Jadual 1 : Harga unit purata bagi bar keluli dan simen 1
Table 1 : Average unit prices for steel bars and cement
Jadual 2 : Harga unit purata bagi bitumen, minyak bahan api dan diesel 5
Table 2 : Average unit prices for bitumen, fuel oil and diesel
Jadual 3 : Harga unit purata bagi : 7
Table 3 : Average unit prices for :
-Pasir/Sand
-Batu baur/Aggregates
-Premix
-Fabric Reinforcement
-Guardrail
-Paip air/Water pipe
-Paip pembetungan/Sewerage pipe
Lampiran A Jadual faktor pelarasan bagi paip air & paip pembetungan 31
Appendix A Adjustment factor table for water pipe & sewerage pipe
Nota Teknikal 39
Technical Notes
Jadual tarikh pengeluaran Siaran Khas 1 (Untuk Kerja-kerja Kejuruteraan Awam), 40
Semenanjung Malaysia, Januari-Disember 2015
Schedule of release dates for Special Release 1 (For Civil Engineering Works),
Peninsular Malaysia, January-December 2015
KANDUNGAN
CONTENTS
Muka SuratPage
i
JADUAL
TABLE
Kawasan
Region
Utara Tengah Timur
North Central East
(1) Bar Bulat Keluli Lembut BS-4449
Mild Steel Round Bars BS-4449
10mm (3/8") 2014 Dis 2321.66 2289.47 2608.75
2015 Jan 2327.50 2276.97 2608.75
Feb 2281.66 2258.94 2608.75
Mac 2280.66 2258.94 2608.75
Apr 2324.77 2350.62 2726.65
Mei 2348.51 2358.90 2707.53
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
12mm (1/2") 2014 Dis 2313.54 2318.56 2602.50
2015 Jan 2319.37 2318.56 2602.50
Feb 2273.54 2297.73 2602.50
Mac 2272.54 2297.73 2602.50
Apr 2319.21 2367.99 2726.65
Mei 2347.92 2380.62 2707.40
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
16mm (5/8") 2014 Dis 2193.33 2260.50 2510.21
2015 Jan 2199.44 2260.50 2510.21
Feb 2177.22 2243.00 2510.21
Mac 2176.11 2243.00 2510.21
Apr 2221.68 2327.84 2636.07
Mei 2248.08 2341.10 2631.99
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Item
RM Per Tan Metrik
RM Per Metric Ton
Jadual 1: Harga unit purata bagi bar keluli dan simen
Table 1: Average unit prices for steel bars and cement
Tempoh
Period
1
Kawasan
Region
Utara Tengah Timur
North Central East
(1) Bar Bulat Keluli Lembut BS-4449 (samb.)
Mild Steel Round Bars BS-4449 (cont'd)
20mm−25mm 2014 Dis 2242.03 2311.79 2576.92
(3/4"−1") 2015 Jan 2249.56 2311.79 2576.58
Feb 2221.25 2276.81 2576.58
Mac 2219.42 2276.81 2576.58
Apr 2269.47 2362.25 2638.76
Mei 2305.58 2373.30 2636.14
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
32mm (1 1/4") 2014 Dis 2219.42 2370.60 2566.25
2015 Jan 2227.75 2370.60 2566.00
Feb 2186.08 2336.22 2566.25
Mac 2182.75 2336.22 2566.25
Apr 2220.13 2436.49 2615.75
Mei 2242.82 2453.07 2584.83
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
(2) Mycon 60
High Tensile Deformed Bars
10mm (3/6") 2014 Dis 2290.56 2358.10 2591.75
2015 Jan 2296.67 2335.20 2600.08
Feb 2249.44 2312.70 2600.08
Mac 2248.33 2312.70 2600.08
Apr 2296.73 2385.16 2704.19
Mei 2323.75 2398.42 2685.06
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
RM Per Metric Ton
ItemPeriod
RM Per Tan Metrik
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd)
Tempoh
2
Kawasan
Region
Utara Tengah Timur
North Central East
(2) Mycon 60 (Samb.)
High Tensile Deformed Bars (Cont'd)
12mm (1/2") 2014 Dis 2293.33 2369.66 2591.75
2015 Jan 2299.44 2346.76 2600.08
Feb 2252.22 2321.76 2600.08
Mac 2251.11 2321.76 2600.08
Apr 2299.51 2399.52 2704.19
Mei 2330.07 2414.96 2685.06
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
16mm−25mm 2014 Dis 2189.85 2271.36 2556.35
(5/8"−1") 2015 Jan 2196.81 2256.09 2556.27
Feb 2170.31 2229.24 2557.46
Mac 2168.86 2229.24 2557.46
Apr 2215.57 2293.30 2635.07
Mei 2249.34 2303.12 2624.44
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
32mm (1 1/4") 2014 Dis 2183.33 2256.08 2526.00
2015 Jan 2195.00 2256.08 2526.00
Feb 2145.00 2227.95 2526.00
Mac 2141.67 2227.95 2526.00
Apr 2185.27 2299.46 2652.00
Mei 2233.37 2316.04 2607.83
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd)
RM Per Metric Ton
RM Per Tan Metrik
ItemTempoh
Period
3
Kawasan
Region
Utara Tengah Timur
North Central East
(3) Simen
Cement
Portland Biasa 2014 Dis 18.20 18.57 18.33
BS 12 2015 Jan 18.26 18.60 18.39
Ordinary Portland Feb 18.07 18.58 18.45
BS 12 Mac 18.07 18.63 18.48
Apr 18.92 19.56 19.48
Mei 19.04 19.71 20.40
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
RM Sekarung 50 Kg
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
23
PeriodItem
Tempoh
RM Per 50 Kg Bag
4
(1) Minyak Bahan Api
Fuel Oil
Sederhana 2014 Dis
Medium 2015 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
(2) Bitumen Penembusan 80/100
Bitumen 80/100 Penetration
2014 Dis
2015 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Harga bitumen penembusan 80/100 adalah berdasarkan harga purata ex-Kuala Lumpur.
