Reading Location 2 3,6mm

(picture 3)

Example 1

Page 30: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

• PEC Results show large area of general wall loss containing deep pitting along the

length. The minimum reading recorded by the PEC 4.2mm.

0.0 14.8 29.6 44.4 59.3 74.1 88.9 103.7 118.5 133.3 148.1 163.0 177.8 192.6 207.4 222.2 237.0 251.9 266.7 281.5 296.3 311.1 325.9 340.7 355.6 370.4 385.2 400.0 414.8 429.6 444.4 459.3 474.1 488.9 503.7 518.5 533.3 548.1 563.0 577.8 592.6 607.4 622.2 637.0 651.9 666.7 681.5 696.3 711.1 725.9 740.7

848.7 6.0 6.0 5.9 6.0 6.0 6.1 6.1 6.2 6.2 6.2 6.2 6.2 6.2 6.1 6.2 5.9 5.7 5.9 5.9 5.9 6.1 6.0 6.0 6.2 6.1 6.0 6.0 6.0 6.0 6.2 6.1 6.0 6.3 6.3 6.4 6.4 6.2 6.3 6.3 6.2 6.2 6.3 6.3 6.2 6.0 6.1 6.1 5.6 5.2

808.2 5.8 5.7 5.9 5.9 6.1 6.0 5.9 6.0 6.2 6.2 6.3 6.3 6.2 6.3 6.1 6.2 6.2 6.3 6.3 6.3 6.2 6.4 6.4 6.3 6.3 6.2 6.3 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.5 6.4 6.2 6.2 5.9 5.9 5.8 5.6 5.3 5.1 5.9 5.4 5.2 5.2 5.2

767.8 5.4 5.2 5.0 4.9 5.1 5.0 5.2 5.2 5.4 5.6 5.7 5.8 5.8 5.8 5.8 5.4 5.6 5.9 6.0 6.2 6.1 6.0 6.0 6.1 6.1 6.2 6.3 6.2 6.1 6.1 6.2 6.1 6.1 6.3 6.3 6.2 6.3 6.2 6.1 6.0 5.9 6.0 5.8 5.7 5.4 5.2 5.2 5.3 4.8 4.4 4.7

727.4 4.0 4.1 4.1 4.1 4.1 4.2 4.3 4.2 4.2 4.2 4.1 4.3 4.5 4.5 4.1 4.1 4.1 4.5 5.0 5.1 5.1 5.0 5.0 5.3 5.6 5.7 5.6 5.2 5.1 5.2 5.3 5.5 5.3 5.4 5.4 5.5 5.4 5.4 5.3 5.2 5.1 5.1 4.9 4.7 4.5 4.6 4.8 4.9 4.5 4.4 4.5

687.0 3.5 4.1 3.6 3.5 3.7 3.6 3.4 3.5 3.4 3.4 3.6 3.8 3.8 3.6 3.4 3.5 3.8 4.2 4.2 4.5 4.6 4.6 4.3 4.3 4.5 4.7 4.9 4.9 4.7 4.6 4.7 4.6 4.4 4.5 4.6 4.5 4.4 4.5 4.7 4.5 4.4 4.5 4.5 4.5 4.5 4.5 4.6 4.7 4.3 4.2

646.6 3.5 3.4 3.4 3.3 3.3 3.4 3.5 3.5 3.3 3.4 3.6 3.8 3.9 3.7 3.6 3.6 3.5 3.8 4.0 4.1 4.3 4.4 4.4 4.3 4.4 4.6 4.6 4.7 4.7 4.6 4.4 4.5 4.2 4.4 4.4 4.4 4.4 4.5 4.3 4.3 4.4 4.7 4.6 4.6 4.5 4.6 4.7 4.8 4.4 4.1 4.4

606.2 3.6 3.8 3.9 3.8 3.8 3.7 3.8 4.0 4.1 4.0 4.0 4.1 4.0 3.8 3.8 3.8 3.7 3.8 4.1 4.2 4.2 4.2 4.3 4.3 4.3 4.3 4.4 4.6 4.5 4.6 4.5 4.2 3.9 3.9 4.0 4.0 3.7 4.0 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.4 4.7 4.8 4.6 4.2

