september 10, 2012 gilruth center – alamo ballroom 9:00 a.m. – 11:00 a.m

118
September 10, 2012 September 10, 2012 Gilruth Center – Alamo Ballroom Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M. 9:00 A.M. – 11:00 A.M.

Upload: donald-lawrence

Post on 21-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

September 10, 2012September 10, 2012Gilruth Center – Alamo BallroomGilruth Center – Alamo Ballroom

9:00 A.M. – 11:00 A.M.9:00 A.M. – 11:00 A.M.

Page 2: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

2

WelcomeWelcome

Irene KayeIrene KayeStreamlined Procurement Team ChairStreamlined Procurement Team Chair

Page 3: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Restrooms can be found in the hallway outside this ballroom.

Fire exits are the front entrance and side exit doors. In the event of a fire, you must move at least 75 ft away from the building.

Fire Exits

Fire Exit

Fire Exit

Restrooms

Safety and Administrative InformationSafety and Administrative Information

3

Page 4: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Topic Presenter

Conference Registration 8:30 – 9:00

Welcome Irene Kaye

Opening Remarks Debra Johnson

Organization, Vision, and Objectives Vincent Watkins

Orientation and Procurement Overview Scott Stephens

SOW, J Attachments, and DRD Overview Irene Kaye

Overview of the Draft RFP NNJ12424577R Christina Hibbs

Section L – Instructions to Offerors Christina Hibbs

Section M – Evaluation Factors for Award Christina Hibbs

Small Business Charles Williams

Government Property Mike Puryear

Security Wayne Sings

Labor Relations Guidelines David Wilson

Safety and Health Programs David Loyd

Site Tour Cheryl Corbin

SMAEC Schedule and Closing Remarks Scott Stephens

4

Page 5: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

5

Opening RemarksOpening Remarks

Debra JohnsonDebra JohnsonDirector, Office of ProcurementDirector, Office of Procurement

Page 6: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

6

Organization, Vision, and ObjectivesOrganization, Vision, and Objectives

Vincent D. WatkinsVincent D. WatkinsDeputy Director, Safety and Mission Deputy Director, Safety and Mission

Assurance DirectorateAssurance Directorate

Page 7: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

7

Page 8: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

8

Vision: – A world leader in management of risk

Mission:– We identify, characterize, mitigate, and communicate risk

S&MA’s primary objective is to provide Government assurance that is critical to the success of human spaceflight. To achieve the S&MA Directorate’s vision and to support NASA’s goals, our contractor partners must provide world class skills for: – Excellence in engineering– A strong and influential safety culture– Sustainability of the safety and mission assurance disciplines

Page 9: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

9

Page 10: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

10

1.1 Create an atmosphere in which our employees can thrive by facilitating an inclusive environment where unique differences, viewpoints and talents are sought and respected.

1.2 Embrace continuous improvement through unique training programs, knowledge transfer, and customer feedback.

1.3 Develop new competencies through collaboration and non-traditional partnerships with internal and external organizations.

1.4 Reinforce organizational continuity through clear roles and accountability, succession planning, targeted recruitment, and career development for all employees.

Page 11: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

11

2.1 Influence culture through increased safety awareness and risk management.

2.2 Enable organizations to minimize mishaps, injuries, and asset losses.

2.3 Utilize analysis and investigation results for knowledge sharing and lessons learned.

2.4 Integrate risk-based analysis into management decisions to optimize risk trades.

Page 12: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

12

3.1 Lead human spaceflight risk management through world-class skills, proven methodologies, and state-of-the-art tools in safety, reliability, maintainability, and quality.

3.2 Tailor our requirements, products, and services to the specific needs of customers.

3.3 Invest in innovative technologies.

Page 13: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

13

4.1 Expand strategic partnerships to leverage our

competencies and processes.

4.2 Engage the U.S. and International assurance

communities to maintain awareness of advanced safety

trends in space flight and other high-risk operations.

4.3 Evolve S&MA capabilities to be more effective and

efficient through benchmarking best practices and

innovative solutions.

Page 14: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

14

Development of innovative approaches in leveraging existing capabilities to advance key human spaceflight safety and mission assurance technologies

Maintenance of an adequate critical skill mix in the face of static or declining budgets

Agility to respond to a changing environment Reduction or elimination of waste Receiving, Inspection, and Test Facility challenges

Page 15: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

15

Orientation and Procurement Orientation and Procurement OverviewOverview

Scott StephensScott StephensContracting OfficerContracting Officer

Page 16: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

These slides are not to be interpreted as a comprehensive description of the procurement strategy or requirements in the Draft Request for Proposal (DRFP)

To the extent there are any inconsistencies between this briefing and any future Request for Proposal (RFP), the RFP will govern

16

Page 17: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Purpose of Preproposal ConferencePurpose of Preproposal Conference

The purpose of this Preproposal Conference is to help Industry understand the Government’s requirements

Questions:– Verbal questions will not be entertained during the conference– Note cards are available to submit written questions– Responses to written questions will be provided during the Q&A session, but

shall not be construed as official answers– Official responses to written questions received by the Contracting Officer

will be posted to the SMAEC procurement website– After this conference, you may continue to submit written questions to the

Contracting Officer as described in the cover letter to the DRFP– The deadline for submitting questions regarding this conference and

the DRFP is 5:00 p.m. CDT on Monday, September 24, 2012

Note: This presentation is posted on the SMAEC website and is available for your reference

17

Page 18: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Source Selection Authority − Ellen Ochoa, Deputy Director, Johnson Space Center

Streamlined Procurement Team (SLPT)− Irene E. Kaye (NA), Chairperson− Stephen Gawenis (OE), Team Member− Scott Henricks (NT), Team Member − Gary Priest (NE), Team Member− Scott Stephens (BR), Contracting Officer− Christina Hibbs (BR), Contract Specialist

18

Page 19: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Contract Specialist: Christina [email protected](281) 483-8119

Contracting Officer:Scott [email protected](281) 792-7521

SMAEC Web Address: http://procurement.jsc.nasa.gov/smaec/−Click on the “Feedback - Anonymous Questions to Contracting