The price for bitumen 80/100 penetration is based on average ex-Kuala Lumpur.
RM Seliter
2.17
2.17
2000.00
RM Per Litre
2.17
RM Per Tan Metrik
2.17
2.17
2.17
RM Per Metric Ton
2000.00
1650.00
1980.00
1650.00
1980.00
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel
Table 2: Average unit prices for bitumen, fuel oil and diesel
Semenanjung MalaysiaTempohItem
Peninsular MalaysiaPeriod
5
Tempoh Semenanjung Malaysia
Period Peninsular Malaysia
RM Seliter
(3) Minyak Gas Automotif RM Per Litre
Automotive Gas Oil Runcit* Sebenar
Retail Actual
Diesel 2014 Jan 2.000 2.728
Diesel Feb 2.000 2.728
Mac 2.000 2.765
Apr 2.000 2.765
Mei 2.000 2.739
Jun 2.000 2.712
Jul 2.000 2.712
Ogos 2.000 2.590
Sept 2.000 2.590
Okt 2.200 2.319
Nov 2.200 2.319
Dis 2.230 2.230R
2015 Jan 1.930 1.930
Feb 1.700 1.700
Mac 1.950 1.950
Apr 1.950 1.950
Mei 1.950 1.950
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Harga diesel adalah ex-Kuala Lumpur.
The price for diesel is ex-Kuala Lumpur.
* Harga runcit ialah harga selepas ditolak subsidi kerajaan.
Retail price is the price less government subsidy.
R = Kemaskini/Revised
Item
Table 2: Average unit prices for bitumen, fuel oil and diesel (cont'd)
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel (samb.)
6
Kawasan
Region
Utara Tengah Timur
North Central East
(1) Pasir
Sand
Pasir Sungai 2014 Dis 43.52 43.91 22.97
River Sand 2015 Jan 43.52 44.11 22.95
Feb 44.77 44.16 22.93
Mac 44.77 44.16 24.73
Apr 49.18 46.68 25.96
Mei 50.23 46.87 26.55
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Pasir Lombong 2014 Dis 30.93 44.62 29.25
Mining Sand 2015 Jan 30.93 44.62 29.25
Feb 31.78 44.72 29.25
Mac 31.78 44.95 29.25
Apr 32.74 48.02 29.25
Mei 32.74 48.98 29.25
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
(2) Batu Baur
Aggregates
Granite 2014 Dis 32.67 30.26 33.27
10mm (3/8") 2015 Jan 32.67 30.31 33.02
Feb 32.67 30.42 33.02
Mac 32.67 30.42 33.02
Apr 32.75 31.06 35.61
Mei 33.09 31.24 35.62
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.
PeriodItem
Tempoh
RM Per Tan Metrik
RM Per Metric Ton
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe
7
Kawasan
Region
Utara Tengah Timur
North Central East
(2) Batu Baur (Samb.)
Aggregates (Cont'd)
Granite 2014 Dis 34.43 26.24 27.56
20mm (3/4") 2015 Jan 34.43 26.22 27.57
Feb 34.43 26.22 27.57
Mac 34.96 29.11 30.70
Apr 37.22 31.71 32.15
Mei 37.53 31.49 33.56
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Granite 2014 Dis 27.80 29.08 27.53
40mm (1 1/2") 2015 Jan 27.80 29.31 28.20
Feb 27.50 29.68 28.30
Mac 27.50 30.73 28.30
Apr 27.97 30.90 29.68
Mei 28.36 31.04 29.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Crushed Aggregate (Crusher Run)
Crushed Aggregate (Crusher Run)
Crusher Run 2014 Dis 22.41 23.51 21.76
2015 Jan 22.41 23.63 21.80
Feb 22.41 23.61 21.80
Mac 22.77 23.61 21.94
Apr 22.96 24.93 22.13
Mei 21.92 25.05 21.83
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
water pipe & sewerage pipe (cont'd)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
RM Per Metric Ton
Tempoh
RM Per Tan Metrik
ItemPeriod
8
Kawasan
Region
Utara Tengah Timur
North Central East
(3) Premix Asphaltic Concrete
Premix Asphaltic Concrete
AC 10 (Wearing Course) 2014 Dis 178.50 194.73 213.00
2015 Jan 178.75 194.73 213.00
Feb 175.40 193.82 213.00
Mac 174.40 193.82 213.00
Apr 181.97 204.19 220.26
Mei 181.97 202.49 220.26
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
AC 14 (Wearing Course) 2014 Dis 181.83 187.67 198.80
2015 Jan 181.83 187.67 198.80
Feb 181.83 186.83 196.80
Mac 177.88 186.83 190.20
Apr 187.44 197.94 201.28
Mei 187.44 196.52 202.07
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
AC 28 (Binder Course) 2014 Dis 175.90 190.82 194.00
2015 Jan 176.22 190.82 194.00
Feb 176.00 189.91 191.40
Mac 176.13 189.91 184.80
Apr 185.85 201.20 197.45
Mei 185.85 199.76 197.72
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
ItemTempoh
Period
water pipe & sewerage pipe (cont'd)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
RM Per Tan Metrik
RM Per Metric Ton
9
Kawasan
Region
Utara Tengah Timur
North Central East
(3) Premix Asphaltic Concrete (samb.)
