Phase Senior Colleges Active Projects Funded Budget Anticipated Project Cost Anticipated Year of Project Completion (in thousands) Baruch College 17 Lex Field Building Renovation, Phase IA Construction $109,756 $109,756 2020 Energy and Controls (Phase I Upgrades) Construction $13,805 $13,805 2018 ITB Student Computer Lab Rehab Construction $2,576 $1,792 2017 NVC Performing Arts Center (BPAC) Accessibility + Terrazzo Construction $2,466 $1,713 2018 17 Lex Ave FA Upgrade Construction $1,300 $1,300 2018 North Campus Exterior Lighting Construction $709 $709 2017 NVC FA Panel Upgrade (Admin Building FA) Construction $610 $578 2018 Admin Bldg Sidewalk Replacement Construction $300 $237 2018 Repair Damage from 26th st water main Break Construction $103 $103 2017 $131,625 $129,993 Sub-Total 25th Street Plaza Bid $2,700 $6,000 2019 Admin Bldg ADA Bid $2,700 $2,600 2019 ITB Skylight Panel Replacement Bid $2,350 $2,325 2018 NVC Atrium Doors Hardware Bid $226 $209 2018 $7,976 $11,134 Sub-Total NVC & ITB Window Washing Equip and Flooring Design $4,150 $3,368 2018 ITB Roof Replacement Design $3,350 $3,229 2019 ITB Elevator Modernization Design $2,544 $9,778 2019 17 Lex Mason Hall Water Damage Design $1,000 $961 2018 Admin Bldg Water Tank Replacement Design $969 $969 2018 Campus Wide Door Replacement Design $832 $832 2019 Admin Bldg Window Replacment Design $510 $6,985 2018 NVC - Steam Condensate Receiver Tank Design $350 $350 2019 NVC / ITB Replace RPZ valves Design $275 $215 2018 $13,980 $26,687 Sub-Total ITB Cooling Towers 4 & 5 Pre-Design $758 $758 2020 $758 $758 Sub-Total 23 $154,339 Project Count and Funding Total $168,572 1 1/24/2018 Office of Facilities Planning, Construction and Management The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs, on-hold, and projects managed by the campuses are not included in this report.

Upload: others

Post on 03-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Baruch College

17 Lex Field Building Renovation, Phase IA Construction $109,756 $109,756 2020

Energy and Controls (Phase I Upgrades) Construction $13,805 $13,805 2018

ITB Student Computer Lab Rehab Construction $2,576 $1,792 2017

NVC Performing Arts Center (BPAC) Accessibility + Terrazzo Construction $2,466 $1,713 2018

17 Lex Ave FA Upgrade Construction $1,300 $1,300 2018

North Campus Exterior Lighting Construction $709 $709 2017

NVC FA Panel Upgrade (Admin Building FA) Construction $610 $578 2018

Admin Bldg Sidewalk Replacement Construction $300 $237 2018

Repair Damage from 26th st water main Break Construction $103 $103 2017$131,625 $129,993Sub-Total

25th Street Plaza Bid $2,700 $6,000 2019

Admin Bldg ADA Bid $2,700 $2,600 2019

ITB Skylight Panel Replacement Bid $2,350 $2,325 2018

NVC Atrium Doors Hardware Bid $226 $209 2018$7,976 $11,134Sub-Total

NVC & ITB Window Washing Equip and Flooring Design $4,150 $3,368 2018

ITB Roof Replacement Design $3,350 $3,229 2019

ITB Elevator Modernization Design $2,544 $9,778 2019

17 Lex Mason Hall Water Damage Design $1,000 $961 2018

Admin Bldg Water Tank Replacement Design $969 $969 2018

Campus Wide Door Replacement Design $832 $832 2019

Admin Bldg Window Replacment Design $510 $6,985 2018

NVC - Steam Condensate Receiver Tank Design $350 $350 2019

NVC / ITB Replace RPZ valves Design $275 $215 2018$13,980 $26,687Sub-Total

ITB Cooling Towers 4 & 5 Pre-Design $758 $758 2020$758 $758Sub-Total

23 $154,339Project Count and Funding Total $168,572

11/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 2: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Brooklyn College

