september 16, 2013 additions and renovations to …

48
September 16, 2013 ADDENDUM NO. 2 ADDITIONS AND RENOVATIONS TO MOOREFIELD HIGH SCHOOL The drawings and specifications for Additions and Renovations to Moorefield High School, as prepared by Williamson Shriver Architects, Inc. are hereby amended and all changes (in either addition or deduction) which may result due to the following amendments shall be included in the bids submitted. DOCUMENTS AMENDED BIDDING REQUIREMENTS 1. Refer to SBA Policy and Procedures APPENDIX J (PART 2 – SUPPLEMENTAL GENERAL CONDITIONS) 11.5 Insurance and delete all references to the General Trades Contractor providing Builders Risk Insurance. Builders Risk Insurance will be provided by the Owner. 2. Form of Proposals for Bid Packages M5 – General Trades Contract; M6 – Mechanical Contract; M7 – Electrical Contact; M8 – Automatic Fire Suppression Contract; M9 – Food Service Equipment Contract; and M10 – Testing, Adjusting, and Balancing Contract are included with this Addendum. SPECIFICATIONS 1. SECTION 01100 Summary A. Refer to Article 1.6 Work Phases and revise all dates to match the dates shown in the revised schedule provided in Addendum No. 1. 2. SECTION 01210 Allowances A. Refer to Article 3.3 and delete Paragraph A. in its entirety. 3. SECTION 07416 Metal Plate Wall Panels A. Refer to Article 2.2 and delete the manufacturers listed in items ‘a’, ‘c’ and ‘d’ and add ‘Division Seven Inc.’ as an approved manufacturer.

Upload: others

Post on 26-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

September 16, 2013 ADDENDUM NO. 2 ADDITIONS AND RENOVATIONS TO MOOREFIELD HIGH SCHOOL

The drawings and specifications for Additions and Renovations to Moorefield High School, as prepared by Williamson Shriver Architects, Inc. are hereby amended and all changes (in either addition or deduction) which may result due to the following amendments shall be included in the bids submitted.

DOCUMENTS AMENDED

BIDDING REQUIREMENTS

1. Refer to SBA Policy and Procedures APPENDIX J (PART 2 – SUPPLEMENTAL GENERAL CONDITIONS) 11.5 Insurance and delete all references to the General Trades Contractor providing Builders Risk Insurance. Builders Risk Insurance will be provided by the Owner.

2. Form of Proposals for Bid Packages M5 – General Trades Contract; M6 – Mechanical Contract;

M7 – Electrical Contact; M8 – Automatic Fire Suppression Contract; M9 – Food Service Equipment Contract; and M10 – Testing, Adjusting, and Balancing Contract are included with this Addendum.

SPECIFICATIONS

1. SECTION 01100 Summary A. Refer to Article 1.6 Work Phases and revise all dates to match the dates shown in the

revised schedule provided in Addendum No. 1. 2. SECTION 01210 Allowances A. Refer to Article 3.3 and delete Paragraph A. in its entirety. 3. SECTION 07416 Metal Plate Wall Panels A. Refer to Article 2.2 and delete the manufacturers listed in items ‘a’, ‘c’ and ‘d’ and add

‘Division Seven Inc.’ as an approved manufacturer.

Page 2: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Addendum No. 2 Additions and Renovations to Moorefield High School September 16, 2013 Page 2 B. Refer to Article 2.3 and add paragraph ‘E’ as follows: “E. Column Covers: Provide 0.125” aluminum plate with finish to match wall

panels. Provide galvanized sub-girts, and 0.125” aluminum attachment clips as required for column system structural requirements as recommended by column manufacturer. Column to be 24” diameter with 0.040” vertical channel filler and all connections are to be concealed. Basis of Design is Firestone Metal Products Series 100.”

4. SECTION 08520 Aluminum Windows A. Refer to Article 2.1 Manufacturers and add “Peerless Products Inc.” to the list of

approved manufacturers. 5. SECTION 08800 Glazing A. Refer to paragraph 2.9.A.4.a and revise the tint color to be: Solarcool.

B. Refer to paragraph 2.9.A.items 4 and 5 and revise the requirement for tempered glass everywhere.

1. Single Hung Windows: Provide tempered glass. 2. Curtain Wall and Storefronts: Provide tempered glass where safety glass

is required by the 2012 IBC, Section 2406 and for panes located above doors. Provide heat strengthened glass at all other panes in the Curtain Wall and Storefront frames.

6. SECTION 08801 Security Glazing A. Refer to Article 3.5, paragraph A, item 3 and add a requirement for the tinted glass to be

reflective to match the “Solarcool” glazing above. B. Add Security Glazing Type SG-2 to be laminated glass with the following materials: 1. Exterior Doors: a. Outer-Ply: 3mm tinted heat strengthened float glass. b. Interlayer: Dupont SentryGlas Ionoplast. c. Inner-Ply: 3mm clear heat strengthened float glass. 2. Interior Doors: a. Outer-Ply and Inner Ply: 3mm clear heat strengthened float glass. b. Interlayer: Dupont SentryGlas Ionoplast. 7. SECTION 08912 Curtain Walls A. Refer to Article 2.1 Performance Requirements and delete paragraph ‘K’ entirely. 8. SECTION 08710 Door Hardware A. Refer to Article 3.7 Schedule of Finish Hardware and revise the following: Hardware Group #01 – Delete door A-02 and add door A-01. Hardware Group #02 – Delete door A-01 and add door A-02. Hardware Group #03 – Delete door A-03 and add door A-04.

Page 3: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Addendum No. 2 Additions and Renovations to Moorefield High School September 16, 2013 Page 3

Delete 2 Power Transfers, one Power Supply and revise the Panic Hardware to be CD-25-R-EO and delete the Description of Operation.

Hardware Group #04 – Delete door A-04 and add door A-03. Hardware Group #12 – Add doors A-31, A-55 and D-51. Hardware Group #18 – Delete doors A-31, A-55 and D-51. Hardware Group #23 – Delete door C-11. Hardware Group #37 – Delete door A-05. Add Hardware Group #70 for door A-05. Add Hardware Group #71 for door C-11.

