BoilersSelected References
Year Site Client Project Name Supply Photo
2016/2017 Marghera (VE) Versalis S.p.A.Turnkey supply of 2 Steam genera-tors
Turnkey supply of 2 Steam genera-tors complete with B.O.P. (piping, pipe racks, degasser, feed pumps, steam tur-bines, etc.).Capacity each. 85 ton/hPressure 33 Barg Temperature 351 C
In construction
2014/2015 Torino Mirafiori EDF Fenice F.C.A. MIRAFIORI (TO)
Turnkey supply of steam generatorCapacity 153 ton/hPressure 28 barTemperature 320C
2014/2015 Priolo Gargallo (SR) Isab S.r.l. IGCC PLANT AND BOP PLANT
Revamping HRSG - Change convertion from syngas to natural gas - capacity 350 ton/h - pressure 130 bar - temperature 520C
BoilersSelected References
Year Site Client Project Name Supply Photo
2013/2014 Bolgiano, Italy EnipowerCogeneration Power Plants ENI-POWER Bolgiano (MI)
Turnkey of one heat recovery steam generator with post-combustion.Fluid: superheated waterCapacity: 1633 t/hInlet temperature: 100COutlet temperature: 125CPressure: 9 bargPost combustion duty: 30 MWthTotal duty: 78 MWth
2014 Sarroch (CA) Saras S.p.A. Revamping Refinery
Complete revamping of CO BOILER.Capacity 112 ton/h Pressure 72,5 barTemperature 490 C
2013/2015 Corleto Perticara (PZ) Renco/Tecnimont/TotalTempa Rossa Corleto Perticara (PZ)
Turnkey Supply Two H.R.S.G. BoilersCapacity 27.8 ton/ hPressure 45 barTemperature 440 C
BoilersSelected References
Year Site Client Project Name Supply Photo
2012/2013 Torino Mirafiori EDF Fenice F.CA Mirafiori (TO)Turnkey supply of water tube boilerCapacity 100 ton/hPressure 29 barTemperature 330 C
2012/2013 Priolo Gargallo,Nord Plant ERG PowerComplete revam-ping of SA1N1 boiler and BOP plant
Complete revamping of the SA1N1 boi-ler and BOP plant.Complete SNCR SCR.Capacity 187 ton/hPressure 120 barTemperature 533 C
2012/2013 Priolo Gargallo ISAB Refinery Impianti Nord CR 27 - CO boiler revamping
Revamping of the CO boilerScope of work:complete substitution D walls and evaporator;Substitution of ignition system;Update of the combustion system.
BoilersSelected References
Year Site Client Project Name Supply Photo
2011/2012 Fiat Mirafiori EDF Fenice Water Tube BoilerTurnkey supply of water tube boilerCapacity 100 ton/hPressure 29 barTemperature 330 C
2011/2012 Val dAgri (PZ)Quinto Treno (ATI Bonatti,Irem/Gavazzi) per Eni Cen-tro Olio Val DAgri (PZ)
Water Tube BoilerTurnkey supply of steam boilerCapacity 82,5 ton/hPressure 37 barTemperature 305
2011 Azerbaijan Republic Renco / SocarNETF DASHLARY GTCPP Cogeneration Plant
Turnkey supply of no. 3 Heat Recovery Water Heaters.Capacity 160 ton/hPressure 10 barTemperature 155 C
BoilersSelected References
Year Site Client Project Name Supply Photo
2011 Reggio Emilia (Italy) Iren Ambiente Plant for district heating
Complete revamping of boilerCapacity 46,5 ton/hPressure 90 barTemperature 510 C
2010/2011 Reggio Emilia (Italy) Iren AmbientePlant for District Heating
Turnkey supply of Direct Fired Steam Boiler: Capacity 46, 5 ton/hPressure 90 Bar, Temperature 505 C
2010 Torrevaldaliga Nord (Rome) Enel ProduzioneCogeneration Plant
Turnkey supply of Direct Fired Steam Boiler: Capacity 60 ton/hPressure 20 BarTemperature 250 C
BoilersSelected References
Year Site Client Project Name Supply Photo
2010 Atessa (CH) FeniceSevel Cogeneration Plant
Turnkey supply of HRSG 2 levels with Post Combustion: Capacity 57,3 ton/hPressure 40 BarTemperature 380 C
2009/2010 Priolo Gargallo (SR) Isab Energy Power Plant
Dismantling and Turnkey supply of HRSG with three pressure levels: Capacity 350 ton/hPressure 130 BarTemperature 520 C
2009 Syria Thorne Int. Boiler Paper Mill
Turnkey supply of Direct Fired Steam Boiler: Capacity 60 ton/hPressure 44 BarTemperature 430 C
BoilersSelected References
Year Site Client Project Name Supply Photo
2009 Sarroch (CA) Saras S.p.A. Revamping in RefineryEngineering, fabrication and erection of CO-Boiler
2009 Cassino (FR) Fenice Fiat Auto
Turnkey Supply of Direct Fired Steam Boiler: Capacity 30 ton/hPressure 30 BarTemperature 234 CHot Stand-by
2008/2009 Sora (FR) STC Power Plant Burgo Paper Mill
Turnkey Supply of HRSG With Post-Combustion and Fresh-Air: Capacity 90 ton/hPressure 70 BarTemperature 450 C
BoilersSelected References
Year Site Client Project Name Supply Photo
2008/2009 Ravenna Cabot Corporation Power Plant
Turnkey Supply of Direct Fired Steam Boiler for Tail Gas: Capacity 110 ton/hPressure 76 BarTemperature 510 C
2007 Collombey Switzerland Foster Wheeler ItalyRevamping of Boiler for Tamoil Refinery