(Tow) Performing Arts Center Construction $100,500 $100,500 2018

Ingersoll Reno Lab/Vent System Construction $42,000 $42,000 2019

Fire Alarm & Security Project Construction $16,376 $16,376 2018

ADA Upgrades (Multiple Lecture Halls) Construction $12,097 $12,097 2018

Whitman Hall - Reconstruction of Ramps and Interiors Construction $10,271 $10,271 2018

2020: Vessel Construction $3,000 $3,000 2017

Whitehead Window Replacement Construction $3,000 $3,000 2018

Whitman Hall Parapets & Roof Construction $1,216 $1,216 2018

James Hall Concrete Cornice Construction $914 $914 2018

Boylan Ansul System Construction $200 $175 2018$189,574 $189,549Sub-Total

Drain and Paving Repair Bid $883 $883 2018$883 $883Sub-Total

Roosevelt Science Building (New Building) Design $132,000 $377,000 2025

2020: AREAC labs Design $2,500 $3,400 2019

Ingersoll Hall Extension Roof Replacement Design $2,011 $3,611 2019

2020: Resiliency Center @ Jamaica Bay Design $2,000 $32,000

Meat Market (Roosevelt Science building) Design $1,200 $1,200 2018

Lab Reno - Ingersoll Hall Geology Lab Design $1,200 $1,200 2019

Aquatics Lab Renovation Design $1,100 $1,100 2018

Campus-wide Fire Protection Design $1,000 $1,200 2018

Chiller Plant Design $800 $3,100 2018

West Quad Air Distribution Design $750 $750 2018

Ingersoll Hall Pump Replacement Design $500 $500 2019

Campus-Wide Cornice Reconstruction Design $500 $500 2018

Whitehead TV Center (Production Lab) - HVAC Design $330 $330 2018$145,891 $425,891Sub-Total

Boiler Replacement Pre-Design $4,255 $22,000 2023

Fire Alarm Rehabilitation at Roosevelt Hall Pre-Design $0 $2,300 2019$4,255 $24,300Sub-Total

Steiner Studios - Equipment for Graduate Film School of Cinema Equipment Purchase

$1,000 $1,000 2018

$1,000 $1,000Sub-Total

27 $341,603Project Count and Funding Total $641,623

21/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 3: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

City College

Marshak Science Bldg (HVAC Ph. II & IIIA-C) Construction $71,838 $71,838 2019

NAC Central Chiller Upgrade Construction $33,796 $33,796 2018

NAC Central Plant, Ph 2A and 2B Construction $25,298 $25,298 2018

Shepard Hall Ph 11 & 12 Construction $22,845 $22,845 2017

Steinman/Shepard Elevator Construction $12,100 $12,100 2019

Sophie Davis Interiors (Medical School) Construction $10,250 $10,250 2017

Daycare Center Renovation Construction $7,958 $7,958 2018

NAC Controls Replacement Construction $4,000 $12,000 2019

Shepard Hall Room 350 Renovation Construction $2,800 $2,800 2017

NAC Lib. Active Learning Center Construction $1,124 $1,124 2017

Steinman Hall First Floor Parapet Wall Construction $920 $920 2018

ASRC Interior Renovations Construction $0* $5,000 2019$192,929 $205,929Sub-Total

Library WHCR Cooling Syst Bid $9,200 $9,200 2019

Baskerville Hall Student Clubs and Lecture Hall Bid $5,300 $6,458 2019$14,500 $15,658Sub-Total

Steinman Hall HVAC Design $15,246 $24,000 2019

Marshak Pool and Locker Room Renovation Design $14,000 $14,000 2019

Marshak Plaza Replacement Design $6,137 $23,500 2020

Marshak-Hall-Steinman IT Modernization Design $6,007 $6,007 2019

Campus-Wide Accessibility Design $3,753 $7,253 2019

Firehouse -MFA Renovation Design $3,285 $6,000 2019

Marshak Emergency Generator Design $2,445 $2,445 2019

Lab Reno 2014 (Marshak 503/504, 507/511) Design $2,400 $2,400 2019

Spitzer Fabrication Lab Design $1,000 $1,000 2018

Shepard Hall Rm 15 Design $500 $500 2018

Aronow Theater Renovation Design $339 $4,000 2020

NAC Culinary Art Design $300 $1,500 2019

Wingate Locker Room Project Design $130 $1,100 2019

Shepard Music Library Roof Replacement Design $50 $500 2019$55,592 $94,205Sub-Total

Pre-Design $350 $3,000 2019

Pre-Design $350 $8,000 2020

Pre-Design $350 $350 TBD

Pre-Design $347 $347 TBD

ASRC/CDI Retrocommissioning

Aaron Davis Hall ADA Upgrade and Theater Renovation Shepard 51 Smart Classroom Project

NAC Hurricane Sandy Repairs

NAC Escalators

*Funded through another project.

