Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 1
Preliminary testing results of Elma and HPK sensors
Sergey Korjenevski Kansas State University
![Page 2: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/2.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 2
Stock @ KSU – 10/10/02
ELMA prototypes: L0 23 detectors
3 irradiated 7 first batch (February 2002) 16 second batch (July 2002)
L1 0 detectors 4 detectors were delivered July 2002, 2 were tested,
sent to Fermilab for SVX4 tests and module construction
Expected more with MMM
HPK prototypes: L1 10 detectors (September 2002) 3 test structures
![Page 3: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/3.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 3
Leakage Current
L0 ELMA
Leakage at 350V Room T
0
1
2
3
4
5
6
100
200
300
400
500
600
700
800
900
1000
2000
3000
4000
5000
6000
7000
8000
Current, nA
Nu
mb
er
of
sen
so
rs
MSU
KSU
Dzero cut off
![Page 4: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/4.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 4
L0 ELMA
Depletion VoltageFull Depletion L0
02468101214
20 30 40 50 60 70 80
Voltage
Nu
mb
er
of
se
ns
ors
MSU
KSU
• Most of the prototypes have depletion point at around 25V • QA document does not require low limit on FDV• For production run raw Si must be changed, FDV will be different
![Page 5: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/5.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 5
L0 ELMA
Strip Measurements Data available for detailed statistical
analysis Polyresistors are lower than specification
237-9d1 230K 1-3d1 550K
![Page 6: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/6.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 6
L1 ELMA
Leakage Current 2-7 432nA @350V 2-9 364nA @350V Breakdown 630V
Depletion Voltage 21V
Strip scan Ileak ~0.2 nA per strip Rpoly 580K (2-7 only) Cac ~100pF No pinholes
![Page 7: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/7.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 7
L1 HPK
Leakage CurrentLeakage current @ 300V
0
50
100
150
200
250
1 3 4 6 7 9 11 12 13 20
Sensor S/N
Cu
rren
t, n
A
HPK
KSU
• DØ requires Ileak < 1700 nA at FDV RT for L1• All 10 detectors are acceptable • HPK_L1_020 has breakdown at ~ 750V, the rest >800V (spec 700V)
![Page 8: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/8.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 8
L1 HPK
Depletion VoltageDepletion Voltage
100
110
120
130
140
150
160
1 3 4 6 7 9 11 12 13 20
Sensor S/N
Vo
ltag
e
HPK
KSU
• DØ requires Vfd < 300 V • All 10 detectors are acceptable • KSU measurements ~10% lower than HPK. Could HPK define Vfd as Depletion + 10%?
![Page 9: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/9.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 9
L1 HPK
Strip Measurements 5 sensors were tested – I leak; I diel; R poly; Cac
Rpoly depends on voltage through polyresistor; Some indication of Rpoly out of specification ~200K too low. Will be investigated. HPK Rpoly estimation is made on Rpoly monitor, - was not supplied.
HPK01 0.04nA per strip; no PH; Cac Cp-Q mode 67pF; HPK03 0.04nA per strip; bad strip 42; Cac 89pF; HPK04 0.05nA per strip; bad strip 346; Cac ~60pF; HPK06 0.05nA per strip; PH 13, 47, 267; HPK07 0.05nA 27 leaking; PH 320; Cac ~65pF;
![Page 10: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/10.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 10
HPK L1 comments
Three Test Structures were sent along
No Rpoly monitor (HPK reports R value)
These 3 TS are being tested at the moment
These TS will be tested by other centers for calibration
![Page 11: Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, 2002 1 Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University](https://reader036.vdocuments.site/reader036/viewer/2022071718/56649ece5503460f94bdb5aa/html5/thumbnails/11.jpg)
Sergey Korjenevski KSUDØ Run2b Silicon meeting, Oct 10, 2002 11
Near Future Plans
Finish testing of HPK_L1 sensors Polysilicon Resistor issue needs to be
resolved Switching matrix to install
Speed up the sensor testing Simplify the procedure
Data Base IO format needs to be addressed
Cool chuck for irradiation studies