Page 1: SEEDS Manual English Version Rev.0

SEEDS

MANUAL

Electrical and Instrument

Engineering Team

Page 2: SEEDS Manual English Version Rev.0

- i -

Contents

0. Preview --- 1

I. SEEDS Log in and Project Setting --- 2

II. Load Summary --- 6

1. Program Composition --- 6

2. Basic Data(1) --- 8

3. Basic Data(2) --- 17

4. Load List --- 21

5. Arrange Bus --- 27

6. Project Applicable Method --- 38

II.0 Motor Schedule Convert --- 39

III. Cable List --- 43

1. Program Composition --- 43

2. Spec, Area --- 45

3. Sequence --- 51

4. Cable Creation --- 52

5. Cable Schedule --- 58

6. Project Applicable Method --- 60

IV. Main Cable Route --- 61

1. Program Composition --- 61

2. Selection of Drawing File --- 64

3. Eqpt. Loc & Cable Path --- 65

4. Cable Modeling --- 71

5. Cable Size --- 75

6. Main Cable Route Modeling --- 84

7. Project Applicable Method --- 95

Page 3: SEEDS Manual English Version Rev.0

- 1 -

0. Preview

SEEDS is the abbreviated word for 'Samsung Engineering Electrical Design System'

SEEDS has objects that Electrical Engineers can use common data base for each project by

managing works and making automatic engineering system to improve a work efficiency and

quality of design.

SEEDS is composed of the 'Load Summary', 'Calculation Program Interface', 'Single Line.

Diagram', 'Sequence Diagram', Equipment Layout, Cable List', 'Main Cable Route', and so on.

The Object of this manual is to explain how to use SEEDS program that is made for

working on windows-based interfaces and web regarding 3D modeling work by intergrating

Load Summary, Cable List and Main Cable.

Page 4: SEEDS Manual English Version Rev.0

- 2 -

I. SEEDS Log in and Project setting

1. SEEDS Log in

1) First, Please push the confirm button after entering the ID and Password supplied from

the administrator.

" 1" : Log in is successful.

"-1" : The computer is not registered.

"-2" : The Password is not correct.

"-3" : The ID is not correct or doesn't exist.

2) After Log in, You can create new Project DB from 'New Project' button or modify

Project DB from 'Project Select' button.

2.1) By clicking the 'Project Select', the window for selecting the Project DB shows up.

You can select the Project DB.

Page 5: SEEDS Manual English Version Rev.0

- 3 -

2.2) By clicking the 'New Project ...' button, the window for creating the Project DB and

inputting information of the Project shows up.

2.2.2) By clicking the 'Create Project', you can create new DB by selecting the name of

'Project DB' and location.

Page 6: SEEDS Manual English Version Rev.0

- 4 -

2.2.3) This screen is for inputting information of the Project after creating new project

DB.

2.3) If you select the 'Project DB' 'Project Name Edit ...' button will be activated so you

can revise the Project No. and Project Description.

Page 7: SEEDS Manual English Version Rev.0

- 5 -

3.1) By clicking the 'Project Name Edit' button, you can modify the Project No. and

Description. They are used for information of report.

4) Only the case Project DB is selected, you can use the program by clicking 'Load

Summary', 'Cable List', 'Main Cable Route' button.

You can not operate new program while operating 'Load Summary', 'Cable List', and 'Main

Cable Route' Programs.

Page 8: SEEDS Manual English Version Rev.0

- 6 -

II. Load Summary

1. Program Composition

1) By selecting the 'Load Summary' button at the Log in Program of SEEDS, the initial

screen of Load Summary shows up.

2) Load Summary's menus is composed of 'Basic Data(1), 'Basic Data(2)' and so on.

'Basic Data(1)' : To set the 'File' and the basic data for calculation of Load Summary

'Basic Data(2)' : To set the S.L.D and the basic data for Sequence Diagram

'Load List' : To Import of the Load Data from Excel Files.

To save or delete the Electrical Load in the Program

To set to calculate the FLC of active power and reactive power by setting

each properties of the Electrical Load (Phase, Voltage, Frequency, Power

Factor, Efficiency, Operation Method, Type of Circuit Breakers)

'Arrange Bus' : To calculate the Load Summary and organize Electrical power system.

'File' Menu

Page 9: SEEDS Manual English Version Rev.0

- 7 -

'Basic Data(1)' Menu

'Basic Data(2)' Menu

'Load List' Menu

Page 10: SEEDS Manual English Version Rev.0

- 8 -

'Arrange Bus' Menu

2. Basic Data(1)

Basic Data(1) is composed of phase, voltage, frequency setting, power factor and

efficiency of motors, BHP Ratio, Feeder Data, Load Factor's sub-menus. They are used for

deciding properties of the 'MOTR' or 'FDR'. Type Load and properties of each Loads set

and then calculate.

1) Setting of phase, voltage, frequency

'Basic Data(1)' → As selecting the 'Volt, Freq, Phase Review' Menu, the window which

can be set shows up. Using the 'Add' and 'Delete' buttons, You can add or delete data of

each capacity.

Page 11: SEEDS Manual English Version Rev.0

- 9 -

1.1) 'Add' button

When you click 'Add' button after inputting the Data, Phase, new data adds to phase,

voltage and frequency's table.

1.2) Delete button

When you click 'Delete' button after selecting data you want to delete, a under

window shows up and confirms whether to delete the data or not.

※ Table of Spread Sheet type

(1) You will input data after selecting cell by mouse or direction key button.

(2) You can modify data through selecting text input box on the table.

If you press the Enter Key in text input box the table changed into working

circumstance.

(3) You can modify contents of multiple cells by right button of mouse after selecting

some cell boundary .

(4) To use Ctrl +C Key and Ctrl +V Key is available about the Cell unit

※ How to exit

'Exit' button saves your changes and closes the window.

'Quit' button closes the window to exit without saving information.

Page 12: SEEDS Manual English Version Rev.0

- 10 -

2) Power Factor Setting

By selecting 'Basic Data (1)' → 'Power Factor Review' Menu, the window that you can

set power factor of each motor capacity appears.

Using the 'Add' and 'Delete' buttons, you can add or delete Power Factor Data of each

motor capacity.

After motor capacity and load factor has been determined, the Power Factor is calculated

by interpolation and it is applied to each motors.

2.1) Add button

When you click 'Add' button after inputting the data, the new data will be added in

the power factor table classified by motors' capacity.

Page 13: SEEDS Manual English Version Rev.0

- 11 -

2.2) Delete button

When you click 'Delete' button after selecting data in the power factor table

classified by motors' capacity then another window shows up and confirms whether

to delete the data or not.

2.3) Power Factor DB

You can set up the power factor data classified by motors' capacity from power

factor DB using the two selection boxes next to the 'Get P.F. From' button.

In the first selection box, you can choose the user who register P.F. DB.

In the second selection box you can choose the name of P.F. DB that is registered

by selected user.

If you choose '*' in the first selection box then you can choose P.F. DB of all user.

By clicking the 'Get P.F. From' button after selecting the name of P.F. DB, you can

use P.F. DB that you select.

2.4) Registering Power Factor DB

By Inputting the name of P.F. DB in the input box next to 'Save P.F. To' button and

clicking 'Save P.F. To' button, you can register working P.F Data in the DB.

Registered power factor DB can be shared by clicking 'Get P.F. From' button with

other user.

If the name of power factor DB was registered by user, previous data will be

deleted and new data will be registered in the DB. You cannot register power factor

data with the name of power factor DB that other user registered. When the data

does not exist in the power factor table classified by motors' capacity, if you

register the P.F DB using registered name in power factor DB ,the name of P.F. DB

will be deleted.

Page 14: SEEDS Manual English Version Rev.0

- 12 -

3) Efficiency setting

When you click 'Basic Data(1)' → 'Efficiency Review' menu, a under window shows up

and then you can set up efficiency of motors classified by capacity.

By selecting the 'Add' or 'Delete' buttons, you can add or delete data about the

efficiency of motors.

After capacity of motor and load factor is determined then efficiency is calculated by

interpolation and it is applied to the efficiency to each motor.

Page 15: SEEDS Manual English Version Rev.0

- 13 -

3.1) Add button

Clicking the 'Add' button after inputting the data, the new data will be added in the

efficiency table classified by motors' capacity.

3.2) Delete button

Clicking the 'Delete' button after selecting the data that you want to delete in the

efficiency table classified by motors' capacity under window will shows up and then

confirm whether to delete the data or not.

Page 16: SEEDS Manual English Version Rev.0

- 14 -

3.3) Efficiency DB

You can set up the efficiency data classified by motors' capacity from efficiency DB

using the two selection boxes next to 'Get Eff From' button.

In the first selection box you can choose the user who register Eff DB.