Pre-Design $300 $2,000 TBD$1,697 $13,697Sub-Total

33 $264,718Project Count and Funding Total $329,489

31/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 4: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

College of Staten Island

2M Renovation Construction $19,048 $19,048 2018

Campus Roadway Reconstruction Construction $9,047 $9,047 2018

Site Hardscape Reconstruction Phase 1 Construction $7,652 $7,652 2018

2M Renovation Phase 3 Construction $5,000 $5,000 2018

Oil Tank Replacement at Central Plant Building 1M Construction $4,400 $4,400 2018

6S Chemical Waste Construction $2,900 $2,900 2018

1R Pool Dehumidification and Water Filtration System Construction $2,818 $2,818 2019$50,865 $50,865Sub-Total

IHPCC Electrical Substation Upgrade Design $39,000 $35,000 2020

Interdisciplinary High Performance Computational Center Design $39,000 $274,000 TBD

2020: Big Data Design $7,600 $7,600 2019

1M Cental Htg & Cooling Design $2,660 $2,660 2019

Soccer field improvements Design $1,500 $1,500 2018

Campus-wide Emergency Generator/automatic transfer switch Design $1,050 $1,050 2019

New Garage for vehicle storage Design $700 $700 2019

Media Culture Screening room renovation Design $510 $550 2019$92,020 $323,060Sub-Total

15 $142,885Project Count and Funding Total $373,925

41/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 5: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

CUNY Law

Trial Courtroom Pre-Design $1,250 $1,250 2019$1,250 $1,250Sub-Total

Omnia-Media Technology System Equipment Purchase

$0 $1,548 2019

$0 $1,548Sub-Total

2 $1,250Project Count and Funding Total $2,798

51/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 6: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

CUNY-Wide Senior

CUNY Data Center Ph. 2 Construction $32,621 $32,621 2018

Water Treatment Pro Construction $2,900 $2,900 2025$35,521 $35,521Sub-Total

Sub-metering: EO-88 Senior Colleges Design $8,988 $8,988 2021

Boiler Reconstruction (CUNY Managed) Design $6,700 $6,700 2025

Boiler Diagnostics Program Design $4,925 $4,925 2022

Solid State Lighting Project Design $4,450 $4,450 2019

Emergency Façade Repair Queens and CCNY Design $3,980 $3,980 2020

PA CCNY, Queens Design $3,300 $3,300 2018

Energy & Greenhouse Design $3,090 $3,090 2025

LL 87/EO 88 Compliance Design $1,685 $1,685 2018

PA Permits Design $1,502 $1,502 2020

Local Law 11 Cycle 8 Design $864 $864 2020$39,484 $39,484Sub-Total

12 $75,005Project Count and Funding Total $75,005

61/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 7: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Graduate Center

Elevator Upgrade Project Construction $3,418 $3,418 2018

Security System Upgrade Construction $1,007 $1,007 2017$4,425 $4,425Sub-Total

Ninth Floor Renovation Design $5,530 $5,530 2019

2020: Big Data Design $4,260 $4,260 2019

VFD Cooling Tower Upgrade Design $2,000 $2,000 2018

Bathroom Upgrades Design $1,000 $1,500 2018$12,790 $13,290Sub-Total

Library Upgrades Pre-Design $500 $500 TBD$500 $500Sub-Total

7 $17,715Project Count and Funding Total $18,215

71/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 8: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Hunter College

