self inspection report (sir)

19
TELKOMSEL HUAWEI Picture 1. Site Location Picture 2. BTS cabinet OPEN

Upload: amanda-wulan

Post on 03-Oct-2014

68 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

Picture 1. Site Location

Picture 2. BTS cabinet OPEN

Page 2: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

Picture 3. BTS cabinet OPEN (from Far and Near)

Picture 4. DC input

Page 3: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

Picture 5. DC Power Output

Picture 6. CPRI (Optical Cable)

Page 4: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

Picture 7. Labeling Inside of Cabinet

Picture 8. Incoming and out going hole blocked

Page 5: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

Picture 9. DDF

Picture 10. Grounding between cabinet and door and PGND to bus bar

Page 6: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

N/A

Picture 11. - Overview vertical tray at of tower

N/A

Picture 12. Overview of RRU, power cable of RRU, CPRI cable and grounding of RRU Protected by black conduit

Page 7: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

N/A

Picture 13. Grounding RRU at Grounding BusBar

N/A

Picture 14. Grounding RRU

Page 8: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

N/A

Picture 15. Connection Jumper to Existing Feeder

N/A

Picture 16. Overview installation Antenna, RRU on the top of tower

Page 9: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

N/A

Picture 17. Overview installation of RRU on the top of tower

N/A

Picture 18. Overview installation Supporting RRU and Antenna

Page 10: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

N/A

Picture 19. Waterproofing at jumper feeder RRU

N/A

Picture 20. Waterproofing at RRU Power cable & CPRI cable

Page 11: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

N/A

Picture 21. Antenna Installation Sector 1

N/A

Picture 22. Panorama Overview Sector 1

Page 12: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

N/A

Picture 23. Antenna Installation Sector 2

N/A

Picture 24. Panorama Overview Sector 2

Page 13: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

N/A

Picture 25. Antenna Installation Sector 3

N/A

Picture 26. Panorama Overview Sector3

Page 14: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

EXISTING

Picture 27. VSWR Sector 1A

EXISTING

Picture 28. DTF Sector 1A

Page 15: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

EXISTING

Picture 29. VSWR Sector 1B

EXISTING

Picture 30. DTF Sector 1B

Page 16: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

EXISTING

Picture 31. VSWR Sector 2A

EXISTING

Picture 32. DTF Sector 2A

Page 17: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

EXISTING

Picture 33. VSWR Sector 2B

EXISTING

Picture 34. DTF Sector 2B

Page 18: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

EXISTING

Picture 35. VSWR Sector 3A

EXISTING

Picture 36. DTF Sector 3A

Page 19: Self Inspection Report (SIR)

TELKOMSEL HUAWEI

EXISTING

Picture 37. VSWR Sector 3B

EXISTING

Picture 38. DTF Sector 3B