sendai framework monitor - prototype · 2017-05-03 · • design phase, prototype presented for...

24
Monitoring the Sendai Framework - Side Event 30 April, 2017 Monitoring the Sendai Framework for Action 2015-2030 and the 2030 Sustainable Development Agenda

Upload: others

Post on 29-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

Monitoring the Sendai Framework - Side Event

30 April, 2017

Monitoring the Sendai Framework for Action 2015-2030 and

the 2030 Sustainable Development Agenda

Page 2: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

□ OIEWGrecommendations in report A/71/644, November 2016

□ UNGA endorses OIEWG report in A/RES/71/276, February 2017

Open-ended intergovernmental expert working group on indicators and terminology relating to disaster risk reduction (OEIWG)

(A/RES/69/284 - June 2015)

Page 3: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

Number of deaths, missing persons and directly affected persons attributed to disasters per 100,000 population

Direct economic loss attributed to disasters in relation to global gross domestic product (GDP)

Direct economic loss in relation to global GDP, damage to critical infrastructure and number of

disruptions of basic services, attributed to disasters

Number of countries that adopt and implement national disaster risk reduction strategies in line with the Sendai

Framework for Disaster Risk Reduction 2015-2030

Proportion of local governments that adopt and implement local disaster risk reduction strategies in line with national

disaster risk reduction strategies.

A

B

C

D

E

F

G

Target Goal / Target

Goal 11.Target 11.5

Goal 1.Target 1.5

Goal 11.Target 11.b

Goal 13.Target 13.1

Page 4: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

Operationalising the indicators to monitor the Sendai Framework and the SDGs

□ Sendai Framework Monitor

• Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017

• Arab States feedback to inform build phase, testing and refinement second half of 2017

• Launch Sendai Framework Monitor in January 2018 for first cycle of global monitoring

Page 5: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

GLOBAL OUTCOME

LEVEL

Indicators for targets A-G

(defined by the OIEWG)

And SDGs

SENDAI FRAMEWORK GLOBAL TARGETS Disaster loss data (Targets A – D)

National assessmt. (Targets E – G)

ODA and STI data (Target F)

NATIONAL RISK & RESILIENCE

DRIVERS LEVEL

Indicators for nationally

determined targets

Sendai Framework nationally determined targets

Reduce existing Prevent Strengthen social andrisk new risk economic resilience

Underlying Risk Drivers

Urban Environmental Social Governance

Risk metrics

NATIONAL POLICY

ACTION LEVEL

Indicators for nationally

determined

Priority 1 Priority 2 Priority 3 Priority 4

Understanding Strengthening Investing Enhancing preparedness for risk governance in DRR effective response, BBB

National self-assessment

A1-A3 B1-B5 C1-C6 D1-D8 F1-F8 G1-G6E1-E2

C D E FA B C D E F G

PROCESS DATA

Drop down menu of indicators to select, modify and customize

SENDAI FRAMEWORK MONITOR – PROTOTYPE

Page 6: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – HOME PAGE

Page 7: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – GLOBAL TARGETS

Page 8: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – GLOBAL TARGETS

Page 9: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – GLOBAL TARGETS

Page 10: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – GLOBAL TARGETS

Page 11: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – GLOBAL TARGETS

Page 12: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – NATIONAL REPORTING

Page 13: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – NATIONAL REPORTING

Page 14: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – NATIONAL REPORTING

Page 15: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SENDAI FRAMEWORK MONITOR - PROTOTYPE Country example – global monitoring – India

India National DRR FP is

awarded user rights for ‘India’

OIEWG Indicators Sendai targets

National DRR FP addsMinistry of Health as

user

National DRR FP addsthe Planning Commission

as user

National DRR FP adds

MeteorologicalDepartment as

userteam of data providers to report against SDGs and Sendai Framework

Page 16: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SENDAI FRAMEWORK MONITOR - PROTOTYPE Country example – national monitoring – India

Selection of indicators for nationallydetermined targets and responsible

agencies to monitor

DRR FP wantsto monitor the

India National Disaster

Management Plan

Selection of national targets

Calls NP meeting

Page 17: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SENDAI FRAMEWORK MONITOR - PROTOTYPE Country example – local monitoring – India

Selection of indicators for locallydetermined targets and responsible

focal points to monitor

DRR FP wantsto monitor the

India local Disaster

Management Plans

LGs select local targets

Calls local governments

meeting

Page 18: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SENDAI FRAMEWORK MONITOR - PROTOTYPE Country example – monitoring system

Global

level

National

level

Local

level

Page 19: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SENDAI FRAMEWORK MONITOR - PROTOTYPE Country example – India

India institutional focal points are set to startmonitoring the Sendai Framework at global,

national and local level as a team!

Page 20: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – ANALYSIS – TARGETS A-D

Page 21: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – ANALYSIS – TARGETS E-G

Page 22: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – ANALYSIS – TARGET A

Page 23: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – ANALYSIS – TARGET A

Page 24: Sendai Framework Monitor - Prototype · 2017-05-03 · • Design phase, prototype presented for validation by Member States at the Global Platform for DRR, May 2017 • Arab States

SFM – PROTOTYPE – GROUP DISCUSSION

• General reactions

• Custom options for national targets, indicators, reporting cycles and data providers

• Analysis functions

• What could be improved?