Officer” link to submit a question

19

Page 20: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Ombudsman (NFS 1852.215-84): “…before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the Contracting Officer for resolution … If resolution cannot be made by the Contracting Officer, interested parties may contact the installation ombudsman …”

JSC Ombudsman:Lauri Hansen/AC2101 NASA ParkwayHouston, TX 77058Phone: (281) 483-2823Email: [email protected]

20

Page 21: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

NASA Agency Ombudsman:NASA HeadquartersMail Code: LP011Washington, DC 20546-0001Phone: (202) 358-0445Email: [email protected]

21

Page 22: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Contract Number: NNJ06JE86C

Prime Contractor: Science Applications International Corporation (SAIC)

Contract Type: Cost Plus Award Fee (CPAF); 90% Level-of-Effort (LOE) and 10% Completion Form (CF)

Period of Performance: May 1, 2006 to April 30, 2013 (5 year base plus 2 year contract extension)

Estimated Value: $357 million

22

Page 23: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Skills currently provided on contract include:– Providing the Johnson Space Center (JSC) Safety and Mission

Assurance (S&MA) Directorate assistance in performing assurance, engineering, and risk assessment in the disciplines of safety, reliability, maintainability, supportability, availability, and quality

– Principal tasks support the overall NASA mission for human space flight which currently includes the International Space Station Program (ISSP), the Multi-Purpose Crew Vehicle (MPCV), the Extravehicular Project Office (EVA), and JSC Institutional S&MA

– Tasks are performed at JSC, White Sands Test Facility (WSTF), and vendor facilities both domestic and abroad. Tasks include the review of work performed by other contractors, the ISSP, International Partners, and other NASA organizations

23

Page 24: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

24

Page 25: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

25

SOW, J Attachments, and DRD OverviewSOW, J Attachments, and DRD Overview

Irene KayeIrene KayeStreamlined Procurement Team (SLPT), Streamlined Procurement Team (SLPT),

ChairChair

Page 26: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Section 1.0 – Contract Management (Firm-Fixed-Price)– The Contract Management section is comprised of activities that are fairly

constant, predictable, and provide the framework under which work ordered by Task Orders will occur

To be negotiated prior to the start of each FY with the technical work

– All work performed in support of any task order shall be charged to that task order which includes supervision

– Formal reporting through DRD 003, Integrated Technical Management Report and DRD 006, Contractor Financial Management Report

– All data shall be organized, controlled, and stored on NASA on-site IT equipment. Proprietary or non-standard applications, protocols, or IT systems shall not be utilized without prior NASA contractual authorization

26

Page 27: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Section 2.0 Technical Services– Contains all technical products and services that could be ordered on the contract

Section 3.0 Institutional– Receiving, Inspection, and Test Facility (RITF) – American Association for

Laboratory Accreditation (A2LA) and ISO/IEC 17025:2005, General Requirements

for the Competence of Testing and Calibration Laboratories accreditations required

– Pressure Systems – Personnel commissioned from the National Board of Boiler

and Pressure Vessels required

– Training for both RITF and other technical requirements

– Education and Outreach (new)

27

Page 28: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

All Section 2 and 3 products and services will be ordered through either completion form or term form (LOE) task orders (TOs)

All TO products are delivered per TO

The RFP includes 6 TOs that are examples of the effort for the first year

The sum of all of the TOs equal the expected work for FY 2014

28

Page 29: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The SLPT took a zero-based approach to DRDs. All DRDs associated with the current contract have been evaluated for inclusion in the new solicitation

Significant DRD changes anticipated include:

– Eliminated DRDs:

Contractor Quality Metrics Monthly Safety and Health Metrics Data Management Plan S&MA Personnel Qualification Program Plan S&MA Prelaunch Assessment Presentations Activity Reports Trend Analysis (JSC Systems) Report Evaluation Reports Assessment Plans and Reports

29

Page 30: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

DRD 001 Contract Management PlanDRD 002 Work Breakdown Structure and DictionaryDRD 003 Integrated Technical Management Report (Updated)DRD 004 Technology, Innovation, and Process Improvement Plan (TIPI) (New)DRD 005 External Customer Plan (New)DRD 006 Contractor Financial Management Report (Updated)DRD 007 Government Property Management Plan (Updated)DRD 008 Safety and Health PlanDRD 009 Safety and Health Program Self EvaluationDRD 010 Lessons Learned Program Plan DRD 011 Quality PlanDRD 012 Information Technology (IT) Capital Planning and Investment Control (CPIC) Document

(New)DRD 013 Information Technology (IT) Security Plan and Reports DRD 014 Total Compensation Plan DRD 015 Reports Required for Logistics (New)DRD 016 Contract Closeout Plan (New)DRD 017 Facilities System Certification ReportDRD 018 Reprocurement Data PackageDRD 019 Contract Phase-In PlanDRD 020 Organizational Conflicts of Interest (OCI) Mitigation Plan (New)DRD 021 Environmental and Energy Consuming Product Compliance Reports (New)DRD 022 Wage/Salary and Fringe Benefits Data Provision L18.4 Small Business Subcontracting Plan

Blue – Due with proposalGreen – Due in accordance with DRL

30

Page 31: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

J-1 Applicable Documents ListJ-2 Data Requirements List (DRL) and Data Requirements Descriptions (DRD) J-3  Reserved J-4  Reserved J-5 Installation Accountable Government Property List J-6  Organizational Conflict of Interest (OCI) Mitigation Plan J-7     Safety and Health Plan J-8            Small Business Subcontracting Plan J-9            Information Technology (IT) Security Program Plan and ReportsJ-10          Government Property Management Plan J-11          Contract Phase-In PlanJ-12          Award Fee PlanJ-13          Wage Determination J-14          Contract Work Breakdown Structure (WBS) and DictionaryJ-15          Contract Management PlanJ-16          Quality PlanJ-17          External Customer PlanJ-18          Technology, Innovation, and Process Improvement (TIPI) PlanJ-19          Standard Labor Categories (SLCs)J-20          Government-Furnished Websites and DatabasesJ-21          Contract Closeout Plan J-22          Acronyms

