section – e · pdf filegas operated relay (buchholz relay) sukrut (cedaspe, italy...

24
TPT/SUPPLY-1 SECTION – E (FORMAT FOR SUBMISSION OF THE PRICE BID OF THE TENDER) (REFER ON-LINE BIDDING FORMS) Note : Only Data provided in on-line bidding forms shall be considered for evaluation.

Upload: buidieu

Post on 07-Feb-2018

296 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

TPT/SUPPLY-1

SECTION – E

(FORMAT FOR SUBMISSION OF THE PRICE BID OF THE TENDER)

(REFER ON-LINE BIDDING FORMS)

Note : Only Data provided in on-line bidding forms

shall be considered for evaluation.

Page 2: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

TPT/SUPPLY-1

SECTION – E CONSISTS OF THE FOLLOWING SUBSECTIONS

TENDER FORM NOTES FORMAT FOR SUBMISSION OF PRICE BID OF

THE TENDER

Page 3: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Tender No :- 20173

Tender Reference No :- CMM/OPS/71-50-9-3116

Template Name :- TENDER FORM - PART II (PRICE BID)

FORMAT FOR SUBMISSION OF PART - II BID

TENDER FORM: PART - II (PRICE BID)

Description Remarks

Tenderer's Bid No. (Bidders Reference No.)

Dated

1. In response to your invitation to the tender and as per you tendering conditions, the price and quantity schedule of items applicable for the scope ofsupply (and other commercial terms and conditions) contained in Part-I (Technical and commercial bid except price) are indicated in the format asAnnexure to this tender form.

2. We hereby agree to keep the price and other commercial terms and conditions valid for your acceptance for a period of 120 (one hundred and twenty)days from the date of opening of Part-II (price bid) of the tender.

NOTE :

Instructions for filling above Declaration:

https://npcil.etenders.in/excelworks/tender_upload_excel/21242/24779/C/N

1 of 2 10-10-2016 02:43 PM

Page 4: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

a) Bidder's reference number to be indicated against " Tenderer's Bid No.

b) Confirmation to be provided against Sr. NO. 1&2 above.

https://npcil.etenders.in/excelworks/tender_upload_excel/21242/24779/C/N

2 of 2 10-10-2016 02:43 PM

Page 5: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

TENDER NO. CMM/OPS/71-50-9-3116

SECTION – E – NOTES

1.0 GENERAL : 1.1 This tender is for Design, engineering, procurement, manufacture, quality assurance,

routine, acceptance testing, type testing and special tests & seismic qualification (As per Clause No. 5 of NPCIL specification) packing & forwarding, transportation, safe delivery of equipment, mandatory spares, special tools & tackles, erection and commissioning & Guarantee of 260 MVA, 16.5/ 420 KV Generator Transformer for RAPP-6 conforming to requirement of tender specifications and drawings.

1.2 Schedule of Quantities are to be read for the purpose of pricing in conjunction with the General Conditions of Contract, Special conditions of contract, Technical Specifications and Drawings, Special Instructions to the contractor etc. as contained in the Tender Document. Prices are to be quoted in accordance with GCC Clause No-5 (Contract Price and Payment) and corresponding SCC, if any.

1.3 This is a Supply indigenous tender including erection and commissioning and prepared

with a single point responsibility on the successful bidder for completion and handing over of all facilities as per specifications.

1.4 Type/ Special tests / Seismic qualification charges: Charges for type/ special tests, design review and seismic qualification charges as listed in Section-E shall be included in the basic cost of Transformer. Unit Prices for Type tests/ Special tests/ design review / Seismic qualification shall be indicated separately only for addition / deletion purpose. These unit rates shall not be considered for Price Bid evaluation.

1.5 Prices for Essential/ Mandatory Spares: The bidders are required to quote for all the items listed under this sub clause and the same shall be considered for Price bid evaluation. In case the rate of any item is not quoted by the bidder/s in their offer, the bidder shall supply such items without any additional price. The break up prices shall be reallocated/ readjusted to match the total price quoted under this sub-section.