HARDWARE GROUP NO. 70 - FOR USE ON DOOR A05

EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR

1 EA CONT. HINGE 628 112HD EPT IVE 1 EA POWER TRANSFER 689 EPT10 FAL 1 EA PANIC HARDWARE 626 RX_EL-25-R-NL-OP-1439 FAL 1 EA RIM HOUSING 626 C953 FAL 1 EA MORTISE CYLINDER 626 C987 FAL 2 EA SFIC CONST. CORE C606CCA FAL 2 EA SFIC CORE 626 CB806 FAL 1 EA 90 DEG OFFSET PULL 630 8190 8" O IVE 1 EA SURF. AUTO

OPERATOR ANCLR 9542 MS LCN

2 EA ACTUATOR, WALL MOUNT

630 8310-852 LCN

1 EA AIPHONE DOOR STATION

BY ACCESS CONTROL SUPPLIER AIP

1 EA CREDENTIAL READER

BLK BY ACCESS CONTROL SUPPLIER B/O

1 EA POWER SUPPLY LGR PS914 900-4R VON DESCRIPTION OF OPERATION DOOR TO BE UNLOCKED AT PRESET TIME OF DAY AND LOCKED BALANCE OF DAY. TIMES WILL BE DETERMINED BY OWNER AT A LATER DATE. WHEN UNLOCKED INSIDE AND OUTSIDE AUTO OPERATOR ACTUATORS ARE OPERABLE LATCH ON EXIT DEVICES RETRACTED

Page 4: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Addendum No. 2 Additions and Renovations to Moorefield High School September 16, 2013 Page 4 DOOR CAN BE OPERATED BY PUSH/PULL DEPRESSING EITHER AUTO OPERATOR ACTUATOR WILL AUTOMATICALLY OPEN ACTIVE LEAF ONLY WHEN LOCKED INSIDE AUTO OPERATOR ACTUATOR IS ACTIVE OUSTIDE AUTO OPERATOR ACTUATOR IS INACTIVE. LATCH ON EXIT DEVICES PROJECTED, AND LATCHED SECURE INTO STRIKE. PRESENTING AN AUTHORIZED CREDENTIAL WILL RETRACT LATCHBOLT ON EXIT DEVICE, ENERGIZE OUTSIDE AUTO OPERATOR ACTUATOR AND DOOR WILL OPEN EITHER MANUALLY OR BY DEPRESSING OUTSIDE AUTO OPERATOR ACTUATOR. DOOR TO RETURN TO LATCHED AND SECURED FREE EGRESS AT ALL TIMES

HARDWARE GROUP NO.

71 FOR USE ON DOOR C11

EACH TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR

6 EA HINGE 652 5BB1 4.5 X 4.5 NRP IVE 1 EA KEYED REMOVABLE

MULLION USP KR4023 FAL

1 EA PANIC HARDWARE 626 CD-25-R-L-DT-510-QUA FAL 1 EA PANIC HARDWARE 626 CD-25-R-L-NL-510-QUA FAL 1 EA RIM HOUSING 626 C953 FAL 3 EA MORTISE CYLINDER 626 C987 FAL 4 EA SFIC CONST. CORE C606CCA FAL 4 EA SFIC CORE 626 CB806 FAL 1 EA ELECTRIC STRIKE 630 6300 FSE VON 2 EA SURFACE CLOSER 689 SC71 FA FAL 2 EA KICK PLATE 630 8400 8" X 1" LDW B4E IVE 2 EA WALL STOP 630 WS407CVX IVE 2 EA SILENCER GRY SR64 IVE 1 EA CREDENTIAL

READER BLK BY ACCESS CONTROL SUPPLIER B/O

1 EA POWER SUPPLY GRY PS902 FAL 1 EA PUSH BUTTON 660PB SCE

Page 5: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Addendum No. 2 Additions and Renovations to Moorefield High School September 16, 2013 Page 5 DESCRIPTION OF OPERATION DOORS TO BE LOCKED AT ALL TIMES. PRESENTING AN AUTHORIZED CREDENTIAL TO READER OR PRESSING UNDER DESK BUTTON WILL RELEASE THE ELECTRIC STRIKE MOMENTARILY TO ALLOW ENTRY. FREE EGRESS AT ALL TIMES BOTH LEAFS 9. SECTION 09912 – Interior Painting A. Refer to paragraph 3.6.A.2 and 3.6.B.3 and revise sub-paragraphs b. and c. to read: b. Intermediate Coat: Water based 2 component epoxy-modified latex MPI #115X. c. TopCoat: Water based 2 component epoxy-modified latex MPI #115X. 10. SECTION 10530 – Canopy Covers

A. Refer to paragraph 2.2.C and revise to read: B. Finishes: Custom color painted finish as selected by Architect from manufactures full

range. 11. SECTION 11491 - Gymnasium Equipment A. Refer to paragraph 2.2.G Goal Height Adjuster and revise sub-paragraph one to read 1. Provide one goal height adjuster at each A-01 Backstop in the Auxiliary Gym. B. Refer to paragraph 3.2.C and replace the words “F&E Sub-Contractor” with the word

“Contractor”. 12. SECTION 15300 Fire Protective Systems A. Revise Article 2.1 to read as follows: “2.1 FIRE PROTECTION PIPING, ABOVE GRADE

A. Threaded end, Standard weight Schedule 40 Steel Pipe: ASTM A 53/A 53M, hot-dip galvanized where indicated and with factory- or field-formed threaded ends. 1. Cast iron Threaded Flanges: ASME B16.1. 2. Malleable iron Threaded Fittings: ASME B16.3. 3. Gray iron Threaded Fittings: ASME B16.4. 4. Steel Threaded Pipe Nipples: ASTM A 733, made of ASTM A 53/A

53M or ASTM A 106, Schedule 40, seamless steel pipe hot-dip galvanized for pool area and dry systems. Include ends matching joining method.

5. Steel Threaded Couplings: ASTM A 865 hot-dip galvanized steel pipe where indicated.

B. Plain end, Standard weight Schedule 40 Steel Pipe: ASTM A 53/A 53M, hot-dip galvanized steel pipe where indicated. 1. Locking-Lug Fittings: UL 213, ductile iron body with retainer lugs that

require one-quarter turn to secure pipe in fitting.

Page 6: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Addendum No. 2 Additions and Renovations to Moorefield High School September 16, 2013 Page 6

a. Manufacturers: 1) Anvil International, Inc. 2) Victaulic Company of America 3) Ward Manufacturing

C. Plain end, Standard weight Steel Pipe: ASTM A 53/A 53M, hot-dip galvanized steel pipe where indicated. 1. Steel Welding Fittings: ASTM A 234/A 234M, and ASME B16.9 or

ASME B16.11. 2. Steel Flanges and Flanged Fittings: ASME B16.5.

D. Grooved end, Standard weight Steel Pipe: ASTM A 53/A 53M, hot-dip galvanized where indicated and with factory- or field-formed, square-cut- or roll-grooved ends. 1. Grooved-Joint Piping Systems

a. Manufacturers: 1) Anvil International, Inc. 2) Victaulic Company of America 3) Ward Manufacturing

b. Grooved end Fittings: UL listed, ASTM A 536, ductile iron casting with OD matching steel-pipe OD.

c. Grooved end pipe Couplings: UL 213 and AWWA C606, rigid

pattern, unless otherwise indicated; gasketed fitting matching steel-pipe OD. Include ductile iron housing with keys matching steel-pipe and fitting grooves, pre-lubricated rubber gasket listed for use with housing, and steel bolts and nuts.