In the second selection box you can choose the name of efficiency DB that is

registered by selected user.

If you choose '*' in the first selection box then you can choose Eff DB of all user.

To click the 'Get P.F. From' button after selecting the name of Eff DB, you can use

Eff DB that you select.

3.4) Registering Efficiency DB

After inputting the name of Eff DB in the input box next to 'Save Eff To' button and

you can register working Eff Data in the DB by clicking 'Save Eff To' button.

Registered efficiency DB can be shared with other users to click 'Get Eff From'

button.

If the name of efficiency DB was registered by user, previous data will be deleted

and new data will be registered in the DB. You cannot register efficiency data as the

name of power factor DB that other user registered. When the data does not exist in

the efficiency table classified by motors' capacity, if you register the efficiency DB

using registered name in efficiency DB ,the name of Eff DB will be deleted.

Page 17: SEEDS Manual English Version Rev.0

- 15 -

4) BHP Ratio setting

When you click 'Basic Data(1)' → 'Motor BHP ratio Review' menu, under window shows

up and then you can set up BHP ratio of motors classified by capacity.

By Selecting 'Add', 'Delete' button, you can add of delete BHP ratio of motors.

4.1) Add button

Clicking the 'Add' button after inputting the data, the new data will be added in the

BHP ratio table classified by motors' capacity.

4.2) Delete button

Clicking the 'Delete' button after selecting the data that you want to delete in the spread

sheet from BHP ratio table a under window shows up and then confirms whether delete

or not.

Page 18: SEEDS Manual English Version Rev.0

- 16 -

5) Feeder Data setting

When you click ''Basic Data(1)' → 'Feeder Data Review' menu, under window shows up

and then you can set up feeder data.

In the case of circuit breaker type you can set up through selecting box.

6) Load Factor setting

When you click ''Basic Data(1)' → 'Load Factor' menu, under window shows up and then

you can set up load factor.

The result of load summary will be applied to continuous load and intermittent load

calculation.

Page 19: SEEDS Manual English Version Rev.0

- 17 -

3. Basic Data(2)

Basic Data(2) is composed of sub menus setting circuit breaker type and starting methods.

It is not related to load summary. However, it can be referred to program of S.L.D. and

Sequence Diagram.

1) Circuit Breaker Type setting

When you click 'Basic Data(2)' → 'Circuit Breaker for Motor' menu, a under window

shows up and then you can set up circuit breaker type.

After selecting the cell that you want to set up you can set up circuit breaker type

through the selecting box.

Page 20: SEEDS Manual English Version Rev.0

- 18 -

1.1) Add button

Clicking the 'Add' button after inputting the data, the new data will be added in the

circuit breaker type table.

1.2) Delete button

Clicking the 'Delete' button after selecting the data that you want to delete in the

spread sheet form circuit breaker type table a under window shows up and confirms

whether to delete the data or not.

Page 21: SEEDS Manual English Version Rev.0

- 19 -

2) Starting Method setting

When you click 'Basic Data(2)' → 'Starting Method for Motor' menu, a under window

shows up and then you can set up starting method.

After selecting the cell that you want to set up you can set up starting method through

selecting box.

Page 22: SEEDS Manual English Version Rev.0

- 20 -

2.1) Add button

Clicking the 'Add' button after inputting the data, the new data will be added in the

starting method table.

2.2) Delete button

Clicking the 'Delete' button after selecting the data that you want to delete in the

spread sheet form starting method table a under window shows up and confirms

whether to delete the data or not.

Page 23: SEEDS Manual English Version Rev.0

- 21 -

4. Load List

Load list is composed of two sub menus 'Edit Load' and 'Get Load From Excel'.

In the 'Edit Load' section load can be added, deleted, revised and active power, reactive

power can be calculated.

In the 'Get Load From Excel' section you can input the load data by using an excel file.

1) Edit Load

Properties of load such as Service Name, Type, Rating, Intermittent, Emergency ... etc

can be revised in the edit load section. In addition, basic data assign classified by

capacity and reactive power, active power FLC can be calculated.

1.1) Data input method

Itemno : 35 character including blank (essential input)

service name : 50 character including blank

type : For Motor, you will input 'MOTR'. For Feeder, you will input 'FDR'.

(When size is zero, you can input another Type except 'MOTR' or 'FDR'.)

type (I/S) : type (I/S) is used CYME Data Interface. 'I' is induction Motor

and 'S' is Synchronous Motor.

rating(est) : Input size of the Load from the Mech.(rot.) team. (essential input)

rating(v) will be used for calculation if you input size of the Load to

rating(v) from from vendors..

Intermittent, Emergency : Input 'Y' or 'N'

design bhp : You should input BHP from Process/Mech.(Rot.) team.

If you don't received BHP, it will be calculated through BHP Ratio.

Page 24: SEEDS Manual English Version Rev.0

- 22 -

pf100(db),pf75(db),pf50(db),eff100(db),eff75(db),eff50(db),phase(db),volt(db),herze(db),

bhp(db),starting(db),cbtype(db) : These values depend on rating(v) or rating(est) from

DB

pf100(v),pf75(v),pf50(v),eff100(v),eff75(v),eff50(v),rating(v) : If you input Load

information from vendors they will have priority over the values from the DB.

phase(s),volt(s),starting(s),cbtype(s) : They will have priority over the values from

the DB when it is not applied Data of Basic Data(1).

All of data related Normal Load or Standby Load is controlled by common Item No

so when you modify Data it will be applied to all the related load.

You can have Load Summary to be considered from Normal and Standby Load when

you apply to system, except for electrical systems of Simple Radial Type.

1.2) Function of view management

To select button on the Load List Table, you can search needed Data.

'Vendor' selection button

Page 25: SEEDS Manual English Version Rev.0

- 23 -

'Database' selection button

'Calc Result' selection button

Page 26: SEEDS Manual English Version Rev.0

- 24 -

1.3) Edit button

After selecting Data which you want to modify to the Load List Table of Spread

Sheet type, by selecting the 'Edit' button you can make Data apply to the Load List

Table.

Common Itemno : Under 35 characters including blank (Recommended input)

Itemno : Under 25 characters including blank (First Itemno is recommended input)

N/S : Normal, Standby's property input (Recommended input)

MCC No. : If you don't input MCC No. you can choose MCC No. by using Assign

Load function of 'Arrange Bus & Output' Menu. You can modify MCC No.

to use function of Move Load.

1.4) Add Button

After you input data and then click 'Add' button, the new data is added in the

Load List Table,

Page 27: SEEDS Manual English Version Rev.0

- 25 -

1.5) Delete button

If you select data that you want to delete in the Load List Table of spread sheet

type then a under window shows up and confirms whether delete or not.

1.6) Calc button

Properties are set by Basic Data to follow input condition when you click 'Calc'

button. You can calculate active power, reactive power and FLC.

2) Get Load From Excel

By selecting menu of 'Load List' → 'Get Load From Excel', a under window shows up.

By using the 'Edit', 'Add', 'Delete' of the 'Load List' → 'Edit Load' button, You can add,

modify and delete Load. Also, you can input Load data to use the Excel after input Data

for efficient work.

You can also rapidly work to make Data File from Motor Schedule from Mech department

with Excel File converting program.

Added or deleted Load in the Excel File is applied to Load Summary Data.

To the first column of Excel File 'ITEMNO', 'SERVICE', 'OUTPUT', 'INTERMIT', 'EMERG',

'EQTYPE' 'AREA', 'DSNBHP' and Item No.,you can input Data after you make 'IT1',

'ITNS1', 'MCCNO1', .... 'IT10', 'ITNS10' and 'MCCNO10'

Page 28: SEEDS Manual English Version Rev.0

- 26 -

2.1) Excel File selection

After clicking 'Select...' button, you can choose Excel File for import.

2.2) Sheet selection

By clicking the To us 'Excel File Open' button, you can see sheet of Excel File from

sheet selection box and select the sheet.

2.3) Import Excel File

After clicking 'Import Excel File' button, Load Summary Data is created from Sheet

of Excel File.

You cannot import information if there are not recommended properties(ITEMNO,

IT1, OUTPUT etc.) when importing Excel contents.

You can check information to overlap Item No. or size 0 Load from Message

window.

When error information shows up, you can[will] modify the Excel File and then

import or modify by using to use 'Edit Load' Menu.

Page 29: SEEDS Manual English Version Rev.0

- 27 -

5. Arrange Bus

You can set relationship of Load Data and organization Data to the 'Update Database' and

can print Load summary to the Sub Menu of 'Arrange Bus & Output'.

1) Update Database

First, please click the Menu of 'Arrange Bus' → 'Update Database'.

Second, set relationship between MCC No. Data and the system of organization Data.

Third,

When you input new MCC No. you make a new panel in the system organization data and

set relationship between panel and load.