North Bldg Roof Construction $8,290 $8,290 2019

North Bldg Elevator Upgrade Construction $6,050 $6,050 2019

Lab Renovations 2014 Construction $5,701 $5,701 2018

North Bldg Boiler Plant Construction $4,551 $4,551 2017

Thomas Hunter Hall 2nd floor Student Union Construction $3,289 $3,300 2019

East Bldg 8th Fl Roof Construction $1,839 $1,839 2018

East Bldg. Leak Construction $420 $420 2018

East/West Bldg. Sump Pumps Construction $350 $350 2018$30,490 $30,501Sub-Total

West Bldg. Plaza Design $2,258 $2,258 2019

Cooperman/Baker Walkway Design $1,245 $1,245 2019

Kaye Playhouse Entrance Design $1,176 $1,176 2019

North and West Bldg. Acid Neutralization Design $650 $650 2019

North Bldg. Stairwell Doors Design $537 $537 2019

West 8th floor Terrace Fence Design $400 $400 2019

West Bldg. Hot Water Heaters Replacement Design $300 $300 2019$6,566 $6,566Sub-Total

Thomas Hunter HVAC Pre-Design $8,700 $17,000 2020

MFA Visual&Perform Arts, Ph1 Pre-Design $6,000 $6,000 2020

Emergency Generator Upgrades Pre-Design $1,000 $1,000 2019

North Bldg. Facade and Window Replacement Pre-Design $1,000 $1,000 2020

Various Mechanical Work in the North Bldg. Pre-Design $750 $750 2018

Kaye Playhouse Dehumidification and HVAC Upgrades Pre-Design $400 $400 2020

THH Bathroom Upgrades Pre-Design $300 $300$18,150 $26,450Sub-Total

Roosevelt House HVAC Upgrade Equipment Purchase

$499 $499 2019

North Bldg.Gas Detection Equipment Purchase

$70 $110 2018

$569 $609Sub-Total

24 $55,775Project Count and Funding Total $64,126

81/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 9: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

John Jay College of Criminal Justice

Haaren Hall Façade Restoration Project Construction $15,238 $15,800 2019

Haaren Hall – Swimming Pool/ Natatorium Rehabilitation Construction $8,300 $8,500 2019

ADA Upgrades Construction $850 $650 2018

New Building Vending Alcove Conversion Construction $250 $250 2018

Haaren Hall Library Rehabilitation Construction $215 $550 2018$24,853 $25,750Sub-Total

Haaren Hall Toilet Renovation Design $4,000 $4,200 2019

Haaren Athletic Facility Design $3,700 $4,800 2021

Haare Hall Lighting Upgrades Design $2,193 $0 2019

Campus Door Upgrages Design $1,000 $0 2019

PH II Retro-Commissioning Design $450 $150 2017$11,343 $9,150Sub-Total

Library Renovation Pre-Design $10,913 $50,000 2021$10,913 $50,000Sub-Total

11 $47,109Project Count and Funding Total $84,900

91/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 10: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Lehman College

Utilities Plant Expansion Construction $42,000 $42,000 2017

Fire Alarm/Security Construction $21,870 $21,870 2011

Concert Hall Addition and ADA Construction $15,316 $15,316 2019

APEX Bird Proofing Construction $7,742 $7,000 2018

Bookstore Relocation Construction $4,252 $4,252 2019

Gillet & Davis Halls Façade Renovation Construction $3,963 $3,500 2017

Elevator Upgrade Ph II (APEX, Old Gym, Fine Arts, Music) Construction $2,850 $2,500 2017

Old Gym Roofs Construction $1,300 $1,000 2018

Standpipe Inspection Construction $500 $500 2018$99,793 $97,938Sub-Total

College Labs Round III Bid $6,927 $6,927 2019$6,927 $6,927Sub-Total

Nursing Education, Research and Practice Center Design $53,150 $61,000 2021

Library Ventilation and Renovation Design $17,900 $17,900 2019

Oil Tank Room and Music Plaza Renovation Design $11,000 $11,000 2019

Dept. Social Work Design $4,811 $4,811 2020

Teaching and Learning Commons Design $3,670 $4,500 2020

Emergency Power Network Design $2,836 $3,000 2020

S&T Amphitheater Design $2,762 $3,000 2019

Lovinger Theater ADA Design $2,504 $2,504 2020

Music Building Chimney Design $1,500 $1,500 2019

Shuster Hall and Fine Arts Envelope Design $1,013 $6,000 2022

Science Hall Greenhouse Truss Replacement Design $928 $0 2018

Hub Rooms HVAC Design $750 $750 2019

Library Windows Replace Design $700 $550 2018

2020: New Media Job Incubator Design $30 $1,700 2019$103,554 $118,215Sub-Total

24 $210,274Project Count and Funding Total $223,080

101/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 11: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Macaulay Honors College