565.8 3.6 3.7 3.8 4.1 3.9 3.7 3.9 4.1 3.9 3.9 3.9 3.9 3.9 3.9 4.0 4.0 3.9 3.9 3.9 3.9 3.8 4.1 4.1 4.1 3.9 4.0 4.2 4.2 4.2 4.3 3.9 3.8 3.7 3.8 3.8 3.6 3.6 3.9 4.2 4.1 4.3 4.1 4.2 4.1 4.2 4.3 4.7 4.7 4.1 4.3

525.4 4.1 4.0 3.7 4.0 4.1 4.2 4.2 4.1 3.8 3.7 3.7 3.5 3.7 4.0 4.2 4.1 4.0 3.9 4.1 4.2 4.0 4.1 4.3 4.2 4.0 3.9 4.0 4.2 4.3 4.2 4.1 4.1 3.8 4.3 4.3 4.2 4.1 4.1 4.3 4.3 4.4 4.3 4.2 3.7 3.7 3.9 4.4 4.8 4.4 4.4

484.9 4.4 4.2 4.2 4.1 3.8 4.0 4.1 3.6 3.6 3.7 3.9 3.7 3.7 3.8 3.8 4.2 4.2 4.3 4.1 4.2 4.0 4.1 4.0 3.9 4.1 4.3 3.9 4.0 4.2 4.4 4.5 4.3 4.1 4.2 4.0 4.0 4.3 4.3 4.1 3.8 3.9 4.1 4.5 4.9 4.6 4.5 4.8 4.7 4.5 4.2 4.4

444.5 4.2 4.2 4.2 4.2 4.1 4.0 3.9 4.0 4.1 3.8 3.6 4.0 4.0 4.1 4.0 3.8 3.5 3.6 3.5 3.9 3.9 3.8 3.8 4.0 3.9 3.8 3.7 3.9 4.1 4.2 3.9 3.7 3.5 3.8 4.0 4.0 4.1 3.9 4.0 3.9 3.7 3.8 4.0 4.1 4.0 3.9 3.8 3.7 4.2 4.5 4.4

404.1 4.3 4.1 4.1 4.1 4.2 4.4 4.2 4.0 4.2 4.0 4.0 4.1 3.9 3.9 3.9 4.0 4.1 4.2 4.2 4.3 4.2 4.1 4.1 4.3 4.2 4.2 4.0 3.9 3.9 4.0 4.1 4.2 4.1 4.0 4.0 4.0 4.0 4.1 4.1 4.2 4.0 3.8 3.8 3.8 4.1 4.2 4.1 4.4 4.4 4.7 4.8

363.7 4.2 4.1 4.2 4.1 4.2 4.0 3.9 4.1 4.1 4.1 3.9 4.0 4.2 4.3 3.9 3.7 3.9 4.0 3.7 3.5 3.4 3.8 3.8 3.8 3.9 3.7 3.9 4.0 4.0 3.7 3.6 3.9 3.8 4.0 3.9 4.0 3.8 3.6 3.7 3.7 3.7 3.9 4.1 4.1 3.8 3.6 3.7 4.0 4.4 4.2 4.3

323.3 4.6 4.7 4.2 4.1 4.2 4.2 4.3 4.6 4.4 4.3 4.2 4.4 4.5 4.3 4.3 4.4 4.2 4.3 3.9 3.9 3.8 4.0 4.1 4.3 4.2 4.2 4.2 4.2 4.6 4.6 4.3 4.2 4.5 4.6 4.1 4.1 4.3 4.1 4.3 4.1 4.0 4.0 4.1 4.6 4.5 4.2 4.0 4.2 4.5 4.3 4.2

282.9 4.5 4.5 4.2 4.1 4.1 4.3 4.5 4.5 4.1 4.2 4.3 4.3 4.1 3.5 4.0 4.3 4.2 4.1 4.1 4.1 4.1 4.2 4.1 4.2 4.2 3.9 4.1 4.3 4.2 4.2 4.4 4.4 4.3 4.3 4.3 4.3 4.1 4.3 4.2 4.2 4.3 4.4 4.2 4.1 4.2 4.1 4.2 4.4 4.1 4.2

242.5 4.3 4.3 4.3 4.2 4.2 4.3 4.1 3.8 3.9 4.1 4.0 3.8 3.9 4.0 4.2 4.0 4.1 3.9 3.9 3.9 4.0 4.2 4.1 3.9 4.0 4.3 4.1 4.1 4.1 4.0 4.0 4.1 4.1 4.1 4.0 3.9 3.9 3.8 4.0 4.2 4.4 4.2 4.3 4.5 4.5 4.6 4.4 4.5 4.2 4.3 4.7