1.6 Prices for Special Tools and Tackles: The bidders are required to furnish price for all Special tools and tackles listed in Section-E and shall be considered for Price bid evaluation. In case the rate of any item is not quoted by the bidder/s in their offer, the bidder shall supply such items without any additional price. The break up prices shall be reallocated/ readjusted to match the total price quoted under this sub-section.

1.7 Erection and Commissioning charges: The bidders are required to quote for all items

under this sub section. This shall be considered for Price bid evaluation. Incomplete offers are liable to be rejected.

1.8 The requirement of special tools, tackles, jigs, equipment, plants etc (other than tools

and tackles listed in the tender document) required for erection, commissioning and subsequent maintenance of all the equipment is in the scope of this tender. The prices of special tools and tackles (other than tools and tackles listed in the tender document) shall be included in the price of corresponding items/equipment.

Page 6: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

1.9 Total price quoted in the Price schedule are deemed to include all the

items/equipment/works required for completion of the scope. The Bidder shall be responsible for inclusion of all Prices towards supply of equipment, design review, essential/mandatory spares, special tools & tackles, type/ special tests, seismic qualification, erection & commissioning (site works) etc as specified in the various sections of tender document.

1.10 Approved Sub- vendor list is enclosed as Annexure - 1. 1.11 The Special Condition of Contract (SCC) shall supplement / amend General contract

condition (GCC) - Form no. GCC /Supply-1/Rev-3, Section –A and C. Whenever there is conflict between above documents, the provisions in SCC shall prevail.

2. BASIS FOR PRICE EVALUATION : 2.1 The Bidders are required to quote for the entire scope of work as contained in the Tender

document.

2.2 Capitalisation of losses: Loading shall be applied for Capitalisation of losses as per the formula indicated below.

2.2.1 Formula for Evaluation of Tenders:

The tenders will be evaluated for losses as per the loading formula given below: L = (A1 X D) + (B1 X E) + (C1 X F)

L = Cost of loading for losses/ cooler consumption in Rupees

A1 = Difference in kW of Iron losses from base case.

B1 = Difference in kW of Copper losses from base case.

C1 = Difference in kW of Cooler consumption from base case. D = Rs. 172319/-per kW of Iron Loss E = Rs. 172319/-per kW of Copper Loss. F = Rs. 172319/- per kW of Cooler Loss.

2.2.2 For evaluation, maximum guaranteed losses shall only be taken and bidders shall

quote maximum guaranteed losses only (without any positive tolerance). 2.2.3 The offer with lowest loss will be considered as the 'Base'. 2.2.4 Penalty for excess loss after manufacture of transformer: 2.2.5 Rates of penalty for exceeding guaranteed losses are as follows:

Page 7: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Iron loss = Rs. 172319/- per kW Copper loss + Cooler Loss = Rs. 172319/- per kW

2.3 Contract Milestones Dates: Bidder shall indicate the period in days to achieve various

milestones of submission of drawings, QAP, manufacturing, testing, supply, packing, dispatch, safe delivery to site, erection , commissioning and test charging of Generator Transformer as detailed at Cl. No. 3.2 (i) to 3.2 (iii) of SCC. The milestones dates indicated by the bidder shall be binding on the contractor and shall form part of PO as ‘Contractual Milestones’.

2.4 Contractual Delivery date (CDD): The transformer is to be manufactured, tested, delivered to site, erected, commissioned and test charged in specified period of 180 days. NPCIL reserves the right to reject any offer, if bidder does not meet the delivery schedule requirement specified.

2.5 The contract will be awarded for full scope of works as described in the tender.

3.0 Imported raw materials / components, required for indigenous manufacture of items

covered in this tender, will attract concessional customs duty as applicable as per sr. no. 370 of General Exemption 165. Necessary recommendatory letter will be provided by the Purchaser, however the bidder shall be responsible for timely submitting request for issue of the recommendatory letter well in advance. In view of this, the bidder shall submit their price bid based on this assumption. Further, the bidder shall avail CENVAT credit against CVD component of imported raw materials meant for manufacture of indigenous item and pass on the benefits to NPCIL.

