  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2016/2017 Marghera (VE) Versalis S.p.A.Turnkey supply of 2 Steam genera-tors

    Turnkey supply of 2 Steam genera-tors complete with B.O.P. (piping, pipe racks, degasser, feed pumps, steam tur-bines, etc.).Capacity each. 85 ton/hPressure 33 Barg Temperature 351 C

    In construction

    2014/2015 Torino Mirafiori EDF Fenice F.C.A. MIRAFIORI (TO)

    Turnkey supply of steam generatorCapacity 153 ton/hPressure 28 barTemperature 320C

    2014/2015 Priolo Gargallo (SR) Isab S.r.l. IGCC PLANT AND BOP PLANT

    Revamping HRSG - Change convertion from syngas to natural gas - capacity 350 ton/h - pressure 130 bar - temperature 520C

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2013/2014 Bolgiano, Italy EnipowerCogeneration Power Plants ENI-POWER Bolgiano (MI)

    Turnkey of one heat recovery steam generator with post-combustion.Fluid: superheated waterCapacity: 1633 t/hInlet temperature: 100COutlet temperature: 125CPressure: 9 bargPost combustion duty: 30 MWthTotal duty: 78 MWth

    2014 Sarroch (CA) Saras S.p.A. Revamping Refinery

    Complete revamping of CO BOILER.Capacity 112 ton/h Pressure 72,5 barTemperature 490 C

    2013/2015 Corleto Perticara (PZ) Renco/Tecnimont/TotalTempa Rossa Corleto Perticara (PZ)

    Turnkey Supply Two H.R.S.G. BoilersCapacity 27.8 ton/ hPressure 45 barTemperature 440 C

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2012/2013 Torino Mirafiori EDF Fenice F.CA Mirafiori (TO)Turnkey supply of water tube boilerCapacity 100 ton/hPressure 29 barTemperature 330 C

    2012/2013 Priolo Gargallo,Nord Plant ERG PowerComplete revam-ping of SA1N1 boiler and BOP plant

    Complete revamping of the SA1N1 boi-ler and BOP plant.Complete SNCR SCR.Capacity 187 ton/hPressure 120 barTemperature 533 C

    2012/2013 Priolo Gargallo ISAB Refinery Impianti Nord CR 27 - CO boiler revamping

    Revamping of the CO boilerScope of work:complete substitution D walls and evaporator;Substitution of ignition system;Update of the combustion system.

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2011/2012 Fiat Mirafiori EDF Fenice Water Tube BoilerTurnkey supply of water tube boilerCapacity 100 ton/hPressure 29 barTemperature 330 C

    2011/2012 Val dAgri (PZ)Quinto Treno (ATI Bonatti,Irem/Gavazzi) per Eni Cen-tro Olio Val DAgri (PZ)

    Water Tube BoilerTurnkey supply of steam boilerCapacity 82,5 ton/hPressure 37 barTemperature 305

    2011 Azerbaijan Republic Renco / SocarNETF DASHLARY GTCPP Cogeneration Plant

    Turnkey supply of no. 3 Heat Recovery Water Heaters.Capacity 160 ton/hPressure 10 barTemperature 155 C

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2011 Reggio Emilia (Italy) Iren Ambiente Plant for district heating

    Complete revamping of boilerCapacity 46,5 ton/hPressure 90 barTemperature 510 C

    2010/2011 Reggio Emilia (Italy) Iren AmbientePlant for District Heating

    Turnkey supply of Direct Fired Steam Boiler: Capacity 46, 5 ton/hPressure 90 Bar, Temperature 505 C

    2010 Torrevaldaliga Nord (Rome) Enel ProduzioneCogeneration Plant

    Turnkey supply of Direct Fired Steam Boiler: Capacity 60 ton/hPressure 20 BarTemperature 250 C

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2010 Atessa (CH) FeniceSevel Cogeneration Plant

    Turnkey supply of HRSG 2 levels with Post Combustion: Capacity 57,3 ton/hPressure 40 BarTemperature 380 C

    2009/2010 Priolo Gargallo (SR) Isab Energy Power Plant

    Dismantling and Turnkey supply of HRSG with three pressure levels: Capacity 350 ton/hPressure 130 BarTemperature 520 C

    2009 Syria Thorne Int. Boiler Paper Mill

    Turnkey supply of Direct Fired Steam Boiler: Capacity 60 ton/hPressure 44 BarTemperature 430 C

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2009 Sarroch (CA) Saras S.p.A. Revamping in RefineryEngineering, fabrication and erection of CO-Boiler

    2009 Cassino (FR) Fenice Fiat Auto

    Turnkey Supply of Direct Fired Steam Boiler: Capacity 30 ton/hPressure 30 BarTemperature 234 CHot Stand-by

    2008/2009 Sora (FR) STC Power Plant Burgo Paper Mill

    Turnkey Supply of HRSG With Post-Combustion and Fresh-Air: Capacity 90 ton/hPressure 70 BarTemperature 450 C

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2008/2009 Ravenna Cabot Corporation Power Plant

    Turnkey Supply of Direct Fired Steam Boiler for Tail Gas: Capacity 110 ton/hPressure 76 BarTemperature 510 C

    2007 Collombey Switzerland Foster Wheeler ItalyRevamping of Boiler for Tamoil Refinery

    Complete revamping of: Existing pressure parts dismantling, fabrication of related parts, erection, commissioning and start-up.HRSG Boiler

    2007 Conselice (RA) Unigr Power Plant

    Turnkey Supply of HRSG Downstream of nr. 3 Palm Oil driven Engine: Capacity 36 ton/hPressure 26 BarTemperature 395 C