202.1 4.5 4.2 4.6 4.6 4.5 4.4 4.5 4.6 4.6 4.5 4.5 4.3 4.3 4.2 4.1 4.3 4.4 4.3 4.0 4.3 4.4 4.4 4.4 4.3 4.4 4.4 4.4 4.3 4.4 4.4 4.3 4.2 4.0 4.1 4.0 4.0 4.0 4.2 4.3 4.5 5.0 4.8 5.0 5.0 4.9 4.9 5.0 4.6 4.5 4.7

161.6 5.4 5.5 5.7 5.3 5.4 5.7 5.7 5.8 5.9 5.8 5.7 5.6 5.6 5.5 5.4 5.6 5.7 5.7 5.6 5.4 5.3 5.6 5.6 5.4 5.5 5.4 5.6 5.3 5.3 5.2 5.4 5.3 5.4 5.4 5.2 5.4 5.6 5.5 5.2 5.1 5.1 5.4 5.5 5.4 5.4 5.3 5.3 5.0 4.5 4.6 4.9

121.2 6.1 6.1 6.1 6.1 6.2 6.2 6.2 6.3 6.3 6.3 6.3 6.2 6.3 6.1 6.1 6.1 6.3 6.1 6.2 6.2 6.1 6.1 6.1 6.1 6.1 6.1 6.0 5.9 6.0 6.1 6.2 6.0 6.2 6.2 6.2 6.1 6.0 6.1 5.8 5.7 5.8 5.8 5.7 5.7 5.7 5.5 5.0

80.8 6.2 6.2 6.3 6.2 6.3 6.3 6.2 6.3 6.3 6.3 6.2 6.3 6.2 6.4 6.3 6.4 6.3 6.2 6.3 6.2 6.2 6.3 6.2 6.4 6.1 6.4 6.4 6.3 6.2 6.3 6.3 6.3 6.4 6.3 6.2 6.2 6.2 6.2 6.1 5.9 6.0 5.9 5.4 5.1 5.2 5.6 5.8 5.5

40.4 5.9 6.0 6.1 6.1 6.1 6.2 6.1 6.2 6.2 6.1 6.1 6.0 6.0 6.1 6.1 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.3 6.2 6.2 6.3 6.3 6.2 6.2 6.2 6.2 6.1 6.2 6.2 6.2 6.3 6.2 6.2 6.1 6.0 5.9 5.9 6.0 5.5 5.3 5.3

0.0 5.9 5.7 5.8 5.9 6.1 6.1 6.2 6.1 6.1 6.1 6.1 6.1 6.1 6.0 6.0 6.2 6.1 6.2 6.1 6.1 6.1 6.1 6.0 6.1 6.1 6.2 6.1 6.2 6.2 6.2 6.2 6.1 6.2 6.2 6.2 6.2 6.3 6.2 6.2 6.2 6.1 6.0 5.9 5.9 6.1 5.9 5.3 5.2 5.4

12 O’clock

3 O’clock

6 O’clock

9 O’clock

Location One Location Two

Example 1

Page 31: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Table shows 14 test point inspected off shore in service.