13. SECTION 15430 Plumbing Specialties A. All lead-free valves that will be installed on this project shall meet the NSF/ANSI 61

Federal Law and have the “LF” marking on the body and on the valve handle. B. Add Article 2.33 to read as follows: “2.33 SOLENOID VALVES

A. ACCEPTABLE MANUFACTURERS - SOLENOID VALVES 1. ASCO 2. Magnatrol 3. Snap-Tite (Solenoid Solutions, Inc) Wattmizer

B. VALVES 1. Up to 2 Inches: Bronze body, normally closed, vacuum valve, Buna-N

seals, diaphragm and disc, Type 1 general purpose solenoid enclosure, continuous duty 120 volt coil, U.L. listed. (For propane use).

2. Red Hat Model 8215 manufactured by ASCO. 3. Re-number 2.31 PREPARATIONS to 2.32 and INSTALLATION to

2.33.

Page 7: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Addendum No. 2 Additions and Renovations to Moorefield High School September 16, 2013 Page 7 14. SECTION 15762 Unit Heaters A. Refer to Article 2.1, Paragraph A., and add Subparagraph 4. to read as follows: “4. Berko.” 15. SECTION 15820 Air Duct Accessories A. Refer to Article 2.6, Paragraph A., and add Subparagraph 6. to read as follows: “6. Prefco.” 16. SECTION 15855 Diffusers, Registers, and Grilles A. Refer to Article 2.1, Paragraph A., and delete Subparagraph 1. B. Refer to Article 2.1, Paragraph A., and add Subparagraph 5. to read as follows: “5. Krueger.” 17. SECTION 15888 Dust Collectors A. Refer to Article 2.1, Paragraph A., and add Subparagraph 2. to read as follow: “2. Donaldson-Torit.” 18. SECTION 15900 Automatic Temperature Controls for HVAC A. Refer to Article 2.1 and revise Paragraph B. to read as follows: “B. Alternate Bid: Automated Logic automatic temperature control systems

furnished and installed by Control Systems Incorporated - Hagerstown, Maryland OR Automated Logic automatic temperature control systems furnished and installed by HSC Building Automation and Controls – Beckley, West Virginia OR

ASI Controls automatic temperature controls systems furnished and installed by Rigney Digital Systems – Hurricane, WV.”

DRAWINGS

1. Drawing a1: Refer to the Room Finish Schedule -400’s and make the following revisions: A. Room 410 Team Locker Room – revise floor and base finish to be Epoxy Resin. B. Delete Room 418 Shwr., 418 Toilet/Shower is correct. C. Delete Room 423 Shower, Keep 423 Team Locker Room, revise base to be Epoxy Resin. 2. Drawing a3: Refer to the Floor Plan and add Coded Note #6 to the masonry pilaster near door A-03, to door

A-05 frame on the Office side and to the wall outside of door A-40, in Vestibule 380 and inside of door A-41. Doors A-01, A-03, A-05, A-40 and A-41 are to have automatic door operators and push plates, see Door Hardware schedule.

Page 8: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Addendum No. 2 Additions and Renovations to Moorefield High School September 16, 2013 Page 8 3. Drawing a19: A. Revise the hardware set numbers for doors A-01, A-02, A-03, A-04, A-05 and C-11 as

noted in Door Hardware spec. revisions in this addendum. 4. Drawing a20: A. Refer to the Window Types and revise the type of glass in the Alternate Bid to be SG-1. 5. Drawing acm1:

A. Refer to Access Control Wiring Details and make the following revisions – Detail 1 - revise the note for the “Electric Strike by Hardware Supplier” to read “Electric

Lock by Hardware Supplier”. Detail 2 – Revised in sketch ad2-1. Detail 5 – Added in sketch ad2-1.

B. Revise Wiring Detail at Doors C-16 and D-27 to be Detail 5. C. Add Wiring Detail 1 at Doors A-31, A-55 and D-51. D. Revise door number at the door between Vestibule 100 & General Office 101 to be A-05.

6. Drawing dp3: A. Add coded note 17 to read: Remove existing wall hydrant and all related piping entirely.

Coded note 17 relates to existing wall hydrant located outside of the existing water heater room identified by coded note 11.

B. Add coded note 18 to read: Remove existing water cooler and all related piping and appurtenances entirely. Cap or plug piping below floor as required so as to be concealed in finished construction. Coded note 18 is located to the left of coded note 16 on sheet.

C. Add coded note 19 to read: Remove existing acid vent piping entirely. Cap or plug piping below floor as required so as to be concealed in finished construction. Repair roof penetration as required. Coded note 19 is located in lower left corner of existing science room on sheet.

7. Drawing dp4: A. Refer to sketches AD2-p2 & AD2-p3 for clarification of coded notes & demolition notes. 8. Drawing fp1: A. Over Media Center 134 and Corridor 170 revise “Wood Panels in Ceiling” to be “Metal

Panels in Ceiling”. B. Fire Protection General Notes – Add note M. to read: Provide sprinkler caps during

construction to protect sprinkler heads. 9. Drawing p2: A. Concrete grease interceptor detail: Revise “Gas tight cast iron manhole heavy duty frame

& cover” to read: “Gas tight cast iron manhole heavy duty frame & cover manufactured by East Jordan

Ironworks based on Model 00103753W01 or equal”.

Page 9: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Addendum No. 2 Additions and Renovations to Moorefield High School September 16, 2013 Page 9 10. Drawing p3: A. Revise coded note #12 pointing to gas over Auditorium Control booth to Coded Note 14

to read: 4” gas up thru roof. B. Revise coded notes #11 pointing to capped gas connection over Auditorium Control

booth to be Coded Note 15 to read: P.C. to provide a 2 ½” valved and capped outlet up on roof for use by H.C.

C. Revise coded notes 11 & 12 over Hall 111 to coded notes 16 & 17 to read: 16 – 2” gas up thru roof, 17 P.C. to provide a 2” valved & capped gas outlet up on roof for use by H.C.

11. Drawing p6: A. Provide 4” gas piping to serve emergency generator. See sketch AD2-p1. B. Revise coded note # 1 to read: P.C. to provide a 2” valved & capped gas outlet up on

roof for use by H.C. 12. Drawing p7: A. Revise floor drain designations under kitchen equipment items #10 & #16. See sketch

AD2-p4. B. Label drain under kitchen equipment item #36 as FS-1. 13. Drawing p8: A. Add coded note 14 to demonstration table gas solenoid located below casework in

Science Classroom 208 & 202. Coordinate electrical connections with E.C. 14. Drawing h4: A. Add general note “G” to read as follows: “G. All HVAC (refrigerant, condensate, etc.)

piping routed in the gymnasium shall be enclosed in a pre-fabricated heavy duty metal pipe enclosure. Piping enclosure system shall be “Soffi-Steel System” as manufactured by JG Innovations or equal. Steel materials shall be 16 gauge. Finish shall be hybrid polyester & epoxy. Confirm color with project architect.

