selected industrial projects

5
PERRY BECKER - ARCHITECT, LEED AP OFFICE / INDUSTRIAL 28th AVE OFFICE / INDUSTRIAL BUILDING STUDIES Phoenix, Arizona Located near Indian School Road and 28th Avenue, these ‘thumb-nail’ schematic yield and architectural character studies examine various building/site configurations that explore building size, parking yield, tenant accommodation and overall project flexibility.

Upload: perry-becker

Post on 18-Jul-2015

43 views

Category:

Design


0 download

TRANSCRIPT

PERRY BECKER - ARCHITECT, LEED AP OFFICE / INDUSTRIAL

28th AVE OFFICE / INDUSTRIALBUILDING STUDIESPhoenix, ArizonaLocated near Indian School Road and 28th Avenue, these ‘thumb-nail’ schematic yield and architectural character studies examine various building/site configurations that explore building size, parking yield, tenant accommodation and overall project flexibility.

PERRY BECKER - ARCHITECT, LEED AP INDUSTRIAL

CALMAT 7TH STREETBUSINESS PARKLOT 7 & LOT 12Phoenix, Arizona

Lot 7 at the Calmat 7th Street Business Park is a one-story 38,755 s.f. tilt-up concrete building on a 3-acre site. Large expanses of storefront glass, minimal interior columns and high interior volume allow for flexible suite sizes as well as a variety of different tenant types including retail uses. Three pop-out bays help to reduce the overall mass of this building while open mitered end cap suites increase visibility.

Lot 12 at the Calmat 7th Street Business Park is a one-story 73,080 s.f. tilt-up dock-high concrete distribution building on a 3.5-acre site. Two large over-sized expanses of end-cap curtain wall glazing provide for 2 stories of light-filled administration space while lending an up-scale contemporary feel to this project. Lush plinth landscaping adds to the entry experience.

PERRY BECKER - ARCHITECT, LEED APINDUSTRIAL / OFFICE

STELLAR BUSINESS CENTERChandler, Arizona

Stellar Business Center is comprised of a series of 5 one-story tilt-up concrete buidings ranging in size from 23,100 s.f. to 37,202 s.f. for a total building area of 135,330 s.f. on a 10.9-acre site in Chandler, Arizona near the Stellar Air Park. Designed as an upscale flex industrial/office project, the buildings feature contemporary glass curtain walls perfect for office and showroom tenants. Minimal interior columns and 22’ interior clear height provide for maximum tenant suite flexibility. Enhanced special landscape features include several lush landscaped social garden gathering areas to provide inviting places for people to enjoy the outdoor environment.

PERRY BECKER - ARCHITECT, LEED APINDUSTRIAL / TENANT IMPROVEMENT

INTREPID TOOL INDUSTRIESSurprise, Arizona

Intrepid Tool Industries is comprised of a of 3 one-story tilt-up concrete buidings ranging in size from 19,500 s.f. to 28,024 s.f. for a total building area of 67,024 s.f. in Surprise, Arizona. Building ‘A’ is the first phase of the multi-phased project and includes the administrative offices for Intrepid Industries and a high-tech manufacturing facility that produces specialized aeronautical tooling. Ease of manufacturing flow and optimization of multi-axis CNC milling equipment proved to be the determining factors in the lay-out of this facility which also includes a large seminar meeting room.

PERRY BECKER - ARCHITECT, LEED APOFFICE / INDUSTRIAL

ARIZONA INDUSTRIESFOR THE BLINDFEDERAL RECORDSSTORAGE FACILITYPhoenix, Arizona

Arizona Industries for the Blind Federal Records Storage Facility is a two-story 120,000 s.f. concrete tilt-up building on a 4.18 acre site. Designed to accommodate secure records storage the main building entrance evokes the strong sense of security traditionally provided by a bank vault door while also providing larger glass areas for administration office area day-lighting and views. Future site flexibility and expandable parking areas are important design considerations.