DISUSUN OLEH : BENY AULIA PUTRANTO L2E009009 ANALISA PERFORMA BOILER FEED WATER PUMP 1 Seminar Kerja Praktek Mechanical Engineering Department Diponegoro University Prof. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059 PT. PLN (Persero) Sektor Pembangkitan Ombilin

Upload: beny-aulia-putranto

Post on 08-Aug-2015

107 views

Category:

Documents


1 download

DESCRIPTION

Analisa Performa Boiler Feed Water Pump

TRANSCRIPT

Page 1: Seminar KP

DISUSUN OLEH :

BENY AULIA PUTRANTO L2E009009

ANALISA PERFORMA BOILER FEED WATER PUMP

1Seminar Kerja Praktek

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Page 2: Seminar KP

OUT LINE PENDAHULUAN

PROFIL PT. PLN PERSERO SEKTOR

PEMBANGKITAN OMBILIN

DASAR TEORI

ANALISA PERFORMA BOILER FEED WATER PUMP

KESIMPULAN

2

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Seminar Kerja Praktek

Page 3: Seminar KP

PENDAHULUAN

3

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Seminar Kerja Praktek

Tujuan :

1. Mempelajari prinsip kerja suatu pembangkit listrik, khususnya PLTU.

2. Mengetahui prinsip kerja alat Boiler Feed Water Pump.

3. Menganalisa performa Boiler Feed Water Pump.

Waktu dan Tempat KP

Waktu : 24 Januari - 24 Februari 2012

Tempat : PT PLN (Persero) Pembangkitan Sumbagsel,

Sektor Pembangkitan Ombilin

Jl. M. Yamin, SH, Talawi, Sawahlunto – Sumatera BaratBatasan Masalah :

1. Penjelasan umum profil PT. PLN (Persero) Sektor Pembangkitan Ombilin

2. Analisa performa Boiler Feed Water Pump

Page 4: Seminar KP

4

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Tugas pokok PT.PLN (Persero) Sektor Pembangkitan Ombilin mengoperasikan pembangkit

yang terdiri dari PLTU Ombilin unit I dan unit II serta PLTG Pauh Limo, yang semuanya

untuk melayani kebutuhan energi listrik sistem kelistrikan SumBagTeng dan SumBagSel.

No. Uraian Peralatan Kapasitas Mulai Operasi

1. PLTU unit I 100 MW 26 Agustus 1996

2. PLTU unit II 100 MW 18 November 1996

3. PLTG Pauh Limo 3 x 21,35 MW 10 September 1983

PROFIL PT. PLN PERSERO SEKTOR PEMBANGKITAN OMBILIN

Seminar Kerja Praktek

Page 5: Seminar KP

5

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

PT. PLN PERSERO SEKTOR PEMBANGKITAN OMBILIN

Seminar Kerja Praktek

Page 6: Seminar KP

SIKLUS KERJA PLTU OMBILIN

6

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Seminar Kerja Praktek

Page 7: Seminar KP
Page 8: Seminar KP

8

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Pompa merupakan salah satu

jenis mesin fluida yang berfungsi

untuk memindahkan zat cair dari

suatu tempat ke tempat yang

diinginkan

Pengertian

DASAR TEORI

Seminar Kerja Praktek

Page 9: Seminar KP

9

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Bagian-Bagian Utama Pompa Sentrifugal

Seminar Kerja Praktek

Page 10: Seminar KP

10

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Head Pompa

Keterangan :

Hs = Head Suction (m)

Ps = Tekanan suction (N/m2)

Pa = Tekanan atmosfer di atas permukaan cairan (N/m2)

Zs = Jarak permukaan air dengan nozzle suction pompa (m)

Hls = Head loss sisi suction (m)

Vs = Kecepatan cairan pada pipa suction (m/s)

ρ = Massa jenis cairan (kg/m3)

