SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

20 CONVENTIONAL DETAILS

& 1:20 BIKE HUB SECTION

HAND IN. 18 JUN 2012

BRIANNAJESSUP

307172686

Page 2: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

STEEL FRAME CONSTRUCTION (JUNCTION OF WALL & ROOF OVER PORTAL FRAME)

EXERCISE NO.

7DATE. 11 APR 2012

DRAWING NO. 1 / 2

SCALE. 1 : 10 @ A4

BRIANNAJESSUP

307172686

A01

EAVES GUTTER SECTION1:10

90MM DIAMETER DOWNPIPE

RAINWATER HEAD

FOR DETAIL REFER TO DRAWING NO. 2, A-02

Page 3: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

STEEL FRAME CONSTRUCTION (JUNCTION OF WALL & ROOF OVER PORTAL FRAME)

EXERCISE NO.

7DATE. 11 APR 2012

DRAWING NO. 2 / 2

SCALE. 1 : 5 @ A4

BRIANNAJESSUP

307172686

A02

EAVES GUTTER DETAIL1:5

EASBOARD SUSPENDED STRAWCEILING PANEL

110

180 PFC

PROPIETARY GALVANISED ANGLE WALL TIE

CAVITY BRICK WALL

GALVANISED BRICK TIE

TIMBER PACKINGSTEEL ‘C’ SECTION

COLORBOND CAPPING

CORRUGATED COLORBOND ROOF SHEETING

TIMBER PACKING

LYSAGHT QUAD GUTTER BRACKETAT 1000MM CENTRES

LYSAGHT QUAD GUTTER

300 COLD FORMED STEEL PURLIN STEEL ANGLE, WELDED TO PORTAL FRAME

INSULATION

12MM COMPRESSED FIBRE CEMENT FASCIAFIXED TO TOP HAT SECTIONTOP HAT SECTION AT 600 CENTRES

11050

BRACKET SUPPORT

Page 4: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

BOX GUTTER OVER PORTAL FRAME

EXERCISE NO.

8DATE. 10 APR 2012

DRAWING NO. 1 /2

SCALE. 1 : 10 @ A4

BRIANNAJESSUP

307172686

A01

BOX GUTTER SECTION 1:10

FOR DETAIL REFER TO DRAWING NO. 2, A-02

EXISITING STRUCTURE

Page 5: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

BOX GUTTER OVER PORTAL FRAME

EXERCISE NO.

8DATE. 10 APR 2012

DRAWING NO. 2 /2

SCALE. 1 : 5 @ A4

BRIANNAJESSUP

307172686

A02

BOX GUTTER DETAIL1:5

ROD SUSPENSION SYSTEM

SPANDECK

INSULATION

CORRUGATED, COLORBOND ROOF SHEETING

BRACKET SUPPORT

12MM FIBRE CEMENT CLADDING

ZINCALUME FLASHING

ZINCALUME FLASHING

CLEAT, WELDED TO PORTAL FRAME

150C GUTTER PURLIN

EASBOARD SUSPENDED STRAW CEILING PANEL

BOX GUTTER BRACKET

ZINCALUME BOX GUTTER

BRICK WALL TIES

CAVITY BRICK WALL

150C GUTTER PURLIN TOSTRUCTURAL ENGINEER’SDETAIL

GUTTER SUMP

WEEP HOLE

Page 6: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

DRY WALL CONSTRUCTION

EXERCISE NO.