15. Drawing h6: A. Revisions per attached sketch “sk-h1” - Add Exhaust Fan EF-D8. Add (2) transfer ducts

and grilles. One between the Vo-Ag shop and each of the two Vo-Ag classrooms. Delete open-ended transfer duct that was between the two vo-ag classrooms. Revise supply duct in Vo-Ag shop to be 20”-diameter. Add two (2) Fan Filter Units (FFU-D2 & FFU-D3, Units to be the same as FFU-D1). Add louver L-D3 (Louver to be the same as L-D2). Add control panels and control switches (Exact location for panels & switches to be coordinated with project architect. Modified DOAS-D2 return duct as shown.

Page 10: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Addendum No. 2 Additions and Renovations to Moorefield High School September 16, 2013 Page 10 16. Drawing h9: A. Revisions per attached sketch “sk-h2” - Update DOAS-D2 information. Add Exhaust

Fan EF-D8. Update Condensing Unit CU-A6 electrical information = 18MCA, 30 MOCP. Fan filter units FFU-D1 - FFU-D3 shall be DA-2200 with MERV-11 bag filter and MERV-8 pleated pre-filter.

17. Drawing se1: A. Provide 24” high concrete base for light fixture type F13 at all locations that are adjacent

and perpendicular to a parking space. B. The electrical contractor is responsible for all trenching associated with underground

electrical conduits. C. Provide a natural gas generator in lieu of the diesel generator shown. 18. Drawing e6: A. Type F04 fixtures shall be served by Panel 1DH1 in Media Center 134. 19. Drawing e7: A. Delete Panel tag 1DH1 from Media Center 134. B. Provide single gang box flush mounted in counter of Librarian’s desk with 1” conduit

concealed in casework, routed under floor to above door C-11. 20. Drawing e9: A. Detail noted as 2/e8 should be noted 2/e9 as referenced in coded note 13. 21. Drawing e14: A. Add attached Panel 1DL3 schedule. 22. Drawings e3, e5, e7 and e9: A. Provide power connection in junction box above ceiling for the following doors, A-01,

A-03, A-05, A-31, A-41, A-49, A-55, A-72, A-90, B-30, C-08, C-11, C-16, C-19, D-12, D-27, D-40 and D-51. Extend the nearest 120 volt general use receptacle circuit.

B. Cable tray shall be 12” wide. END OF ADDENDUM

Page 11: September 16, 2013 ADDITIONS AND RENOVATIONS TO …
Page 12: September 16, 2013 ADDITIONS AND RENOVATIONS TO …
Page 13: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM5-1-

FORM OF PROPOSAL

_____________________________________________________

Bidder's Name

____________________________________________________ Bidder's Address

___________________________

Bidder's Phone No.

______________________________________ Bidder's WV Business Registration I.D. No.

___________________________________ Bidder's WV Contractor License No. PROPOSAL FOR BID PACKAGE NO. M5

GENERAL TRADES CONTRACT

ADDITIONS AND RENOVATIONS TO MOOREFIELD HIGH SCHOOL

MOOREFIELD, WEST VIRGINIA

DATE________________ The Board of Education County of Hardy 510 Ashby Street Moorefield, WV 26836 Gentlemen: I (We) in accordance with your Advertisement for Bids for Bid Package No. M5 – General Trades Work for Additions and Renovations to Moorefield High School, having examined drawings and specifications, all as prepared by Williamson Shriver Architects, Inc. and having visited the site of the proposed work, and being familiar with all of the conditions surrounding this proposal, propose to provide for the Project Work stated herein in accordance with the contract documents, within the time stated herein, and at the prices stated below.

Page 14: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM5-2-

BASE PROPOSAL To provide all labor, materials, tools, equipment and supervision to perform all General Trades Work for Additions and Renovations to Moorefield High School, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) Alternate Proposal No. 1 – Bleachers: Separately state the amount to be added to the Base Proposal for Alternate No. 1, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) Alternate Proposal No. 2 – Cast-In-Place Terrazzo: Separately state the amount to be added to the Base Proposal for Alternate No. 2, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) Alternate Proposal No. 3 – Security Glass: Separately state the amount to be added to the Base Proposal for Alternate No. 3, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) It is expressly agreed that all work shall be started immediately upon Commencement of Work date and shall be substantially completed within the time stated in Section 01100. I (we) further agree to pay liquidated damages for each consecutive calendar day thereafter as herein provided in the Supplementary General and Special Conditions. Bid Security in the sum of Dollars ($ ), including alternates, in the form of AIA Document A310 is submitted herewith, in accordance with the Instructions to Bidders.

Page 15: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM5-3-

I (we) have received Addenda Nos. , , , , , and have included their provisions in the Bids submitted. With this Bid, I (we) agree to submit a copy of the Contractor's License as required by the WV Contractor Licensing Act. In submitting this Bid, I (we) agree to submit a Contractor's Qualification Statement, and a Financial Statement as stated in the Supplementary Instructions to Bidders. In submitting this Bid, it is understood that the right is reserved by the Board of Education to reject any and all Bids. If written notice of acceptance of this Base Proposal is mailed, telegraphed, or delivered to the undersigned within thirty (30) after the opening thereof, or at any time thereafter before this Bid is withdrawn, the undersigned agrees to execute and deliver a Contract in the prescribed form and furnish the required Bond within ten (l0) days after the Contract is presented to him for signature. If the Base Proposal is accepted and written notice of acceptance of any of the Alternate Proposals is mailed, telegraphed, or delivered to the undersigned within one hundred eighty (180) days after Notice of Award, the undersigned agrees to execute and deliver a Change Order in the prescribed form to add any or all alternates at the Alternate Proposal Sums included in this Proposal.

(SEAL IF BID IS BY Respectfully submitted, CORPORATION)

FIRM NAME_______________________________________ BY________________________________________________ PRINT NAME TITLE_____________________________________________

Page 16: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM6-1-

FORM OF PROPOSAL

_____________________________________________________

Bidder's Name

____________________________________________________ Bidder's Address

___________________________

Bidder's Phone No.

______________________________________ Bidder's WV Business Registration I.D. No.

___________________________________ Bidder's WV Contractor License No. PROPOSAL FOR BID PACKAGE NO. M6

MECHANICAL CONTRACT

ADDITIONS AND RENOVATIONS TO MOOREFIELD HIGH SCHOOL

MOOREFIELD, WEST VIRGINIA

DATE________________ The Board of Education County of Hardy 510 Ashby Street Moorefield, WV 26836 Gentlemen: I (We) in accordance with your Advertisement for Bids for Bid Package No. M6 – Plumbing and HVAC Work for Additions and Renovations to Moorefield High School, having examined drawings and specifications, all as prepared by Williamson Shriver Architects, Inc. and having visited the site of the proposed work, and being familiar with all of the conditions surrounding this proposal, propose to provide for the Project Work stated herein in accordance with the contract documents, within the time stated herein, and at the prices stated below.