Complete revamping of: Existing pressure parts dismantling, fabrication of related parts, erection, commissioning and start-up.HRSG Boiler
2007 Conselice (RA) Unigr Power Plant
Turnkey Supply of HRSG Downstream of nr. 3 Palm Oil driven Engine: Capacity 36 ton/hPressure 26 BarTemperature 395 C
BoilersSelected References
Year Site Client Project Name Supply Photo
2006 Correggio (RE) Silcompa Power Plant
Turnkey Supply of Direct Fired Water Tube Boiler, Equipments and Piping for Thermal Plant: Capacity 15 ton/hPressure 48 BarTemperature 400 C
2006 Teverola (CE) Foster Wheeler Italy Power Plant SET Energia
Turnkey Supply of HRSG with three pressure levels: Capacity 465 ton/hPressure 120 barTemperature 540 C
2006 Voghera (PV) Foster Wheeler Italy Power Plant Voghera Energia
Turnkey of HRSG with three pressure levels: Capacity 465 ton/hPressure 120 barTemperature 540 C
BoilersSelected References
Year Site Client Project Name Supply Photo
2004 Le Havre (France) Ansaldo Caldaie Power PlantEDF Revamping of fossil fuel boiler 700 MW
2003/2008 Libya Technip KTI Italy Wafa Turnkey supply of No. 3 HRSGs
2003 Ferrera B. (PV) Nooter Eriksen Eni Power
Supply of no. 2 HRSGs: Capacity 465 ton/h Pressure 120 barTemperature 540 Cno. 1 HRSG Syngas with capacity 280 ton/h
BoilersSelected References
Year Site Client Project Name Supply Photo
2003 Mantova Nooter Eriksen Eni PowerSupply of nr. 2 HRSGs with capacity 465 ton/hPressure 120 barTemperature 540 C
2002 Cameroon Exxon Halliburton/Kellog Brown & RootSupply of no. 10 Waste Heat Recovery Units
2002 Saudi Arabia Technip Italy Harad Supply of No. 4 Waste Heat Boilers
Heaters Selected References
Year Site Client Project Name Supply Photo
2014/2016 EXXon MobilAntwerp Foster Wheeler USA Antwerp
Supply and modularization of 2 Cocker Heater ( 3 radiants 27 x 6.5 x 4 m with insulation and pressure parts) , hot air duct, radiant to convection flue gas, duct & lower convection section, 1 stack (60 mt 4.4 diameter with insu-lation), preheater ducts and structural steel, platform steel, handrail, grating and lader.
In progress
2014/2015 Priolo Gargallo (SR) ITALY IsabHeater Go-Finer Unit 700-F 101N
Turn-key supply No. 1 Heater Go Finer Termal Power 25 MW , Pressure 66.5 bar , temperature 600C.
In progress
2014/2015 Chinarevskoye- NorthWest KazakhstanIPM/Zhaikmunai LLP GGTU3 Turn-key Complete System Hot Oil In progress
Heaters Selected References
Year Site Client Project Name Supply Photo
2013/2014 Takreer, Abu Dhabi Foster Wheeler USAPlant RefineryTAKREER, ABU DHABI
Supply and modularization of 1 Cocker Heater (6 radiants 27 x 6.5 x 4 m with in-sulation and pressure parts), 1 stack (60 m x 4 diameter with insulation), ducts with insulation and structural steel, pla-tform steel, handrail, grating and lader.
2012/2013 Tupras, Turkey Foster Wheeler USA Plant Refinery TUPRAS TURKEY
Supply and modularization 2 Cocker He-ater (8 radiants 27 x 6.5 x 4 m with insu-lation and pressure parts), 2 stackS (60 m x 4 diameter with insulation), ducts with insulation and structural steel, pla-tform steel, handrail, grating and lader.
2010/2011 Priolo Gragallo Isab Revamping Revamping of sulphur heaters tag. 1200X-1 F 102 1200X-3-F102
Heaters Selected References
Year Site Client Project Name Supply Photo
2010 Texas USA Foster Wheeler USA Valero Refinery Supply and modularization of nr. 2 Cocker Heaters
2009 Arzew Algeria UHDE GmbH Sorfert
Turnkey Supply of no. 2 Start-Up Heaters: Thermal Power 7,3 MWPressure 230 BarCapacity 48 ton/h
2009 Bourgas Bulgaria UHDE GmbH / LucoilBourgas Refinery/Lukoil/Neftochim Oil Company
Turnkey Supply of no. 1 Prime G Start-Up Heater: Thermal Power 3,7 MWPressure 27,6 BarCapacity 120 ton/h
Heaters Selected References
Year Site Client Project Name Supply Photo
2009 Damietta Egypt UHDE GmbHDamietta/Egyp-tian Eagrium Ni-trogen Prod. Co.
Turnkey Supply of no. 2 Convection Bank Heaters: Thermal Power 60 MWPressure 35-122 BarCapacity 194 ton/h
2009 Damietta Egypt UHDE GmbHEgyptian Eagrium Nitrogen Prod. Co.
Turnkey Supply of no. 2 Start-Up Heaters: Thermal Power 6 MWPressure 107-190 BarCapacity 40 ton/h
2009 Port Said Egypt UHDE GmbH Egypt Propylene & Polypropylene
Turnkey Supply of no. 2 Convection Bank Heaters: Thermal Power 19 MWPressure 45 BarCapacity 69 ton/h
Heaters Selected References
Year Site Client Project Name Supply Photo
2009 Sirri Island Persian Gulf SadelmiIranian Offshore Sirri Island Oil Company
Turnkey Supply of no. 1 Cylindrical Heater including Convection: Thermal Power 6 MWPressure 54 BarCapacity 34 ton/h
2008 Point Lisas Trinidad Birrwelco/Man Ferrostaal Met