4.0 Section – E – III – Price for Type Testing/ Special / NPCIL Specific Testing will not be considered for evaluation.

Page 8: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

ANNEXURE -1

LIST OF APPROVED SUB VENDORS 1.0 The corresponding Annexure (List of Approved Sub vendors) to the TENDER specifies

major items of supply or services and a list of approved Subcontractors against such items. The Bidder shall satisfy himself regarding NPCIL approved subcontractors for their technical and financial capabilities. The bidder at the time of submission of Part-I (Technical) bid may indicate additional subcontractors for any of the given items, for evaluation by the Purchaser and if found acceptable, inclusion of such subcontractor in approved subcontractors list, before opening of Price Bid. In so far as no Subcontractors are listed against any such item or items not covered in the list, the Contractor shall prepare and submit to Purchaser a list of Subcontractors for such items for approval and inclusion in such list. List of sub-contractors as issued with the Contract shall be strictly adhered to for procurement of goods/services from designated subcontractor(s). Clause No. 3.6 of GCC is applicable for sub contracting the work.

2.0 Approval by the Purchaser for any of the Subcontractors shall not relieve the

Contractor from any of its obligations, duties or responsibilities under the Contract. 3.0 BIDDER shall furnish along with technical offer (Part-I) complete details and

credentials of additional sub-contractor/sub-sub contractor in the format attached with Annexure–2 of Specification to enable PURCHASER to evaluate them expeditiously.

4.0 Followings are list of approved sub vendor for different materials / components used in

manufacture of Generator Transformer.

SL NO. ITEM DESCRIPTION SUB-SUPPLIER APPROVED BY NPCIL

1. Condenser Bushings TELK GE, Hosur Trench CGL

2. Continuously Transposed Copper Conductor

Sam Dong, Korea KSH International,Chakan,Pune Precision Wires Asta, Vadodara

3. Copper Wire Rod Birla Copper/Hindalco Sterlite (Vedanta) Hindustan Copper Norddeasstsche Affirnerie, Germany Kembel Wire & Rod, Australia

4. CRGO Steel (Lamination Supplier)

Nippon Steel, Japan Kawasaki Steel / JFE, Japan AK Steel, USA British Steel, UK

Page 9: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Posco, Korea 5. Fan & Motor for Cooler Marathon Electric 6. Gas Operated Relay

(Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan

7. Transformer Oil (Properties as per NPCIL technical specifications)

Apar Ltd Raj Petro Specialties, SILVASSA

8. CRGO Lamination Processors BHEL TOSHIBA Kryfs Nexus TELK CGL, Mumbai Mahindra Steel Services Centre, Kanhe (Pune) Mahindra Steel Services Centre, Mandideep

9. Magnetic Oil Gauge Sukrut Udyog, Pune QUALITROL MESSKO

10. Marshalling Box &CCC Ashoka, Bhopal Enterprising Engineering, Bhopal TELK TOSHIBA

11. MS Steel (Used for Tank, Supports and fabrication etc.)

SAIL Jindal Steel & Power, Raigarh Tata Steel RINL ESSAR, Hazira

12. Oil Flow Indicator Sukrut Udyog, Pune TAIJIN INDUSTRIES, SOUTH KOREA

13. Oil Pump SPP, UK (Sterling Fluid Systems Ltd.) Flow Well pumps & meters, Bengaluru

14. Off circuit Tap Changer and Cabinet

MR, Germany BHEL, Bhopal Easun MR, Chennai TELK

15. Paper Insulated Copper Conductor

KSH International, Chakan, Pune Precision Wires Bhandari Power Lines Shree Cables, Bhopal

16. Insulators (Porcelain for 400 KV) BHEL WSI Jayshree

17. Press Boards Weidmann ABB Figeholms

Page 10: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Raman Board, Mysore (ABB Ltd.) Note :- Raman Board Mysore is

approved only for a) Press Board wrap between windings and core of winding. b) Press board barriers on tank walls and wall shunts. c) DOF washers d) Auxiliary Leg Barriers e) Pressboard End Ring f) TG Cleats g) Spacers between wraps and between winding and wrap. h) Block and Washer Assembly ( To be used in Axial Insulation Arrangement) i) Press Board Packing on Yoke Shunt j) Half Ring Segment