Blue – Provided by the Government Red – Provided by the Offeror

31

Page 32: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

DRD 004, Technology, Innovation, and Process Improvement Plan and Report (TIPI) Plan– The contractor shall develop and implement a plan to continuously

identify and propose initiatives to infuse advanced technology, innovations, and industry best practices, that promote improvements in quality, capability, and overall efficiency

– If approved by NASA, the initiatives will be implemented through TOs

DRD 005, External Customer Plan– Recruit and secure external customers for the purpose of retaining skills

and offsetting the Government’s cost of maintaining and improving technical capabilities

– An example Estimated Price Report (EPR) for the RITF is in the Technical Library

32

Page 33: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

DRD 012, Information Technology (IT) Capital Planning and Investment Control (CPIC) Document – Requirement is on the current contract but was not a DRD

DRD 015, Reports Required for Logistics– This report is only required when program stock in on-site storage in one location

exceeds $75,000

DRD 016, Contract Closeout Plan– This is a new requirement

DRD 020, Organizational Conflicts of Interest (OCI) Mitigation Plan– Requirement is on the current contract but was not a DRD

DRD 021, Environmental and Energy Consuming Product Compliance Reports– Requirement is on the current contract but was not a DRD

33

Page 34: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

DRD 003, Integrated Technical Management Report

Highlights Intent is to capture all reporting in one DRD

– Example requirements for monthly management and technical reporting include: Safety Cost performance by task order Product Completion and Schedule Summary Technology, Innovations, and Process Improvement Status External Customer Status

34

Page 35: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Award Fee Evaluation Plan Attachment J-12

Evaluation Criteria Weighting

1. Management Performance 15%

Program ManagementSchedule Performance

Technology, Innovation, and Process ImprovementsExternal Customer Development

2. Technical Performance 40%

Quality of WorkSchedule Performance

3. Cost (Objective Metric) 25%

4. Small Business Goals (Objective Metric) 10%

5. Safety and Health 10%

35

Page 36: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Access to the SMAEC Online Technical Library– http://procurement.jsc.nasa.gov/SMAEC/

What it is:– Contains SMAEC technical data associated with the SOW, Task Orders and other

contract requirements

Why it is important:– Data can be accessed by prospective Offeror for review and subsequent use in

development of proposals

Updates:– The SMAEC Technical Library was updated for the release of the Draft RFP

– Will be updated prior to Final RFP release

– Final RFP release is planned for 11/10/2012 at which time the Online Technical Library will be frozen

– Any updates will be announced on the SMAEC website

36

Page 37: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

37

Overview of the Draft RFP Overview of the Draft RFP NNJ12424577RNNJ12424577R

Christina HibbsChristina HibbsContract SpecialistContract Specialist

Page 38: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

If an RFP is issued, the actual issued RFP and amendments take precedence over this conference or any Draft RFP issued

The Proposed Solicitation will be a Full and Open Competition

Explanation of “OFI” and “TBD”– OFI = Offeror Fill In

These areas to be filled in by the Offeror and submitted with the proposal– TBD = To be Determined

These areas will be filled in by the Government at a later date

When reading the Draft RFP, note that: Important information is contained in the SF33 and numerous clauses and

provisions that have been incorporated, via full text and/or referenced text, throughout the document

Clauses incorporated by reference have the same force and effect as if they were included in their full text

38

Page 39: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Complete, sign, and date the Standard Form 33 (SF 33)

Offerors shall insert “240” into Block 12 of Standard Form 33, Solicitation, Acceptance, and Award −Per provision L.16, Proposal Acceptance Period

39

Page 40: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

B.2, Contract Type:− Indefinite Delivery/Indefinite Quantity (IDIQ), comprised of:

Cost-Plus-Award-Fee (CPAF) task orders (TOs)− These TOs may be either completion form or term form level-of-effort

Firm-Fixed-Price (FFP) TOs− The phase-in effort will be FFP

B.3, IDIQ Maximum and Guaranteed Minimum Quantity of Work− Maximum not-to-exceed (NTE) amount: $150,000,000− Guaranteed Minimum amount: $100,000

B.5, Contract Value− Offeror to fill in the phase-in price in B.5(a)

40

Page 41: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

B.8, Fully Burdened Rate Table for Pricing Cost Reimbursement Task Orders− Propose all fully-burdened labor rates (exclusive of fee) in Table B-1− Propose Indirect Cost Rate to be applied to Non-Labor Resources if required by a

task order − Propose NTE Award Fee Rate

B.9, Fully Burdened Rate Table for Pricing Firm-Fixed-Price Task Orders− Propose all fully-burdened labor rates in Table B-2

B.10, Required Level-of-Effort for Term Form Task Orders− Because this is an IDIQ contract, term form task orders will be issued as work is

required− The Contractor shall provide between 95% and 105% of the cumulative amount of

direct labor hours ordered on these task orders− This cumulative amount of direct labor hours shall not exceed 105% of 369,000

hours for the base period of performance

41

Page 42: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

F.3, Completion of Work and Period of Performance−Phase-In Period: 8/02/13 to 9/30/13−Basic Contract: 10/01/13 to 9/30/16

F.5, Option to Extend−Option 1:

Increases the required level-of-effort hours in B.10 by 123,000 hours Extends period of performance end date to 9/30/17

−Option 2: Increases the required level-of-effort hours in B.10 by 123,000 hours Extends period of performance end date to 9/30/18

42

Page 43: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

F.6, IDIQ Maximum Flex Options−Allows the Government to increase the maximum NTE amount in

clause B.3 by up to $52,500,000

−This may be done through the exercise of one or more of the following IDIQ maximum flex options: IDIQ Maximum Flex Option 1:

− Increases the NTE amount in clause B.10 by $15,000,000 IDIQ Maximum Flex Option 2:

− Increases the NTE amount in clause B.10 by an additional $15,000,000 IDIQ Maximum Flex Option 3:

− Increases the NTE amount in clause B.10 by an additional $22,500,000

−These IDIQ Maximum flex options may be exercised at any time during the period of performance

