COMMISSION OF THE EUROPEAN COMMUNITIESFP7- INFRASTRUCTURES-2008-1SP4-Capacities
S E R I E SSEISMIC ENGINEERING RESEARCH INFRASTRUCTURES
SP4 Capacities
FOR EUROPEAN SYNERGIES1st Workshop – Iasi, July 14th 2009
Transnational Access to the ELSA InfrastructureInfrastructure
Georges Magonetteg gand
Fabio Taucer
Joint Research Centre (JRC)Ispra - Italy
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
Overview of the presentationOverview of the presentation
• Contractual issues
• Mission of ELSA• Mission of ELSA
• ELSA Experimental Activities
• ELSA instrumentation and servo-control equipmentequipment
• Example: The ESECMaSE project
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
Summary of Contractual issuesSummary of Contractual issues
SERIES Project Per Project
# of Access Days 24 6# of Access Days 24 6Number of users 46 12Days spent at the infrastrutcure 140 35
Days spent (per user) 3.0
Estimated number of projects: 4
Only reaction wall among the facilities offering
SERIES 1st Workshop - Iasi, July 14th 2009
Translational Access (TA) in SERIES
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
Unit of access: “access day”Unit of access: access day
• Is a day when experimental activities are carried outIs a day when experimental activities are carried outusing the facilities of the infrastructure to perform thosetests requested by a user group to fulfil the objectives oftheir project
• These activities involve: use of the structural controlsystem and the data acquisition system of the laboratoryhooked up to the loading system (actuators, hammerand/or shaker) and to the instrumentation, respectively.
• A full day, equivalent to 7.5 working hours, will bey q grecorded for the project to which access is delivered.
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
An access day encompasses the An access day encompasses the following experimental activities:
• Modal evaluation
• Ambient or forced vibration,
M t i h li d d i• Monotonic, pushover, cyclic, pseudo-dynamic,sub-structured or snap-back tests
• Photographic and video records of the specimen
• Photogrammetric records for tracing damage• Photogrammetric records for tracing damage
• Real-time data visualisation of the tests viaT l
SERIES 1st Workshop - Iasi, July 14th 2009
Telepresence
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
Activities included in the cost of an Activities included in the cost of an access day but not accounted as access da s:access days:
Preparatory tests planned by the laboratory staffPreparatory tests planned by the laboratory staffand conducted to:
• Guarantee the functionality and safety of theexperiment
• Ensure the reliability of data and to calibrate theinstrumentation and servo-systemsinstrumentation and servo systems
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
Other services given to UsersOther services given to Users
• Fabrication of full scale models• Fabrication of full scale models
• Preliminary destructive or non destructive tests for material properties identification of the test model
• Techniques for modal assessment and system identificationidentification
• Training
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
Mission of the ELSA LaboratoryMission of the ELSA LaboratoryTo provide research and contribute to European Standards for risk mitigation in
construction through integrated use of experimental testing and numerical modeling in Structural Mechanics
SERIES 1st Workshop - Iasi, July 14th 2009
General view
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental ActivitiesDevelopmentsSeismic Assessment of Civil Structures
Research for structural vulnerability assessment Quasi-static testing:
Conventional PsD testing
- Research for structural vulnerability assessment
of civil structures under earthquakes
Strengthening/repair techniques for civil and on full-scale models
Continuous PsD (CPsD)
- Strengthening/repair techniques for civil and
cultural heritage structures.
- Tests on Components testing
PsD testing with b t t i
Tests on Components
Structural Response Control
substructuring
Fast on-line testing with substructuring (fast hybrid
-Passive Control: Base isolation, energy dissipation devices.(metallic yield, friction, viscoelastic dampers, tuned mass, tuned liquid dampers)
-Semi-Active Control Variable-friction, variable-orifice,controllable-fluid dampers (ER/MR), controllable tuned liquid dampers. substructuring (fast hybrid
testing)
p ( ), q p
- Active Control (Cable Stayed Bridges…)
Structural Health Monitoring
SERIES 1st Workshop - Iasi, July 14th 2009
Dynamic testing: shaker…- Experimental Modal Analysis, Struct. Identification
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental Activities
The ELSA reaction wallThe ELSA reaction wall.