Replace HVAC Construction $4,400 $4,216 2018$4,400 $4,216Sub-Total

Server Room HVAC Upgrade Design $605 $450 2019

2020: New Media Jobs Incubator Design $30 $5,500 2020$635 $5,950Sub-Total

Fire Alarm Replacement Pre-Design $412 $412 2018$412 $412Sub-Total

4 $5,447Project Count and Funding Total $10,578

111/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 12: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Medgar Evers College

AB1 + Bedford Heating Cooling Cross Connection Construction $19,000 $17,305 2018

Campus Wide Security Upgrade Construction $2,496 $2,764 2018

Carroll St. Façade Repairs & Site Work, Ph II Construction $1,325 $1,035 2018$22,821 $21,104Sub-Total

Bedford Building - Lobby Reconstructions Bid $5,391 $7,400 2019$5,391 $7,400Sub-Total

Carroll St. Building Egress and ADA Design $8,000 $8,000 2019

Carroll St. Athletic Cntr Upgrades & ADA Bathrooms Design $7,435 $7,435 2019

Bedford Avenue Building- Site Reconstruction Site Work. Design $6,800 $5,200 2018

Carroll St. Fire Alarm and Egress Design $3,280 $1,369 2018

Carroll Street Building Energy Upgrade Phase 1 Design $2,750 $34,000 2018

AB1 SSB Energy Reconstruction Project Design $1,000 $700 2019

Bedford Building Roofing Reconstruction Design $300 $2,200 2019$29,565 $58,904Sub-Total

Master Plan Pre-Design $300 $300 2017$300 $300Sub-Total

12 $58,077Project Count and Funding Total $87,708

121/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 13: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

New York City College of Technology

Academic Bldg. 1 Construction $410,000 $410,000 2018

Allied Health (Pearl St) 1st Fl Reno Construction $14,252 $15,852 2018

Voorhees Hall Interior Reno & Exterior Site Improvements Construction $3,900 $3,900 2018

Campus-wide Roof and Plaza Replacement Construction $3,856 $3,830 2018

Misc. Campus-wide MEP Upgrades Construction $780 $575 2018$432,788 $434,157Sub-Total

Installation of Permanent Piping for Temp. Boilers in Namm Hall Bid $475 $1,200 2018$475 $1,200Sub-Total

Voorhees MEP Upgrade Design $24,200 $28,900 2018

Namm Hall Vestibule Renovation Design $6,250 $6,089 2019

Campus-wide Elevator Modernization Design $4,100 $4,100 2019

Replace 5 Existing Air Units Design $3,950 $3,700 2018

Namm Hall Loading Dock Renovations Design $3,427 $2,465 2019

Lab Renovations (Namm & E Bldg) Design $475 $2,500 2018$42,402 $47,754Sub-Total

Namm Hall Replacement of Cooling Systems in Server Rooms Pre-Design $1,250 $1,250 2019

Allied Health Building Renovations Pre-Design $1,185 $1,185 2018

Allied Health Building Electrical Upgrades Pre-Design $313 $49 2019

Voorhees Hall 3rd Floor Renovation Pre-Design $275 $15,000 2018$3,023 $17,484Sub-Total

16 $478,688Project Count and Funding Total $500,595

131/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 14: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Queens College

Campus Chiller Plant, Phase I Construction $31,811 $29,350 2018

Louis Armstrong Education Center Construction $23,900 $25,000 2019

Kiely Hall Energy Reconstruction, Phase I Construction $15,539 $15,500 2018$71,250 $69,850Sub-Total

Gym Roof Replacement Bid $12,075 $12,000 2020

Storm Damage Restoration (Kupferberg Roof Railings) Bid $650 $650 2018$12,725 $12,650Sub-Total