43

Page 44: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

F.7, Required Level-of-Effort (LOE) Flex Options−Allows the Government to increase the amount of LOE direct labor

hours required to be furnished in Clause B.10 by up 161,500 hours

−This may be done through the exercise of one or multiple LOE flex

options

−These LOE flex options may be exercised at any time during the

period of performance

44

Page 45: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

G.4, Submission of Vouchers for Payment (NFS 1852.216-87)

−Offeror to fill in Cognizant DCAA Mailing Address in G.4(c)(1)

G.10, Security/Badging Requirements for Foreign National Visitors

and Employees/Representatives of Foreign Contractors (JSC 52.204-

91)

−Read this clause thoroughly and understand that the badging

process can be lengthy

45

Page 46: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

H.2, Limitation on Future Contracting (NFS 1852.209-71)−A limitation on future contracting opportunities may be imposed if it

is determined that an Organizational Conflict of Interest (OCI) issue cannot be adequately mitigated

H.3, Task Ordering Procedure−This clause describes the process for issuing task orders to the

Contractor

H.9, External Customer Effort−The primary purpose of this clause is to enable external customer

use of the Receiving, Inspection and Test Facility (RITF) under this contract

46

Page 47: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

I.1, Central Contractor Registration (52.204-7)−Offeror is responsible for updating and/or completing

company information prior to proposal submission −Processing time, which normally takes 48 hours, should be

taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation

−Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data

47

Page 48: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The Offeror shall fill in all required elements of this section K.3, Annual Representations and Certifications (52.204-8) −The Offeror shall complete the annual representations and

certifications electronically via the Online Representations and Certifications Application (ORCA) website accessed through https://www.acquisition.gov

48

Page 49: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

49

Section L – Instructions to OfferorsSection L – Instructions to Offerors

Christina HibbsChristina HibbsContract SpecialistContract Specialist

Page 50: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The Offeror’s proposal shall:− Demonstrate understanding of the overall and specific requirements of

the proposed contract;− Convey the company’s capabilities for transforming understanding into

accomplishment;− Provide in detail, the plans and methods for so doing; and − Provide the price associated with doing so Demonstrate that the Offeror understands the requirements

and the inherent risks associated with the objectives of this procurement

It is inadequate to simply state that the Offeror understands and will comply with the requirements, or to paraphrase the requirements

50

Page 51: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

51

Volume No. Title Page Limits Electronic FormatI Technical Acceptability 170

Contract Management Plan (DRD 001) Included in 170 MS Word

Contract Work Breakdown Structure (WBS) and Dictionary (DRD 002)

Included in 170 MS Word

Total Compensation Plan (DRD 014)Not included in 170, but limited to 25 pages

MS Word

Contract Phase-In Plan (DRD 019) Included in 170 MS Word

Safety and Health Plan (DRD 008)Not included in 170, but limited to 40 pages

MS Word

Technology, Innovation, and Process Improvement Plan (DRD 004)

Included in 170 MS Word

External Customer Plan (DRD 005) Included in 170 MS Word

Small Business Subcontracting Plan Included in 170 MS Word

Narrative - Commitment to the Small Business Program

Included in 170 MS Word

Technical Approach - NarrativeSpecific Technical Understanding and Resources

Included in 170 Note: TRST* is not included in the page count

MS Word

Page 52: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

52

Volume No. Title Page Limits Electronic Format

II Past Performance 100Past Performance Description Included in 100 MS Word

Program Manager Letter of CommitmentNot included in 100, but limited to 1 page

MS Word

Past Performance Attachments

Note: Safety and Environmental Data, as well as Insurance Information, is not subject to page count limitations

MS Word

III Cost/Price Proposal Not LimitedCost Narrative Not Limited MS WordTemplates Not Limited MS Excel

Page 53: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

53

Volume No. Title Page Limits Electronic Format

IV Other Proposal Requirements Not Limited

Organization Conflict of Interest Mitigation Plan (DRD 020)

Not Limited MS Word

Government Property Management Plan (DRD 007)Response to Provision L.12, “GOVERNMENT PROPERTY MANAGEMENT INFORMATION” (NFS 1852.245-80). Title the response “1852.245-80 Data.”

Not Limited MS Word

V Model Contract Not Limited

Sections A-J, with all fill-ins completed, and Section K, Representations and Certifications, with all fill-ins completed

Not Limited MS Word

Page 54: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

This acquisition will be conducted using JSC’s Streamlined Procurement Process

L.18.3, Performance Price Tradeoff (PPT) Instructions– This procurement will be conducted using a combination of

technically acceptable baseline requirements (Technically Acceptable/Technically Unacceptable), past performance, and cost/price

– The Government seeks to select an offeror whose proposal represents the best value after evaluation

– The baseline requirements are considered as basic government needs in determining technical acceptability

54

Page 55: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

An initial review will be conducted to determine the technical acceptability of the proposals

– Overall Management Approach– Technical Approach

All technically unacceptable proposals will be eliminated from further evaluation

55

Page 56: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Overall Management Approach– The Offeror shall demonstrate their overall management approach

by providing the following: DRD 001, Contract Management Plan DRD 002, Work Breakdown Structure and Dictionary DRD 014, Total Compensation Plan DRD 019, Contract Phase-in Plan DRD 008, Safety and Health Plan DRD 004, Technology, Innovation, and Process Improvement Plan DRD 005, External Customer Plan Small Business Subcontracting Approach

56

Page 57: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Technical Approach– The Offeror shall demonstrate their understanding of the

requirements outlined in the Representative IDIQ Task Orders and the functions listed under SOW Section 3.2, Pressure Systems

– The Offeror shall provide the following: Technical Understanding of Requirements Basis of Estimate (BOE) & Efficiencies Proposed Resources (Labor and Non-Labor)