Since it is possible to make a panel and to organize system by user's discretion, panel is

not deleted and connection properties between panels is remained.You can delete panel

and change connection properties between panel by using 'Arrange Bus & Output' menu.

2) Arrange Bus & Output

By selecting menu of 'Arrange Bus' → 'Arrange Bus & Output', a under window will show

up.

By using Graphic User Interface, you can organize system and calculate Load Summary

and print it.

Page 30: SEEDS Manual English Version Rev.0

- 28 -

2.1) 'Locate' Button

Set the Panel Location on the Graphic.

With pushing 'Locate' button, choose panel at the bottom of 'Locate' button.

Then panel will be appeared if you push mouse button on the Graphic.

If you move mouse with pushing mouse button panel will be moved following the

mouse movement and if you stop to push mouse button panel location will be fixed.

You can set up the new location when panel is on the graphic, the properties of

panel connection will be remained.

In the early stage panel what appear in the panel selection box is made by MCC No.

that is inputted in 'Edit Load' , and Panel can be made by 'New MCC' button.

If you set the printing sequence of panel by MCC button, panel will appear in the

selection box by printing sequence.

With 'Delete' button you delete panel, then panel will be deleted in the panel

selection box.

Page 31: SEEDS Manual English Version Rev.0

- 29 -

2.2) 'Move' button

You can change the location of panel in the graphic.

With clicking 'Move' button, selecting center of panel by mouse, you can change the

location of panel. And properties of panel connection will be maintained.

2.3) 'Erase' button

'Erase button has the role to hide panel in the graphic.

You can hide panel and connection status with clicking 'Erase' button and selecting

the panel that you want to hide with mouse.

With 'Locate' button you can represent connection status with panel when you

specify the location of panel.

2.4) 'Delete' button

Delete button has the role to delete information of panel.

You can delete panel with clicking 'Delete' button and selecting the panel that you

want to delete with mouse.'

You cannot delete the panel when some loads are connected to the panel or panel is

connected.

In this case you can delete panel if you move load of panel by using 'Move Load'

button and delete connection properties by using 'Disconnect' button.

When you delete panel, the panel is also deleted in the selection box bottom of

'Location' button and panel data of 'MCC Data'.

Page 32: SEEDS Manual English Version Rev.0

- 30 -

2.5) 'Connect Fdr' Button

Two panels can be connected as feeder by 'Connect Fdr' Button.

If you push 'Connect Fdr' button, contents of title box will be changed as 'Connect

Feeder'.

If you select superior position panel that you want to connect, contents of title box

will be changed as 'Connect Feeder 2nd'.

If you select subordinate position panel that you want to connect, panel will be

connected to feeder and contents of title box will be changed as 'Connect Feeder'

then you can continue to use 'Connect Fdr'.

Page 33: SEEDS Manual English Version Rev.0

- 31 -

2.6) 'Connect Tr' button

Two panels can be connected to transformer by 'Connect Tr' button.

If you push 'Connect Tr' button, contents of title box will be changed as 'Connect Tr'

If you select superior position panel that you want to connect, contents of title box

will be changed as 'Connect Tr 2nd'.

If you select subordinate position panel that you want to connect, a under window

will shows up for inputting Tr. name. And you input the name of Tr. then panel will

be connected to Tr. and contents of title box will be changed as 'Connect Tr.' and

you can continue to use 'Connect Tr.'.

Page 34: SEEDS Manual English Version Rev.0

- 32 -

2.7) 'Disconnect' button

You can delete connection properties of panel that is connected to feeder of Tr. by

'Disconnect' button.

If you select subordinate position panel of connected panel after clicking 'Disconnect'

button, connection properties will be deleted.

2.8) 'Move Load' button

You can move loads of one panel to another panel.

If you select the panel that has the load that you want to move after clicking 'Move

Load' button, a under window will shows up that you can check the load of selected

panel. You can move selected load by selecting Item No. If you select Item No with

clicking Shift Key, you can move the loads of selecting range. And if you select

Item No with clicking Control Key, you can move the loads by selecting area as you

want.

If you click 'Select' button after selecting load that you want to move, the contents

of Title box will be changed to 'Move Load 2nd' and you can move the loads with

selecting panel that you want to move.

If you click 'Move Load' button or another button when contents of title box is 'Move

Load 2nd' status the function selecting load will return.

If the load is moved then contents of title box is changed to 'Move Load' and you

can continue to use function of 'Move Load'.

In the window that you can check load if you click titles as 'Item No.', 'N/S', "Rating',

Page 35: SEEDS Manual English Version Rev.0

- 33 -

'Area', 'Emergency' etc. the rows will stand in ascending sort or descending sort.

2.9) 'Assign Load' button

You can include the load in panel by 'Assign Load' button.

If you click 'Assign Load' button the window will shows up that you can check the

Page 36: SEEDS Manual English Version Rev.0

- 34 -

loads that are not included panel.

You can assign selected load by selecting Item No. If you select Item No with

clicking Shift Key, you can assign the loads of selecting range. And if you select

Item No with clicking Control Key, you can assign the loads by selecting area as

you want.

If you click 'Select' button after selecting load that you want to assign, the contents

of Title box will be changed to ''Assign Load 2nd' and you can assign the loads with

selecting panel that you want to assign.

If you click 'Assign Load' button or another button when contents of title box is

'Assign Load 2nd' status the function selecting load will return.

If the load is assigned then contents of title box is changed to 'Assign Load' and

you can continue to use function of 'Assign Load'.

In the window that you can check load if you click titles as 'Item No.', 'N/S', "Rating',

'Area', 'Emergency' etc. the rows will stand in ascending sort or descending sort.

2.10) 'New MCC' button

You can make a new panel or a panel that has no load by 'New MCC' button.

If you click New MCC' button the under window that you can input panel No. will

shows up.

If you input Panel No. you can choose location of panel and you can input properties

of panel by 'MCC Data' button.

Page 37: SEEDS Manual English Version Rev.0

- 35 -

2.11) 'MCC Data' button

If you click 'MCC Data' button the under window that you can input the properties of

panel will shows up.

You can input the properties of panel that is needed to print Load Summary and to

calculate technical calculation interface.

You can decide the printing order when printing Load Summary and the order of

appearing panel in the panel selection box bottom of 'Locate' button.

You can change MCC No. clicking 'MCC No. Edit' button after selecting cell.

2.12) 'Load Sum Type1' button

According to organization of system and properties of assigned load it is possible to

calculate Load Summary of all system and to print it as Excel File.

The load summary of subordinate position panel make effect to the load summary of

superior position panel. Type1 is applied Simple Radial Type Load Summary that

doesn't include standby load in continuous load because it only consider properties of

normal and standby.

If you click 'Load Sum Type1' button a window will shows up then you can select

excel file that is used as Templet.

If you click 'Open' button after selecting excel file, excel program will make a load

summary.

If you modify contents of Type1, Type2 sheet of Excel Templet File then load

summary will be made as modified format.

Page 38: SEEDS Manual English Version Rev.0

- 36 -

'Selection window of Excel Templet File'

'Result of Load Summary Type 1'

Page 39: SEEDS Manual English Version Rev.0

- 37 -

2.13) 'Load Sum Type2' button

According to organization of system and properties of assigned load it is possible to

calculate Load Summary of all system and to print it as Excel File.

The load summary of subordinate position panel make effect to the load summary of

superior position panel.

In case of Type2 it is necessary to calculate standby load that will be included in

continuous load.

If normal load and standby load are not in the same panel, standby load will be

regarded as continuous load.

If normal load and standby load are not in the same panel and that are in same

superior position panel, standby load will not included in the summary of continuous

load.

If you click 'Load Sum Type2' button a window will shows up then you can select

excel file that is used as Templet.

If you click 'Open' button after selecting excel file, excel program will make a load

summary.

If you modify contents of Type1, Type2 sheet of Excel Templet File then load

summary will be made as modified format.

'Selection box of Excel Templet File'

Page 40: SEEDS Manual English Version Rev.0

- 38 -

'Result of Load Summary Type 2'

2.14) 'Print Image' button

If you click 'Print Image' button, you can print out the image by default printer.

2.15) 'Enlargement', 'Reduction' button

If you click 'Enlargement', 'Reduction' button, you can change the size of image.

Page 41: SEEDS Manual English Version Rev.0

- 39 -

6. Project Applicable Method

1) When you change basic data to reflect contents of basic data in load, fist you do 'Calc'

of 'Load List' → 'Edit Load' and then you should print out Load Summary.

2) When you change capacity of load or basic data you should recalculate basic calculation

by 'Calc' of 'Load List' → 'Edit Load' and then you should print out Load Summary.