Central Chiller Plant Phase 2 Design $11,780 $23,240 2019

Steamline Distribution Reconstruction Design $6,317 $5,383 2019

Boiler Plant Reconstruction Phase 1 Design $5,000 $5,000 2019

Campus Wide Fire Alarm Project Ph 2 Design $5,000 $22,000 2022

Powdermaker Hall Lighting Upgrade Design $4,450 $4,450 2021

Gertz Hall Speech Hearing Learning Design $4,390 $4,390 2019

Razran Lab Renovations (Razran 4 Labs) Design $4,265 $4,265 2019

Local Law 11: Kiely and Rosenthal Design $3,100 $3,083 2019

Sci Labs 2015 (Avella) Renovation Design $2,000 $2,000 2019

Outdoor Athletic Facility Reconstruction Design $1,500 $7,200 2019

Perimeter Sidewalk Reconstruction Design $1,000 $1,000 2019

Perimeter Fence Design $950 $950 2020

CUNY- wide Public Assembly Project Design $671 $671 2019

Gym Sills & Façade Reconstruction Design $480 $1,230 2020

Campuswide Security Camera Project Design $400 $400 2019

Behavioural Neuroscience and Molecular Cellular Design $372 $2,784 2020

IT Bldg/Dining Hall Roofing Reconstruction Design $350 $2,000 2019

Rosenthal Library Renovation, Phase II Design $266 $2,000 2019

Environmental Labs Renovation Design $242 $2,000 2019

Gym Pool Filtration System Reconstruction Design $230 $1,100 2019$52,763 $95,146Sub-Total

One Stop Student Services Center Pre-Design $12,000 $15,200 TBD

ADA Bathroom Upgrade Phase 2 Pre-Design $108 $1,200 2020$12,108 $16,400Sub-Total

27 $148,846Project Count and Funding Total $194,046

141/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 15: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

School of Professional Studies

31 Street Lobby Expansion Construction $250 $250 2018

IT Center HVAC Modifications Construction $75 $75 2018$325 $325Sub-Total

2 $325Project Count and Funding Total $325

151/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 16: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

York College

Computer & Multimedia (Faculty Dining Room) Construction $1,883 $1,883 2019

Sci Bldg FA Upgrade Construction $250 $250 2019

Academic Core Water Main Leak Construction $193 $193 2017$2,326 $2,326Sub-Total

Campus Wide Escalators and Elevator Upgrades Bid $14,803 $14,803 2019$14,803 $14,803Sub-Total

Academic Village & Conference Cntr Design $41,000 $287,000

Groundwater Infiltration at Academic Core Design $13,097 $13,097 2018

BMS Controls Upgrade Design $10,731 $10,731 2020

Campus Wide MEP Upgrades Design $8,820 $8,820 2019

PAC Renovations/Upgrade/Improvements Design $7,734 $7,734 2021

Track & Field Upgrade Design $7,225 $12,800 2020

PAC Roof Upgrades and Facade Repairs Design $4,049 $5,000 2020

PAC- Various Interior Upgrades (Design) Design $4,000 $4,000 2021

Chemistry and Biology Lab Renovations Design $3,046 $3,046 2019

Ac Core Lecture Hall Upgrade Design $2,765 $2,765 2020

Ac Core Building Entrance Door Restoration Design $2,000 $2,000 2019

Replacement of Pool Dehumidification Unit Pool Pak Design $1,500 $2,200 2019

Campus Wide A/C IT Closets Design $1,000 $1,000 2019$106,967 $360,193Sub-Total

Ac Core Building Roof Pre-Design $1,000 $1,000 2020

Bathroom Upgrades Pre-Design $500 $500

PAC Passenger Elevator Expansion Pre-Design $500 $1,300 2020

Fuel Oil Tank Pre-Design $400 $0 2018$2,400 $2,800Sub-Total

21 $126,496Project Count and Funding Total $380,122

161/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 17: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Senior Colleges Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

260Senior CollegeProject Count and Funding Total $2,128,552 $3,155,107

171/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 18: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

BMCC

HVAC and Controls Upgrade Construction $22,095 $22,095 2018

ADA Bathrooms Upgrades Ph. II Construction $16,328 $16,328 2019

Roof Replacement and Photovoltaic Installation Construction $12,000 $12,000 2018

Pool Deck Restoration Construction $11,500 $11,500 2018

Emergency Generator Construction $7,400 $7,400 2018

ADA Bathrooms Upgrades Ph. I Construction $6,300 $16,328 2017

Façade Restoration & Ancillary Exterior Improvements Construction $5,687 $5,687 2018