10DATE. 29 APR 2012

DRAWING NO. 1 / 1

SCALE. 1 : 20 @ A4

BRIANNAJESSUP

307172686

A01

ELEVATION1:20

C01

PLAN1:20

B01

SECTION1:20

605

200

1000

150

20013MM PLASTERBOARD

STEEL CLEAT PLATE BOLTEDTO PANEL

SILICONE SEAL

200 x 200 x 200 STEEL ANGLE CAST INTO PANEL, FIXED BY STEEL THREADED STUDS WELDED TO BEAM

150MM CONCRETE SLAB

460 UB, REFER TO ENGINEER’S SPEC

THREADED ROD WELDED PLATEASSEMBLY SCREWED INTOFERRULES

PRECAST CONCRETE PANEL

BAFFLE STRIPSILICON SEAL & BACKING ROD

200 x 200 x 200 STEEL ANGLE CAST INTO PANEL FIXED BY A STEEL THREADED STUDS WELDED INTO BEAM

CONCRETE SLABPRECAST CONCRETE PANEL

460UB BELOW, REFER TO ENGINEER’S SPEC

REBATE

STEEL CLEAT PLATE BOLTED TO PANEL

STEEL ANGLE CASTINTO PANEL, FIXED BYSTEEL THREADED STUDS WELDED INTOBEAM

PRECAST CONCRETEPANEL

25MM REBATE

70MM REBATE

200

STEEL STUD FRAME

FIRE RATE BULK HEAD13MM PLASTERBOARD

SUSPENDED PLATERBOARD CEILING SYSTEM

Page 7: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

DRY WALL CONSTRUCTION

EXERCISE NO.

11DATE. 04 MAY 2012

DRAWING NO. 1 / 1

SCALE. 1 : 5 @ A4

BRIANNAJESSUP

307172686

ACOUSTIC SEALANT

A01

ACOUSTIC PARTITION DETAIL1:5

2 x 13MM PLASTERBOARD,INNER SHEETING IS SEALED AT TOP &BOTTOM WITH ACOUSTIC SEALANT

SERVICES HUNG FROM CEILING

UNDERSIDE OF CONCRETE SLAB

INSULATION,50MM ABSORPTIVE QUILT IN CAVITY. REFER TO ACOUSTIC SPEC.

SUSPENDED PLASTERBOARD CEILING

SUSPENSION ROD

SUSPENSION ROD BRACKETFIXED TO SLAB

STUD C SECTION, LIGHTWEIGHT DEFLECTION HEAD TRACK, SCREWED TO SLAB & SEALED WITH ACOUSTIC SEALENT

92MM STEEL STUD FRAME,SCREWED TO HEAD & BASE TRACK@ 600 CENTRES

STUD C SECTION, BASE TRACK, SCREWED TO SLAB & SEALED

10MM SHADOW LINE BRACKET

CONCRETE SLAB

FFL

JOINER AGAINST THE WALL FOR STABILITY

ACOUSTIC SEALANT

FURRING CHANNEL@ 600 CENTRES

TOP CROSS RAIL @ 1250 CENTRES

Page 8: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

GRC PANEL

EXERCISE NO.

12DATE. 06 MAY 2012

DRAWING NO. 1 / 2

SCALE. 1 : 10 @ A4

BRIANNAJESSUP

307172686

A01

SECTION1:10

POLISHED GRC PANEL (20MM)

BEARING SUPPORT COMPRISING BOLTWELDED TO STEEL PLATE CONNECTED TO UNISTRUT CAST IN BEAM

SUSPENDED 13MM PLASTERBOARD CEILING

SEALANT

SPRING LOADED ATTACHMENT

2 x 13MM PLASTERBOARD

STEEL STUD, SCREWED TO HEAD & BASE TRACK WHICH ARE FIXED TO SLAB

INSULATION

CONCRETE SLAB

WINDOW OPENING

SPRING LOADED ATTACHMENT

FURRING CHANNEL@ 600 CENTRES

TOP CROSS RAIL @ 1250 CENTRES

SUSPENSION ROD

SUSPENSION ROD BRACKETFIXED TO SLAB

LIGHTWEIGHT STEEL SUBFRAME

STEEL FIXING ANGLE

UNISTRUT

890

Page 9: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

GRC PANEL

EXERCISE NO.

12DATE. 06 MAY 2012

DRAWING NO. 2 / 2

SCALE. 1 : 10 @ A4

BRIANNAJESSUP

307172686

A02

PLAN1:10

GALVANISED STEEL FRAME SUPPORTINGGRC PANELS THROUGH SPRING LOADEDATTACHMENTS

BEARING SUPPORT COMPRISING BOLT WELDEDTO STEEL PLATE CONNECTED TO UNISTRUT CAST IN BEAM TO SUPPORT THROUGH AN ANGLE

POLISHED GRC PANEL

UNISTRUT CHANNEL

Page 10: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

FIRE SEPERATION: CURTAIN WALL

EXERCISE NO.