18. Pressure Relief Device SukrutUdyog Qualitrol MESSKO

19. Radiators (HDG) TTP, Bengaluru MENK Euro Cooler Tran Tech

20. Silica gel Breather Yogya, Jhansi TELK COMEM, Italy Taijin, South Korea

21. Tank Fabricators and Support Structures etc.

TELK BHEL Electro Auto, Bhopal Electro Mechanical, Bhopal Toshiba Mech& Fab Industries, Bhopal MPP Technologies

22. Air Cell Pronol MUSTHANE FUJIKURA, JAPAN

23. Terminal Connector Vinayak Transmission, Mumbai KlemmenEngg, Chennai Milind Engineering, Mumbai NutanEng, Baroda Pee VeeEngg, Bangalore

24. Valves (Gate, Globe & Check) Audco (L&T Valves) Niton Leader Engineering Works Fouress

25. WTI & OTI ( Without mercury Switches)

Perfect Controls Precimeasure Controls

Page 11: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Accurate Control MESSKO QUALITROL

26. Annunciators Procon Aplab Minilec

27. Online Bushing Monitor Qualitrol Doble

28. Control & Auxiliary Transformer

Prayog Electricals Indcoil, Mumbai Kappa, Chennai Pragati Electricals

29. Contactor Siemens L&T Schneider Telemechanique, France GE

30. HRC Fuse Link & Base Siemens L&T Schneider GE

31. Indicating Meters Rishab Meco IMP

32. Nylon rope sling M/s B & S Enterprises, Bhopal M/s Green Field Material Handling Pvt. Ltd., Thane M/s Kalpesh Traders, Bhopal M/s Microsign Products, Bhavnagar M/s Quality Agencies, Bhopal M/s Qureishi Enterprises, Mumbai

33. Auxiliary Contactors/Relays Siemens L&T Schneider GE ABB

34. MCB / MCCB Siemens L&T Schneider GE

35. Push Button Siemens L&T Schneider

36. Fibre Optic Temperature Monitoring System

LUMASENSE QUALITROL(NOEPTIX INO make FOS) OPSENS INO

37. Switch Fuse Unit Siemens

Page 12: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

L&T Schneider ABB GE

38. Terminal Blocks Elemex Connect Well

39. Thermal Overload Relays Siemens L&T Schneider ABB GE

40. Time Delay Relay Siemens L&T Schneider ALSTOM GE ABB

41. Pipes for tank and Cooling Circuits Jindal

42. On Line DGA Equipment PCI Ltd. (Kelmen, UK make) SIEMENS Serveron, USA

43. Butterfly Valves Petson (Eapen Joseph & Co) ETI, Italy TAIJIN, South Korea MAIER, Germany

44. Insulation Paper Munksjo/Amortfos / TullisRussel / H Weidmann

45. Cables NICCO Cables, Kolkata/ UNIVERSAL cables, Satna/ PARAMOUNT Cable Corporation, Khushkera/HAVELL’s India, Alwar/FINOLEX Cables, Urse, Pune/POLYCAB Cables, Daman/UNI FLEX Cables, Gujarat/ KEI/ TORRENT Cables / RAVIN Cables / RALLISON ELECTRICALS, Chopanki, Bhiwadi

46. Control Wires NICCO Cables, Kolkata / UNIVERSAL Cables, Satna / FINOLEX Cables, Urse,Pune / POLYCAB Cables, Daman / UNI FLEX Cables, Gujarat / TORRENT Cables, Ahmedabad/KEI/ RAVIN Cables /RADIANT Cables,Hyderabad

47. Paints for Tank, Accessories, CCC and Marshalling Box

Asian/Akzo Nobel/ JOTUN / Berger / Ching, Germany

48. Welding Electrodes As per NPCIL Approved List 49. Sudden Oil Pressure Relay Qualitrol

ABB 50. BCTS BHEL

Page 13: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Mahendra Electricals, Mumbai / Pragati ENPAY, Turkey TELK EPRO, Germany SAMNUNG, South Korea

51. Nylon rope sling M/s B & S Enterprises, Bhopal M/s Green Field Material Handling Pvt. Ltd., Thane M/s Kalpesh Traders, Bhopal M/s Microsign Products, Bhavnagar M/s Quality Agencies, Bhopal M/s Qureishi Enterprises, Mumbai

