W. STEVEN KING ROUND ROCK, TX. 78681 (817)917-6764 [email protected] WWW. LINKEDIN. COM/IN/STEVEKING23/ Senior Facility/Project Manager Research & Development Labs/Clean Rooms Production Facilities Sports Facility Management Start-ups, Turn-arounds & Relocations, Project Management Extensive expertise leading engineering, maintenance, quality, safety and cost control strategic initiatives for Fortune 100 companies in semiconductor and architectural supply industries. Demonstrated successes in design and implementation of process improvement, preventative maintenance and work procedures that improve systems, streamline operations, elevate equipment effectiveness, productivity and profitability. Recognized for ability to see and balance the “big picture” with executional details in fast-paced environments with notable commitment to building and leading world class teams. Collaborative cross-functional team builder with exceptional communication skills. Core areas of expertise: Strategic Planning Six Sigma Green Belt Lean Methodologies Engineering & Maintenance Management Customer Service Facility Management Energy/Environment (LEED) Team/Staff Training & Development Microsoft Office Apps Project Management Supplier/Government Relations Project, Operating & Capital Budgets CAREER HIGHLIGHTS Executed a site turnaround. Customer service had bottomed out at 58% after a new operation was introduced. Was recruited to instill standards into the engineering and maintenance departments. With support and efforts of entire focused team, we were able to improve customer service metric to 98% in 4 months time and it has sustained those levels for past 3 years. (Sherwin Williams) Accelerated complex equipment builds for large scale semiconductor industry with super aggressive start up plans . Traveled to various locations around the world and worked daily with manufacturers to ensure that all specifications were precise and operated equipment to ensure that it functioned prior to shipment. Returned to site during installation and spearheaded start-ups which resulted in on time delivery and within budget plan. (Motorola) Designed site’s first ever water based pigging system that was implemented based off of data indicating large loss to facility via waste and lost production. System enabled more products to be filled as sellable goods and less water required to clean process lines in preparation for following run. Overall project decreased waste by 46%, improved output 38% with a $1.6M annual savings. Project was awarded the Governor’s Environmental Award and U.S. Department of Energy’s Energy Saver Star Award. (Sherwin Williams) PROFESSIONAL EXPERIENCE SOCCER ZONE, Austin, Tx. 2015-Present Facility Manager/Team Captain Provide leadership and direction to premier indoor sports facilities in Central Texas. Oversee field maintenance, client invoicing and fees, networking/marketing efforts, scheduling of league games, employee schedules, recruitment of sponsorships, and ensure safety of staff and clients at facilities. SHERWIN WILLIAMS, Flora, IL and Crisfield, MD 1999–2014 Site Engineering/Project Manager, Specialty Applicators (2010–2014) Provided Engineering expertise for purchase, construction, installation and modification of two production facilities, including electro/mechanical, design and specification, troubleshooting and preventative maintenance management. Managed a team of 23- 28 Process Engineers, Engineering Interns, Integrators, Programmers, Machinists, Supervisors, Technicians and Purchasers/Inventory Specialists. Supported manufacturing of ~370 SKUs in 200+ employee facility. Oversaw $870K-$2.6M operating and $800K- $4.6M capital budgets annually. Increased productivity 26% by designing near real-time KPI tools to provide management team with performance results that facilitated proactive approach to problem-solving, identifying and eliminating non-value added work. Surpassed supply chain and total site cost, employee productivity, and operational objectives for two consecutive years; led region in reliability excellence savings of $334K and reduced energy consumption by 8.8% in 2013.

Upload: stevenking

Post on 07-Apr-2016

9 views

Category:

Documents


0 download

DESCRIPTION

Steven King possesses extensive expertise leading engineering, maintenance, quality, safety and cost control strategic initiatives for Fortune 100 companies in semiconductor and architectural supply industries.