• 22 dynamic actuators 500 – 2000 kN• 4 actuators 3000kN; 4 actuators 5000kN
• Pseudodynamic testing on full scale models• 2 testing platforms
SERIES 1st Workshop - Iasi, July 14th 2009
• Hydraulic capacity: 1500 l/min – 21 Mpa • Unique test installation in Europe• Integrated in European network of shaking tables
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA instrumentation and servo-ELSA instrumentation and servocontrol equipment
Data acquisition System: 200 channels, 16-bit SSH
Transducers: displacement acceleration force pressure deformationTransducers: displacement, acceleration, force, pressure, deformation (Strain gages), inclinometers…
In-house developments:p
Servo-controllers dedicated to continuous PsD tests
Photogrammetry equipment used for Stereo Vision and Displacement Field on 3D ObjectsGrid
Dedicated Database Software for easy signal recovery and processing
Strong involvment in the development of techniques for telepresence,
SERIES 1st Workshop - Iasi, July 14th 2009
teleoperation and in general, distributed laboratory environment
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental ActivitiesIllustration of the “Hardware in the loop” concept:
The Continuous PsD method
Input Interface (ADC) Measurement transducers
SpecimenComputer p( ) ( ) ( ) gt t t a+ + = −Ma Cv r MI
Numerical Model
p
Servo-control Algorithm
Output Interface (DAC) Actuation system
SERIES 1st Workshop - Iasi, July 14th 2009
High speed loop
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental ActivitiesAdvantages of Continuous PsD Method:
•Test speed is increased and control errors are
diminished at the same timediminished at the same time
•Stress relaxation is strongly reduced
•Explicit integration scheme is always stable
•The quality of every measure is increased since it takesThe quality of every measure is increased since it takes
the average of many real sub-steps
•Possibility to test structures protected by strain rate
sensitive devices
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental Activities
Construction norms (Eurocodes) Strengthening/repair and rehabilitation
SERIES 1st Workshop - Iasi, July 14th 2009Anti-seismic Isolation Preservation of
monuments
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental Activities
SERIES 1st Workshop - Iasi, July 14th 2009Transportation of the building specimen inside of ELSA
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesSeismic PErformance Assessment and Rehabilitation of existing buildings
ELSA Experimental Activities
Bi-axial PsD test of a 3-storey torsionally unbalanced RC structure
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental ActivitiesSpear: Tests on the rehabilitatedstructure (PGA=0.30g)
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental ActivitiesConsidering the different phases of a test, the total duration
of a project is generally at least 2 years !!!of a project is generally at least 2 years !!!
Project design, modeling, numerical simulation,• Construction outside of the laboratory• Construction outside of the laboratory,• Move the structure in the laboratory,• Instrumentation servo-control equipment and dynamicInstrumentation, servo control equipment and dynamic
analysis,• Pre-tests campaign (verification tests and preliminary
1 yeap g ( p yanalysis),
• Tests campaign and (if requested) tests on the
ar
rehabilitated structure, • Experimental results analysis, validation of numerical
models
SERIES 1st Workshop - Iasi, July 14th 2009
models,• Move the structure outside for demolition.
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental ActivitiesThe PsD testing with substructuring
∫= V
T dVCBBKPseudo-Dynamic LoadingSimulates deck motiondue to earthquake
Deck modeledanalytically byF.E.M.
Piers tested
- Critical parts are tested- The remaining structure is computedPiers tested
physicallyThe remaining structure is computed
Allow asynchronous loading! Both are coupled through Pseudo-Dynamic
numerical model
SERIES 1st Workshop - Iasi, July 14th 2009Application for bridge, subcomponent or distributed testing
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental Activities
Numerical models for the
Application to the Warth Bridge, Austria
substructured piers A20, A30
Numerical models for the substructured piers A50, A60
Numerical model for the deck and PSD master
Construction of the large-scale bridge piers outside of the
Master experimental process
WIEN GRAZ
bridge piers outside of the ELSA lab Physical piers A40 & A70
in the lab
Warth Bridge
62.00 m 62.00 m67.00 m 67.00 m 67.00 m 67.00 m 67.00 m
P6(A70)
SERIES 1st Workshop - Iasi, July 14th 2009
P1(A20)P2(A30) P3(A40) P4(A50) P5(A60)
P6(A70)
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
The ESECMaSE projectEnhanced Safety and Efficient Construction of Masonry Structures in Europe
p j
