Top results
engineering standard saes-a-102 air pollutant emission source control environmental standards committee members al-sharif, a.a., chairman abed hezam, m.h. al-bokhedaim, y.s.…
previous issue: 7 september 2009 next planned update: 7 september 2014 page 1 of 1 primary contact: hammad, bakr sulaiman on 966-3-8760264 copyright©saudi aramco 2010. all…
engineering standard saes-w-012 welding requirements for pipelines welding standards committee members al-awwami, a.n., chairman al-nasir, g.t. beaty, w.d. moyer, r.e. omar,…
saudi aramco engineering standardelectrical systems designs and automation standards committee members hamrani, majed muhsen, chairman sultan, mansour ramadan, vice chairman
metal eco system workshop © saudi arabian oil company 2020 disclaimer this presentation may contain certain forward-looking statements with respect to saudi aramco’s the…
previous issue: 29 october 2003 next planned update: 1 april 2010 page 1 of 30 primary contact: naeem a. khan on 874-7951 engineering standard saes-x-400 30 march 2005 cathodic…
sacs-002 third party cybersecurity standard disclaimer: the contents of this report should be treated by third parties as confidential and is intended solely for the use
previous issue: 22 november 2008 next planned update: 5 may 2012 revised paragraphs are indicated in the right margin page 1 of 34 primary contact: hamood abdulrazaq abduljabbar…
previous issue: 18 september 2012 next planned update: 15 august 2017 revised paragraphs are indicated in the right margin primary contact: bugshan jamal ahmed bugshaja on…
previous issue: 19 october 2008 next planned update: 5 december 2017 page 1 of 23 primary contact: hamrani majed muhsen on 966-3-8809647 copyright©saudi aramco 2012 all…
previous issue: 30 april 2012 next planned update: 30 april 2017 revised paragraphs are indicated in the right margin page 1 of 24 primary contact: abdul razak mokhtarudin…
previous issue: 8 august 2010 next planned update: 24 february 2019 page 1 of 32 primary contact: hamood, abdulrazaq abduljabbar on +966-13-8809647 copyright©saudi aramco…
previous issue: 22 september 2010 next planned update: 28 july 2018 page 1 of 31 primary contact: abdul razak, mokhtarudin m. on +966-3-8801303 copyright©saudi aramco 2013.…
saudi aramco: company general usesaudi aramco: company general use by ahsan z ansari, pe saudi aramco saudi aramco: company general use objective optimize design to control…
previous issue: 30 march 2005 next planned update: 1 december 2010 revised paragraphs are indicated in the right margin page 1 of 49 primary contact: adnan n. al-awwami on…
previous issue: 2 march 2011 next planned update: 16 june 2018 page 1 of 18 primary contact: al-hamrani majed muhsen on +966-3-8809647 copyright©saudi aramco 2013 all rights…
engineering standard saes-p-104 22 november 2008 wiring methods and materials electrical systems designs and automation standards committee members hamrani, majed muhsen,…
best practice sabp-h-092 01 jun 2017 inspection and root cause analysis of fbe external coating failures document responsibility: coatings standards committee primary contact:…
previous issue: 30 november, 2003 next planned update: 1 october, 2008 revised paragraphs are indicated in the right margin page 1 of 24 primary contact: thani s. al-anizi…
note: the source of the technical material in this volume is the professional engineering development program pedp of engineering services warning: the material contained…