52. SS Material for LV Turret and Tank cover M/s Jindal Stainless Steel

53. Crepe Paper Covered Copper Conductor

M/s Gupta Industrial Corp. Thane M/s Pooja Cables Pvt. Ltd, Bhopal M/s NKM Cables and Strips Pvt. Ltd., Mandideep M/s Rational Engineers Pvt. Ltd., Thane

54. Copper Flats M/s Copper Strips Pvt Ltd M/s Emjay Industries, M/s Excelsior Industries M/s Mileen Engineers M/s Shree Cables & Conductors (P) Ltd, M/s Forward Engineering Industries M/s Champion Engg. Industries

55. Gaskets M/s Bharat Corrub M/s NU Cork M/s CorticaMfg (I) Ltd. M/s Indian Cork Industries.

56. Rubber Cord M/s Nu-cork M/s Indian Rubber M/s VAKO SEALS PVT LTD M/s Bombay Oil Seal

57. Roller Assembly M/s Excelsior Industries M/s Anupam Industries M/s United Engg. Bhopal M/s Champion Engg. Industries, Bhopal M/s Farmer Engg. Bhopal M/s Sigma Heavy Engg. industry, Bhopal M/s. TELK M/s New Bharat Engg. Works, Bhopal M/s DTL Machines Pvt ltd, Bhopal M/s Alert Engg. Enterprises, Bhopal

58. Threaded Fasteners M/sNexo Industries Ltd, Ludhiana M/s Precision Auto Engineers, Ludhiana M/s Lakshmi Precision Screws Ltd., Rohtak M/s Pankaj International, Ludhiana

Page 14: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

59. Polyester Resi Glass Tape M/s Nashik Insulation Pvt. Ltd., Nashik M/s Industial Tapes and Fabrics Pvt. Ltd. Kolkata M/s Rotomac Electricals Pvt. Ltd, New Delhi

60. Densified laminated wood M/s Permalli Wallace, Bhopal M/s Western India Plywood, Kerala M/s Mysore Polymer M/s Dehonit Germany M/s Rochlling Germany

61. Clamp Plates SAIL JINDAL ESSAR JFE, Japan

62. Hydraulic Jack M/s BEMCO Hytech Pvt. Ltd., Belgaum(Karnataka) M/s Hydropack (India) Pvt. Ltd., Belgaum(Karnataka) M/s Oriental Engg. works Pvt. Ltd., Haryana M/s Orione Hydraulics Pvt. Ltd., Belgaum(Karnataka) M/s Vankos & company, Patna

63. Wire rope steel sling M/s Dominion Hardware Store, Kolkata M/s Kalinga industrial company, Kolkata M/s Konark commercial Company, Kolkata M/s Mining Allied Machinery Stores, Kolkata M/s Vikrant Ropes Pvt. Ltd., Bhillai

64. Nylon rope sling M/s B & S Enterprises, Bhopal M/s Green Field Material Handling Pvt. Ltd., Thane M/s Kalpesh Traders, Bhopal M/s Microsign Products, Bhavnagar M/s Quality Agencies, Bhopal M/s Qureishi Enterprises, Mumbai

Page 15: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Tender No :- 20173

Tender Reference No :- CMM/OPS/71-50-9-3116

Template Name :- Section - E - I - PRICE FORMAT FOR SUPPLY OF 16.5kV/420 kV, 3 PHASE, 260 MVA, ONAN/ONAF/OFAF GENERATORTRANSFORMER ALONGWITH SPARES, SPECIAL TOOLS &TACKLES.

Section - E - I

PRICE FORMAT FOR SUPPLY OF 16.5 kV/420 kV, 3 PHASE, 260 MVA, ONAN/ONAF/OFAF GENERATOR TRANSFORMER ALONGWITHSPARES, SPECIAL TOOLS & TACKLES.