57

Page 58: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Representative IDIQ Task Orders (TOs)– These TOs are intended to be representative of the work expected

to be executed under the SMAEC contract

58

Task Order

Task Order Number

TitleReference Attachment

1 TO-RFP-01 Contract Management and Reporting/FFP L-1-2

2 TO-RFP-02ISS Safety and Mission Assurance Integration Support/CF

L-1-6

3 TO-RFP-03 EVA Projects Support/CF L-1-9

4 TO-RFP-04ISS Safety and Mission Assurance Integration Avionics Software Support/CF

L-1-13

5 TO-RFP-05Receiving Inspection Test Facility (RITF) Operations/CF

L-1-16

6 TO-RFP-06Safety and Mission Assurance Term Form Support/Term Form

L-1-19

Page 59: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Provide information on up to 3 past contracts for:– The Offeror

– Each major subcontractor (subcontracts estimated annual value

greater than $1,000,000)

– The proposed Program Manager

– Each team member or subcontractor company involved in a

proposed joint-venture (if applicable)

59

Page 60: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Past Performance Description– References with Government contracts are preferred, but not required

– Offerors shall consider relevancy, recency, and magnitude of the effort(s) as they

relate specifically to this requirement

Environmental Data – For all work performed during the past 3 years

Safety Data – For all work performed during the past 3 years

Small Business Performance– Provide a statement of small business participation over the last 3 years on work that

is relevant to this effort

60

Page 61: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Past Performance Questionnaires (Attachment L-3)

– Completed Past Performance Questionnaires shall be sent directly to the

Contracting Officer

– The Offeror is responsible for ensuring that questionnaires are submitted in

time

Program Manager Letter of Commitment (Attachment L-6)

– Provide evidence of commitment to the program for the proposed Program

Manager

61

Page 62: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The Cost/Price Proposal includes the following workbooks:– Technical Workbook (Attachment L-4)– IDIQ Workbook (Attachment L-8)– Other Supporting Data Workbook (Attachment L-9)

A pricing WebEx will be held on Monday, September 17, 2012 from 9:00 a.m. to 10:30 a.m. CDT to provide detailed understanding and instructions on how to prepare the cost proposal

Further information regarding how to RSVP and request log-in instructions for the WebEx is available on the acquisition website

62

Page 63: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

This following information is required to determine responsibility in accordance with FAR 9.104-1, General Standards

– Organizational Conflict of Interest Information 1852.209-71, Limitation on Future Contracting 1852.237-72, Access to Sensitive Information 1852.237-73, Release of Sensitive Information

– Business Systems Adequacy The Offeror shall demonstrate in the Cost/Price Proposal that the accounting system

they have in place is adequate The Offeror shall provide an adequate disclosure statement, if required, per

Provision K.13, Cost Accounting Standards Notices and Certification (52.230-1)

– Government Property DRD 007, Government Property Management Plan, and NFS 1852.245-80,

Government Property Management Information Note: The Contractor shall perform the logistical and property management,

shipping, and receiving processes under this contract

63

Page 64: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

64

Contract Section Areas of Model Contract Offerors are Required to CompleteSection A Complete, sign, and date the SF 33 Section B B.5(a) - Fill-in total firm-fixed price of all phase-in effort

B.8(a) - Complete the table of Fully Burdened Labor Rates for Cost Reimbursable TOs  B.8(c) - Fill-in award fee for TOs  B.9(a) - Complete the table of Fully Burdened Labor Rates for the Firm-Fixed-Price

TOSection C Statement of Work – Add descriptive language in the appropriate SOW section.Section D NoneSection E NoneSection F NoneSection G G.4(c)(1) insert cognizant DCAA office, Supervisory Auditor, Address, Telephone

Number, Fax Number, and E-Mail AddressSection H NoneSection I NoneSection J Offerors will submit the required documentsSection K Offerors to fill in required elements

Page 65: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

65

Section M – Evaluation Factors for AwardSection M – Evaluation Factors for Award

Christina HibbsChristina HibbsContract SpecialistContract Specialist

Page 66: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The Offeror’s initial proposal should contain the best terms from a price and technical standpoint

The Government preference is to award without discussions, however, the Government reserves the right to conduct discussions with those Offerors who have made it to competitive range

If discussions are held, the Offeror will:−Have the opportunity to correct areas of concern and; −Be requested to resubmit the SF33 with Final Proposal Revisions

(FPR) which will include clearly marked changes

66

Page 67: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Instructions for proposal arrangement, page limitations, copies and due dates are specified in Section L.18.2.

− Offerors shall submit their proposals in accordance with those instructions− Pages and foldouts not conforming to the definition of a page will not be

evaluated by the Government and will be returned to the Offeror− Note: This is a change from the Draft RFP

− Pages submitted in excess of the limitations specified will not be evaluated by the Government and will be returned to the Offeror

− For example, Volume I has a page limit of 170 pages with Times New Roman 12 point font and one-inch margins. If an Offeror submits this volume with 175 pages, two of which contain tables with 10 point font, the final 5 pages of Volume I and the two pages of tables with 10 point font [if those two pages of tables in 10 point font were not removed as a result of excess pages] will be returned to the Offeror and will not be evaluated

67

Page 68: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Pay close attention to ensure that the number of pages, page margins, font type, font size, and page size are in conformance to Section L.18.2

Please note page limitations—Some volumes/sections are subject to a page limitation and others are not

In the Past Performance Volume, the Past Performance Description is subject to the page limit of 100 pages, but the Safety Data, Environmental Data, Insurance Information, and Program Manager Letter of Commitment are not subject to the 100 page limitation

—Proposal information must be provided in the correct volume—Proposal information in a page-limited volume or section should not be

moved to another volume/section without such page limitations

►Having non-conforming pages returned may affect the Government’s evaluation of a proposal, and how this proposal is ultimately rated

68

Page 69: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Initial review of proposals to determine acceptability of the proposals in accordance with NFS 1815.305-70, Identification of Unacceptable Proposals

– All unacceptable proposals will be eliminated from further evaluation

Remaining proposals will be evaluated against the Technical Acceptability requirements

69

Page 70: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

All Technically Acceptable and Potentially Acceptable Offerors will be evaluated against past performance and cost/price

For those Offerors determined to be Technically Acceptable, tradeoffs will be made between past performance and cost/price

– Past performance is significantly more important than cost/price

70

Page 71: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Technical Acceptability will be rated as one of the following:

− Acceptable: ALL Technical Acceptability subfactors must be passed

− Potentially Acceptable: After the initial evaluation, the proposal does not have an