Premix Asphaltic Concrete (cont'd)
ACW 20 (Wearing Course) 2014 Dis 178.75 190.27 194.33
2015 Jan 179.00 190.27 194.33
Feb 178.71 189.36 194.33
Mac 177.38 189.36 194.33
Apr 186.91 197.81 201.67
Mei 186.91 197.81 202.73
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Period
Tempoh
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
RM Per Tan Metrik
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
Item
RM Per Metric Ton
10
Kawasan
Region
Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam
Premix Bituminous Macadam
BMR40 (Bound Roadbase) 2014 Dis 172.00 192.33 153.00
2015 Jan 172.00 192.33 153.00
Feb 172.00 190.67 157.50
Mac 172.00 190.67 129.00
Apr 178.08 195.11 136.74
Mei 178.08 196.78 139.92
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
BMR28 (Bound Roadbase) 2014 Dis 172.50 183.63 153.00
2015 Jan 172.50 183.63 153.00
Feb 172.50 182.38 153.00
Mac 172.50 182.38 153.00
Apr 178.08 192.02 153.00
Mei 178.08 192.02 153.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
BML10 (Levelling Course) 2014 Dis 166.50 201.33 176.50
2015 Jan 166.50 201.33 176.50
Feb 166.50 201.33 176.50
Mac 166.50 201.33 160.00
Apr 180.20 204.09 164.44
Mei 180.20 204.09 166.03
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
R = Kemaskini/Revised
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
water pipe & sewerage pipe (cont'd)
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
ItemTempoh
Period
RM Per Tan Metrik
RM Per Metric Ton
11
Kawasan
Region
Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam (samb.)
Premix Bituminous Macadam (cont'd)
BMB28 (Binder Course) 2014 Dis 180.67 184.22 171.50
2015 Jan 180.67 184.67 171.50
Feb 180.67 183.56 171.50
Mac 180.67 183.56 155.00
Apr 182.03 199.28 159.26
Mei 182.03 199.28 160.85
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
BMB20 (Binder Course) 2014 Dis 172.50 181.25 196.67
2015 Jan 172.50 181.25 196.67
Feb 172.50 181.25 196.67
Mac 172.50 181.14 183.00
Apr 178.08 192.68 191.17
Mei 178.08 192.68 191.80
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
BMW14 (Wearing Course) 2014 Dis 176.67 188.22 202.67
2015 Jan 176.67 188.22 202.67
Feb 176.67 185.44 202.67
Mac 176.67 183.40 191.67
Apr 180.20 195.03 203.17
Mei 180.20 194.03 204.23
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
paip air & paip pembetungan (samb.)
RM Per Metric Ton
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
RM Per Tan Metrik
12
Kawasan
Region
Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam (samb.)
Premix Bituminous Macadam (cont'd)
BMW20 (Wearing Course) 2014 Dis 173.50 185.70 201.00
2015 Jan 173.50 185.70 201.00
Feb 173.50 184.00 201.00
Mac 173.50 183.10 201.00
Apr 180.20 194.72 207.96
Mei 180.20 193.72 207.96
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
RM Per Tan Metrik
RM Per Metric Ton
13
Kawasan
Region
Utara Tengah Timur
North Central East
(4) Fabric Reinforcement
Fabric Reinforcement
A4, MS145 2014 Dis 2.45 2.97 3.43
2015 Jan 2.45 2.97 3.63
Feb 2.45 2.97 3.63
Mac 2.45 2.97 3.63
Apr 2.45 2.97 3.77
Mei 2.30 3.03 3.73
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
A5, MS145 2014 Dis 2.44 2.95 3.40
2015 Jan 2.44 2.95 3.60
Feb 2.44 2.95 3.60
Mac 2.44 2.95 3.60
Apr 2.44 2.95 3.73
Mei 2.29 2.99 3.70
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
A6, MS145 2014 Dis 2.18 2.60 3.05
2015 Jan 2.18 2.60 3.23
Feb 2.18 2.60 3.23
Mac 2.18 2.60 3.23
Apr 2.18 2.60 3.35
Mei 2.05 2.66 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
RM Per Kg
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
RM Per Kg
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
14
Kawasan
Region
Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.)