3) When you revise MCC No. in 'Load List' → 'Edit Load' you should match properties of

load and data of system organization by selecting 'Arrange Bus' → 'Update Database'.

4) When you do 'Load List' → 'Excel Import', you should recalculate basic calculation by

'Calc' of 'Load List' → 'Edit Load' and you should match properties of load and data of

system organization by selecting 'Arrange Bus' → 'Update Database' then you should

print out Load Summary.

5) If you do 'Move Load' or 'Assign Load' of 'Arrange Bus & Output' the properties of

Load can be changed, so it is acceptable not to do 'Arrange Bus' → 'Update Database'.

Page 42: SEEDS Manual English Version Rev.0

- 40 -

II.0 Motor Schedule Convert

By Motor Schedule Convert Program you can make Excel format that you can import

motor schedule of Mechanical department or other part to load summary of SEEDS.

In Process/Mechanical department they manage motors by common Item No. but in

Electrical/Piping/Civil department it requires to manage normal and standby motors so

SEEDS make item numbers of normal and standby motors according to quantities of normal

and standby motors.

'Motor Schedule Convert' Program initial window

Page 43: SEEDS Manual English Version Rev.0

- 41 -

1. 'Test Convert ...' button

By 'Test Convert ...' button you can check Item No. of normal and standby motors before

making Excel File.

First you click 'Partition character' and 'Connection character' and then you input the

required character and common item no. and quantities of normal and standby motors.

Then if you click the 'Test Convert ...' button you can check the item no. of normal and

standby motors.

result of selecting 'None Partition Charcater' and inputting 'ciphers of section unit'.

Page 44: SEEDS Manual English Version Rev.0

- 42 -

2. 'Open Motor Schedule' button

By clicking 'Open Motor Schedule' button, you can select Excel File that you want to

revise.

If you select file the file is opened by excel program.

The construction of Motor Schedule file is shown as below.

Page 45: SEEDS Manual English Version Rev.0

- 43 -

3. 'Open Load Summary' button

By clicking 'Open Load Summary' button, you can select Excel File that you want to print

out.

If you select file the file is made by excel program.

The construction of Load Summary file is same excel format that is used to import.

Page 46: SEEDS Manual English Version Rev.0

- 43 -

III Cable List

Cable List controls the Cable by using Load and Cable Gen. Spec which are created at Load

Summary and makes Cable Database for Main Cable Route operation.

1. Program Structure

1) Press the 'Cable List' button at 'SEEDS Log in Program' or Load Summary Program',

then Cable List main screen appears.

2) Cable List consists of 'File', 'Spec, Area', 'Sequence', 'Cable Creation' and 'Cable

Schedule'. Each of them has Main Menu and Sub Menu, respectively.

'Spec, Area' - Generate Cable and Select Gen. Spec Type.

'Sequence' - Assign Cable Gen. Spec Type to Load created in Load Summary

'Cable Creation' - Generate Cable according to Assigned Cable Gen. Spec Type

'Cable Schedule' - Manage Cable Schedule & Cable No., which can be used in Power

Plan. Print Cable Schedule.

'File' Menu Structure

Page 47: SEEDS Manual English Version Rev.0

- 44 -

'Spec, Area' Menu Structure

'Sequence' Menu Structure

'Cable Creation' Menu Structure

Page 48: SEEDS Manual English Version Rev.0

- 45 -

'Cable Schedule' Menu Structure

2. Spec, Area

There are 2 menus. 'Cable Spec' define Cable Gen. Spec Type. 'Area' Sub menu seek

information of Area at Load and revise it.

1) Cable Spec

Add, Delete, Copy Cable Gen. Spec Type. Input properties of Cable Gen. Spec Type.

Control Cable Gen. Spec Type Database.

1.1) Method for Input Data

Page 49: SEEDS Manual English Version Rev.0

- 46 -

EQPT FROM : Input From property of Cable. If you input '[PNL]' it is replaced with Panel

No. including Load and If you input '[EQUI]' it is replaced with Item No. of

Load.

EQPT TO : Input To property of Cable. If you input '[PNL]' it is replaced with Panel No.

including Load and If you input '[EQUI]' it is replaced with Item No. of Load.

TAG NO : With combined Item No. of Load it is used to make Cable No. that is managed in

the computer system, and it is used for arrange key in the same load when you

print out cable schedule etc.

(To print out Power Cable before Control Cable, you can use '-' in front of tag

no. of Power Cable.)

CONV : Assign the letter in front of serial No. that is used for making Cable No. in Cable

Schedule and Power Plan

Cable No. composition : CONV + a serial No. for Load (+ Suffix)

SUFFIX : Assign the letter after series No. to avoid the duplication when you create Cable

No. that is used in Cable Schedule, Power Plan and so on.

VOLT : Enter the voltage of Cable (unit : V)

CORE : Enter the number of Cable's Core

Cable Type : Enter Cable Type like CV, CVV and so on.

Calc. Type : Select the method of calculation in 'Main Cable Route'. 'HV' is for the

calculation of high-pressure Cable Size considering short-circuit capacity, FLC

and so on, using the attribute of Cable creation Load. 'LV' is for the

calculation of low-pressure Cable Size considering voltage drop, FLC and so

on. In the case of Control Cable of which Size is determined in a lump, enter

'CONT', 'DCS', 'IRP', 'RTD' and so on according to the use.

Disp Rating : If you enter 'Y', the capacity of Load are reported in Cable Schedule.

1.2) Select Cable Gen. Spec

By using selection box next to 'Select Cable Gen. Spec', Select Cable Gen. Spec Type.

Page 50: SEEDS Manual English Version Rev.0

- 47 -

you have to click 'Save' button to save Calbe Gen. Spen Type.

When Cable Gen. Spec Type is selected, Cables of that type are sorted by TAG NO.

1.3) 'Add Type' button

By clicking 'Add Type' button, you can add Cable Gen. Spec Type.

That Cable Gen. Spec Type is added to Cable Gen. Spec selection box. and then you can

enter the data about Cable after selecting Cable Gen. Spec Type.

1.4) 'Del Type' button

After clicking 'Del Type' button, you can delete Cable Gen. Spec Type, the window,

checking up deletion or not, shows up. and if you click 'Yes', it is deleted from Cable Gen.

Spec selection box too.

Page 51: SEEDS Manual English Version Rev.0

- 48 -

1.5) 'Copy Type' button

By clicking 'Copy Type' button, you can copy Cable Gen. Spec Type.

By selecting Cable Gen. Spec Type and then clicking 'Copy Type' button, you can enter

Type No. to copy and that type is added to Cable Gen. Spec selection box.

Page 52: SEEDS Manual English Version Rev.0

- 49 -

1.6) 'Add Cable' button

By 'Add Cable' button, you can add Cable to Cable Gen. Spec Type that you select.

Cells where you enter cable are added to the bottom of Table. and After entering Data and

selecting Cable Gen. Spec Type, Cables of that type are sorted by TAG NO.

1.7) 'Del Cable' button

By clicking 'Del Cable' button, you can delete Cable of Cable Gen. Spec Type that you

work.

By Selecting Cells of Cable to delete and clicking 'Del Cable' button, Cable is deleted.

1.8) 'Save' button

By click 'Save' button, you can save Cable Data of Cable Gen. Spec Type that you work.

1.9) Using Cable Gen. Spec DB

By using two selection boxes next to 'Get Cable Gen. Spec. From' button, you can setup

Cable Gen. Spec Data from Cable Gen. Spec DB.

By using upper selection box, you can select user who registered Cable Gen. Spec DB. And

By using lower selection box, you can select Cable Gen. Spec DB registration names of

that user.

If you select '*' in upper selection box, you can select Cable Gen. Spec DB registration

names of all users in lower selection box.

By clicking 'Get Cable Gen. Spec From' button, after selecting Cable Gen. Spec DB

registration name, you can use Cable Gen. Spec DB that you select.

Page 53: SEEDS Manual English Version Rev.0

- 50 -

1.10) Cable Gen. Spec DB registration

By entering Cable Gen. Spec DB Registration name in the input box next to 'Save Cable

Gen. Spec To' button and clicking that button, you can register Cable Gen. Spec Data that

you work in DB.

Using 'Get Cable Gen. Spec From', you can share registered Cable Gen. Spec DB with

other users.

If Cable Gen. Spec DB registration name is already made by you, the data that you

registered is deleted and new data is registered. But you cannot register with Cable Gen.

Spec DB registration name made by other user. If there is no data on Cable Data Table

and Cable Gen. Spec DB registration name is already made, that name is deleted.

2) Area

Cable No. is assigned by Area, Item No.

By selecting 'Spen, Area' and 'Area' menus in order, you can refer and edit the Area

information that you input in Load Summary.