Unacceptable rating for any of the Technical Acceptability subfactors and the Government anticipates the provision of additional information during discussions could result in a proposal rating of “Acceptable”

− Unacceptable: The proposal does not meet the Government’s requirements

71

Page 72: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Past Performance information will be gathered from:

− Proposal data required by provisions of Section L,

− References contacted directly by NASA, and

− Other information NASA obtains from government or

commercial sources, such as information from the Past

Performance Information Retrieval System

72

Page 73: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Past Performance will be evaluated for recency and relevancy

− Recency: Contracts: within the past 3 years

Program Manager past performance: within the past 5 years

− Relevancy: Very Relevant

Relevant

Somewhat Relevant

Not Relevant

73

Page 74: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Offeror Past Performance Confidence Rating will be assigned as follows:

− Very High

− High

− Moderate

− Low

− Very Low

− Neutral

74

Page 75: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

To ensure that the final agreed-to prices are fair and reasonable, the Government will perform price analysis and will also perform cost analysis to include a cost realism analysis

75

Page 76: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

For those Offerors who are determined to be technically acceptable, tradeoffs will be made between past performance and cost/price

− Past performance is significantly more important than cost/price

If all offers are of approximately equal past performance, award will be made to the Offeror with the lowest most probable cost/price

The Government will consider awarding to an Offeror with higher past performance if the difference in probable cost/price is commensurate with added value

The Government will consider making award to an Offeror whose offer has lower past performance if the probable cost/price differential between it and other offers warrant doing so

76

Page 77: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The following information will be used to determine eligibility in accordance with FAR 9.104-1(g):

− Organizational Conflict of Interest (OCI) Information The Government will perform an analysis to ensure an OCI issue that cannot be

mitigated does not exist

− Business Systems Adequacy This contract may only be awarded to an Offeror with an accounting system

determined by the Government to be adequate for determining costs applicable to the contract

The disclosure statement, if required, will be evaluated for adequacy

− Government Property Approach The Government Property Management Plan will be assessed to determine

whether the Offeror will adequately manage government property used for the performance of the SMAEC requirements

77

Page 78: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The model contract will not be evaluated for selection purposes

It will be reviewed to ensure: − It was signed by a person authorized to commit the Offeror,

− There is completion of all fill-ins, and

− It accurately captures the content as set forth in the Offeror’s proposal

Errors or inconsistencies in the Model Contract may result in an offeror being removed from consideration for award

78

Page 79: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

NOTE TO PROSPECTIVE OFFERORS

Prospective Offerors are reminded not to contact incumbent personnel (either directly or through electronic means) during duty hours or at their place of employment, as such contacts are disruptive to the performance of the current contract

79

Page 80: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

80

Small BusinessSmall Business

Charles T. WilliamsCharles T. WilliamsSenior Small Business SpecialistSenior Small Business Specialist

Page 81: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

This solicitation contains FAR clause 52.219-9, “Small Business Subcontracting Plan with Alternate II”

There are 11 main elements. You must address each element

Commitment to Small Business section

81

Page 82: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

82

Category Goal

Small Business 25.0%

Small Disadvantaged Business 5.0%

Woman-Owned Small Business 7.0%

HUBZone 4.0%

Veteran-Owned Small Business 5.0%

Service-Disabled, Veteran-Owned Small Business 4.0%

HBCU 1.0%

Page 83: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

83

  Column A Column B Column C

Business Category Goal as Percent of Contract Value

Dollar Value to be subcontracted per

Category

Goal as Percent of Subcontracting

Value

Small Business Concerns

Large Business Concerns

Total Dollars to be Subcontracted

Subcategories of Small Business Concerns

Women Owned Small Business Concerns

Small Disadvantaged Business Concerns

Veteran Owned Small Business Concerns

Service-Disabled Veteran-Owned Small Business Concerns

HUBZone Small Business Concerns

Minority Serving Institutions

Page 84: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

84

  Column A Column B Column CBusiness Category Goal as Percent of

Contract ValueDollar Value to be subcontracted per

Category

Goal as Percent of Subcontracting

ValueSmall Business Concerns 25 percent $25,000,000 50 percentLarge Business Concerns n/a $25,000,000 50 percentTotal Dollars to be Subcontracted n/a $50,000,000 100 percent

The following small business subcategories do not necessarily add up to the percentage and dollar amount in the “Small Business Concerns” category above, since some small businesses do not fall into any of the subcategories below, while others will fall into more than one subcategory below.

Subcategories of Small Business Concerns

Women Owned Small Business Concerns 9 percent $9,000,000 18 percent

Small Disadvantaged Business Concerns 5.0 percent $5,000,000 10 percentVeteran Owned Small Business Concerns 2.5 percent $2,500,000 5 percentService-Disabled Veteran-Owned Small Business Concerns

1.5 percent $1,500,000 3 percent

HUBZone Small Business Concerns 1.5 percent $1,500,000 3 percentMinority Serving Institutions 1.5 percent $1,500,000 3 percent

Page 85: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

85

Company Name DUNS/ Cage

CodeType of

BusinessNAICS SOW Ref. Dollar Value

XYZ Corp 123456789 SB, SDB 811212 3.2 $400,000

Acme Ltd.5KWH50 Large 541579 2.1 $1,520,000

Smith & Jones

VOSB, SDVOSB

541512 2.4 $4,650,000

Total $6,570,000

Page 86: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

86

Government PropertyGovernment Property

Mike Puryear, CPPM, CFMike Puryear, CPPM, CFContract Property AdministratorContract Property Administrator

Page 87: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

1. What is the significance of the date June 2007?

2. What is APP and will you have any on this contract?

3. What are “voluntary consensus standards”?

4. What does “Relief of stewardship” refer to and how would it be reflected on a NASA 1018 report?

5. Is there a difference between Installation Accountable Government Property and Government Furnished Property and what, if any, is the impact on the contractor?

6. Is there a difference between transfer of accountability and transfer of responsibility and what, if any, is the impact on the contractor?

87

Page 88: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

7. True or False? The only expense you must include in establishing the cost of purchased or fabricated items is direct material and direct labor costs.