13DATE. 11 MAY 2012

DRAWING NO. 1 / 2

SCALE. 1 : 50 @ A4

BRIANNAJESSUP

307172686

A01

CURTAIN WALL ELEVATION1:50

900

FL

FL

FL

TRANSOME

TRANSOME

TRANSOME

STACK JOINT

STACK JOINT

STACK JOINT

COUPLING MULLIONS

COUPLING MULLIONS

GLASS SPANDREL PANEL

GLASS SPANDREL PANEL

GLASS SPANDREL PANEL

W

W

750

A02

Page 11: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

FIRE SEPERATION: CURTAIN WALL

EXERCISE NO.

13DATE. 11 MAY 2012

DRAWING NO. 2 / 2

SCALE. 1 : 10 @ A4

BRIANNAJESSUP

307172686

A02

CURTAIN WALL SECTION1:10

150

SUSPENDED 13MM PLASTERBOARD CEILING

SUSPENSION ROD BRACKETFIXED TO SLAB

SUSPENSION ROD

FURRING CHANNEL@ 600 CENTRES

TOP CROSS RAIL @ 1250 CENTRES

TIMBER

13MM PLASTERBOARD SHEETING

50 MM INSULATION (RELFECTIVEROLL SURFACE),

FIXED TO BACK PAN 1.2MM SMOKE SEAL (MADE FROMLIGHT WEIGHT METAL)EXTRUDED 150MM SQUAREALUMINIUM ANGLE

STEEL STUD, SCREWED TO HEAD& BASE TRACK

UNISTRUT CAST INTO CONCRETE SLAB

ALUMINIUM STACK JOINT

DOUBLE GLAZINGSEALANT

FIBREGLASS CEMENT SHEETING

DOUBLE GLAZING

ALUMINIUM TRANSOM

GLAVANISED STEEL BACKPAN(FIXED TO TRANSOM &

STACK JOINT)200MM REBATED CONCRTE SLAB

FIRE SEAL INSULATION(FIXED CONTINUOUSLY ALONG

EDGE OF SLAB)

SMALL ALUMINIUM ANGLE &10MM SHADOWLINE

AIR SEAL(RUNS CONTINUOUSLY AROUND

INSULATION PANEL)

200

Page 12: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

CURTAIN WALL JUNCTIONS

EXERCISE NO.

14DATE. 12 MAY 2012

DRAWING NO. 1 / 1

SCALE. 1 : 2 @ A4

BRIANNAJESSUP

307172686

B01

MULLION DETAIL1:2

135

A01

STACK JOINT DETAIL1:2

FALL

ALUMINIUM STACK JOINT

SILICONE SEALANTDOUBLE SIDED TAPE

NEOPRENE SEALDOUBLE GLAZING

SILICONE SEALANTDRIP GROOVING

BACKING ROD

SILICONE SEALANT

SILICONE SEALANT

COLOUR BACK GLAZED SPANDREL

THE 2 PART ARE NOT CONNECTEDSTRUCTURALLY TO ALLOW FORVERTICAL MOCEMENT WITHIN THEFACADE TO PREVENT FACADEDAMAGE

150

16013

0

PACKING

DOUBLE SIDED TAPEPACKING

THE 2 PART OF THE MULLION ARE NOT CONNECTED STRUCTURALLY

TO ALLOW FOR HORIZONTAL MOVEMENT WITHIN THE FACADE

TO PREVENT FACADE DAMAGE

ALUMINIUM MULLION

NEOPRENE SEAL

BACKING ROD

SILICONE SEALANT

DOUBLE SIDED TAPE

STRUCTURAL DOUBLE GLAZING

SILICONE SEALANT

4010 10

DRAIN HOLE

Page 13: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

FIXING ANGLESECURES CURTAIN

WALL TO SLAB

EXERCISE.

PARAPET WATERPROOFING (NON ACCESSIBLE)

EXERCISE NO.