Fabric Reinforcement (cont'd)
A7, MS145 2014 Dis 2.18 2.60 3.05
2015 Jan 2.18 2.60 3.23
Feb 2.18 2.60 3.23
Mac 2.18 2.60 3.23
Apr 2.18 2.60 3.35
Mei 2.05 2.65 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
A8, MS145 2014 Dis 2.19 2.60 3.05
2015 Jan 2.19 2.60 3.23
Feb 2.19 2.60 3.23
Mac 2.19 2.60 3.23
Apr 2.19 2.60 3.35
Mei 2.05 2.66 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
A9, MS145 2014 Dis 2.18 2.60 3.05
2015 Jan 2.18 2.60 3.23
Feb 2.18 2.60 3.23
Mac 2.18 2.60 3.23
Apr 2.18 2.60 3.35
Mei 2.05 2.65 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
Tempoh
Period
RM Per Kg
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
Item
RM Per Kg
15
Kawasan
Region
Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.)
Fabric Reinforcement (cont'd)
A10, MS145 2014 Dis 2.36 2.52 3.05
2015 Jan 2.36 2.52 3.23
Feb 2.36 2.52 3.23
Mac 2.36 2.52 3.23
Apr 2.36 2.52 3.35
Mei 2.09 2.57 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B5, MS145 2014 Dis 2.63 2.94 3.39
2015 Jan 2.63 2.94 3.59
Feb 2.63 2.94 3.59
Mac 2.63 2.94 3.59
Apr 2.63 2.94 3.72
Mei 2.33 2.98 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B6, MS145 2014 Dis 2.36 2.62 3.05
2015 Jan 2.36 2.62 3.23
Feb 2.36 2.62 3.23
Mac 2.36 2.62 3.23
Apr 2.36 2.62 3.35
Mei 2.09 2.65 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
RM Per Kg
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
RM Per Kg
16
Kawasan
Region
Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.)
Fabric Reinforcement (cont'd)
B7, MS145 2014 Dis 2.36 2.65 3.05
2015 Jan 2.36 2.65 3.23
Feb 2.36 2.65 3.23
Mac 2.36 2.65 3.23
Apr 2.36 2.65 3.35
Mei 2.09 2.68 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B8, MS145 2014 Dis 2.37 2.65 3.05
2015 Jan 2.37 2.65 3.23
Feb 2.37 2.65 3.23
Mac 2.37 2.65 3.23
Apr 2.37 2.65 3.35
Mei 2.10 2.69 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B9, MS145 2014 Dis 2.36 2.65 3.05
2015 Jan 2.36 2.65 3.23
Feb 2.36 2.65 3.23
Mac 2.36 2.65 3.23
Apr 2.36 2.65 3.35
Mei 2.09 2.69 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
RM Per Kg
RM Per Kg
17
Kawasan
Region
Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.)
Fabric Reinforcement (cont'd)
B10, MS145 2014 Dis 2.36 2.64 3.04
2015 Jan 2.36 2.64 3.22
Feb 2.36 2.64 3.22
Mac 2.36 2.64 3.22
Apr 2.36 2.64 3.34
Mei 2.09 2.68 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
B12, MS145 2014 Dis 2.61 2.90 3.37
2015 Jan 2.61 2.90 3.57
Feb 2.61 2.90 3.57
Mac 2.61 2.90 3.57
Apr 2.61 2.90 3.70
Mei 2.32 2.94 3.66
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
C5, MS145 2014 Dis 2.63 2.84 3.39
2015 Jan 2.63 2.84 3.59
Feb 2.63 2.84 3.59
Mac 2.63 2.84 3.59
Apr 2.63 2.84 3.72
Mei 2.33 2.88 3.69
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
RM Per Kg
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
RM Per Kg
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
18
Kawasan
Region
Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.)
Fabric Reinforcement (cont'd)
C6, MS145 2014 Dis 2.63 2.84 3.39
2015 Jan 2.63 2.84 3.59
Feb 2.63 2.84 3.59
Mac 2.63 2.84 3.59
Apr 2.63 2.84 3.72
Mei 2.33 2.88 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
C7, MS145 2014 Dis 2.63 2.94 3.39
2015 Jan 2.63 2.94 3.59
Feb 2.63 2.94 3.59
Mac 2.63 2.94 3.59
Apr 2.63 2.94 3.72
Mei 2.33 2.98 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
C8, MS145 2014 Dis 2.62 3.01 3.38
2015 Jan 2.62 3.01 3.58
Feb 2.62 3.01 3.58
Mac 2.62 3.01 3.58
Apr 2.62 3.01 3.71
Mei 2.32 3.05 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
Tempoh
Period
RM Per Kg
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
Item
RM Per Kg
19
Kawasan
Region
Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.)