Page 54: SEEDS Manual English Version Rev.0

- 51 -

3. Sequence

Sequence is composed of Sub Menus- 'Feeder Cable Spec' and 'Moter Cable Sequence'

'Feeder Cable Spec' manages Cable creation data related Feeder.

'Motor Cable Sequence' assigns Cable Gen. Spec Type in Load from Load Summary.

1) Feeder Cable Spec

After selecting 'Sequence' and 'Feeder Cable Spec' in order, the window where you can

setup Cable Data related Feeder shows up.

Page 55: SEEDS Manual English Version Rev.0

- 52 -

you can refer the information of Feeder among Panels and Tr., and you can setup Data

related to Cable.

The method of input is identical with that of Cable Gen. Spec.

Enter 'N' in 'Apply Data' if Cable is not applied like Bus Duct and so on.

Enter the number of Cable in 'Q'TY Data' and according to that number, the letter of

SUFFIX increase and Cable No. is assigned.('1, 2, 3, ...', 'a, b, c, ...' and so on)

In the case of high-pressure Cable, enter 'FHV' in Cable Type. And in the case of low-

pressure Cable, enter 'FLV' in Cable Type.

2) Motor Cable Sequence

After selecting 'Sequence' and 'Motor Cable Sequence', the window, where you can assign

Cable Gen. Spec Type in Load from Load Summary, shows up.

Enter Cable Gen. Spec Type made in 'Cable Spec' menu in Cable Spec Type

4. Cable Creation

Cable Creation is composed of Sub Menus - 'Cable Creation' and 'Cable List'

Cable Creation creates Cable accoding to the assigned Cable Gen Spec. Type.

Cable List refers and manages Cable created by user.

1) Cable Creation

By selecting 'Cable Creation' and 'Cable Creation' menus in order, you can create Cable and

the window where you select the Option of Cable creation shows up.

By clicking 'Create Cable' button, Cable is created according to the Cable Gen. Spec Type.

Page 56: SEEDS Manual English Version Rev.0

- 53 -

if Cable NO. that you created is already existed, you have an option to delete Cable that

you created or not.

2) Cable List

After selecting 'Cable Creation' and 'Cable List' menus in order, the window, where you can

refer Cable created according to the assigned Cable Gen. Spec Type, shows up.

By using buttons near the bottom of the table, you can add, edit and delete Cable. And you

can add Cable from Excel File.

In the case of user-created Cable, BY USER Data is '*'

2.1) 'Add' button

By using 'Add' button. you can create Cable.

After selecting Cable from Cable List next to 'Copy From' button and clicking 'Copy From'

button in order, you can create Cable using Cable Data created before.

Source Item No. represents Load. And it is referred, creating Cable No. and calculating

Cable Size.

Page 57: SEEDS Manual English Version Rev.0

- 54 -

the window of creating Cable

the window of creating Cable using Cable Data created before.

2.2) 'Edit ...' button

Page 58: SEEDS Manual English Version Rev.0

- 55 -

By clocking 'Edit' button after selecting Cell of Cable that you want to edit the window

where you edit Cable Data shows up.

You can edit not Cable No. but user-created Cable.

2.3) 'Delete ...' button

After selecting Cell of Cable that you want to delete and clicking 'Delete' button, the

window where you can refer and delete Cable Data shows up.

You can delete only user-created Cable.

2.4) 'Change Att.' button

By using 'Change Att.' button, you can change Cable that created according to the Cable

Gen. Spec into user-created Cable.

Page 59: SEEDS Manual English Version Rev.0

- 56 -

If you want to change attribute of user-created Cable, you can edit or delete that Cable

using 'Edit' or 'Delete' button.

At the time of 'Cable Creation', if you select 'Overwrite User Create Cable Option', things

you changed are deleted and Cable is created again according to the Cable Gen. Spec Type.

If you don't select Overwrite User Create Cable Option, things you changed are not deleted.

2.5) 'Excel Import' button

By using 'Excel Import' button, you can add user-created Cable from Excel File.

By clicking 'Select' button, selecting Excel File to Import and clicking 'Excel File Open'

button in order, Excel Program starts to run and Excel File is open.

By selecting sheet that you want in the Sheet selection box and clicking 'Import Excel File'

button, Cable Data made in Excel is added to user-created Cable.

If you select 'Append' Option, Cable is created, maintaining user-created Cable Data.

If you select 'Overwrite' option, Cable is created, deleting user-created Cable Data.

Page 60: SEEDS Manual English Version Rev.0

- 57 -

Excel File to Import is composed of CABLENO, FROM, TO, TAG, CONV, SUFFIX, TYPE,

VOLT, CORE, SOURCEITEM, AREA, CALCTYPE, and DISPRATING.

Page 61: SEEDS Manual English Version Rev.0

- 58 -

5. Cable Schedule

Cable Schedule is composed of Sub Menus - 'Cable No.' and 'Cable Schedule'

'Cable No.' manages Cable No. to use in Cable Schedule, Power Plan and so on.

'Cable Schedule' reports Cable Schedule.

1) Cable No.

After selecting 'Cable Schedule' and 'Cable No.' menus in order, the window, where you

manage 'Cable No.' to use in Cable Schedule, Power Plan and so on, shows up.

Cable No. is sorted by Area, Fixed No and Cable No.

By clicking 'Refresh' button after selecting 'Panel Group 적용', Cable No. is sorted by Area,

Fixed No, Cable From and Cable No.

1.1) 'Refresh' button

If you click 'Refresh' button, Cable Data on the Table is resorted by the condition that user

changed.

1.2) 'Serial No. Gen.' button

By clicking 'Serial No. Gen' button, Serial No. is assigned according to the Start No.

If Source Items are identical, same Serial No. is assigned.

If Start No. is changed, Serial No. is assigned according to new Start No.

1.3) 'Fixed No. Gen.' button

By clicking 'Fixed No. Gen.' button, Fixed No.-that is identical with Serial No.- is created.

In case of the Cable No. is used in Cable Schedule and Power Plan etc. so it is needed to

maintain same Cable No. you can manage same Cable No. to make Fixed No.

In case of added Cable, Fixed No. is '*'.

Page 62: SEEDS Manual English Version Rev.0

- 59 -

1.4) 'Clear Fixed No.' button

You can delete data in Fixed No. Cell by 'Clear Fixed No.' button.

After resorting by clicking 'Refresh' button, you can assign new Serial No.

1.5) 'Comp. Cable No. Gen.' button

By clicking 'Comp. Cable No. Gen' button, you can create Comp. Cable No.- to use in

Cable Schedule, Power Plan and so on-, using Conv letter + Fixed No. + Suffix letter

If Fixed No. is blank or '*', 'Comp. Cable No.' is created, using Serial No.

2) Cable Schedule

Cable Schedule is reported in the form of Excel File using Cable Data.

By selecting 'Cable Schedul' menu, 'Cable Schedule' menu and Cable Schedule Templet File'

in order, the window of Cable Schedule Creation shows up.

By clicking 'Select' button, selecting Excel Templet File and clicking 'Create Cable Schedule'

button in order, Excel Program starts to run and you can make Cable Schedule.

If you revise Templet File according to Project condition, Cable schedule is made by

revised format.

Data of Cable Size, length and name of path is made after working 'Main Cable Route'

Program.

the window of 'Excel Templet File selection'

Page 63: SEEDS Manual English Version Rev.0

- 60 -

the result of 'Cable Schedule' Report

6. How to apply to the Project

1) In 'Load Summary' Program, in case of Load or Panel is added or deleted, you can add

or delete cable to use 'Feeder Cable Spec' and 'Motor Cable Sequence' by selecting

Cable Gen. Spec Type and doing 'Cable Creation'. After revising Cable No. you can print

out Cable Schedule.

2) In case of Cable Gen. Spec is revised, you can add or delete cable by doing 'Cable

Creation'. After revising Cable No. you can print out Cable Schedule.

3) In case of Cable Gen. Spec Type is revised, you can add or delete cable by doing

'Cable Creation'. After revising Cable No. you can print out Cable Schedule.

4) If you revise information of Load의 Area you can print out Cable Schedule after revising

Cable No.

Page 64: SEEDS Manual English Version Rev.0

- 61 -

IV. Main Cable Route

'Main Cable Route' creates a 3D Cable Route using Load, Cable Data and Plot plan made at

Load Summary and Cable List, and creates the 3D model by calculating the size of Cable,

Cable Tray and so on.

1. Program Composition

1) By selsecting the 'Main Cable Route' button at the Log-in Program, Load Summary, Cable

List Program of SEEDS, the initial screen of Main Cable Route shows up

2) Main Cable Route is composed of the main menus 'File', 'Eqpt. Loc & Cable Route''Cable

Modeling', 'Cable Size' and 'Main Cable Route Modeling', and their sub-menus.