Page 17: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM6-2-

BASE PROPOSAL M6A – PLUMBING WORK To provide all labor, materials, tools, equipment and supervision to perform all Plumbing Work for Additions and Renovations to Moorefield, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) BASE PROPOSAL M6B – HVAC WORK To provide all labor, materials, tools, equipment and supervision to perform all HVAC Work for Additions and Renovations to Moorefield High School, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) Alternate Proposal No. 4 – Outdoor Central Station Air Handling Units: Separately state the amount to be added to or deducted from the Base Proposal for Alternate No. 4, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) Alternate Proposal No. 5 – Dedicated Outdoor Air Units: Separately state the amount to be added to or deducted from the Base Proposal for Alternate No. 5, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________)

Page 18: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM6-3-

Alternate Proposal No. 6 – Modular Indoor Central Station Air Handling Units: Separately state the amount to be added to or deducted from the Base Proposal for Alternate No. 6, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) Alternate Proposal No. 7 – Automatic Temperature Control Systems: Separately state the amount to be added to or deducted from the Base Proposal for Alternate No. 7, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) BASE PROPOSAL M6C – PLUMBING AND HVAC COMBINED To provide all labor, materials, tools, equipment and supervision to perform all Plumbing and HVAC Work for Additions and Renovations to Moorefield High School, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) Alternate Proposal No. 4 – Outdoor Central Station Air Handling Units: Separately state the amount to be added to or deducted from the Base Proposal for Alternate No. 4, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________)

Page 19: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM6-4-

Alternate Proposal No. 5 – Dedicated Outdoor Air Units: Separately state the amount to be added to or deducted from the Base Proposal for Alternate No. 5, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) Alternate Proposal No. 6 – Modular Indoor Central Station Air Handling Units: Separately state the amount to be added to or deducted from the Base Proposal for Alternate No. 6, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) Alternate Proposal No. 7 – Automatic Temperature Control Systems: Separately state the amount to be added to or deducted from the Base Proposal for Alternate No. 7, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) It is expressly agreed that all work shall be started immediately upon Commencement of Work Date and substantial completion shall comply with the schedule stipulated by the General Construction Contractor. I (we) further agree to pay liquidated damages for each consecutive calendar day thereafter as herein provided in the Supplementary General and Special Conditions. Bid Security in the sum of Dollars ($ ), including alternates, in the form of AIA Document A310 is submitted herewith, in accordance with the Instructions to Bidders. I (we) have received Addenda Nos. , , , , , and have included their provisions in the Bids submitted.

Page 20: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM6-5-

With this Bid, I (we) agree to submit a copy of the Contractor's License as required by the WV Contractor Licensing Act. In submitting this Bid, I (we) agree to submit a Contractor's Qualification Statement, and a Financial Statement as stated in the Supplementary Instructions to Bidders. In submitting this Bid, it is understood that the right is reserved by the Board of Education to reject any and all Bids. If written notice of acceptance of this Base Proposal is mailed, telegraphed, or delivered to the undersigned within thirty (30) after the opening thereof, or at any time thereafter before this Bid is withdrawn, the undersigned agrees to execute and deliver a Contract in the prescribed form and furnish the required Bond within ten (l0) days after the Contract is presented to him for signature. If the Base Proposal is accepted and written notice of acceptance of any of the Alternate Proposals is mailed, telegraphed, or delivered to the undersigned within one hundred eighty (180) days after Notice of Award, the undersigned agrees to execute and deliver a Change Order in the prescribed form to add any or all alternates at the Alternate Proposal Sums included in this Proposal. (SEAL IF BID IS BY Respectfully submitted, CORPORATION)

FIRM NAME_______________________________________ BY________________________________________________ PRINT NAME TITLE_____________________________________________

Page 21: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM7-1-

FORM OF PROPOSAL

_____________________________________________________

Bidder's Name

____________________________________________________ Bidder's Address

___________________________

Bidder's Phone No.

______________________________________ Bidder's WV Business Registration I.D. No.

___________________________________ Bidder's WV Contractor License No. PROPOSAL FOR BID PACKAGE NO. M7

ELECTRICAL CONTRACT

ADDITIONS AND RENOVATIONS TO MOOREFIELD HIGH SCHOOL

MOOREFIELD, WEST VIRGINIA

DATE________________ The Board of Education County of Hardy 510 Ashby Street Moorefield, WV 26836 Gentlemen: I (We) in accordance with your Advertisement for Bids for Bid Package No. M7 – Electrical Work for Additions and Renovations to Moorefield High School, having examined drawings and specifications, all as prepared by Williamson Shriver Architects, Inc. and having visited the site of the proposed work, and being familiar with all of the conditions surrounding this proposal, propose to provide for the Project Work stated herein in accordance with the contract documents, within the time stated herein, and at the prices stated below.

Page 22: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM7-2-

BASE PROPOSAL To provide all labor, materials, tools, equipment and supervision to perform all Electrical Work for Additions and Renovations to Moorefield High School, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) It is expressly agreed that all work shall be started immediately upon Commencement of Work date and shall be substantially completed within the time stated in Section 01100. I (we) further agree to pay liquidated damages for each consecutive calendar day thereafter as herein provided in the Supplementary General and Special Conditions. Bid Security in the sum of Dollars ($ ), including alternates, in the form of AIA Document A310 is submitted herewith, in accordance with the Instructions to Bidders. I (we) have received Addenda Nos. , , , , , and have included their provisions in the Bids submitted. With this Bid, I (we) agree to submit a copy of the Contractor's License as required by the WV Contractor Licensing Act. In submitting this Bid, I (we) agree to submit a Contractor's Qualification Statement, and a Financial Statement as stated in the Supplementary Instructions to Bidders. In submitting this Bid, it is understood that the right is reserved by the Board of Education to reject any and all Bids. If written notice of acceptance of this Base Proposal is mailed, telegraphed, or delivered to the undersigned within thirty (30) after the opening thereof, or at any time thereafter before this Bid is withdrawn, the undersigned agrees to execute and deliver a Contract in the prescribed form and furnish the required Bond within ten (l0) days after the Contract is presented to him for signature.

Page 23: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM7-3-

(SEAL IF BID IS BY Respectfully submitted, CORPORATION)

FIRM NAME_______________________________________ BY________________________________________________ PRINT NAME TITLE_____________________________________________

Page 24: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM8-1-

FORM OF PROPOSAL

_____________________________________________________

Bidder's Name

____________________________________________________ Bidder's Address

___________________________

Bidder's Phone No.

______________________________________ Bidder's WV Business Registration I.D. No.

___________________________________ Bidder's WV Contractor License No. PROPOSAL FOR BID PACKAGE NO. M8

AUTOMATIC FIRE SUPPRESSION CONTRACT

ADDITIONS AND RENOVATIONS TO MOOREFIELD HIGH SCHOOL

MOOREFIELD, WEST VIRGINIA

DATE________________ The Board of Education County of Hardy 510 Ashby Street Moorefield, WV 26836 Gentlemen: I (We) in accordance with your Advertisement for Bids for Bid Package No. M8 – Automatic Fire Suppression Work for Additions and Renovations to Moorefield High School, having examined drawings and specifications, all as prepared by Williamson Shriver Architects, Inc. and having visited the site of the proposed work, and being familiar with all of the conditions surrounding this proposal, propose to provide for the Project Work stated herein in accordance with the contract documents, within the time stated herein, and at the prices stated below.