Fabric Reinforcement (cont'd)
C9, MS145 2014 Dis 2.62 2.94 3.38
2015 Jan 2.62 2.94 3.58
Feb 2.62 2.94 3.58
Mac 2.62 2.94 3.58
Apr 2.62 2.94 3.71
Mei 2.32 2.98 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
C10, MS145 2014 Dis 2.63 2.94 3.38
2015 Jan 2.63 2.94 3.58
Feb 2.63 2.94 3.58
Mac 2.63 2.94 3.58
Apr 2.63 2.94 3.72
Mei 2.33 2.98 3.68
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA4, MS145 2014 Dis 2.65 2.97 3.42
2015 Jan 2.65 2.97 3.62
Feb 2.65 2.97 3.62
Mac 2.65 2.97 3.62
Apr 2.65 2.97 3.72
Mei 2.35 3.01 3.72
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
RM Per Kg
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
RM Per Kg
20
Kawasan
Region
Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.)
Fabric Reinforcement (cont'd)
DA5, MS145 2014 Dis 2.64 2.95 3.40
2015 Jan 2.64 2.95 3.60
Feb 2.64 2.95 3.60
Mac 2.64 2.95 3.60
Apr 2.64 2.95 3.73
Mei 2.34 2.99 3.70
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA6, MS145 2014 Dis 2.36 2.64 3.05
2015 Jan 2.36 2.64 3.23
Feb 2.36 2.64 3.23
Mac 2.36 2.64 3.23
Apr 2.36 2.64 3.35
Mei 2.09 2.67 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA7, MS145 2014 Dis 2.36 2.65 3.05
2015 Jan 2.36 2.65 3.23
Feb 2.36 2.65 3.23
Mac 2.36 2.65 3.23
Apr 2.36 2.65 3.35
Mei 2.09 2.68 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
RM Per Kg
RM Per Kg
21
Kawasan
Region
Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.)
Fabric Reinforcement (cont'd)
DA8, MS145 2014 Dis 2.37 2.65 3.05
2015 Jan 2.37 2.65 3.23
Feb 2.37 2.65 3.23
Mac 2.37 2.65 3.23
Apr 2.37 2.65 3.35
Mei 2.10 2.68 3.32
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA9, MS145 2014 Dis 2.36 2.65 3.05
2015 Jan 2.36 2.65 3.23
Feb 2.36 2.65 3.23
Mac 2.36 2.65 3.23
Apr 2.36 2.65 3.35
Mei 2.09 2.68 3.31
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
DA10, MS145 2014 Dis 2.36 2.64 3.03
2015 Jan 2.36 2.64 3.21
Feb 2.36 2.64 3.21
Mac 2.36 2.64 3.21
Apr 2.36 2.64 3.33
Mei 2.09 2.68 3.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ItemTempoh
Period
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
RM Per Kg
RM Per Kg
22
Kawasan
Region
Utara Tengah Timur
North Central East
(5) Guardrail
Guardrail
Single Mounted 2014 Dis 138.35 140.05 143.00
i) 1.95m Post Spacing 2015 Jan 138.35 140.05 143.00
Feb 138.35 140.05 143.00
Mac 138.35 140.05 143.00
Apr 139.95 141.75 145.50
Mei 139.95 141.75 145.50
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ii) 3.80m Post Spacing 2014 Dis 98.10 99.25 101.40
2015 Jan 98.10 99.25 101.40
Feb 98.10 99.25 101.40
Mac 98.10 99.25 101.40
Apr 99.30 100.55 103.20
Mei 99.30 100.55 103.20
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
RM Per Meter
RM Per Metre
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
23
Kawasan
Region
Utara Tengah Timur
North Central East
(5) Guardrail (samb.)
Guardrail (cont'd)
Double Mounted 2014 Dis 212.10 214.60 219.20
i) 1.95m Post Spacing 2015 Jan 212.10 214.60 219.20
Feb 212.10 214.60 219.20
Mac 212.10 214.60 219.20
Apr 214.95 217.60 223.30
Mei 214.95 217.60 223.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ii) 3.80m Post Spacing 2014 Dis 163.85 165.85 169.30
2015 Jan 163.85 165.85 169.30
Feb 163.85 165.85 169.30
Mac 163.85 165.85 169.30
Apr 166.15 168.20 172.60
Mei 166.15 168.20 172.60
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.
R = Kemaskini/Revised
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
Period
RM Per Meter
RM Per Metre
ItemTempoh
24
Kawasan
Region
(6a) Paip Air
Water Pipe
Mild Steel Pipe 2014 Dis 196.00
300mm 2015 Jan 196.00
Feb 196.00
Mac 196.00
Apr 189.00
Mei 189.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Stainless Steel Pipe 2014 Dis 27.00
25mm 2015 Jan 27.00
Feb 27.00
Mac 27.00
Apr 27.00
Mei 27.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Ductile Iron Pipe 2014 Dis 283.30
300mm 2015 Jan 283.30
Feb 283.30
Mac 283.30
Apr 283.30
Mei 283.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Harga bagi paip air dan paip pembetungan adalah harga di kilang.
The prices for water pipe and sewerage pipe are ex-factory prices.
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
ItemTempoh
Period
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre
25
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
(6a) Paip Air (samb.)