In the 'File' selection, you can select a CAD file or quit the program.

In the 'Eqpt. Loc & Cable Route' selection, you can assign the location of equipment and

manage the information of Cable Route.

In the 'Cable Modeling' selection, you can create a 3D Route and calculate the length of

cable.

In the 'Cable Size' selection, you can select the Cable DB to apply to the Project, and

calculate the size of Cable.

In the 'Main Cable Route Modeling' selection, you can calculate the Cable Tray Size and

create the 3D Model.

Page 65: SEEDS Manual English Version Rev.0

- 62 -

'File' Menu

'Eqpt. Loc & Cable Route' Menu

Page 66: SEEDS Manual English Version Rev.0

- 63 -

'Cable Modeling' Menu

'Cable Size' Menu

Page 67: SEEDS Manual English Version Rev.0

- 64 -

'Main Cable Route Modeling' Menu

2. Selecting the Drawing File

You can select the Drawing file which is to be used at Main Cable Route Program after

clicking 'file' and then 'Open Drawing' menus

To create a 3D Model compatible with PDS(3D Model Software of Intergraph), you use the

Microstation File.

In the case of an AutoCad file, you can open it and work at Microstation.

In the case of general drawing, you can open it and work at Microstation after scanning.

You can select a Microstation File after clicking the 'Select' button.

By clicking the 'Microstation File Open' button after selecting the Microstation File,

Microstation Program starts to run and you can use it at the main cable route program.

Page 68: SEEDS Manual English Version Rev.0

- 65 -

The window of selecting the Microstation File The Microstation file selection window

Example of Microstastion File

3. Eqpt. Loc & Cable Route

'Eqpt. Loc & Cable Route' is composed of sub-menus which create the data required, the

information of location, input the information of location and manage the Cable Route.

Page 69: SEEDS Manual English Version Rev.0

- 66 -

1) Extr. Cable List

After clicking 'Eqpt. Loc & Cable Route' and then 'Extr. Cable List' menus, the data

which requires the information of location is generated by using the information of Cable

From and Cable To at Cable List.

Overlapping data are managed as one data (ex: Same Panel No. of Cable From and so

on)

2) Assign Eqpt. Loc

By clicking 'Eqpt. Loc & Cable Route' and then 'Assign Eqpt. Loc' menus, you can input

the information of location for the equipment which requires this information[the

information of location].

By double-clicking Eqpt. at the 'Eqpt No', you can select the location by using the mouse

at the Microstation. The coordinates of the chosen location are shown on the table.

You can input the information of location on the Table directly. You input the Elevation

of the spot of cable leading in directly. The information you input into the Group Code

attribute is used to designate the installation Route of cable with the Cable Group

attribute of Cable Route. (if the Group Code attribute is 'LV', the cable is installed using

the cable Route which attribute is 'LV')

If the coordinate of location is down to decimal point, you re-setup the attributes of Grid

Lock, Snap Lock, Coordinate Readout of Microstation and so on.

3) Cable Path

By clicking 'Eqpt. Loc & Cable Route' and then 'Cable Route' menus, you can manage the

Cable Route where cables will be installed.

Page 70: SEEDS Manual English Version Rev.0

- 67 -

3.1) How to input the data

Fixed Side : At the time of creating the Cable Route, you cannot know the size of

the Cable Tray, Trench and so on. So you assign the line which is

invariable according to the result of calculating the size in the direction

of N, S, E, W and so on. In the case of the sagging Cable Route, you

can assign the Fixed side in the direction of N, S, E, W and so on.

According to the attribute of the Fixed Side, the Fitting Type like

Reducer Type, and location are determined.

Height : You can create the Cable Route using the x, y coordinates on the plane,

and assign the Elevation using the Height attribute.

Route Group : If the Cable Tray of 2 levels or more is needed to be installed, you

can assign connection of the Cable Tray using the attribute of the

Route Group. And in the case of the installation of the Cable Tray

for high-pressure, low-pressure and control, you can assign HV, LV1,

LV2, CONT to the Group attribute.

Route Type : Input 'TRAY', 'TENCH', 'DUCT' and so on. You can input any type

value like 'DUMMY' if the Cable Route where the Cable Tray and the

Cable Trench are connected is necessary but the 3D modeling

element is not necessary.

Cable Group : By using the attribute of the Group Code, you can designate the Cable

to be installed using the Cable Route. If the number of the

attribute of the Group Code is 2 or more, you input the values,

dividing[separating] each Group Code by ','

Page 71: SEEDS Manual English Version Rev.0

- 68 -

Area : Inputting Area when you do B/M Summary.

* After selecting 'Route Name' or 'Route Type', and then clicking the 'Sort' button,

they are sorted according to the condition chosen.

3.2) 'Add' button

If you click 'Exit' button after input of the attribute of the Cable Route, you can

create the Cable Route by assigning the start point and the end point at the

Microstation. When the Cable Route is created, the information of location and the

attributes are shown up on the table. The Cables are created using the connecting

coordinate of the Cable Route.

3.3) 'Edit' button

By clicking the 'Edit' button, you can select the Cable Route which you want to

modify at the Microstation.

If you select the Cable Route, the attributes about the Cable Route selected show up

on the window. And when you click the 'Exit' button after modification, the changes

are reflected at the Microstation and the Table.

Page 72: SEEDS Manual English Version Rev.0

- 69 -

3.4) 'Delete' button

If you click 'Delete' button, you can select the Cable Route which you want to delete

at the Microstation.

If you select the Cable Route, the Cable Route at the Microstation is deleted and

[the Table]it is also deleted on the table.

Double-click the Route Name on the Table, and check yes or not. If you click the

'Yes' button, the Cable route is deleted from Microstation and from the Table.

3.5) Function of Microstation's Tag

If you create the Cable Route using 'Add', 'Delete' and 'Edit', you can refer for for

the same attribute using Review Tag at Microstation.

Using Attach Tag, Edit Tag and so on at Microstation, you can work related to Cable

Route. To reflect the data that you worked at Microstation, you can use 'Get Data

From Drawing(Append)' and 'Get Data From Drawing(Overwrite)'

When you create the Cable Route from two or more Microstation Files, you can use

'Get Data From Drawing(Append)' button.

To reflect the data you worked at the table to Microstation inversely, you can

reconcile the contents of the DB with the attribute of Microstation using 'Edit

Attribute To Drawing' and 'Create Cable Route To Drawing'

Clicking 'Edit Attribute To Drawing' button, you can change the attribute of the Cable

Route at the Microstation among the Cable Route on the Table. Clicking 'Create

Cable Route To Drawing' button, you can create new Cable Route at Microstation by

using the 'Cable Route Data' button.

Creating the Cable Route newly, you can create Elevation using the information of

Height on the Table.

Page 73: SEEDS Manual English Version Rev.0

- 70 -

4) Annot. Cable Route

Selecting 'Eqpt. Loc & Cable Route' and then 'Annot. Cable Route' menus, the name of

the Cable Route which is at the center of Microstation shows up.

Page 74: SEEDS Manual English Version Rev.0

- 71 -

4. Cable Modeling

Cable Modeling is composed of Sub Menus - create 3D Route of all the Cable or selected

Cable. Calculates and compensates the length of Cable, designate the starting Route and

ending Route, and check the 3D Route of Cable, using the information of Cable location and

Cable Route.

1) Assign Start/End Cable Route

The 3D Route of Cable is created as the shortest Route among the Cable Route which can

be installed, using Group Code of Cable.

Cable Route is determined considering the shortest Route. So in order to designate the

Start/End Cable Route arbitrarily, you can change the attribute selecting 'Cable Modeling'

and then 'Assign Start/End Cable Route' menus.

2) Display All Cable

If you select 'Cable Modeling' and then 'Display All Cable' menus and input the condition to

create 3D Route of Cable and then click the 'Create' button, Microstaion Program starts to

be run. And all the 3D Routes of Cable are created using the information of Cable location

and Cable Route.

Page 75: SEEDS Manual English Version Rev.0

- 72 -

If the length between Cable Route and the spot of Cable leading in is larger than the input

value, Minimum U/G Conduit Distance represents the attribute to install Cable underground.

Minimum U/G Conduit Height means the Elevation of the Cable's leading spot on this

condition.

the creation of 3D Cable Route

3) Select Cable

Page 76: SEEDS Manual English Version Rev.0

- 73 -

By selecting 'Cable Modeling', 'Selected Cable' and 'Select Cable' menus in order, you can

select Cable to create the 3D route of Cable

When the information of location of some Cable is changed, you can create the 3D Cable

Route for the changed Cable.

4) Display Selected Cable

Select 'Cable Modeling', 'Selected Cable' and 'Display Selected Cable' menus in order. Input

the condition to create the 3D Route of Cable. And then the 3D Route of the selected

Cable is created using this information of Cable location and Cable Route.