Head Suction

Hs = = ± Zs – hls – Ps

ρgPs

ρg

Vs2

2g

Seminar Kerja Praktek

Page 11: Seminar KP

11

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Keterangan :

Hd = Head discharge (m)

Pd = Tekanan discharge (N/m2)

Pa = Tekanan atmosfer di atas permukaan cairan (N/m2)

Zd = Jarak permukaan air dengan nozzle discharge pompa (m)

Hld = Head loss sisi discharge (m)

Vd = Kecepatan cairan pada pipa discharge (m/s)

ρ = Massa jenis cairan (kg/m3)

Head Discharge

Hd =

= ± Zd – hld –

Pd ρg

Pd

ρgVd2

2g

Seminar Kerja Praktek

Page 12: Seminar KP

12

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Keterangan :

Pd = Tekanan discharge (N/m2)

Ps = Tekanan suction (N/m2)

Hz = Tinggi kenaikan statis (m)

ΣHs = Rugi pada sisi isap

ΣHd = Rugi pada sisi tekan

Vd = Kecepatan cairan pada pipa discharge (m/s)

Vs = Kecepatan cairan pada pipa suction (m/s)

ρ = Massa jenis cairan (kg/m3)

Head Total

H = + Hz + ΣHs + ΣHd

+

(Pd – Ps)ρg(Vd2 – Vs2)

2g

Seminar Kerja Praktek

Page 13: Seminar KP

13

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Daya Motor

P = √3 VI cos ø

Keterangan :

P = Daya pompa (watt)

V = Tegangan (volt)

I = Kuat arus (A)

Cos ø = Faktor daya

Daya Pompa

Seminar Kerja Praktek

Page 14: Seminar KP

14

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Daya Fluida

Pf = ρ ˣ g ˣ H ˣ Q

Keterangan :

Pf = Daya fluida (watt)

Q = Kapasitas yang dihasilkan pompa (m3/s)

H = Head total (kg/m3)

g = Percepatan grafitasi

Seminar Kerja Praktek

Page 15: Seminar KP

15

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Keterangan :

Ŋ = Efisiensi (%)

Pf = Daya fluida (watt)

P = Daya pompa (watt)

Efisiensi Pompa

ŋ = x 100%Pf

P

Seminar Kerja Praktek

Page 16: Seminar KP

16

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

ANALISA PERFORMA

BOILER FEED WATER PUMP

Seminar Kerja Praktek

Page 17: Seminar KP

17

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Discharge Suction

Komponen

• Motor

•Kopling

•Pompa

Seminar Kerja Praktek

Page 18: Seminar KP

18

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Spesifikasi Pompa

Manufaktur : Weir Pumps Ltd

Serial number : 13192-001/006

Type : Barrel Casing

No of stage : 8

Liquid pump : Feed Water

Capacity : 252 m3/h

Suction temperatur : 1570C

Specific grafity : 0.91

Seminar Kerja Praktek

Page 19: Seminar KP

19

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Differential head : 1405 m

Efficiency : 81.5 %

Tekanan suction : 5 bar

Tekanan discharge : 165 bar

Power absord of duty : 1125 kW

Speed : 2980 rpm

Laju aliran minimum : 70 m3/h

Diameter Nominal Suction : 154.08 mm

Diameter Nominal Discharge : 139.76 mm

Seminar Kerja Praktek

Page 20: Seminar KP

20

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Manufacture : GEC Alsthom Large Machine Ltd