TRANSCRIPT

Page 1: Senior Facilities Project Manager in Austin TX Resume Steven King

W. STEVEN KING ROUND ROCK, TX. 78681

(817)917-6764 [email protected] WWW.LINKEDIN.COM/IN/STEVEKING23/

Senior Facility/Project Manager Research & Development Labs/Clean Rooms ▪ Production Facilities ▪Sports Facility Management

Start-ups, Turn-arounds & Relocations, Project Management

Extensive expertise leading engineering, maintenance, quality, safety and cost control strategic initiatives for Fortune 100 companies in semiconductor and architectural supply industries. Demonstrated successes in design and implementation of process improvement, preventative maintenance and work procedures that improve systems, streamline operations, elevate equipment effectiveness, productivity and profitability. Recognized for ability to see and balance the “big picture” with executional details in fast-paced environments with notable commitment to building and leading world class teams. Collaborative cross-functional team builder with exceptional communication skills. Core areas of expertise:

Strategic Planning Six Sigma Green Belt Lean Methodologies Engineering & Maintenance Management Customer Service Facility Management Energy/Environment (LEED) Team/Staff Training & Development Microsoft Office Apps Project Management Supplier/Government Relations Project, Operating & Capital Budgets

CAREER HIGHLIGHTS

Executed a site turnaround. Customer service had bottomed out at 58% after a new operation was introduced. Was recruited to instill standards into the engineering and maintenance departments. With support and efforts of entire focused team, we were able to improve customer service metric to 98% in 4 months time and it has sustained those levels for past 3 years. (Sherwin Williams) Accelerated complex equipment builds for large scale semiconductor industry with super aggressive start up plans. Traveled to various locations around the world and worked daily with manufacturers to ensure that all specifications were precise and operated equipment to ensure that it functioned prior to shipment. Returned to site during installation and spearheaded start-ups which resulted in on time delivery and within budget plan. (Motorola) Designed site’s first ever water based pigging system that was implemented based off of data indicating large loss to facility via waste and lost production. System enabled more products to be filled as sellable goods and less water required to clean process lines in preparation for following run. Overall project decreased waste by 46%, improved output 38% with a $1.6M annual savings. Project was awarded the Governor’s Environmental Award and U.S. Department of Energy’s Energy Saver Star Award. (Sherwin Williams)

PROFESSIONAL EXPERIENCE SOCCER ZONE, Austin, Tx. 2015-Present Facility Manager/Team Captain Provide leadership and direction to premier indoor sports facilities in Central Texas. Oversee field maintenance, client invoicing and fees, networking/marketing efforts, scheduling of league games, employee schedules, recruitment of sponsorships, and ensure safety of staff and clients at facilities. SHERWIN WILLIAMS, Flora, IL and Crisfield, MD 1999–2014 Site Engineering/Project Manager, Specialty Applicators (2010–2014) Provided Engineering expertise for purchase, construction, installation and modification of two production facilities, including electro/mechanical, design and specification, troubleshooting and preventative maintenance management. Managed a team of 23-28 Process Engineers, Engineering Interns, Integrators, Programmers, Machinists, Supervisors, Technicians and Purchasers/Inventory Specialists. Supported manufacturing of ~370 SKUs in 200+ employee facility. Oversaw $870K-$2.6M operating and $800K- $4.6M capital budgets annually.

Increased productivity 26% by designing near real-time KPI tools to provide management team with performance results that facilitated proactive approach to problem-solving, identifying and eliminating non-value added work.

Surpassed supply chain and total site cost, employee productivity, and operational objectives for two consecutive years; led region in reliability excellence savings of $334K and reduced energy consumption by 8.8% in 2013.

Page 2: Senior Facilities Project Manager in Austin TX Resume Steven King

Established and successfully executed process improvement initiatives using lean principles to achieve $6M cumulative savings across Production/Manufacturing, Engineering and Operations for multiple clients.

Streamlined overhead maintenance inventory 33% by initiating basic min/max reorder process and refining EAM database.

Site Engineering/Project Manager, Wood Care Division (1999-2010) Led all operational equipment asset engineering and maintenance as well as management of a 375K sf, 24/7 sole global architectural coating production facility through leadership of 19 Engineers, Maintenance, Machinists and Administrative personnel. Provided critical support to drive operating efficiency and effectiveness for organization through reliability excellence initiatives and Engineering standards and principles. Administered $2M operating budget; capital budgets between $750K–$2M per year. Served as site’s Emergency Response Team Coordinator and Site Security Administrator.