5) Cable Length Calculation

If you select 'Cable Modeling' and 'Cable Length Calculation' menus in order, the length of

Cable is calculated and saved in the DB.

6) Cable Route Check

Select 'Cable Modeling' and 'Cable Route Check' menus in order. You can check up the

Cable Route changing the color and line thickness of cable.

'Select Cable' : selecting Cable to check up the Route in Select Cable Box and clicking

'Check' button. The color and line thickness of selected Cable are changed.

'Reset' : if you click 'Reset' button, the color and line thickness of selected Cable is

changed back to the original values.

Page 77: SEEDS Manual English Version Rev.0

- 74 -

The Select Cable window to check up Cable Route

The result of changes of the color and line thickness

Page 78: SEEDS Manual English Version Rev.0

- 75 -

7) Cable Length Modify

Selecting 'Cable Modeling' and 'Cable Length Modify' menus in order, you can refer for and

vary 'Cable Leng' using the Cable Leng(Adj) Field.

Calculate Voltage Drop using Cable Length.

If you don't know the information about Cable location, you can calculate Cable Size by

entering the length in Cable Leng(Adj) Field.

5. Cable Size

Cable Size is composed of Sub Menus - Select and Modify Cable Data to apply to the

Project from Cable DB, Calculate Cable Size for high pressure and low pressure, assign

Cable Size arbitrarily.

1) Cable Data Selection

You can build the Cable Data to apply to the Project, selecting 'Cable Size' and 'Cable Data

Selection' menus in order.

Select the Cable to apply to the project, using the Selection boxes of Cable Vendor, Cable

Type, Cable Voltage and Cable Core. By clicking the 'Add' button, Cable Data for Project is

added. By clicking 'Delete' button, Cable Data for Project is deleted.

Entering '*' in Cable Type, Cable Voltage, Cable Core, all the data is added to or deleted

from Cable Data.

Selecting Conductor Type, you can refer the values related to calculation of Short Circuit

Current Capacity.

Selecting 'Ref...' button, you can refer for the values related to T1 and T2.

Using 'Cable Data Modify' menu, you can refer for and modify the Cable Data for Project.

Page 79: SEEDS Manual English Version Rev.0

- 76 -

'Cable Data Selection' window

The 'Cable Data Selection Ref.' window

Page 80: SEEDS Manual English Version Rev.0

- 77 -

2) Cable Data Modify

Selecting 'Cable Size' and 'Cable Data Modify' menus in order, you can view and modify the

Cable Data from the Cable DB for the Project

2.1) 'Add' button

By Clicking the 'Add' button, you can add the Cable Date to the Cable DB for the Project.

When data under the same conditions of Cable Type, Cable Voltage, Cable Core and so on

is selected, the Cable Data added by clicking the 'Add' button is deleted.

2.2) 'Delete' button

By selecting the Cable Data that you want to delete and clicking the 'Delete' button, you

can delete that Cable Data from the Cable DB for the project.

When data under the same conditions of Cable Type, Cable Voltage, Cable Core and so on

is selected, the Cable Data deleted by clicking the 'Add' button is added.

Page 81: SEEDS Manual English Version Rev.0

- 78 -

The Cable Data Add window

The Cable Data Delete window

Page 82: SEEDS Manual English Version Rev.0

- 79 -

3) LV Cable Size

By selecting 'Cable Size' and 'LV Cable Size' Menus in order, you can calculate the Cable

Size for the low-pressure motors

Enter the conditions related to the calculation of Cable Size for all the low-pressure motors

If you select 'Air' at 'Cable Construction', Ampacity(Air) in Cable DB is applied.

If you select 'Underground' at 'Cable Construction' Ampacity(Ground) in Cable DB is applied.

The Value of 'Maximum Operating Temp.' is applied for temperature compensation of the

Cable resistance.

When the value of Minimum Size is larger than the Cable Size, Cable Size is calculated.

3.1) 'Edit Each Cable Size Condition' button

By clicking the 'Edit Each Cable Size Condition' button, you can assign the special

conditions to apply to each cable.

These conditions have priority over the general conditions to apply to all the cables.

If you enter 'a' in the 'Installation Condition(A/G)' Cell, Ampacity(Air) in Cable DB is applied.

If you enter 'G' in 'Installation Condition(A/G)' Cell, Ampacity(Ground) is applied.

If you want to apply the different values of Derating Factor for all the Cables, enter those

values in the 'Derating Factor' Cell.

Cables for High-pressure, low-pressure and control are shown up on the table.

You can enter the conditions for high and low pressure cables.

Page 83: SEEDS Manual English Version Rev.0

- 80 -

3.2) 'Select...' button

By clicking the 'Select' button, you can select an Excel File for LV Cable Size Report.

The selected Excel File is to include 'Sheet1' sheet without specific format.

Page 84: SEEDS Manual English Version Rev.0

- 81 -

3.3) 'L.V. Cable Size Calculation' button

After clicking the 'L.V. Cable Size Calculation' button, Excel Program is run and you can

make the L.V Cable Size Calculation Report.

Select the minimum Cable Size that satisfies these two conditions -

condition 1 : The calculation condition of Motor Capacity of Load Summary, compensated

Cable length and Cable Size

condition 2 : Cable Size according to the permissible current and a drop of electric pressure

The L.V Cable Size Calculation Report. has the process of calculating each Cable Size in

Excel Format.

4) HV Cable Size

Selecting 'Cable Size' and 'HV Cable Size' menus in order, you can calculate the Cable Size

for high-pressure motors. (Cables [of] which Calc. type in Gen. Spec are 'HV')

Page 85: SEEDS Manual English Version Rev.0

- 82 -

Enter the conditions related to the calculation of Cable Size of all the high-pressure Motors.

If you select 'Air' at 'Cable Construction', Ampacity(Air) in Cable DB is applied. If you

select 'Underground' at 'Cable Construction' Ampacity(Ground) in Cable DB is applied.

When the value of Minimum Size is larger than the Cable Size, Cable Size is calculated.

4.1) 'Edit Each Cable Size Condition' button

By clicking the 'Edit Each Cable Size Condition' button, you can assign the special

conditions to apply to each cable.

These conditions have priority over the general condition to apply all the cables.

If you enter 'a' in the 'Installation Condition(A/G)' Cell, Ampacity(Air) in Cable DB is applied.

And if you enter 'G' in 'Installation Condition(A/G)' Cell, Ampacity(Ground) is applied.

If you want to apply the different values of Derating Factor for all the Cables, enter those

values in the 'Derating Factor' Cell.

Cables for High-pressure, low-pressure and control are shown up on the table

You can enter the conditions for high and low pressure cables.

4.2) 'Calc ...' button

By clicking the 'Calc' button, you can calculate the Cable Size according to the Short

Circuit Current Capacity and the permissible current for Cable of which type in Cable

Gen. Spec is 'HV and you can determine minimum Cable Size.

* How to enter the data

Breaker Type : 'CB' -If you use circuit breakers like VCB, ACB and so on.

'FUSE' - If you use FUSE,

Page 86: SEEDS Manual English Version Rev.0

- 83 -

Fault Current : If Breaker Type is 'CB', enter the short circuit current. (Unit : kA)

Fault Clear Time : Enter Short Circuit Duration (Unit : Sec)

Let Through Current : If Breaker Type is 'FUSE', enter the Peak Let Through Current.

(Unit kA)

After calculating Cable Size according to the Short Circuit Current Capacity and the

permissible current, the minimum Cable Size is shown up on the 'Cable Size' Cell.

When Cable size by Short Circuit Current Capacity is large and Breaker Type is 'CB', the

value in 'Calc. Cable Size' Cell represents the Cable Size which has been calculated.

5) Control Cable Size

By selecting the 'Cable Size' and 'Control Cable Size' menus in order, you can assign the

Control Cable Size ((Cables of which Calc. type in Gen. Spec is 'CONT', 'DCS', IRP' and

'RTD')

6) Cable Size Modify

By selecting the 'Cable Size' and 'Cable Size Modify' menus in order, you can refer for the

Page 87: SEEDS Manual English Version Rev.0

- 84 -

calculation result of Cable Size and assign the Cable Size arbitrarily.

6. Main Cable Route Modeling

Main Cable Route Modeling is composed of Sub Menus - Build the Cable Route data using

each Cable Route Data and Cable Data. Calculate Cable Tray Size. Create Cable Tray 3D

Modeling by entering the conditions related to Cable Tray Modeling. Produce B/M..

1) Cable Route

By selecting the 'Main Cable Route Modeling' and 'Cable Route' Menus in order, you can

build the Cable Route data using each Cable Route Data and Cable Data.

2) Cable Tray Size Calc.