Water Pipe (cont'd)
High Density Polyethylene 2014 Dis 1.50
(HDPE) Pipe 2015 Jan 1.50
i. Compression Fitting Using Feb 1.50
For Jointing Mac 1.50
25mm Apr 1.50
Mei 1.50
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ii. Electrofusion Jointing 2014 Dis 72.30
160mm 2015 Jan 72.30
Feb 72.30
Mac 72.30
Apr 72.30
Mei 72.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
iii. Butt Fussion 2014 Dis 57.63
160mm 2015 Jan 57.63
Feb 57.63
Mac 57.63
Apr 57.63
Mei 57.63
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
Tempoh
Period
RM Per Meter
RM Per Metre
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
water pipe & sewerage pipe (cont'd)
Item
26
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.)
Sewerage Pipe (cont'd)
Mild Steel Pipe 2014 Dis 211.68
300mm 2015 Jan 211.68
Feb 211.68
Mac 211.68
Apr 204.12
Mei 204.12
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Ductile Iron Pipe 2014 Dis 185.00
250mm 2015 Jan 185.00
Feb 185.00
Mac 185.00
Apr 185.00
Mei 185.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
High Density Polyethylene 2014 Dis 19.30
(HDPE) Pipe 2015 Jan 19.30
i. Profile Pipe Feb 19.30
150mm Mac 19.30
Apr 27.50
Mei 27.50
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ItemTempoh
Period
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
RM Per Meter
RM Per Metre
27
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.)
Sewerage Pipe (cont'd)
High Density Polyethylene 2014 Dis 68.80
(HDPE) Pipe 2015 Jan 68.80
ii. Solid Pipe Feb 68.80
250mm Mac 68.80
Apr 98.20
Mei 98.20
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
Vitrified Clay Pipe 2014 Dis 66.00
i. Standard Pipe 2015 Jan 66.00
225mm Feb 66.00
Mac 66.00
Apr 66.00
Mei 66.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ii. Jacking Pipe 2014 Dis 302.00
225mm 2015 Jan 302.00
Feb 302.00
Mac 302.00
Apr 302.00
Mei 302.00
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
RM Per Metre
ItemTempoh
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
Period
RM Per Meter
28
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.)
Sewerage Pipe (cont'd)
Reinforced Concrete Pipe 2014 Dis 185.30
i. Without Lining 2015 Jan 185.30
900mm Feb 185.30
Mac 185.30
Apr 185.30
Mei 185.30
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ii. With Lining (High Alumina) 2014 Dis 241.70
900mm 2015 Jan 241.70
Feb 241.70
Mac 241.70
Apr 241.70
Mei 241.70
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
iii. With Lining (Sacrificial Lining) 2014 Dis 213.60
900mm 2015 Jan 213.60
Feb 213.60
Mac 213.60
Apr 213.60
Mei 213.60
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
water pipe & sewerage pipe (cont'd)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
RM Per Meter
RM Per Metre
ItemTempoh
Period
29
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.)
Sewerage Pipe (cont'd)
ABS Pipe 2014 Dis 28.92
i. Gravity 2015 Jan 28.92
110mm Feb 28.92
Mac 28.92
Apr 28.92
Mei 28.92
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
ii. Force Main 2014 Dis 81.65
225mm 2015 Jan 81.65
Feb 81.65
Mac 81.65
Apr 81.65
Mei 81.65
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
RM Per Metre
Tempoh
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)
paip air & paip pembetungan (samb.)
Period
RM Per Meter
Item
30
LAMPIRAN APPENDIX
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
1. Mild Steel Pipe
100 mm Ø 0.25
150 " 0.36
200 " 0.47
250 " 0.59
300 " 1.00
350 " 1.16
400 " 1.32
450 " 1.48
500 " 1.63
600 " 2.18
700 " 2.80
750 " 2.99
800 " 3.18
900 " 3.56
1000 " 4.25
1100 " 5.53
1150 " 5.83
1200 " 6.40
1300 " 7.60
1400 " 8.16
1500 " 10.32
1600 " 10.98
1700 " 11.64
1800 " 12.30
1900 " 12.96
2000 " 14.74
2100 " 16.01
2200 " 17.33
2. Stainless Steel Pipe
13 mm Ø (1/2") 0.53
20 " (3/4") 0.69
25 " (1") 1.00
32 " (1 ") 1.34
38 " (1 ") 1.59
50 " (2") 2.14
63 " (2 ") 3.42
75 " (3") 4.66
100 " (4") 6.72
Category and size of pipe
Paip air
Water pipe
Jadual faktor pelarasan bagi paip air dan paip pembetungan
Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
21
21
41
31
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
3. Ductile Iron Pipe
100 mm Ø 0.35
150 " 0.45
200 " 0.60
250 " 0.79
300 " 1.00
350 " 1.25
400 " 1.50
450 " 1.78
500 " 2.05
600 " 2.70
700 " 3.50
4. High Density Polyethylene (HDPE) Pipe
i. Compression Fitting Using For
Jointing
20 mm Ø 0.69
25 " 1.00
32 " 1.63
40 " 2.59
50 " 3.93
63 " 6.18
75 " 8.83
90 " 12.68
ii. Electrofusion Jointing
110 mm Ø 0.48
125 " 0.63
140 " 0.80
160 " 1.00
180 " 1.30
200 " 1.54
225 " 1.96
250 " 2.46
280 " 3.27
315 " 3.97
355 " 6.29
400 " 7.80
450 " 12.98
500 " 17.76
560 " 21.02
Water pipe
Jadual faktor pelarasan bagi paip air dan paip pembetungan
Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe
Paip air
32
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
iii. Butt Fussion
110 mm Ø 0.48
125 " 0.62
140 " 0.76
160 " 1.00
180 " 1.25
200 " 1.56
225 " 1.94
250 " 2.38
280 " 2.97
315 " 3.76
355 " 4.79
400 " 6.06
450 " 7.90
500 " 7.90
560 " 12.61
Kategori dan saiz paip
Category and size of pipe
Paip air
Water pipe
Jadual faktor pelarasan bagi paip air dan paip pembetungan
Adjustment factor table for water pipe and sewerage pipe
33
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
1. Mild Steel Pipe
100 mm Ø 0.40
125 " 0.50
150 " 0.59
200 " 0.79
250 " 0.99
300 " 1.00
350 " 1.38
400 " 1.58
450 " 1.78
500 " 1.98
550 " 2.20
600 " 2.37
650 " 2.50
700 " 2.77
750 " 2.96
800 " 3.16
850 " 3.40
900 " 3.56
950 " 3.80
1000 " 3.95
1200 " 4.74
1400 " 5.53
1600 " 6.32
1800 " 7.11
2000 " 7.91
2100 " 8.30
2200 " 8.70
2. Ductile Iron Pipe
80 mm Ø 0.35
100 " 0.40
150 " 0.60
200 " 0.80
250 " 1.00
300 " 1.20
350 " 1.40
400 " 1.60
450 " 1.80
500 " 2.00
600 " 2.40
700 " 2.80
800 " 3.20
1000 " 3.40
1200 " 3.60
Category and size of pipe
Kategori dan saiz paip
Jadual faktor pelarasan bagi paip air dan paip pembetungan
Adjustment factor table for water pipe and sewerage pipe
Paip pembetungan
Sewerage pipe
34
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
i. HDPE (Profile) Pipe
100 mm Ø 0.64
125 " 0.80
150 " 1.00
200 " 1.73
250 " 1.28
300 " 4.10
350 " 7.50
400 " 10.55
450 " 12.00
500 " 17.00
550 " 19.31
600 " 19.32
650 " 19.50
700 " 20.25
750 " 21.27
800 " 25.60
850 " 31.07
900 " 35.00
950 " 38.19
1000 " 54.82
1200 " 74.00
1400 " 94.00
1600 " 123.23
1800 " 165.00
2000 " 207.35
2100 " 300.00
2200 " 400.00
ii. HDPE (Solid) Pipe
100 mm Ø 0.20
125 " 0.25
150 " 0.50
200 " 0.65
250 " 1.00
300 " 1.50
350 " 2.00
400 " 2.69
450 " 3.51
500 " 4.48
550 " 5.50
600 " 6.00
650 " 7.50
700 " 8.50
750 mm Ø 10.00
Kategori dan saiz paip
Jadual faktor pelarasan bagi paip air dan paip pembetungan
Adjustment factor table for water pipe and sewerage pipe
Category and size of pipe
Sewerage pipe
Paip pembetungan
35
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
800 " 11.75
850 " 15.00
900 " 16.50
950 " 18.00
1000 " 20.40
1200 " 24.00
1400 " 26.00
1600 " 32.00
1800 " 36.00
2000 " 38.00
2100 " 42.00
2200 " 45.00
4. Vitrified Clay Pipe
i. Vitrified Clay (Standard) Pipe
100 mm Ø 0.40
150 " 0.52
200 " 0.84
225 " 1.00
300 " 2.37
375 " 4.24
400 " 4.95
450 " 5.63
500 " 7.96
600 " 11.78
700 " 14.33
800 " 14.50
ii. Vitrified Clay (Jacking) Pipe
100 mm Ø 0.80
150 " 0.85
200 " 0.90
225 " 1.00
300 " 1.60
375 " 1.87
400 " 2.17
450 " 2.60
500 " 3.22
600 " 3.75
700 " 4.15
800 " 4.65
Kategori dan saiz paip
Category and size of pipe
Jadual faktor pelarasan bagi paip air dan paip pembetungan
Adjustment factor table for water pipe and sewerage pipe
Paip pembetungan
Sewerage pipe
36
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
5. Reinforced Concrete Pipe (RCP)
i. Without Lining
375 mm Ø 0.26
450 " 0.31
600 " 0.47
750 " 0.69
900 " 1.00
1050 " 1.33
1200 " 1.56
1350 " 1.97
1500 " 2.44
1650 " 2.80
1800 " 3.59
ii. With Lining (High Alumina)
375 mm Ø 0.26
450 " 0.31
600 " 0.47
750 " 0.69
900 " 1.00
1050 " 1.33
1200 " 1.56
1350 " 1.97
1500 " 2.44
1650 " 2.80
1800 " 3.59
iii. With Lining (Sacrificial Lining)
375 mm Ø 0.26
450 " 0.31