UT & PEC Comparisons

Line ID Test Point

Nom Min Reading Difference Indication Position

(mm) UT (mm) PEC (mm) (mm) UT PEC

2" Test Point 12 3.9 2.4 2.7 -0.3 6 o'clock 5-10 o'clock

2" Test Point 2 3.9 2 2.9 -0.9 not identified 4-10 o'clock

2" Test Point 3 3.9 2 2.7 -0.7 not identified 4-10 o'clock

3" Test Point 45 5.5 2.3 3.7 -1.4 6 o'clock 1-11 o'clock

4" Test Point 19 6.02 2 3.6 -1.6 8 o'clock 4-8 o'clock

4" Test Point 21 6.02 2.8 3.7 -0.9 4 o'clock 4-8 o'clock

8" Test Point 8 8.2 2.8 4.2 -1.4 3 o'clock 3-6 o'clock

8" Test Point 11 8.2 3.5 3.5 0 6 o'clock 5-8 o'clock

10" Test Point 6 6.35 3.7 3.3 0.4 3-6 o'clock full circ

10" Test Point 1 6.35 3.8 3.4 0.4 3-9 o'clock 2-10 o'clock

10" Test Point 2 6.35 3.6 3.5 0.1 3-9 o'clock 2-10 o'clock

10" Test Point 11 6.35 3 3.9 -0.9 1-5 o'clock, 8-11 o'clock full circ

12" Test Point 48 8.38 1 3.3 -2.3 6 o'clock 6 o'clock

12" Test Point 49 8.38 1 3.5 -2.5 6 o'clock 6 o'clock

Page 32: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 2

• Nominal 7.92mm

• PEC (48% Remaining) 3,8mm

• Measured remaining before

wrap applied 3mm

Page 33: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 3

• Pitting with leak path

through to wrap PEC

detected 68% remaining

(pit approx. 10 mm

diameter hole approx.

5mm)

Page 34: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 4

Page 35: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 4

• A-scan for Position E9

• Red line calibration White Line the A-scan

for the reading Notice they follow the

same path until the white A-scan falls off

4ms

Page 36: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 5

• Remaining wall

measured through

blister then blister

removed.

• PEC measured 7.2

remaining

• UT measured 6.8

Page 37: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Page 38: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