Gym HVAC Upgrade Construction $3,000 $2,900 2018

Chamber St. Hurricane Sandy - North & South Feeders Construction $2,750 $2,750 2018

West Street Façade Windows Construction $800 $800 2018$87,860 $97,788Sub-Total

Chambers St. Ramp & Plaza Paver Replacement Bid $9,121 $11,900 2019

70 Murray Street, Seond and Third Floor Expansion Bid $0 $0 2018$9,121 $11,900Sub-Total

Student Commons Expansion Design $11,000 $11,000 TBD

Theatres 1, 2 and 3 Upgrades Design $3,042 $3,042 TBD

Battery Interconnect Design $300 $600 2018$14,342 $14,642Sub-Total

Gym LED Lighting Pre-Design $249 $249 2019

Cooling Tower Replacement Pre-Design $0 $3,600 2019$249 $3,849Sub-Total

17 $111,572Project Count and Funding Total $128,179

11/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 19: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Bronx Community College

Campus Utility Upgrade, Phase IV Distribution Construction $27,000 $27,000 2018

Fire Alarms - Meister GML CPH & New Halls Construction $4,995 $4,995 2018

Alumni Gym Pool Rehabilitation Construction $4,846 $4,113 2018

Havemeyer Roof Construction $2,160 $2,160 2018

New Hall Roof - Upper Roof Replacement Construction $500 $500 2018$39,501 $38,768Sub-Total

Student Center Roof Replacement & Façade Repair Bid $4,900 $5,374 2018

New Hall Data Center Air Conditioning Bid $700 $700 2019

Alumni Gym Bridge Replacement Bid $618 $618 2018

Dominican Veterans Memorial fka Monument Hill Bid $295 $295 2017$6,513 $6,987Sub-Total

Campus Utility Upgrade, Phase V Electric Design $69,632 $69,632 2021

2020: Automotive & Fuel Technology Design $9,000 $9,000 2020

Gould Memorial Library Dome Roof & Oculus Design $5,320 $11,600 2020

Gould Memorial Library Egress Stairs Design $855 $855 2019

Community Hall LL11 Design $250 $1,500 2018

Snow Hall Elevator Design $210 $1,700 2020

Ohio Field Track Restoration Design $150 $2,500 2019

Nichols Hall ADA Entrance Ramp Design $87 $512 2019

Bliss ADA Restrooms & Entrance Ramp Design $80 $680 2019

Alumni Gym Locker Room Restrooms Design $67 $567 2019$85,651 $98,546Sub-Total

New Hall Roof - Plaza & Facade Pre-Design $3,000 $3,000 2020

Loew Hall Accessibility & Elevator Pre-Design $113 $900 2019

Bronx Express, aka Student Success Center Pre-Design $100 $14,170 2021$3,213 $18,070Sub-Total

22 $134,878Project Count and Funding Total $162,371

21/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 20: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

CUNY-Wide Community

CC Solid State Lighting Pre-Design $528 $528 2025

CUNY LL87 Compliance (Retrocommissioning) Pre-Design $300 $300 2025

Boiler Reconstruction (CUNY Managed) Pre-Design $68 $68 2025

CC Water Treatment Program Pre-Design $0 $0 2025$896 $896Sub-Total

4 $896Project Count and Funding Total $896

31/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 21: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Guttman Community College

North Hall Condition Assessment and Programming Study Pre-Design $1,898 $1,898 2018$1,898 $1,898Sub-Total

1 $1,898Project Count and Funding Total $1,898

41/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 22: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Hostos Community College