15DATE. 19 MAY 2012

DRAWING NO. 1 / 2

SCALE. 1 : 10 @ A4

BRIANNAJESSUP

307172686

A01

PARAPET DETAIL 1:10

FALL

FALL

100100

300

250

200

WATERPROOF MEMBRANE

STONE BALURST (100-150MM DEEP)

INSULATION; ROOF MATE (50MM)FILTER FABRIC

CONCRETE SLAB (WITH FALL)

FLASHING

25MM CAPPING FIXING STRAP @ 300 CENTRES

PARAPET CAPPING (WITH FALL)

ANGLE

INSULATION,50MM

SMALL WALL ANGLE

SUSPENSION ROD BRACKET,FIXED TO SLAB

SUSPENSION RODFURRING CHANNEL @ 600 CENTRESTOP CROSS RAIL @ 1250 CENTRES

SUSPENDED PLATERBOARD CEILING

GLAZING

Page 14: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

PARAPET WATERPROOFING (NON ACCESSIBLE)

EXERCISE NO.

15DATE. 19 MAY 2012

DRAWING NO. 2 / 2

SCALE. 1 : 10 @ A4

BRIANNAJESSUP

307172686

A02

RAINWATER OUTLET DETAIL 1:10

50

STONE BALURST (100-150MM DEEP)

STAINLESS STEEL GRAVEL RETAINER

CAST OUTLET IN SLAB

CONCRETE SLAB

INSULATION, ROOF MATE (50MM)

FILTER FABRIC

WATERPROOF MEMBRANE

RAINWATER OUTLET SITTS IN SLAB,CONNECTED TO PIPE

Page 15: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

PARAPET WATERPROOFING

EXERCISE NO.

16DATE. 20 MAY 2012

DRAWING NO. 1 /1

SCALE. 1 : 10 @ A4

BRIANNAJESSUP

307172686

A01

ACCESSIBLE PARAPET DETAIL 1:10

110

SANDSTONE PARAPET CAPPING

B01

DETAIL 1:5

BRICKWORK

CONCRETE PAVING, (LEAVE GAPS OPEN TOALLOW FOR DRAINAGE)

METAL HANDRAIL

FALL

SHELF ANGLESUSPENSION ROD

SUSPENSION ROD BRACKET

ADJUSTABLE PEDESTALS

FILTER FABRIC

INSULATION, ROOF MATE (50MM)WATERPROOF MEMBRANE

CONCRETE SLAB

FLASHING

WEEP HOLE

FURRING CHANNEL @ 600 CENTRES

TOP CROSS RAIL @ 1250 CENTRES

SUSPENDED PLATERBOARD CEILING

FLASHING

CONCRETE PAVING(20MM)

ADJUSTABLE PEDESTALS

FILTER FABRIC

INSULATION, ROOF MATE (50MM)WATERPROOF MEMBRANE

CONCRETE SLAB(WITH FALL)

10MM MORTOR

BRICKWORK

FLASHING

WEEP HOLE

250

Page 16: Selection of Building Details

A01

SECTION DETAIL1:5

150

STEEL STUD FRAMING

STEEL ANGLE

PRECAST PANEL

CONCRETE SLAB

SEAL

STAINLESS STEELFLASHING

STAINLESS STEELFLASHING

STONE CLADDING

STAINLESS STEELFIXING ANGLE

POLYSULPHINE SEALANT

STONE CLADDING

50

200

2003030

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

STONE PANEL FIXING

EXERCISE NO.

17DATE. 24 MAY 2012

DRAWING NO. 1 /2

SCALE. 1 : 5 @ A4

BRIANNAJESSUP

307172686

B01

DETAIL1:2

STAINLESS STEELFIXING ANGLE

SEALANT

STAINLESS STEELPINS

40

Page 17: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

STONE JOINT DETAILS

EXERCISE NO.

17DATE. 24 MAY 2012

DRAWING NO. 2 /2

SCALE. 1 : 2 @ A4

BRIANNAJESSUP

307172686

A02

BUTT JOINT1:2

30

ROD

B02

BIRDS MOUTH JOINT1:2

C02

MITRE JOINT1:2

D02

CORNER BUTT JOINT1:2

E02

CORNER REBATE1:2

6

10

6

30

10

30

30

66

30

30

10

30

30

6SEALANTSTONE (30MM)

30

Page 18: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

TERRART FLEX - SUBSTRUCTURE SYSTEM

EXERCISE NO.

