    Bancroft Entrance

    Joe BrownMarty Farkas

    Danielle JacobyHannah Renzhofer

    Demar Watkins

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    2/45

    Background

    The North entrance to

    the University of Toledo

    campus has poor traffic

    flow and congestion

    Lack of direct accessibilityfrom Lot 2 to Bancroft St.sidewalks

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    3/45

    Objectives

    Reduce congestion at

    intersection of N.

    Towerview Blvd. and

    Bancroft St.o School rush hours

    o Game day traffic

    Create ADA compliant ramp

    connecting Lot 2 to sidewalk

    along Bancroft St.

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    4/45

    Constraints

    AASHTO Guidelines

    ADA Compliance

    City of Toledo Rehabilitation Plan

    Maintenance of Traffic

    Space

    Timing

    University of Toledo Campus Aesthetics

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    5/45

    Components

    1. Intersection

    1. Pedestrian Ramp

    1. East Ramp Drive - One Lane

    1. East Ramp Drive - Two Lanes

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    6/45

    Site Map

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    7/45

    Intersection

    Projected 20 year Design hourly volumes

    **1% per year - growth factor

    175

    772

    37639

    7

    252

    180

    181

    1220

    127

    114

    248

    288

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    8/45

    Intersection

    ** Highway Capacity Manual 2000 - Level of Service

    Letters A to F. (A is best and F is the worst) Most design or planning efforts use service flow rates

    at LOS C or D

    LOS E is a common standard in larger urban areas,

    where some roadway congestion is inevitable

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    9/45

    Intersection

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    10/45

    Intersection

    Current Striping Striping - Build

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    11/45

    Intersection

    Current Phasing

    2033 Build Phasing

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    12/45

    Intersection

    Timing - 2013 Current (120 sec)

    Timing - 2033 Build (120 sec)

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    13/45

    Current Crosswalk

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    14/45

    Crosswalk

    Concrete Crosswalk - Cross-sectional Area

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    15/45

    Crosswalk

    Pavement Resurfacing

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    16/45

    Future Crosswalk

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    17/45

    Intersection

    Components

    Resignal

    Resurface

    Striping

    Crosswalk

    Mobilization

    Total

    Cost

    $5,200

    $18,100

    $2,900

    $19,700

    $8,000

    $53,900

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    18/45

    Pedestrian Ramp

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    19/45

    Existing Conditions

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    20/45

    Existing Gateway

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    21/45

    'Goat Path'

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    22/45

    Pedestrian Ramp

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    23/45

    Pedestrian Ramp

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    24/45

    Pedestrian Ramp

    Advantages

    Provides access toBancroft from

    Parking Lot 2

    ADA compliantramp (1:12 slope)

    Stairs provided asan alternativeroute to the ramp

    Disadvantages

    Cost

    Relocation ofexisting light pole

    Loss of 7 parkingspaces

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    25/45

    Pedestrian Ramp

    Components

    Removal

    Ramp Wall

    Decorative Wall

    Sidewalk

    Landscaping

    Relocate Light

    Miscellaneous

    Total

    Cost

    $12,500

    $42,500

    $13,500

    $9,000

    $15,000

    $2,500

    $9,500

    $104,500

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    26/45

    East Ramp Drive - One & Two Lane

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    27/45

    Current View from Bancroft

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    28/45

    Existing Snow Gate

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    29/45

    East Ramp Drive - One Lane

    Right Turn Exit Only

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    30/45

    East Ramp Drive - One Lane

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    31/45

    East Ramp Drive - One Lane

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    32/45

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    33/45

    East Ramp Drive - One Lane

    Advantages

    No retaining wall

    Lower cost

    Reduces exitingcongestion

    Disadvantages

    Single direction

    Loss of 4 parkingspaces

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    34/45

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    35/45

    East Ramp Drive - Two Lanes

    Entrance & Right Turn Exit Only

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    36/45

    East Ramp Drive - Two Lanes

    jjjjjjjj

    Design Alternative I Alternative II

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    37/45

    East Ramp Drive - Two Lanes

    Entrance & Right Turn Exit Only

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    38/45

    East Ramp Drive - Two Lanes

    Entrance & Right Turn Exit Only

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    39/45

    East Ramp Drive - Two Lanes

    Entrance & Right Turn Exit Only

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    40/45

    East Ramp Drive - Two Lanes

    Advantages

    Both entrance &exit

    Reduces congestionfrom otherentrance/exit

    Disadvantages

    Retaining wallneeded

    Higher cost

    Loss of 6 parkingspaces

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    41/45

    East Ramp Drive - Retaining Wall

    Factor of Safety - Sliding: 7.11

    Factor of Safety - O.T.: 3.06

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    42/45

    East Ramp Drive - Two Lanes

    Components

    Demolition

    Pavement

    Drainage

    Pavement Marking

    Structures

    Miscellaneous

    Total

    Cost

    $24,500

    $71,000

    $13,100

    $1,100

    $44,200

    $32,800

    $186,700

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    43/45

    Cost Estimates Overview

    Component

    1. Intersection

    2. Pedestrian Ramp

    3. Drive - One Lane

    4. Drive - Two Lanes

    Package (1,2,& 3)

    Package (1,2, & 4)

    Cost

    $53,900

    $39,000*

    $144,800

    $186,700

    $237,700*

    $279,600*

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    44/45

    Conclusion/Recommendations

    Based on extensive modeling, the bestcomponents and options have beenprovided

    All provided components meet the initialguidelines set by the University of Toledo

    Components can be packaged together inany configuration desired or separately

  • 7/30/2019 Senior Capstone Project - Bancroft Entrance

    45/45

    Acknowledgements

    Daniel P. KlettUniversity Architect

    Douglas CollinsDirector, Grounds and Off-Site Facilities

    Richard S. Martinko, P.E.Director, Intermodal Transportation Institute

    UT University Transportation Center

    Donald O'Connor, P.E.City of Toledo, Division of Transportation

    Gary A. Stookey, P.E.

    City of Toledo, Division of Transportation

    Karl Huss, P.E.City of Toledo, Division of Transportation

    Nicholas A . Taylor, P.E.DGL Consulting Engineers

    Mike LivingstonRudolph/Libbe Inc

    Christian SimpsonRudolph/Libbe Inc

    Bryan Ellis, P.E., P.S.University of Toledo

    Dr. Douglas Nims, P.E., Ph.D.University of Toledo

    Dr. Nicholas KissoffUniversity of Toledo