VFD Installation Construction $2,257 $2,257 2017

Savoy Manor Roof Construction $1,800 $1,800 2017

450 GC FA Upgrade Construction $650 $650 2018$4,707 $4,707Sub-Total

500 GC Window Replacement Bid $6,000 $6,000 2019

500 GC Emergency Generator and Sub-Cellar Renovation Bid $5,900 $5,900 2018$11,900 $11,900Sub-Total

New Allied Health & Science Building Complex Design $2,000 $239,000 TBD

500 GC 3rd Floor Renovation Design $850 $12,000 2019

HVAC Upgrade 475 GC and Admin Bldg Design $800 $2,800 2019

475 GC Replacement of (9) Air Handling Units Design $250 $6,450 2018

300-Ton Chiller Replacement at 475 Grand Concourse Design $245 $3,245 2018

Summer Boiler Design $237 $237 2018$4,382 $263,732Sub-Total

Retaining Wall Pre-Design $30 $2,000 TBD$30 $2,000Sub-Total

12 $21,019Project Count and Funding Total $282,339

51/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 23: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Hunter College Campus Schools

HVAC & Boiler Upgrade Bid $12,565 $12,565 2019$12,565 $12,565Sub-Total

Athletic Facilities Renovation Design $1,333 $1,629 2019$1,333 $1,629Sub-Total

2 $13,898Project Count and Funding Total $14,194

61/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 24: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Kingsborough Community College

LED Lighting Conversion Bid $3,369 $6,500 2019

Fire Alarms U & P Building Bid $2,998 $2,998 2018

Student Conference Ctr Bid $2,491 $2,900 2019$8,858 $12,398Sub-Total

T7 Ph 1 Electrical and HVAC Design $3,298 $3,298 2018

Bursar Renovation Design $1,581 $1,581 2019

T4 Roof Replacement Design $1,233 $3,000 2019

KGBCC Performing Arts Design $1,138 $14,900 2019

Storm Sandy HVAC T2,T3,T4 Buildings Design $1,068 $1,368 2019

Marina Rehabilitation Design $600 $9,800 2019

West Academic Cluster Setback Roof Replacement Design $0 $350 2019$8,918 $34,297Sub-Total

Pool Renovation Pre-Design $810 $5,000 2020

Physical Sciences Equipment Pre-Design $0 $227 2019

Library Roof Partial Replacement Pre-Design $0 $1,100 2020

Gas Booster Pump Upgrade Pre-Design $0 $252 2019$810 $6,579Sub-Total

14 $18,586Project Count and Funding Total $53,274

71/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 25: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

LaGuardia Community College

Center 3 Façade Construction $116,000 $116,000 2018

2020: Goldman Sachs 10,000 Small Businesses Ed Cntr Construction $5,000 $5,000 2018

Building E Fire Alarm Construction $3,461 $3,414 2018$124,461 $124,414Sub-Total

Business, Entrepreneurial & Career Center Design $1,220 $15,074 2021

Library Expansion and Renovation Phase II Design $1,185 $6,000 2020

Boiler & Chiller Centralization Design $650 $8,880 2020

E Building Roof Replacement Design $483 $5,300 2019

Fire Alarm replacement in Shenker Hall Design $0 $4,500 2019$3,538 $39,754Sub-Total

Center 3 Infrastructure Pre-Design $3,172 $30,000 2022$3,172 $30,000Sub-Total

9 $131,171Project Count and Funding Total $194,168

81/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 26: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

Queensborough Community College

Campus-Wide Electrical Reconstruction Construction $42,100 $37,733 2018

Medical Arts, Science and Admin Bldgs - Roof Replacements Construction $8,900 $7,725 2018$51,000 $45,458Sub-Total

Humanities Building - Performing Arts Center Upgrades Bid $9,500 $9,500 2019

Medical Arts Bldg Sprinkler/Standpipe Bid $2,300 $1,300 2018$11,800 $10,800Sub-Total

Central Plant Chiller Reconstruction - Phase II Design $21,164 $21,164 2018

Cafeteria and Kitchen - Phase II Design $9,500 $9,034 2019

Lab Renovations Design $316 $3,100 2019$30,980 $33,298Sub-Total

Ph II Fire Alarm Pre-Design $2,928 $2,652 2018

W Building- ASAP Expansion Pre-Design $366 $2,990 2019$3,294 $5,642Sub-Total

9 $97,074Project Count and Funding Total $95,198

91/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.

Page 27: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project

Phase

Community College Active Projects

Funded Budget

Anticipated Project Cost

Anticipated Year of Project

Completion(in thousands)

90 $530,992 $932,517Community Colleges Project Count and Funding Total

101/24/2018 Office of Facilities Planning, Construction and Management

The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.