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2006 Correggio (RE) Silcompa Power Plant

    Turnkey Supply of Direct Fired Water Tube Boiler, Equipments and Piping for Thermal Plant: Capacity 15 ton/hPressure 48 BarTemperature 400 C

    2006 Teverola (CE) Foster Wheeler Italy Power Plant SET Energia

    Turnkey Supply of HRSG with three pressure levels: Capacity 465 ton/hPressure 120 barTemperature 540 C

    2006 Voghera (PV) Foster Wheeler Italy Power Plant Voghera Energia

    Turnkey of HRSG with three pressure levels: Capacity 465 ton/hPressure 120 barTemperature 540 C

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2004 Le Havre (France) Ansaldo Caldaie Power PlantEDF Revamping of fossil fuel boiler 700 MW

    2003/2008 Libya Technip KTI Italy Wafa Turnkey supply of No. 3 HRSGs

    2003 Ferrera B. (PV) Nooter Eriksen Eni Power

    Supply of no. 2 HRSGs: Capacity 465 ton/h Pressure 120 barTemperature 540 Cno. 1 HRSG Syngas with capacity 280 ton/h

  • BoilersSelected References

    Year Site Client Project Name Supply Photo

    2003 Mantova Nooter Eriksen Eni PowerSupply of nr. 2 HRSGs with capacity 465 ton/hPressure 120 barTemperature 540 C

    2002 Cameroon Exxon Halliburton/Kellog Brown & RootSupply of no. 10 Waste Heat Recovery Units

    2002 Saudi Arabia Technip Italy Harad Supply of No. 4 Waste Heat Boilers

  • Heaters Selected References

    Year Site Client Project Name Supply Photo

    2014/2016 EXXon MobilAntwerp Foster Wheeler USA Antwerp

    Supply and modularization of 2 Cocker Heater ( 3 radiants 27 x 6.5 x 4 m with insulation and pressure parts) , hot air duct, radiant to convection flue gas, duct & lower convection section, 1 stack (60 mt 4.4 diameter with insu-lation), preheater ducts and structural steel, platform steel, handrail, grating and lader.

    In progress

    2014/2015 Priolo Gargallo (SR) ITALY IsabHeater Go-Finer Unit 700-F 101N

    Turn-key supply No. 1 Heater Go Finer Termal Power 25 MW , Pressure 66.5 bar , temperature 600C.

    In progress

    2014/2015 Chinarevskoye- NorthWest KazakhstanIPM/Zhaikmunai LLP GGTU3 Turn-key Complete System Hot Oil In progress

  • Heaters Selected References

    Year Site Client Project Name Supply Photo

    2013/2014 Takreer, Abu Dhabi Foster Wheeler USAPlant RefineryTAKREER, ABU DHABI

    Supply and modularization of 1 Cocker Heater (6 radiants 27 x 6.5 x 4 m with in-sulation and pressure parts), 1 stack (60 m x 4 diameter with insulation), ducts with insulation and structural steel, pla-tform steel, handrail, grating and lader.

    2012/2013 Tupras, Turkey Foster Wheeler USA Plant Refinery TUPRAS TURKEY

    Supply and modularization 2 Cocker He-ater (8 radiants 27 x 6.5 x 4 m with insu-lation and pressure parts), 2 stackS (60 m x 4 diameter with insulation), ducts with insulation and structural steel, pla-tform steel, handrail, grating and lader.

    2010/2011 Priolo Gragallo Isab Revamping Revamping of sulphur heaters tag. 1200X-1 F 102 1200X-3-F102

  • Heaters Selected References

    Year Site Client Project Name Supply Photo

    2010 Texas USA Foster Wheeler USA Valero Refinery Supply and modularization of nr. 2 Cocker Heaters

    2009 Arzew Algeria UHDE GmbH Sorfert

    Turnkey Supply of no. 2 Start-Up Heaters: Thermal Power 7,3 MWPressure 230 BarCapacity 48 ton/h

    2009 Bourgas Bulgaria UHDE GmbH / LucoilBourgas Refinery/Lukoil/Neftochim Oil Company

    Turnkey Supply of no. 1 Prime G Start-Up Heater: Thermal Power 3,7 MWPressure 27,6 BarCapacity 120 ton/h

  • Heaters Selected References

    Year Site Client Project Name Supply Photo

    2009 Damietta Egypt UHDE GmbHDamietta/Egyp-tian Eagrium Ni-trogen Prod. Co.

    Turnkey Supply of no. 2 Convection Bank Heaters: Thermal Power 60 MWPressure 35-122 BarCapacity 194 ton/h

    2009 Damietta Egypt UHDE GmbHEgyptian Eagrium Nitrogen Prod. Co.

    Turnkey Supply of no. 2 Start-Up Heaters: Thermal Power 6 MWPressure 107-190 BarCapacity 40 ton/h

    2009 Port Said Egypt UHDE GmbH Egypt Propylene & Polypropylene

    Turnkey Supply of no. 2 Convection Bank Heaters: Thermal Power 19 MWPressure 45 BarCapacity 69 ton/h

  • Heaters Selected References

    Year Site Client Project Name Supply Photo

    2009 Sirri Island Persian Gulf SadelmiIranian Offshore Sirri Island Oil Company

    Turnkey Supply of no. 1 Cylindrical Heater including Convection: Thermal Power 6 MWPressure 54 BarCapacity 34 ton/h

    2008 Point Lisas Trinidad Birrwelco/Man Ferrostaal Met