8. True or False? The term “property” includes both materials and equipment regardless of unit cost?

9. True or False? There is no minimum dollar threshold in regards to reporting and managing NASA property.

10. True or False? There are 11 property management “outcomes” you must follow.

11. True or False? There is no difference between transfer of accountability and transfer of responsibility.

12. True or False? There is no experience needed to perform property management and anyone can do it successfully!

88

Page 89: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

89

SecuritySecurity

Wayne SingsWayne SingsSecurity SpecialistSecurity Specialist

Page 90: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

90

David WilsonDavid WilsonJSC Contractor Industrial Labor Relations OfficerJSC Contractor Industrial Labor Relations Officer

Labor RelationsLabor Relations Guidelines for Responding to Labor Relations Guidelines for Responding to Labor Relations

Requirements in the Draft Request for Proposal (DRFP)Requirements in the Draft Request for Proposal (DRFP)

Page 91: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Wage Determination

Data Requirements Descriptions

References (Regulations and Clauses)

91

Page 92: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

WD 2005-2516, Revision 15 is applicable to this contract, and will be included in Attachment J-13 of the RFP and resultant contract. Also included is the Standard Form (SF) 98a– This WD applies to all non-exempt labor categories, and sets forth

the minimum wages and fringe benefits for these categories– The purpose of the SF 98a is to identify the non-exempt labor

categories in the SMAEC effort, and to map these categories to categories in the corresponding wage determination Total Compensation Template (a) must be consistent with this SF98a

92

Page 93: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Total Compensation Plan (DRD 014)

Wage/Salary and Fringe Benefit Data (DRD 022)

93

Page 94: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The Total Compensation Plan will identify and discuss wages, salaries, and fringe benefits for professional employees and non-exempt service employees in all proposed labor categories

The Total Compensation Plan and Total Compensation Templates (a) through (e) will be required for both the prime team members and all subcontractors that meet the criteria in NFS 1852.231-71(d)– Total Compensation Templates (a)-(e) will be provided in the

Cost/Price volume

This DRD is due with the proposal; and is updated 3 years following contract award or upon any major changes to the TCP

94

Page 95: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

This DRD is used by the NASA Contracting Officer (CO) to assist in the monitoring of Service Contract Act compliance

This DRD is due 15 days prior to the end of the phase-in period, and 90 days prior to the anniversary dates of the contract

Offerors will submit data on their labor categories, and map these categories to the wage determination

Offerors will provide detailed information on the fringe benefits offered to service employees

95

Page 96: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

96

Reference Title

FAR Part 22 Application of Labor Laws to Government Acquisitions

FAR 52.222-41 Service Contract Act

NFS Part 1822 Application of Labor Laws to Government Acquisitions

29 CFR 541 Defining and Delimiting the Exemptions for Executive, Administrative, Professional, Computer, and Outside Sales Employees

Page 97: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

97

David LoydDavid LoydSafety and Test Operations DivisionSafety and Test Operations Division

Safety & Health ProgramsSafety & Health Programs Guidelines for responding to Safety Requirements in Guidelines for responding to Safety Requirements in

the Draft Request for Proposal (DRFP)the Draft Request for Proposal (DRFP)

Page 98: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

NASA safety objective is to avoid loss of life, personal injury and illness, property loss or damage, environmental harm resulting from any of its activities and to ensure safety and healthful conditions for persons working at or visiting NASA facilities

NASA shall comply with all applicable regulations– NASA Safety & Health requirements– Requirements of those federal agencies with regulatory authority

over NASA such as OSHA, EPA, and DoT

NASA requires every employee to report workplace hazards– NASA ensures that there is no reprisal to personnel for reporting

unsafe or unhealthy conditions

98

Page 99: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The NASA Safety Policy stresses the individual responsibility of each employee for their own safety and that of their co-worker. Risk within the work environment must be managed to control hazards and continuously improve workplace conditions

The Occupational Safety & Health Administration (OSHA) has recognized JSC as a leader in health and safety by awarding the “Star” designation level of achievement in the Voluntary Protection Program (VPP)

As a VPP Star, JSC is recognized as having a comprehensive and successful safety and health program, is below the national average for the industry in injury/illness rates, has demonstrated good faith in working with OSHA, and serves as a safety & health mentor to regional industry

99

Page 100: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

All contractors performing work at JSC shall comply with all applicable safety and health regulations

Every major onsite contractor shall have a designated safety official and shall conform to a written safety and health plan

Safety and health approach shall follow OSHA, JSC, and VPP guidelines

Failure to comply with safety and health requirements may result in one or more of the following - contract termination, lower fee, or exclusion from future contract awards

100

Page 101: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Submission of detailed safety and health data as part of the proposal including:– Safety & Health Plan which shall include a detailed discussion of

the policies, procedures, and techniques that will be used to ensure the safety and occupational health of your employees and to ensure safe working conditions throughout the performance of the contract

– Statement regarding past OSHA and EPA citations and corrective actions taken to prevent recurrence

– Records of OSHA recordable injuries (OSHA 300 and 300A Logs & calculated frequency rates)

– Insurance carrier information - including Experience Modifier Rates (EMR)

101

Page 102: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Based on 4 Basic VPP elements defined by OSHA Region VI

102

Management (Commitment)Employee (Involvement)

Safety and HealthTraining

Worksite Analysis Hazard Preventionand Control

Page 103: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Safety & Health Plan provisions you should expect to address on a typical JSC service contract– Management Leadership and Employee Involvement

Policy, Goals and Objectives - Discuss company policies, goals and objectives for safety and health and top leadership’s level of commitment for achieving objectives

Management Leadership and Employee Participation - Discuss visible leadership actions that motivate and reinforce safety and health performance and discuss meaningful opportunities for employees to engage and support the safety and health program

Assignment of Responsibility – Discuss roles, responsibilities and accountability of safety representatives

Program Evaluation – Discuss annual evaluation of safety and health program consistent with OSHA’s VPP criteria