Page 25: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM8-2-

BASE PROPOSAL To provide all labor, materials, tools, equipment and supervision to perform all Automatic Fire Suppression Work for Additions and Renovations to Moorefield High School, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) It is expressly agreed that all work shall be started immediately upon Commencement of Work date and shall be substantially completed within the time stated in Section 01100. I (we) further agree to pay liquidated damages for each consecutive calendar day thereafter as herein provided in the Supplementary General and Special Conditions. Bid Security in the sum of Dollars ($ ), including alternates, in the form of AIA Document A310 is submitted herewith, in accordance with the Instructions to Bidders. I (we) have received Addenda Nos. , , , , , and have included their provisions in the Bids submitted. With this Bid, I (we) agree to submit a copy of the Contractor's License as required by the WV Contractor Licensing Act. In submitting this Bid, I (we) agree to submit a Contractor's Qualification Statement, and a Financial Statement as stated in the Supplementary Instructions to Bidders. In submitting this Bid, it is understood that the right is reserved by the Board of Education to reject any and all Bids. If written notice of acceptance of this Base Proposal is mailed, telegraphed, or delivered to the undersigned within thirty (30) after the opening thereof, or at any time thereafter before this Bid is withdrawn, the undersigned agrees to execute and deliver a Contract in the prescribed form and furnish the required Bond within ten (l0) days after the Contract is presented to him for signature.

Page 26: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM8-3-

(SEAL IF BID IS BY Respectfully submitted, CORPORATION)

FIRM NAME_______________________________________ BY________________________________________________ PRINT NAME TITLE_____________________________________________

Page 27: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM9-1-

FORM OF PROPOSAL

_____________________________________________________

Bidder's Name

____________________________________________________ Bidder's Address

___________________________

Bidder's Phone No.

______________________________________ Bidder's WV Business Registration I.D. No.

___________________________________ Bidder's WV Contractor License No. PROPOSAL FOR BID PACKAGE NO. M9

FOOD SERVICE EQUIPMENT CONTRACT

ADDITIONS AND RENOVATIONS TO MOOREFIELD HIGH SCHOOL

MOOREFIELD, WEST VIRGINIA

DATE________________ The Board of Education County of Hardy 510 Ashby Street Moorefield, WV 26836 Gentlemen: I (We) in accordance with your Advertisement for Bids for Bid Package No. M9 – Food Service Equipment Work for Additions and Renovations to Moorefield High School, having examined drawings and specifications, all as prepared by Williamson Shriver Architects, Inc. and having visited the site of the proposed work, and being familiar with all of the conditions surrounding this proposal, propose to provide for the Project Work stated herein in accordance with the contract documents, within the time stated herein, and at the prices stated below.

Page 28: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM9-2-

BASE PROPOSAL To provide all labor, materials, tools, equipment and supervision to perform all Food Service Equipment Work for Additions and Renovations to Moorefield High School, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) It is expressly agreed that all work shall be started immediately upon Commencement of Work date and shall be substantially completed within the time stated in Section 01100. I (we) further agree to pay liquidated damages for each consecutive calendar day thereafter as herein provided in the Supplementary General and Special Conditions. Bid Security in the sum of Dollars ($ ), including alternates, in the form of AIA Document A310 is submitted herewith, in accordance with the Instructions to Bidders. I (we) have received Addenda Nos. , , , , , and have included their provisions in the Bids submitted. With this Bid, I (we) agree to submit a copy of the Contractor's License as required by the WV Contractor Licensing Act. In submitting this Bid, I (we) agree to submit a Contractor's Qualification Statement, and a Financial Statement as stated in the Supplementary Instructions to Bidders. In submitting this Bid, it is understood that the right is reserved by the Board of Education to reject any and all Bids. If written notice of acceptance of this Base Proposal is mailed, telegraphed, or delivered to the undersigned within thirty (30) after the opening thereof, or at any time thereafter before this Bid is withdrawn, the undersigned agrees to execute and deliver a Contract in the prescribed form and furnish the required Bond within ten (l0) days after the Contract is presented to him for signature.

Page 29: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM9-3-

(SEAL IF BID IS BY Respectfully submitted, CORPORATION)

FIRM NAME_______________________________________ BY________________________________________________ PRINT NAME TITLE_____________________________________________

Page 30: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM10-1-

FORM OF PROPOSAL

_____________________________________________________ Bidder's Name

____________________________________________________

Bidder's Address

___________________________ Bidder's Phone No.

______________________________________ Bidder's WV Business Registration I.D. No.

___________________________________ Bidder's WV Contractor License No. PROPOSAL FOR BID PACKAGE NO. M10

HVAC TESTING, ADJUSTING AND BALANCING CONTRACT

ADDITIONS AND RENOVATIONS TO MOOREFIELD HIGH SCHOOL

MOOREFIELD, WEST VIRGINIA

DATE________________ The Board of Education County of Hardy 510 Ashby Street Moorefield, WV 26836 Gentlemen: I (We) in accordance with your Advertisement for Bids for Bid Package No. M10 – HVAC Testing, Adjusting and Balancing Work for Additions and Renovations to Moorefield High School, having examined drawings and specifications, all as prepared by Williamson Shriver Architects, Inc. and having visited the site of the proposed work, and being familiar with all of the conditions surrounding this proposal, propose to provide for the Project Work stated herein in accordance with the contract documents, within the time stated herein, and at the prices stated below.

Page 31: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM10-2-

BASE PROPOSAL To provide all labor, materials, tools, equipment and supervision to perform all HVAC Testing, Adjusting and Balancing Work for Additions and Renovations to Moorefield High School, for the sum of: _____________________________________________________________________________ ______________________________________________________________($_____________) It is expressly agreed that all work shall be started immediately upon Commencement of Work date and shall be substantially completed within the time stated in Section 01100. I (we) further agree to pay liquidated damages for each consecutive calendar day thereafter as herein provided in the Supplementary General and Special Conditions. Bid Security in the sum of Dollars ($ ), including alternates, in the form of AIA Document A310 is submitted herewith, in accordance with the Instructions to Bidders. I (we) have received Addenda Nos. , , , , , and have included their provisions in the Bids submitted. With this Bid, I (we) agree to submit a copy of the Contractor's License as required by the WV Contractor Licensing Act. In submitting this Bid, I (we) agree to submit a Contractor's Qualification Statement, and a Financial Statement as stated in the Supplementary Instructions to Bidders. In submitting this Bid, it is understood that the right is reserved by the Board of Education to reject any and all Bids. If written notice of acceptance of this Base Proposal is mailed, telegraphed, or delivered to the undersigned within thirty (30) after the opening thereof, or at any time thereafter before this Bid is withdrawn, the undersigned agrees to execute and deliver a Contract in the prescribed form and furnish the required Bond within ten (l0) days after the Contract is presented to him for signature.