PEC, Radiography & Scanning

Page 39: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 6

Page 40: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 6

Section 0-24

Page 41: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 6

Section 18-48

Page 42: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 6

Section 36-68

Page 43: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 6

Section 58-88

Page 44: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 6

Section 74-100

Page 45: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 7

Page 46: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 7

Section 22-54

Page 47: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 7 - PEC Results

Section 10-42

AB

CD

EF

GH

IJ

KL

MN

OP

Qmm

020

4060

80100

120140

160180

200220

240260

280300

3201

06.7

6.67.0

7.37.0

7.17.0

6.96.9

6.76.9

7.07.1

7.17.1

7.37.1

220

6.96.8

6.97.1

6.96.9

6.86.7

6.66.5

6.46.6

6.66.6

6.76.7

6.83

407.2

6.96.7

7.07.0

7.07.0

6.96.9

6.86.7

6.86.7

6.76.7

6.87.0

460

7.36.9

7.07.2

7.27.2

7.17.1

7.06.9

6.97.0

6.96.9

6.86.9

7.05

807.4

7.17.1

7.37.2

7.27.1

7.17.1

7.17.0

7.17.1

7.17.0

7.06.9

6100

7.67.3

7.27.2

7.17.1

7.17.1

7.17.1

7.17.2

7.27.2

7.17.1

7.17

1207.6

7.57.4

7.37.1

7.17.1

7.17.1

7.17.1

7.27.3

7.37.1

7.27.2

8140

7.67.7

7.67.4

7.27.2

7.27.0

7.07.0

7.17.3

7.37.3

7.27.3

7.39

1607.5

7.77.7

7.57.4

7.37.3

7.17.1

7.07.0

7.17.2

7.37.5

7.37.3

10180

7.47.6

7.67.6

7.57.5

7.57.2

7.27.0

6.97.1

7.17.2

7.27.3

7.311

2007.3

7.47.5

7.67.3

7.67.5

7.47.3

7.27.0

7.17.1

7.17.1

7.27.2

12220

7.37.4

7.47.5

7.37.6

7.57.5

7.57.4

7.27.2

7.27.1

7.17.1

7.113

2407.4

7.47.4

7.47.2

7.57.4

7.57.5

7.57.3

7.37.3

7.37.2

7.17.1

14260

7.47.4

7.47.3

7.27.2

7.27.4

7.37.4

7.57.5

7.57.4

7.37.2

7.115

2807.5

7.57.5

7.37.2

7.17.1

7.17.1

7.27.3

7.57.5

7.57.5

7.37.3

16300

7.47.5

7.57.4

7.37.1

7.17.0

7.07.0

7.17.3

7.47.5

7.47.5

7.417

3207.2

7.57.5

7.57.4

7.27.2

7.17.1

7.17.0

7.17.2

7.37.5

7.57.5

18340

7.27.4

7.57.4

7.47.4

7.37.2

7.27.1

7.17.1

7.17.2

7.37.3

7.319

3607.2

7.37.4

7.47.5

7.47.3

7.27.3

7.27.1

7.27.1

7.27.2

7.17.1

20380

7.37.3

7.37.4

7.47.4

7.37.3

7.27.3

7.27.1

7.17.2

7.17.0

7.121

4007.3

7.37.3

7.37.3

7.27.2

7.27.2

7.27.1

7.27.2

7.27.1

7.07.0

22420

7.47.3

7.37.1

7.06.9

6.97.0

7.07.1

7.07.0

7.07.0

7.17.0

7.023

4407.5

7.47.2

6.86.7

6.56.5

6.56.8

6.86.6

6.56.3

6.16.7

6.97.0

24460

7.37.3

7.06.6

6.36.1

5.95.8

5.96.1

6.06.2

6.36.1

6.26.7

7.025

4807.2

7.16.8

6.66.2

5.85.6

5.45.6

5.65.8

6.16.4

6.46.4

6.77.0

26500

7.17.0

6.86.5

6.15.6

5.14.9

4.95.1

5.76.1

6.36.5

6.66.8

7.027

5207.1

6.96.7

6.46.0

5.55.2

5.15.1

5.15.8

6.16.4

6.56.7

6.87.0

28540

7.16.9

6.86.4

6.15.7

5.55.3

5.25.4

6.06.2

6.46.5

6.66.7

6.829

5607.3

7.16.8

6.46.2

5.95.7

5.65.6

5.76.1

6.36.4

6.56.6

6.76.7

30580

7.27.0

6.86.6

6.46.1

5.95.9

5.85.8

6.16.4

6.46.6

6.76.7

6.731

6006.9

6.86.8

6.66.5

6.36.1

6.06.0

5.96.2

6.36.4

6.56.7

6.96.7

32620

6.66.8

6.86.7

6.66.4

6.26.0

6.06.0

6.26.3

6.56.7

6.96.8

6.833

6406.4

7.06.9

6.76.4

6.26.1

6.16.1

6.26.4

6.76.8

7.06.8

6.934

6606.3

7.06.8

6.76.4

6.36.3

6.36.1

6.06.4

6.46.5

6.86.7

7.035

6806.4

6.86.6

6.56.4

6.56.5

6.46.4

6.66.5

6.56.7

6.86.7

7.2

Page 48: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

7.37.3

7.37.3

7.37.2

7.27.2

7.27.2

7.17.2

7.27.2

7.17.0

7.07.4

7.37.3

7.17.0

6.96.9

7.07.0

7.17.0

7.07.0

7.07.1

7.07.0

7.57.4

7.26.8

6.76.5

6.56.5

6.86.8

6.66.5

6.36.1

6.76.9

7.07.3

7.37.0

6.66.3

6.15.9

5.85.9

6.16.0

6.26.3

6.16.2

6.77.0

7.27.1

6.86.6

6.25.8

5.65.4

5.65.6

5.86.1

6.46.4

6.46.7

7.07.1

7.06.8

6.56.1

5.65.1

4.94.9

5.15.7

6.16.3

6.56.6

6.87.0

7.16.9

6.76.4

6.05.5

5.25.1

5.15.1

5.86.1

6.46.5

6.76.8

7.07.1

6.96.8

6.46.1

5.75.5

5.35.2

5.46.0

6.26.4

6.56.6

6.76.8

7.37.1

6.86.4

6.25.9

5.75.6

5.65.7

6.16.3

6.46.5

6.66.7

6.77.2

7.06.8

6.66.4

6.15.9

5.95.8

5.86.1

6.46.4

6.66.7

6.76.7

6.96.8

6.86.6

6.56.3

6.16.0

6.05.9

6.26.3

6.46.5

6.76.9

6.76.6

6.86.8

6.76.6

6.46.2

6.06.0

6.06.2

6.36.5

6.76.9

6.86.8

6.47.0

6.96.7

6.46.2

6.16.1

6.16.2

6.46.7

6.87.0

6.86.9

6.37.0

6.86.7

6.46.3

6.36.3

6.16.0

6.46.4

6.56.8

6.77.0

6.46.8

6.66.5

6.46.5

6.56.4

6.46.6

6.56.5

6.76.8

6.77.2

Example 7 - PEC Results

Page 49: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 8

Page 50: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 8

Section 4-36

Page 51: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 8 - RAD & PEC of Elbow

Different

Schedule

Different

Schedule

Weld Area

Weld Area

Detected Defect

Page 52: Service Safety Quality Innovation - IOM3 Experience... · Verify the procedure under site conditions –coating / surface condition, real degradation –not artificial flaws or verify

JOINT ICORR/IOM3 EVENT, ABERDEEN BRANCH, TUESDAY 28TH NOVEMBER, 2017

Example 9