Generated $75K in first year savings by minimizing air leaks; reduced plant air supply from 105 psi to 90 psi; produced a 3 psi drop across entire facility to successfully complete Six Sigma project and earn Six Sigma Green Belt Certification.

Decreased waste by 46% and improved output 38%—$1.6M in annual savings for site, by designing a water base pigging system that was implemented company-wide and earned government recognition through receipt of Illinois Governor’s Environmental Award and U.S. Department of Energy’s Energy Star Saver Award, 2010.

Delivered $1.75M net savings on $215K investment with supporting ROI of 240% in the 1st

year by designing a Supplier Owned Managed Inventory (SOMI) program to reduce material usage variance (MUV). Transitioned manual tank measurement to RF non-intrusive signal to read tank capacity. Worked with IT to implement “eyes” for raw material (RM) suppliers via an Intranet site to ensure accurate deliveries, reduce waste, cost associated with tank over/under filling as well as incorrect billing.

Instrumental contributor in planning and design of 102K sf expansion, a $4.6M investment. Completed project 3.5 weeks early and $68K under budget, despite several days of inclement weather.

Key leader in achievement of Sherwin Williams Manufacturing Site of the Year, 2007 bestowed to location demonstrating excellence in safety, people, service, cost and quality for the operating year.

MOTOROLA INC., Mesa, AZ & Austin, TX 1993–1999 Equipment Engineer, MOS21 & CISD (1997–1999) Transferred from APRDL to start-up Center for Integrated Semiconductor Design (CISD). Oversaw disassembly of equipment and transfer to new facility; created comprehensive instruction set. Collaborated with vendors on equipment installations; orchestrated equipment and safety training. Managed four direct reports in 24/7 environment.

Assigned to a Motorola Technical Advisory Board (TAB) to evaluate new equipment and/or ideas for continuous improvement. Instrumental member of the Motorola Emergency Response Team (ERT); developed emergency evacuation, lock-out/tag-out,

contractor and employee safety protocols for clean room facility. Drafted Piping and Instrumentation Diagrams (P&ID) for start-up, operational, control, safety and shutdown purposes. Expertise: Diffusion/EPI/HiPoX/Thin Film AMAT processes in Oxide, CVD, LPCVD & APCVD.

Equipment/Project Engineering Lead, APRDL & MOS13 (1993–1997) Recruited as member of small team for a 880K sf, 200mm Advanced Product Research & Development Lab (APRDL) for Metal Oxide Semiconductors (MOS) start-up. Worked at supplier sites on equipment builds, performed source inspection audits and completed fingerprinting documentation. Helped lead tool installations and testing; shared responsibility for facility and vendor start-up. Maintained tool sets, performed Semi process equipment upgrades and collaborated closely with Process Engineering on cycle time and mean time between failure (MTBF) improvements. Managed $10M+ in service warranties and contracts; relationships with ~12 major suppliers. Supervised and trained direct reports.

Sustained uptime and operations following dissolution of agreements with major suppliers, Thermco, SVG, TEL, and Applied Materials, Microscan and FSI; saved organization $2M+ annually by developing parts inventory and building in-house expertise in maintenance of equipment.

Improved product yield by introducing first TEL Vertical thermal furnace to APRDL after demonstrating with Process Engineering shorter profile recipes using new PID technology, adopted in other facilities and still utilized today..

TEXAS INSTRUMENTS, Dallas, TX 1986–1993 Equipment Engineering Technician, DMOS IV Sustained process level floor in full production 150mm DRAM clean room environment; created fingerprinting documents to baseline processes and track performance. Utilized MISTI equipment tracking database with SPC controls built in. Expertise: Diffusion/WET/HiPoX/EPI & SCRAM room processes & applications.

EDUCATION R.E.T.S Electronic Engineering Institute, Louisville, KY Western Governor’s University, Austin, TX

Studied Associates of Science in Electronic Engineering Technology Studied Bachelor of Science, Business Management