103

Page 104: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Worksite Analysis– Hazard Identification – Describe the methods and techniques

used to systematically identify hazards– Inspections – Describe the procedures and frequency for regular

inspections and who will be accountable for implementing corrective measures

– Employee Reports of Hazards – Describe the methods to be used to encourage employees to report hazards and how the reports will be analyzed and resolved

– Mishap Investigations – Discuss methods of response, reporting, and investigation of mishaps

– Trend Analysis – Discuss approach in performing trend analysis and methods of documenting data

104

Page 105: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Hazard Prevention and Control– Discuss the approach to be used for selecting controls appropriate to the

hazardous operations associated with this contract Maintain a list of hazardous operations and processes Develop written procedures to identify safety procedures Describe methods for notification of personnel

– Medical (Occupational Healthcare) Program –describe medical surveillance program, response to injuries & illnesses, case management

– Disciplinary System – approach to modify behaviors– Emergency Preparedness – approach used for emergency preparedness

and contingency planning that addresses fire, explosion, weather, environmental releases or other potential emergencies

105

Page 106: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Safety and Health Training– Program Description – describe your training program to

ensure safe work practices, hazard recognition and to meet all regulatory requirements

– Tailor training toward specific audiences – managers, supervisors, employees (crafts, office workers, etc.)

– Train for emergencies – fire drills, evacuation drills, site emergencies

106

Page 107: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Pay special attention to the miscellaneous reports contained in the body of the Safety & Health Plan DRD under Other Deliverables – building fire warden roster; hazardous materials inventory; roster of terminated employees; material safety data sheets; OSHA logs; program self evaluation

Tailor your plan to what you will do on the contract Review the requirements provided in JSC Safety and Health

Handbook (JPR 1700.1) http://jschandbook.jsc.nasa.gov and describe how you will incorporate JSC requirements into your Safety & Health Program

For the good of your employees and your business, take safety seriously and proactively plan to PREVENT injuries

107

Page 108: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

108

Receiving, Inspection and Test FacilityReceiving, Inspection and Test FacilitySite TourSite Tour

Cheryl CorbinCheryl Corbin

Page 109: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Tours are designed to provide potential Offerors with a better understanding of the Receiving, Inspection, and Test Facility (RITF)

Tours will include:– A technical overview of the facility– An overview of the work that the Safety and Mission

Assurance Support Contract (SMASS) contractor currently performs in the facility

109

Page 110: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The RITF effort will be established by Task Orders once the contract has been awarded– The Representative RITF Task Order, in the Draft RFP,

outlines the effort to be covered by your proposal

Any questions regarding the Draft Request For Proposal (DRFP) or the effort that may be performed under the SMAEC contract should be addressed to the SMAEC Contracting Officer at this meeting, via email, or through the SMAEC website– Tour guides will not be responding to DRFP questions

110

Page 111: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Questions on the tour will be limited to the technical aspects of the facility

Those who have registered for the Site-Tour must pick up a badge at the sign-in desk immediately following the conference– Please have your Drivers License– You must have a badge to board the Tour Bus– Buses depart from the Gilruth main entrance, please arrive 15

minutes before departure There are three tours (they are exactly the same), tours

are one hour long, please note your group assignment– Group A departs at 1:00 pm– Group B departs at 2:00 pm– Group C departs at 3:00 pm

111

Page 112: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

The site tour may require walking on uneven surfaces and using stairways

Please, no open-toed shoes or shorts In the event of a fire alarm follow your tour guide to exit

the building and assemble at the muster site Cell phones should be on vibrate or turned off during the

entire tour Please, no food or drinks on the tour Be mindful of tight spaces

– Recommend not bringing laptops or backpacks on the tour

112

Page 113: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

113

SMAEC Schedule and Closing RemarksSMAEC Schedule and Closing Remarks

Scott StephensScott StephensContracting OfficerContracting Officer

Page 114: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

114

Release Draft RFP August 28, 2012

Preproposal Conference September 10, 2012

Draft RFP Cost/Pricing WebEx September 17, 2012

Draft RFP Questions Due September 24, 2012

Release Final RFP November 9, 2012

Proposals Due December 21, 2012

Contract Award May 3, 2013

Phase-In Begins August 2, 2013

Contract Start October 1, 2013

Page 115: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

115

Topics covered today are not inclusive and potential Offerors should not place any added emphasis based on the content of this briefing

Information provided today is to assist in the development of proposals; however, the Final RFP will take precedence over information provided in this presentation

Email the Contracting Officer per the guidance on the SMAEC website if you wish to participate in the Cost and Pricing WebEx to be held online next Monday, September 17, 2012, 9:00-10:30 a.m. CDT (Deadline to respond is this Friday, September 14, 2012 at noon CDT).

Continue to monitor the NASA Acquisition Internet Service (NAIS) and SMAEC website for information related to SMAEC

Page 116: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

116

For your proposal to be considered timely, your package must be delivered to Building 420 by the due date and time stated in the RFP

Review all proposal delivery instructions with your courier to stress the importance of timeliness and the proper location of delivery◦ Shipping and Receiving will give your courier a receipt of delivery

When delivering a proposal in person, remember to deliver the proposal through Gate 4, and not through the Central JSC Gate 1◦ Directions to Gate 4 are in the proposal instructions

Allot at least 48 hours to over-night a proposal through a mail carrier◦ A commercial/government mail carrier may have a mechanical breakdown or otherwise fail to

deliver in a timely manner If you choose to deliver in person on the due date, remember that late flights, traffic

jams, and congestion in the JSC area may affect the timeliness of your proposal Review the proposal instructions, coordinate with the point of contact in advance of

the delivery, and ask questions if any instructions are not clear Review paragraph (c)(3) of FAR 52.215-1,“Instructions to Offerors – Competitive

Acquisition”

Page 117: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

117

Page 118: September 10, 2012 Gilruth Center – Alamo Ballroom 9:00 A.M. – 11:00 A.M

Thank you for attending the Thank you for attending the Johnson Space CenterJohnson Space Center

Preproposal ConferencePreproposal Conference for the Safety and Mission Assurance for the Safety and Mission Assurance

Engineering Contract (SMAEC)Engineering Contract (SMAEC)

118