Framework: Collective Research Project (DG RTD call FP6-2002-SME-2), 2004 200826 partners (Industrial Associations/Groupings, SMEs and RTD performers)3 ME f 2004 t 20083 MEuro from 2004 to 2008
Motivation: With EC6/EC8 and the new seismic zonation, traditional load bearing masonry will no longer be possible in many areas of central Europe will no longer be possible in many areas of central Europe
Loss of market share
Objectives: Assessment, improvement and exploitation of the actual capacity of (modern) j , p p p y ( )masonry buildings to sustain lateral loading
Possible updating of European Norms (design codes and test standards)
T k O i i i f i l i h i l i i i ( i Tasks: Optimization of material properties, theoretical investigations (stress state in shear walls, suitable test methods for masonry materials and members, design methods), static/PsD/dynamic tests on masonry walls and structures
SERIES 1st Workshop - Iasi, July 14th 2009
Test at ELSA: Full scale verification of the seismic performance of a selected type of building
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
The ESECMaSE projectp j
1.005.30
1 00
+ symmetry conditions on the cutting planeLoading direction + equal displacements on both sides at each floor
1.001.00
4.751.50
Ground 5.301.20
1.40
level0.20
2.50
0.20
SERIES 1st Workshop - Iasi, July 14th 2009
2.50
Weak direction
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: materials and constructionESECMaSE: materials and constructionClay bricks Calcium silicate brick
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: the test set-up… and in the labOn the paper …
p
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: Vertical and horizontal loadinggVertical loading:
- Seismic design value (dead loads + 30% live loads)g ( 3 )- Water tanks are distributed on each floor to account for the dead/live loads missing in the lab and for the loads inherent to the testing set-up
* g
Horizontal loading:- Artificial time history (10s)
0 .0 8
0 .1 0
0 .1 2
y ( )- Compatible EC8 spectrum- Type I, Soil B, PGA = 0.04g
T [ s ] 0 .4 0 . 8 1 .2 1 . 6 2 . 0 2 .4 2 . 8 3 .2 3 .6
0 .0 2
0 .0 4
0 .0 6
0 2
0 . 4
[ m / s 2 ]
- 0 2
0 . 2
SERIES 1st Workshop - Iasi, July 14th 2009 1 . 2 . 3 . 4 . 5 . 6 . 7 . 8 . 9 . [ s ]
- 0 . 4
- 0 . 2
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: Pseudodynamic testingy g• Two d.o.f. system• Diagonal mass matrixDiagonal mass matrix• No damping• Testing sequence: 0.02g, 0.04g, 0.06g, …until failureg q g, 4g, g,• Continuous PsD testing• 114 recording channels + photogrammetry on a shear wall
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: Evolution of top displacement ESECMaSE: Evolution of top displacement (calcium silicate specimen)
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: Low Intensity test (0.02g)ESECMaSE: Low Intensity test (0.02g)
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: First relevant damages (0.12g) ESECMaSE: First relevant damages (0.12g)
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: High intensity test (0 20g)ESECMaSE: High intensity test (0.20g)
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECM SE L t t t (0 20 ) th ESECMaSE: Last test (0.20g) on the calcium silicate specimenp
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: Evolution of top ESECMaSE: Evolution of top displacement (clay brick specimen)
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECM SE L t t t (0 22 ) th ESECMaSE: Last test (0.22g) on the clay specimeny p
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ESECMaSE: ConclusionESECMaSE: Conclusion
• The continuous PsD method is a very accurate techniquefor the seismic testing of brick structures. It does not modifyh d i d i d d ll i f ithe dynamic damping and produces excellent informationfor the calibration of numerical models
BUT
• The PsD method does not model local vibrations/failuresobserved in the shaking table tests because thesegvibrations/failures are due to local inertial forces
SERIES 1st Workshop - Iasi, July 14th 2009
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental Activities
PRECAST EC8: Seismic Behaviour of Precast Concrete Structures with
SEISRACK: Research activity on the seismic behaviour of standard steel
Precast Concrete Structures with respect to Eurocode 8 (Co-normative research)
SERIES 1st Workshop - Iasi, July 14th 2009
seismic behaviour of standard steel storage racks in seismic areas
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental ActivitiesPROMETEO project: Test of full scale 14 m glass / carbon composite box beam connected to a concrete deck
The bending test set up
The composite box beamThe composite box beam
Beam at failureD i l d 1600 kN
SERIES 1st Workshop - Iasi, July 14th 2009
Design load 1600 kNFailure load 2400 kN
SEISMIC ENGINEERING RESEARCH INFRASTRUCTURES FOR EUROPEAN SYNERGIES
ELSA Experimental ActivitiesELSA Experimental Activities
Thank you very much for your attention Thank you very much for your attention