600 " 0.47
750 " 0.69
900 " 1.00
1050 " 1.33
1200 " 1.56
1350 " 1.97
1500 " 2.44
1650 " 2.80
1800 " 3.59
Jadual faktor pelarasan bagi paip air dan paip pembetungan
Paip pembetungan
Sewerage pipe
Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe
37
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
6. ABS Pipe
i. Gravity
90 mm Ø 0.67
110 " 1.00
150 " 2.07
225 " 3.64
315 " 7.10
ii. Force Main
15 mm Ø 0.01
20 " 0.02
25 " 0.03
32 " 0.04
40 " 0.05
50 " 0.08
65 " 0.15
80 " 0.18
100 " 0.30
150 " 0.61
200 " 1.13
225 " 1.00
250 " 3.73
280 " 1.48
315 " 1.87
355 " 2.37
400 " 3.01
450 " 3.81
500 " 4.71
630 " 7.47
Sewerage pipe
Paip pembetungan
Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe
Jadual faktor pelarasan bagi paip air dan paip pembetungan
38
NOTA TEKNIKAL
TECHNICAL NOTES
39
NOTA TEKNIKAL TECHNICAL NOTES
Harga bar keluli, simen dan fabric reinforcement
yang diterbitkan dalam Siaran Khas 1 ini
diperoleh dari pungutan harga yang dibuat oleh
Jabatan Perangkaan Malaysia.
Harga yang dilaporkan adalah mengikut 3
kawasan di Semenanjung Malaysia seperti
berikut:
Utara = Perlis, Kedah, Pulau Pinang
dan Perak
Tengah = Wilayah Persekutuan Kuala
Lumpur, Melaka, Negeri
Sembilan, Selangor dan
Johor
Timur = Pahang, Terengganu dan
Kelantan
Harga bitumen penembusan 80/100 adalah
berdasarkan harga purata ex-Kuala Lumpur.
Harga diesel diperoleh daripada Kementerian
Perdagangan Dalam Negeri, Koperasi dan
Kepenggunaan.
Harga paip air dan paip pembetungan diperoleh
daripada persatuan pembekal. Faktor pelarasan
bagi kategori dan saiz paip yang tidak diterbitkan
dalam Siaran Khas 1 ini adalah seperti di
Lampiran A.
Harga bagi bahan-bahan binaan lain (yang tidak
dinyatakan di atas) adalah diperoleh dari
pungutan harga yang dibuat oleh Jabatan
Perangkaan Malaysia.
Semua harga yang tersebut di atas adalah bagi
tujuan pengiraan kadar perubahan harga sahaja
dan tidak boleh digunakan untuk mewakili
kedudukan harga yang sebenar.
The prices for steel bars, cement and fabric
reinforcement published in this Special Release 1
are obtained from the price collection conducted
by Department of Statistics, Malaysia.
Prices are reported according to 3 regions in
Peninsular Malaysia as follows:
North = Perlis, Kedah, Pulau
Pinang and Perak
Central = Wilayah Persekutuan Kuala
Lumpur, Melaka, Negeri
Sembilan, Selangor and
Johor
East = Pahang, Terengganu and
Kelantan
The Bitumen 80/100 Penetration is based on the
average ex-Kuala Lumpur.
The price for diesel is obtained from the Ministry
of Domestic Trade, Co-operatives and
Consumerism.
The prices for water pipe and sewerage pipe are
obtained from the supplier associations. The
adjustment factors for the other categories and
sizes not published in this Special Release 1 are
shown in Appendix A.
The prices for other building materials (not stated
above) are obtained from the price collection
conducted by Department of Statistics, Malaysia.
All prices mentioned above are relevant for
escalation purposes only and should not be used
to represent actual price levels.
Bulan Rujukan Tarikh
Reference Month Date
Januari 2015 10 Februari 2015
January 2015 10 February 2015
Februari 2015 10 Mac 2015
February 2015 10 March 2015
Mac 2015 10 April 2015
March 2015 10 April 2015
April 2015 11 Mei 2015
April 2015 11 May 2015
Mei 2015 10 Jun 2015
May 2015 10 June 2015
Jun 2015 10 Julai 2015
June 2015 10 July 2015
Julai 2015 10 Ogos 2015
July 2015 10 August 2015
Ogos 2015 10 September 2015
August 2015 10 September 2015
September 2015 12 Oktober 2015
September 2015 12 October 2015
Oktober 2015 11 November 2015
October 2015 11 November 2015
November 2015 10 Disember 2015
November 2015 10 December 2015
Disember 2015 11 Januari 2016
December 2015 11 January 2016
Semenanjung Malaysia, Januari - Disember 2015
Jadual Tarikh pengeluaran Siaran Khas 1 (Untuk Kerja-Kerja Kejuruteraan Awam),
Schedule Of Release Dates For Special Release 1 (For Civil Engineering Works),
Peninsular Malaysia, January - December 2015
40