Serial number : J74025501-06

Rated Output : 1300 kW

Electrical Supply : 6600 V, 3 Ph, 50 Hz

No of poles : 2

Type : Squirrel Cage

Temperature Rise : 80oC

Protection : IP 56

Full load current : 147 A

Spesifikasi Motor Penggerak

Seminar Kerja Praktek

Page 21: Seminar KP

21

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Head Total

H =

=

= 1630 m

(Pd – Ps)ρg

(165 – 5) 105

1000 x 9.81

Perhitungan Spesifikasi

Seminar Kerja Praktek

Page 22: Seminar KP

22

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Daya Fluida

Pf = H ˣ Q ˣ ρ ˣ g

= 1630 x 0.07 x 1000 x 9.81

= 1119 kW

Efisiensi Pompa

ŋ = x 100%

= x 100% = 99%

Pf

P

11191125

Seminar Kerja Praktek

Page 23: Seminar KP

23

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Head Total

H =

=

= 1403 m

(Pd – Ps)ρg

(142.87 – 5.14) 105

1000 x 9.81

Perhitungan Sebelum Overhaul September 2011

Seminar Kerja Praktek

Page 24: Seminar KP

24

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Daya Fluida

Pf = H x Q x ρ x g

= 1403 x 0.07 x 1000 x 9.81

= 963 kW

Efisiensi Pompa

ŋ = x 100%

= x 100% =

85.6%

Pf

P

9631125

Seminar Kerja Praktek

Page 25: Seminar KP

25

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Head Total

H =

=

= 1507 m

(Pd – Ps)ρg

(153 – 5.1) 105

1000 x 9.81

Perhitungan Setelah Overhaul September 2011

Seminar Kerja Praktek

Page 26: Seminar KP

26

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Daya Fluida

Pf = H x Q x ρ x g

= 1507 x 0.07 x 1000 x 9.81

= 1034 kW

Efisiensi Pompa

ŋ = x 100%

= x 100% = 92%

Pf

P

10341125

Seminar Kerja Praktek

Page 27: Seminar KP

27

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Dari perhitungan didapat hasil head total boiler feed water pump pada data yang diambil

dari comisioning yaitu 1630 m dengan efisiensi sebesar 99%. Hal ini berbeda pada Differential

Head pada spesifikasi pompa yang mungkin disebabkan karna pada perhitungan head total, head

losses dianggap nol.

Sedangkan head total boiler feed water pump sebelum overhaul September 2011 dapat

diketahui sebesar 1403 m dan efisiensi pompa sebesar 85,6%. Dapat kita lihat terjadi penurunan

performa pompa yang mungkin disebabkan oleh kegagalan supply listrik pada motor, vibrasi,

kebocoran pada wearing ring dan mechanical seal, serta factor- factor lainnya.

Sedangkan head total boiler feed water pump yang didapat setelah dilakukan overhaul

adalah 1507 m dengan efisiensi pompa sebesar 92%. Dengan dilakukannya perbaikan pada

komponen-komponen pompa serta clearance pompa, maka akan meninkatkan performa dari

pompa boiler feed water pump itu sendiri.

Analisa Perhitungan

Seminar Kerja Praktek

Page 28: Seminar KP

28

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Spesifikasi

Head 1630 m

Efisiensi 99%

Sebelum Overhaul September 2011

Head 1403 m

Efisiensi 85.6%

Setelah Overhaul September 2011

Head 1507 m

Efisiensi 92%

KESIMPULAN

1. Boiler Feed Water Pump adalah pompa yang digunakan untuk mengalirkan air umpan boiler

yang di suplai dari deaerator

2. Dari data yang ada, maka didapat hasil sebagai berikut

Seminar Kerja Praktek

Page 29: Seminar KP

29

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

3. Pompa mengalami penurunan performa setelah lama digunakan, hal ini

disebabkan terjadinya keausan komponen, getaran, kavitasi, dan lain-lain.

4. Performa tersebut dapat dikembalikan dengan dilakukannya overhaul

( penggantian komponen- komponen yang telah aus/ rusak serta perbaikan

clearance)

Seminar Kerja Praktek

Page 30: Seminar KP

30

Mechanical Engineering DepartmentDiponegoro UniversityProf. H. Sudarto, S.H Street Tembalang _ Semarang Postcode 50275 Phone. (024) 7460059 Fax. (024) 7460059

PT. PLN (Persero)Sektor Pembangkitan Ombilin

Seminar Kerja Praktek

TERIMA KASIH