By selecting the 'Main Cable Route Modeling' and 'Cable Tray Size Calc.' Menus in order,

you can select the Calculation Method of all the Cable Tray Size. And then by clicking the

'Calc. All' button, the Cable Tray Size is calculated as selected method and you can check

up the result of calculation.

You can assign an arbitrary size for each Cable Tray. After entering 'Y' in the 'Calc

Method' cell, you can select the Calculation Method by double-clicking 'Cable Tray No.' on

the Table.

Page 88: SEEDS Manual English Version Rev.0

- 85 -

By double-clicking 'Cable Tray No.' on the window of 'Tray Size Calculation', you can refer

to for the list of Cables supported by each Cable Tray and check out the detailed

calculation results.

If you select 'Calc. Method(By Tray), you can select the Calculation Method. And if you

select Calculation Method, you can check up the result of calculation.

If you click 'Unload Check' button after entering 'Y' in 'Unload Cell' on the Table, the Cable

Tray Size is recalculated and the result is shown up except for the selected Cables.

In the case of Unload Cable, you need to recreate the Cable Route by changing the

attribute of 'Cable Group Code' in the menu of 'Assign Eqpt. Loc'.

Page 89: SEEDS Manual English Version Rev.0

- 86 -

Cable List of Cable Tray and result of calculation

Recalculated Cable Tray Size by changing calculation method

Page 90: SEEDS Manual English Version Rev.0

- 87 -

3) Cable Assign Report

By selecting 'Cable Route Type', After Selecting the 'Main Cable Route Modeling' and

'Cable Assign Report' Menus in order, you can create a Report of Cable List related to the

Cable Path under the selected Cable Route Type as an Excel File.

The Cable Route Type selection window.

After clicking 'Create Report...' button, if you choose Excel Template File Excel Program

make Cable Assign Report.

The name of Excel Sheet is determined by Cable Route Path. And when you click the

Excel Sheet you can check the Cable Data that goes through Cable Path.

The length next to Cable Route represent the length of cable route that you input in

CAD.

Page 91: SEEDS Manual English Version Rev.0

- 88 -

4) Cable Schedule

The Cable Schedule with data like cable length, size and so on are displayed in the form

of Excel File.

After selecting the 'Main Cable Route Modeling' menu, 'Cable Schedule.' Menu and Cable

Schedule Template File in order, the Cable Schedule Creation window shows up.

If you click the 'Select' button, select an Excel Template File and click the 'Create Cable

Schedule' button in order, the Excel Program starts to run and you can create Cable

Schedule.

If you change the Template File according to the Project conditions, the Cable Schedule is

made in the modified Format.

The window of Excel Template File selection

Page 92: SEEDS Manual English Version Rev.0

- 89 -

Output of printing 'Cable Schedule '

5) Define Model Area

The window of assigning Area to create 3D Model

Page 93: SEEDS Manual English Version Rev.0

- 90 -

If you select the 'Main Cable Route Modeling' and 'Define Model Area' Menus in order,

Microstation appears on screen and then you can assign the Area to create a 3D Model.

You can model the Cable Tray only in the assigned Area.

6) Cable Tray Model

Enter the conditions related to Cable Tray Modeling such as Bend Angle, Fitting Elevation,

Vertical Fitting and so on. And figure out B/M.

6.1) Bend Angle

By selecting the 'Main Cable Route Modeling', 'Cable Tray Model', 'Bend Angle' Menus in

order, you can choose the Horizontal Bend Angle that will be applied to Project.

Except for the arranged angles, they are modeled as Horizontal Adjustable.

6.2) Fitting Elevation

By selecting the 'Main Cable Route Modeling', 'Cable Tray Model', 'Fitting Elevation' Menus

in order, you can set the Elevation of Bend, Tee, Cross and so on.

Set the Elevation, referring for the Cable Path Data at crossings of more than two Cable

Paths. In the case that a crossing has the same Cable Path Elevation as another one, an 'N'

appears in the Check Cell. In that case, you cannot set the Elevation.

Peripheral Fittings, such as Reducer, Elbow, Vertical Adjustable and so on, are set

according to the Elevation of each Bend, Tee, Cross and so on.

If Cable Path Elevations are different from each other, it must be figured out whether

Modeling is executed using a 90 degree Elbow. If there is no need for space, Modeling is

executed using a 45 degree Vertical Adjustable.

If you want to assign an Elbow to P1(T) ~ P4(T), enter 'E'.

If you want to assign an Adjustable [to there], enter 'A'.

After setting the angles for P1(A) ~ P4(A), you can create an arbitrary Fitting for the user.

Page 94: SEEDS Manual English Version Rev.0

- 91 -

6.3) Cable Tray Vertical Fitting

If you select the 'Main Cable Route Modeling', 'Cable Tray Model' and 'Cable Tray

Vertical

Fitting' Menus in order, you can specify the Modeling method for the vertical part

located

at the end point of the Cable Path.

Specify the Modeling method, referring for Cable Path Data at the points that are not

connected

to the Cable Path.

* How to input Data

Fitt. Type (N/S/E) : Enter the Fitting Type for of the endpoint of the Cable Path.

In case of additional fitting is not required, enter 'N'.

In case of additional fitting is required for to the selected Elevation for straight, enter 'S'.

In case of additional fitting is required for certain distance and Elevation, enter 'E'.

Drop Elev.(mm) : Enter the Elevation of the endpoint of Fitting.

Change Elev.(mm) : If Fitt. Type is 'E', please enter the Elevation of the point, starting

point of Bend, where the direction is changed.

Distance(mm) : If Fitt. Type is 'E', please enter the distance from the center of the Cable

Path to the center of the endpoint of Fitting.

Direction(R/L) : If Fitt. Type is 'E', please enter the direction of the endpoint of Fitting

using 'R'(Right) or 'L'(Left) on the direction where the Elevation gets

lower.

Angle : If Fitt. Type is 'E', please enter the Bend Angle to use for a change of direction.

Page 95: SEEDS Manual English Version Rev.0

- 92 -

6.4) Cable Tray Modeling

Select the 'Main Cable Route Modeling', 'Cable Tray Model' and 'Cable Tray Modeling'

Menus in order.

And then you can see a window to input the properties of the Cable Tray.

The Tray Height value, which was entered when you calculated Cable Tray Size, is

used as it is.

Enter the Ground Elevation value of the project in the Ground Elevation text box.

If you click the 'EXIT' button after inputting the properties of the Cable Tray,

Microstation appears on the screen and the 3D Modeling is created.

the window for properties of 'Cable Tray'

Page 96: SEEDS Manual English Version Rev.0

- 93 -

The result of Created 'Cable Tray 3D Model'

6.5) Cable Tray B/M

After Selecting the 'Main Cable Route Modeling', 'Cable Tray Model' and 'Cable Tray

B/M' Menus then, if you select the Excel Template File, the Excel Program is executed

and then the Cable Tray B/M Report is made.

Cable Tray B/M displays the amount of the Cable Tray that is finally modeled.

The Cable Tray B/M Report is composed of a 'Breakdown' Sheet and a 'Summary' Sheet

respectively.

The 'Breakdown' Sheet shows details about each Fitting.

The 'Summary' Sheet displays the amounts according to Tray area and Type Size.

Page 97: SEEDS Manual English Version Rev.0

- 94 -

'Cable Tray B/M Breakdown Sheet'

'Cable Tray B/M Summary Sheet'

Page 98: SEEDS Manual English Version Rev.0

- 95 -

7. Project Applicable Method

1) In the case of adding or deleting Loads and Panels from the 'Load Summary'

and changing the channel, you can input the added location information after running the

Cable List Program , re-making the Cable List and making the data needed for location

information.

2) In the case of adding cables to the 'Cable List' Program or deleting them from the 'Cable

List' Program, you can input the added location information after making the data needed

for location information.

3) In the case that the Location or Group Code of Cable was changed, you can update the

3D Modeling and B/M if you run the program related to Cable Size, Cable route and

Cable Tray Size after re-making the 3D route of the modified Cable by using Select

Cable and calculating the length.

4) In the case that the capacity of the Load was changed from the 'Load Summary' Program,

you can update the 3D Modeling and B/M after running the program related to Cable

Size or Cable Tray Size.

5) In the case that the Data about the Cable Path is changed, you can update the 3D

Modeling and B/M if you run the program related to Cable Size, Cable route and Cable

Tray Size after creating the 3D route and calculating the length.

6) In the case that the Data about the Cable Size was changed, you can update the 3D

Modeling and B/M after running the 'Cable Size, Cable Tray Size' Program.

7) In the case that the Data about Cable No. is changed from the 'Cable List' Program, you

can update the 3D Modeling and B/M if you run the program related to Cable Size, Cable

route and Cable Tray Size after creating the 3D route and calculating the length.