18DATE. 26 MAY 2012

DRAWING NO. 2 /2

SCALE. 1 : 2 @ A4

BRIANNAJESSUP

307172686

A01

SECTION1:2

10

TERRACOTTA TILE

INSULATION

FIXING CLIP

OPEN JOINT

GASKET

‘T’ BRACKET

‘T’ FRAME

40

Page 19: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

SUSPENDED GLASS WALL SYSTEM

EXERCISE NO.

19DATE. 11 JUNE 2012

DRAWING NO. 1 / 1

SCALE. 1 : 100 @ A4

BRIANNAJESSUP

307172686

A01

SECTION1:100

STEEL BEAM

B01

ELEVATION1:100

C01

SPIDER FITTING, SIDE ELEVATION1:5

ALUMINIUM SHEETCLADDING

PROPRIATARY HANGERBRACKETS

PROPRIATARYSPIDER CONNECTION

STRUCTURAL GLASS FIN

FFL

FFL

SILICONE SEALANT

DOUBLE GLAZING

Page 20: Selection of Building Details

SUBJECT.

ADVANCED TECHNOLOGIES 1

SUBJECT NO. MARC4101

EXERCISE.

FRAMED PARAPET WATERPROOFING

EXERCISE NO.

20DATE. 09 JUNE 2012

DRAWING NO. 1 /1

SCALE. 1 : 5 @ A4

BRIANNAJESSUP

307172686

PURLING CHANNELS

A01

COMPOSITE ALUMINIUM CLADDING1:5

150

300

100

200 ‘I’ SECTIONFASCIA FRAME

ALUCO BOND JOINT SLEEVES

ALUCO BOND FASCIACLADDING 4-6MM

ALUCO BONDSECTION

BACKING ROD & SILICONE SEALANT

250 UB

INSULATION

ROOF FLASHING

200 ZED PURLIN

WINDOW OPENING

Page 21: Selection of Building Details

CONCRETE PAVERS

SAND-ASPHALT SETTING BED (20MM)

COMPACT SOIL SUBGRADE

PRECAST CONCRETE PANEL(150 MM)

GLASS LOUVRES

PRECAST CONCRETE PANEL (150MM)

REINFORCED CONCRETE SLAB TO ENGINEER’S SPECIFICATION

CAST IN FIXING, BOLTS & PLATE

CAST IN FIXING, BOLTS & PLATE

GIRT

RECESSED DOWNLIGHT

PRECAST CONCRETE PANELS(50MM)

SUSPENDED PLASTERBOARDCEILING (13MM)

CONCRETE BLOCK WORK

WATERPROOF MEMBRANE

PVC PIPE WITH ELECTRIC PUMPTO SUMP TO HYDRAULIC

ENGINEER’S SPECIFICATIONSAND INFILL

REMOVABLE CONCRETE BLOCK FROM DRAIN SERVICES

10MM CEMENT MORTOR

REINFORCED CONCRETE SLAB TO ENGINEER’S SPECIFICATION

DRAIN

CONCRETE PIER

SLIDING DOOR WITHFIXED GLAZING

PRECAST CONCRETE BENCH

WATERPROOF MEMBRANE

ZINCALUME FLASHING

SPANDECKINSULATION (50MM) CLEAT, WELDED TO PORTAL FRAME

150C GUTTER PURLIN

SUBJECT.

ADVANCED TECHNOLOGIES 1

PROJECT.

NEWTOWN BIKE HUB

DATE. 16 JUN 2012

DRAWING NO. 1 /1 SCALE. 1 : 20 @ A3

BRIANNAJESSUP

307172686

SUBJECT NO.

MARC4101

CONCRETE PAVERS

GUIDE CHANNEL CAST INTO SLAB

STEEL PORTAL FRAME(500MM COLUMN)

ROD SUSPENSIONSYSTEM

CORRUGATED, COLORBOND ROOF SHEETING ZINCALUME FLASHING

BOX GUTTER BRACKETZINCALUME BOX GUTTER

STEEL PORTAL FRAME (500MM DEEP BEAM)

A01

WALL SECTION1: 20

FOR THIS PROJECT, A 500MM STEEL PORTAL FRAME WAS CONSIDERED NECESSARY AS THE FRAME SUPPORTS A MECHANICAL BIKE RACK SYSTEM.

1015

1000

1000

1000