Sl.No.C0

Item DecriptionC1

UnitC2

QuantityC3

UnitEx-worksprices(Includingpacking andforwardingcharges.)C4

Unit Chargestowards SafeDelivery to site(i.e InlandTransportationcharges & TransitInsurancecharges)C5

Total Unit Priceinclusive ofEx-works prices(Including packingand forwardingcharges),Transportationand TransitInsurance Chargesin INRC6=C4+C5

Total FOR Priceinclusive ofEx-works prices(Including packingand forwardingcharges),Transportationand TransitInsurance Chargesin INRC7=C3*C6

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24770/C/FIM

1 of 5 10-10-2016 05:16 PM

Page 16: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

1.0

Design, Engineering, Material, Construction, Manufacture, Testing(including all routine tests, type tests, special tests & NPCILspecific tests), Inspection at works, Packing & Forwarding,Transportation & Safe delivery to site of 260 MVA, 420/16.5 kV,14 % impedance, +2.5 % to -7.5% OCTC, Temp. rise : Oil - 35deg. C, Wdg. 40 deg. C, ONAN/ONAF/OFAF, 3 phase GeneratorTransformer (GT) with all accessories (except Transformer Oil,Online DGA Monitor for Transformer, Online Condition Monitoringfor HV Bushings & Fiber Optic sensor based temperature monitorsystem) conforming to requirement of NPCIL Tender SpecificationNo:- PP-E-00029. (Contractor shall offer type tested equipment asper latest codes and standards mentioned in the tenderspecification. Charges for type/ special tests, design review andseismic analysis shall be included in the basic cost of Transformer.However unit rates of all the Type/ special / NPCIL specific tests,design review and seismic analysis shall be indicated separately inAnnexure-1 of Price schedule for addition / deletion purpose only.This also includes supply of all interfaces required for retrofittingwith existing equipments such as IPBD, protection panels,Transformer fire fighting system, 400 KV overhead linetermination for GT, Main Control Room, SCADA etc. It alsoincludes supply of all appropriate cables as per specificationrequired for the cabling work from all tank mounted devices toCCC/MB.)

No. 1

1.1

Un-inhibited Napthenic based EHV grade transformer oil for firstfilling till transformer is commissioned shall be supplied ineffectively sealed non-returnable drums. ( Plus 2 extra drums forNPCIL usage)

Lot 1

1.2Online DGA monitor with 8 gases and moisture detection /measurement for Transformer as per specification No.-PP/E/00002/R0

No. 1

1.3 Online Condition Monitoring for HV Bushings No. 1

1.4 Fiber Optic sensor based temperature monitor system as perPP-E-00029 No. 1

2.0 Supply of Essential spares for Generator Transformer (GT) -

2.1 Complete set of gaskets (List of various types and sizes of gasketsshall be furnished during detailed engineering stage) Set. 1

2.2 Set of bushings -

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24770/C/FIM

2 of 5 10-10-2016 05:16 PM

Page 17: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

2.2 a HV Bushing No. 1

2.2 b LV Bushing No. 1

2.2 c HV N Bushing No. 1

2.3 Set of current transformers consisting of one current transformerof each type Set 1

2.4 Set of Cooler fan and fan motor of each type Set 1

2.5 Set of Oil pump & pump motor of each type Set 1

2.6 Oil temperature indicator with micro switches (without mercuryswitches) No. 1

2.7 Magnetic oil level gauge No. 1

2.8 Set of Winding temperature indicating equipment complete withall accessories including WTI repeater Set 1

2.9 Set of Power contactors required for motor starters consisting ofone of each type Set 1

2.10. Pressure relief device No. 1

2.11 Silica gel breather No. 1

2.12 Set of valves consisting of one valve of each type Set 1

2.13 Buchholz relay ( Reed Type) ( suitable for Seismic duty) No. 1

2.14Set of spares for marshalling boxes consisting of MCBs, DoorSwitch, Illumination lamp, heater switch, thermostat, heater,circuit breaker, socket etc.( one of each type/rating)

Set 1

2.15 Set of Pipe fittings (Bidder to indicate quantity for each unit) Set 1

2.16 Set of transducers consisting of one transducer of each type Set 1

2.17 Air bag for the conservator No. 1

2.18 Radiators along with fans & all other accessories Set 1

2.19

Set of spares for cooler control cabinet( one set consisting of oneeach of each type/ rating of switches, contactors, bimetal relays ,timers , Auxiliary relays, lamps etc. and three Nos. of each type/rating of expendables like fuses/bulbs etc.)

