Page 1SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
SDO Independent Annual ReviewHMI Instrument
June 28, 2006
Page 2SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
Optics Package Cutaway View
Front Door
Front Window
Sun Shade
Detector (Vector)
Detector (Doppler)
CEB (Doppler)
CEB (Vector)
Limb Sensor
Shutters
BDS Beam SplitterBDS Fold Mirror
Alignment Mechanism
Michelson Interferometer.
Lyot Filter
Filter Oven Housing
Connector Panel
Support Leg
Focus Wheels
ISS Active Mirror
HCM
ISS Beam Splitter
Telescope
Vents
OP Structure
Page 3SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Overview
• Schedule aligned with current S/C need date (15 days reserve)• HMI Optics Package integration nearing completion and optics being calibrated• Flight electronics are progressing and available for system test in August 06• HMI has undergone system level characterization during initial Sun Tests• Preparing for HMI Pre Environmental Review on August 1, 2006• Observatory Integration and Test planning in process• JSOC development progressing well on parallel schedule with instrument• Current issues
– Flight camera deliveries
Page 4SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
Current Status (1)
• All flight CCDs and spares received (10), all received “highest quality” grading.• Flight HMI Optics Package (HOP) is reassembled and ready for second sun test
after rework of anodized parts and final optics selections.– Replaced filter oven.– Upgraded Lyot filter and selected Michelson Interferometers.– ETU cameras are being used for initial calibrations, characterization, and testing.– Flight cameras are due in July 2006.
• Mass simulator delivered to GSFC and installed on the flight IM for SVU testing.• HMI ICD, Revision H is released. No interface or accommodation issues.• August 2006 Pre-Environmental review planning has begun.
– 18 HMI CDR RFAs closed, 1 being iterated with originator.– Test plans and initial procedures are in draft form, verification matrix established and reviewed.– Second Sun Test is currently underway.– Vacuum check/calibration of flight HMI Optics Package will start in July 2006.– Environmental testing will start in August 06.
• All flight mechanisms assembled and integrated, and all mechanism life tests completed.
Page 5SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
Current Status (2)
• Electronics– Flight CEBs are scheduled for delivery in July 2006.– ETU electronics are completing final test.
• FPGA for camera interface brass board is completing test and final refinements.• End-To-End testing with Camera Interface (CIF) and DC/HRI boards is in process.
o CIF board development issues slowed progress.
– Flight boards are in production (4 boards remaining – 2 DC/HRI and 2 CIF).
• JSOC development progressing well on parallel schedule with instrument.– MOC to SOC (command, health and safety) testing is scheduled for Oct 2006.– Prototype science data capture and archiving system has completed initial development
phase.
Page 6SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Resource SummaryHMI Mass Trend
45
50
55
60
65
70
75
80
1-Apr-03
1-Jul-0330-Sep-03
31-Dec-03
31-Mar-04
30-Jun-04
30-Sep-04
30-Dec-04
1-Apr-05
1-Jul-0530-Sep-05
31-Dec-05
1-Apr-06
1-Jul-06
Mas
s (k
g)
Basic Mass
Mass Allocation
74.90
12.36
44.00
18.54
Mass (kg)
77.00Total
7.70Harness
46.97HMI Optics Package
22.33HMI Electronics Box
Allocated (kg)Mass Estimate
HMI Power Trend
90
95
100
105
110
115
120
125
1-Apr-03
1-Jul-0330-Sep-03
31-Dec-03
31-Mar-04
30-Jun-04
30-Sep-04
30-Dec-04
1-Apr-05
1-Jul-0530-Sep-05
31-Dec-05
1-Apr-06
1-Jul-06
Pow
er (W
)
Nominal Mode Estimate
Nominal Mode Allocation
Eclipse Mode Estimate
Eclipse Mode Allocation
N/A0Launch Mode
TBD65.7Orbit Raising Mode
122103.5Eclipse Mode
11196.0Nominal / Operations Mode