Page 32: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Additions and Renovations to Moorefield High School Addendum No. 2 FOPBPM10-3-

(SEAL IF BID IS BY Respectfully submitted, CORPORATION)

FIRM NAME_______________________________________ BY________________________________________________ PRINT NAME TITLE_____________________________________________

Page 33: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

JUNCTION BOXABOVE DOOR

TYPE 2 WIRE

CEILING LINE

FLOOR

CR

CARD READER

MC MC

DOUBLE DOOR CARD READER/WIRING DETAILNO SCALE2

DS

AIPHONE DOOR STATIONWHERE SHOWN ON PLAN

POWER TRANSFER BY HARDWARE SUPPLIER

ELECTRIFIED EXIT DEVICE HAS AREQUEST TO EXIT FUNCTIONPROVIDED AND INSTALLEDBY G.C.

MULLION - FURNISHED BY HARDWARESUPPLIER

POWER TRANSFER BYHARDWARE SUPPLIER

POWER SUPPLYABOVE CEILING

AUTOMATIC DOOR OPERATOR WHERESCHEDULED

CEILING LINE

FLOOR

JUNCTION BOXABOVE DOOR

TYPE 2 WIRE

CARD READER

CR

SINGLE EXIT DOOR CARD READER/WIRING DETAILNO SCALE

POWER TRANSFER BY HARDWARE SUPPLIER

POWER SUPPLYABOVE CEILING

ELECTRIFIED EXIT DEVICE HAS A REQUESTTO EXIT FUNCTION PROVIDED ANDINSTALLED BY G.C.

REVISED DETAIL

5NEW DETAIL

MC

W I L L I A M S O N

I V E RRHS

ETIHCRA C T S

1" = 20'-0"

Access Control Wiring DetailsMoorefield High School

09/06/132012-021

dks

ad2-1

Page 34: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

2012-021

SAG

9-16-20131"= 30'

DRAWING REVISION

DRAWING REVISIONS:

Page 35: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

2012-021

SAG

9-16-20131"= 30'

DRAWING REVISION

DRAWING REVISIONS:

Page 36: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

2012-021

SAG

9-16-2013N.T.S.

DRAWING REVISION

DRAWING REVISIONS:

DEMOLITION NOTES: 1. BUIDLING TO BE REMOVED. 2. TRANSFORMER TO BE REMOVED. 3. FENCE TO BE REMOVED. 4. HVAC UNITS TO BE REMOVED. 5. CLEAR AND GRUB SITE. 6. CUT AND CAP WATER LINE, ABANDON IN PLACE AND CLOSE VALVE AT CONNECTION

TO MAIN LINE. WATER LINE TO REMAIN IN SERVICE UNTIL IT CAN BE ABANDONED IN

7. SEWER LINE TO BE REMOVED. 8. STORM LINE TO BE REMOVED. 9. DRAIN INLET TO BE REMOVED.10. WATER LINE TO BE ABANDONED IN PLACE. WATER LINE TO REMAIN IN SERVICE UNTIL

11. CUT AND CAP UNDERGROUND ELECTRIC AND ABANDON IN PLACE.12. CUT AND CAP UNDERGROUND TELEPHONE AND ABANDON IN PLACE.13. ASPHALT PAVEMENT TO BE REMOVED.14. CONCRETE WALK TO BE REMOVED.15. BUILDING STOOP TO BE REMOVED.16. SIGN TO BE REMOVED AND RETURNED TO OWNER.17. UTILITY POLE TO BE REMOVED.18. ELECTRIC AND CABLE LINES TO BE REMOVED.19. UNDERGROUND ELECTRIC TO BE REMOVED.20. UNDERGROUND TELEPHONE AND CABLE TO BE REMOVED.21. DOWN SPOUT TO BE REMOVED.22. GREASE TRAP TO BE REMOVED.23. CLEAN OUT TO BE REMOVED.24. CURB TO BE REMOVED.25. SAW CUT LINE.26. LIMITS OF CONSTRUCTION/DISTURBANCE.27. GENERAL CONTRACTOR TO REMOVE WALKWAYS, STEPS AND RAMPS AROUND

28. PORTABLE CLASSROOMS TO BE REMOVED BY OTHERS. (N.I.C.)29. MANHOLE TO BE REMOVED.30. FREEZER TO BE REMOVED AND RETURNED TO OWNER.31. AGGREGATE PAVING TO BE REMOVED.32. 6' TEMPORARY CONSTRUCTION FENCE.

PORTABLE CLASSROOMS.

33. REMOVE ASPHALT PAVEMENT AS NEEDED TO ACHIEVE MIN. 2' WIDE FULL DEPTH INFILL FOR ROAD WIDENING.

34. CLEAN OUT CATCH BASIN AND CULVERT CROSSING TO STORM DRAIN ACROSS WATER STREET.

35. MANHOLE TO BE REMOVED. CUT AND CAP LINE TO BE ABANDONDED IN PLACE.36. SEWER LINE TO BE ABANDONED IN PLACE. SEWER LINE TO REMAIN ACTIVE UNTIL IT

CAN BE ABANDONED IN PHASE 2.37. INSTALL TEMPORARY ORANGE SAFETY FENCE TO ISOLATE STORM WATER RETENTION

SYSTEM DURING CONSTRUCTION.

PHASE 2.

IT CAN BE ABANDONED IN PHASE 2.

DRAWING REVISION

Page 37: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

39. 30" TALL x12" Ø CONCRETE ENTRY BOLLARDS, SET ON STEEL PIPE EMBEDDED IN CONCRETE FOOTING. 5'-0" O.C. (SEE DETAIL A-st2) 32 TOTAL.

40. CONCRETE SEAT BENCH. TITAN BENCH BY ARCHITECTURAL PRECAST, INC. BURLINGTON, KY1-800-541-1738 STOCK #1006 OR EQUAL. COLOR SELECTED BY ARCHITECT/OWNER.

DRAWING REVISION 1

DRAWING REVISION 1

DRAWING REVISION 1

2012-021

SAG

9-16-20131"= 30'

1 REVISED BOLLARD AND BENCHES NOTES.

DRAWING REVISIONS:

Page 38: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

DRAWING REVISION 1

2012-021

SAG

9-16-2013N.T.S.