Set 1

2.20. Set of spares for motors ( one set of bearing for fan motor) No. 1

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24770/C/FIM

3 of 5 10-10-2016 05:16 PM

Page 18: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

2.21 Spare Un-inhibited Napthenic based EHV grade transformer oil . Ltrs. 200

2.22 Necessary spare parts for Online condition monitoring system(Details to be indicated by Bidder during detailed engineering ) Set. 1

2.23 Necessary spares for Fiber Optic temperature monitoring system Set. 1

2.24 Sudden Pressure Relay No. 1

3.0 Supply of Special Tools & Tackles for Maintenance of GeneratorTransformer (GT) -

3.1 Hydraulic jack suitable for lifting GT as per SpecificationPP-E-00029 Set. 1

3.2 Slings

3.2 aWire rope steel Slings meeting applicable National / InternationalStandard and suitable for lifting of tank cover and core coilassembly for offered GT as per Specification

Set. 1

3.2 bNylon rope Slings meeting applicable National / InternationalStandard and suitable for lifting of HV Bushings for offered GT asper Specification

Set. 1

3.3

Standard hand tool kit comprising of following : a) Set ofSpanners of all sizes as required for dis-assembly of tank, turret,radiators and internal components of offered GT as perSpecification(2 Nos. of each size) b) Tommy bar for box spannerc) Set of Wrenches as required for dis-assembly of tank, turret,radiators and internal components of offered GT as perSpecification (2 Nos. each) d) Set of Screw drivers as required fordis-assembly of tank, turret, radiators and internal components ofoffered GT as per Specification(2 Nos. each) e) Set of pliers,gasket punches, Files, hammers, knifes,hack-saws and coldchistle as required for dis-assembly of tank, turret, radiators andinternal components of offered GT as per Specification.

Set. 1

4.0 Charges towards CLND Lot 1

NOTES :

1.0 Bidder shall take note of Section - E - Notes while quoting.

2.0 The prices indicated above shall be exclusive of taxes & duties. Applicable

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24770/C/FIM

4 of 5 10-10-2016 05:16 PM

Page 19: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

taxes and duties shall be clearly indicated in the on-line bidding form'ANNEXURE - B - I- TERMS OF BID' only.

3.0 Place of Delivery : Rajasthan Atomic Power Station – 6, NPCIL, Rawatbhata,Rajasthan Site, P.O. Anushakti, via Kota, Rajasthan, Pin – 323 303.

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24770/C/FIM

5 of 5 10-10-2016 05:16 PM

Page 20: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Tender No :- 20173

Tender Reference No :- CMM/OPS/71-50-9-3116

Template Name :- Section - II - Price Format for Erection & Commissioningof Generator Transformer

Section - E - II

Price Format for Erection & Commissioning of Generator Transformer

Sr.No.C0

Item DescriptionC1

UnitC2

TotalChargesCurrency: INRC3

1.0

Erection, Commissioning, vacuum pulling of transformer, oil filling, drying and testing at Site, interfacing with existing systems like IPBD,fire protection system, 400 KV overhead lines, LA/BP insulator etc and successful Charging of Generator Transformer (GT) as per Technicalspecification No:- PP-E-00029, Section- C of Tender document. Interconnection between CCC/MB to purchaser protection panel, MCR,SCADA etc. This shall also include minor civil work for erection and commissioning of equipment (including required changes in the existingcivil foundation arrangement)

1Set

NOTES

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24771/C/FIM

1 of 2 10-10-2016 02:47 PM

Page 21: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

1.0 Bidder shall take note of Section - E - Notes while quoting.

2.0 The prices indicated above shall be exclusive of taxes & duties. Applicabletaxes and duties shall be clearly indicated in the on-line bidding form'ANNEXURE - B - I- TERMS OF BID' only.

3.0 Place of Erection & Commissioning : Rajasthan Atomic Power Station – 6,NPCIL, Rawatbhata, Rajasthan Site, P.O. Anushakti, via Kota, Rajasthan, Pin –323 303.

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24771/C/FIM

2 of 2 10-10-2016 02:47 PM

Page 22: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Tender No :- 20173

Tender Reference No :- CMM/OPS/71-50-9-3116

Template Name :- Section - E - III - Price Format for Type / Special /NPCIL Specific Testing

Section - E - III

Price Format for Type / Special / NPCIL Specific Testing

Sl.No.C0

Item DescriptionC1

UnitC2

QuantityC3

Unit Price inINRC4

1.0 Type /Special / NPCIL specific testing Charges

1.1 Temperature rise Test on GT with tank surface temperature thermography No. 1

1.2 LTAC- Line Terminal AC Withstand Voltage Test (AC Short Duration test) as per cl. 12.3 of IEC 60076-3 No. 1

1.3 Measurement of Zero-sequence impedance Test No. 1

1.4 Measurement of Noise level No. 1

1.5 Measurement of harmonics in No-Load current No. 1

1.6 Transient Voltage Transfer characteristics No. 1

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24772/C/FIM

1 of 2 10-10-2016 02:48 PM

Page 23: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

1.7 Measurement of power taken by cooling system (Fan & Oil pump for GT) No. 1

1.8 Magnetic balance test with low voltage single phase supply before & after final inspection for three phase transformers No. 1

1.9 Core isolation test No. 1

1.10. Sweep Frequency Response Analysis (SFRA) No. 1

1.11 Recovery voltage test No. 1

1.12 Measurement of Earth Leakage Current during power frequency test and temperature rise test from all earthing terminalpoints like main tank, radiator banks etc to earth. No. 1

1.13 Full vacuum Test on Transformer Tank at fabrication stage No. 1

1.14 Air Pressure Test on Transformer Tank and conservator at fabrication stage No. 1

1.15 Full vacuum test on assembled transformers with all accessories mounted (including pipe work, bushings and cooling circuitradiators fitted and excluding PRD & Conservator) No. 1

1.16 Oil Leakage Test on completely assembled transformer (including pipe work and cooling equipment and excluding PRD &Conservator) No. 1

1.17 Test on Transformer Oil as per NPCIL specification No. 1

2.0 Charges for Design Review as per CIGRE SC 12 Working Group 12.22 guidelines No. 1

3.0 Charges for Seismic analysis of the transformer and its accessories as per IS - 1893 No. 1

NOTES :

1.0 Bidder shall take note of Section - E - Notes while quoting.

2.0 The prices indicated above shall be exclusive of taxes & duties. Applicabletaxes and duties shall be clearly indicated in the on-line bidding form'ANNEXURE - B - I- TERMS OF BID' only.

3.0 The above prices will not be considered for Evaluation of tenders.

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24772/C/FIM

2 of 2 10-10-2016 02:48 PM

Page 24: SECTION – E · PDF fileGas Operated Relay (Buchholz Relay) SUKRUT (CEDASPE, ITALY Design- EE3 MA/MG) P & B WEIR, UK HITACHI, Japan 7. Transformer Oil (Properties as

Tender No :- 20173

Tender Reference No :- CMM/OPS/71-50-9-3116

Template Name :- SECTION - E - IV - Concessional Custom Duty Format

SECTION - E - IV - CONCESSIONAL CUSTOM DUTY FORMAT

1.0 - Imported raw materials meant for manufacturing of indigenous supply for thistender will attract concessional Custom Duty as per Sr.No. 370 under GeneralExempetion No.165 of Customs Tariff Act. Necessary Recommendatory Letter will beprovided by the Purchaser. In view of this, the bidder shall submit their price bid basedon this assumption. Further, the bidder shall avail CENVAT credit against CVDcomponent of Imported raw materials meant for manufacturing of Indigenous supplyand pass on the benefits to NPCIL.

Description Value in figures inRupees, if applicable

Limiting CIF Value (in Figures) of Imported raw materials in rupees meant for manufacturing of Indigenous Supply in Column 'C7' ofSECTION - E - I - PRICE FORMAT FOR SUPPLY OF 16.5 kV/420 kV, 3 PHASE, 260 MVA, ONAN/ONAF/OFAF GENERATOR TRANSFORMERALONGWITH SPARES, SPECIAL TOOLS & TACKLES.

https://npcil.etenders.in/excelworks/tender_upload_excel/21240/24776/C/FIM

1 of 1 10-10-2016 02:55 PM