1 ADDED DETAIL.

DRAWING REVISIONS:

CONCRETE BOLLARD ANCHOR/FOOTER DETAIL NOT TO SCALE (CONCRETE BOLLARD_DETAIL.DWG)

19"

6"

TO W

ALK

18"

5" CONCRETE SIDEWALKSEE DETAIL C-st7

SUBG

RAD

E

4.5" Ø O.D.x36" STEEL BOLLARD

DAWN ENTERPRISES, ITEM #BOC12R 12" CONCRETE BOLLARDOR APPROVED EQUAL

3000 PSICONCRETE

12"

30"

6"x14" CAVITY

Page 39: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

DRAWING REVISION

2012-021

SAG

9-16-20131"= 30'

DRAWING REVISIONS:

DRAWING REVISION

Page 40: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

2012-021

SAG

9-16-20131"= 30'

DRAWING REVISIONS:

D. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF WATER LINE INSTALLATION WITH THE TOWN OF

C. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF GAS LINE INSTALLATION WITH GASUTILITY COMPANY.

BENDS AND TEES ON WATER MAIN.B. CONTRACTOR TO PROVIDE CONCRETE THRUST BLOCKING ON ALL HORIZONTAL & VERTICAL

GENERAL UTILITY NOTES:A. ALL NEW UTILITY RUNS ARE TO BE STUBBED 5' FROM BUILDING ENTRY POINT.

CONSTRUCTION DEMOLITION IS THE RESPONSIBILITY OF THE CONTRACTOR.E. RELOCATION/ABANDONMENT AND OR DAMAGES TO EXISTING UTILITIES ENCOUNTERED DURING

NOT BE ACHIEVED. F. CONTRACTOR TO ENCASE STORM PIPE W/ CONCRETE WHEN A MIN. OF 2.5' OF COVER CAN

CONSTRUCTION, CONTACT ENGINEER TO VERIFY LOCATION AND DETERMINE NEW CONNECTION POINT.G. EXISTING DOWNSPOUTS CONNECTED TO SUB-SURFACE PIPING. IF PIPING IS ENCOUNTERED DURING

DARK TEXT ARE PROPOSED AND ARE TO BE INSTALLED BY THE CONTRACTOR.H. UTILITIES TAGGED WITH GRAY SCALE TEXT ARE EXISTING. SEE GENERAL NOTE B. UTILITIES TAGGED WITH

MOOREFIELD.

DRAWING REVISION

PROVIDING SMOOTH TRANSITIONS.WITHOUT SHARP TRANSITIONS. AVOID ABRUPT CHANGES IN GRADE, ROUND SURFACES

8. GRADE SLOPES BETWEEN SPOT ELEVATIONS PROVIDING A CONTINUOUS SMOOTH SURFACE

3. THE ENTIRE SITE WITHIN THE LIMIT OF CONSTRUCTION SHALL BE GRADED TO DRAIN FREELY.

5. CONTRACTOR MUST COORDINATE ALL DRAINAGE STRUCTURE GRATES AND TOP ELEVATIONSSHOWN WITH ACTUAL FIELD CONDITIONS TO ENSURE THAT GRATES AND TOPS ARE FLUSH

6. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES (INCLUDING SANITARY, STORM DRAINAGE,AND WATER) FROM DAMAGE DURING CONSTRUCTION. ALL UNDERGROUND UTILITIES EXPOSEDDURING CONSTRUCTION OR THOSE LEFT WITH LESS THAN ACCEPTABLE MINIMUM EARTH COVERSHALL BE RELOCATED TO A LOWER DEPTH WITH ACCEPTABLE MINIMUM COVER.

7. LONGITUDINAL SLOPE ON SIDEWALKS CAN NOT EXCEED 5.0%, CROSS SLOPE ON SIDEWALKS

GENERAL GRADING NOTES:

WITH FINISHED GRADE.

CAN NOT EXCEED 2.0%.

4. ALL CONTOURS SHOWN ON PLAN ARE FINISHED GRADE, CONTRACTOR IS RESPONSIBLE FOR CALCULATING SUBGRADE OF BUILDING (8" BELOW F.F.E.), SUBGRADE OF PAVEMENTS (REFERTO PAVEMENT DETAILS), AND SUBGRADE OF LAWN AREAS (6" TOPSOIL).

1. NOT USED.

2. NOT USED.

DRAWING REVISION

Page 41: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

2012-021

SAG

9-16-20131"= 30'

DRAWING REVISIONS:

DRAWING REVISION

Page 42: September 16, 2013 ADDITIONS AND RENOVATIONS TO …
Page 43: September 16, 2013 ADDITIONS AND RENOVATIONS TO …
Page 44: September 16, 2013 ADDITIONS AND RENOVATIONS TO …
Page 45: September 16, 2013 ADDITIONS AND RENOVATIONS TO …
Page 46: September 16, 2013 ADDITIONS AND RENOVATIONS TO …

Vo Ag Shop

224

Tools

228

Mech.

229

Meat Room

230

Office

226

Elec

222

Pantry

220b

FRG

2222

FRG

2222

SF

C�D

12

SF

C�D

13

FRG

2210

SCD

104300

SFC�D9

SCD

104400

SCD

104400

SCD

6440

FRG

2222

FRG

2222

14/12

12/12

WFD�D1

WFD�D2

12"ø

11"ø

10"ø

9"ø

6"ø

6"ø

4"ø

6"ø

5"ø

6"ø

6"ø

6"ø

ECG

3030

SG

1610450

(TYP 6)

ECG

2210

(TYP 2)

3

h6

4

h6

L�D

2(4

8x24

)

T

TT

T

EDC�D1

AHU�D1

EF�D6

12/12

FF

U�D

1

(IN RISE)(IN RISE)(IN RISE)(IN RISE)

1

1

42/8 42/8

13

16

12

12

12

T

ECG

1212

ECG

1212

TS TS

11 11

14

20

22/10

FRG

2210

22/10

FRG

2210

EF�D8

20"øL

�D3

(48x24

)

FF

U�D

2

13

FF

U�D

3

13

SPRAY NOZZEL

DC STARTER PANEL

EQUIP DUST SWITCH

SPARK PANEL

$F $F $F

FFU SWITCH

Storage

210c

Mech/Elec

221

Girls RR

218

Boys RR

219

Corridor

280

Elec

222

SCD

104300

DO

AS

�D2

(ON ROOF)

(ON ROOF)

(ON ROOF)

(ON ROOF)

30

/16

12

/6

8/6

10/1014/12

16/12

8/6

14/12

SCD

64150

30

/16

12

/10

EF�D1

12/12

EF�D5

12/12

DDCU�D2(ON ROOF)(ON ROOF)(ON ROOF)(ON ROOF)

CU�D3(ON ROOF)(ON ROOF)(ON ROOF)(ON ROOF)

T

ECG

1212

(TYP. 2) (TYP. 2)

W I L L I A M S O N

I V E RRHS

ETIHCRA C T S

1/8" = 1'�0"

Partial Unit 'D' Floor Plans

Moorefield High School

09/12/13

2012�021

JRP

sk$h1

Page 47: September 16, 2013 ADDITIONS AND RENOVATIONS TO …
Page 48: September 16, 2013 ADDITIONS AND RENOVATIONS TO …