Allocated Power (W)
Estimated Power (W)
Power Budget
Page 7SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
Significant Changes Since CDR
• Technical– No significant design changes
• Risk Changes– Retired risks: detector deliveries, CEB noise, LM drawing release and procurement system– Added risks: CEB deliveries
• Schedule Reserve Trend
HMI INSTRUMENT SLACK (RESERVE)(Internal to Planned Delivery)
-10
0
10
20
30
40
50
60
70
Apr-
04
May
-04
Jun-
04
Jul-0
4
Aug-
04
Sep-
04
Oct
-04
Nov
-04
Dec
-04
Jan-
05
Feb-
05
Mar
-05
Apr-
05
May
-05
Jun-
05
Jul-0
5
Aug-
05
Sep-
05
Oct
-05
Nov
-05
Dec
-05
Jan-
06
Feb-
06
Mar
-06
Apr-
06
May
-06
Slac
k to
pla
nned
del
iver
y (d
ays)
P lannedDelivery Date: 3/16/2007
Critical Path: CEB delivery
Recovery f rom improper ly
anodized part s
FY05 RescissionReplan Schedule
EEE parts procurement HSB development issues
M odif ied Test Flow
CEB Delivery Slip
HM I delivery date moved from 2/2/07 to 3/16/07
Page 8SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Summary Schedule
• Delivery Date: March 16, 2007– 15 days of reserve
• Critical Path– CEB deliveries
Page 9SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Risk Assessment
Risk ID Title Board L C I A
RMHMI019 Electronic Parts DeliveriesRMRB 4 May 2006No change in rankings. Bridgeboard oscillators are still lagging.
3 4 S M
RMHMI020 Camera Interface Board Design
RMRB 4 May 2006Decreased likelihood and consequence: SDRAM problem understood and solved. CIF board routinely transferring images from camera to camera simulator through DCHRI at full readout rate. Final board layout is underway.
3 4 S M
RMHMI025 CEB deliveriesRMRB 4 May 2006Increased likelihood based on recent 2 week slip in RAL delivery.
4 5 S M
Title Concern Mitigation(19) Electronic Parts Deliveries If the electronic parts are not delivered on time to meet
the production schedule, the instrument schedule will be impacted.
Work with vendors to improve deliveries and work with engineers to find alternative parts. Build around shortages as necessary (build partial boards).
(20) CEB Delivery Schedule If the CEB deliveries continue to slip, then the HMI instrument delivery will slip.
Increased oversight of RAL
(25) Camera Interface Board Design
If the design of the camera interface board and its associated FPGAs are not completed in a timely way, its testing and testing with the DCHRI and the rest of the system cannot proceed and the flight HEB schedule will be delayed.
Conducting a detailed review of the camera interface FPGA designs and assigning additional resources to the design update and testing of the camera interface board.
Page 10SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Current Status - Photos
HMI CCD in Focal Plane Assembly
HMI Flight Headboard
Page 11SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Current Status - Photos
HMI Mass Simulator Integrated onto Flight IM
Flight Harness on SDO Harness Mock-Up
Page 12SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Current Status - Photos
Flight Narrow Band Michelson Interferometer
Flight Hollow Core Motors
Page 13SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Current Status - Photos
HMI Flight Optics Package1st Sun Test Configuration - February 2006
Page 14SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Current Status - Photos
HMI Flight Optics Package Assembly
Detector Assembly
CEB
Flex-Cables
Telescope
Front Window
ISS Mirror
Polarization Selector
Focus/Cal Wheels
Limb Sensor
ISS Beam Splitter
BDS Beamsplitter
Shutters
BDS Fold Mirror
CCD Fold Mirror
Alignment Mechanism
Internal Harness
Limb Pre-amp Box
Structure
Oven Controller
Oven Assembly
Page 15SDO Independent Annual Assessment – June 28-29, 2006 SDO Project
HMI Current Status - Photos
HMI Dopplergram from Sun Test HMI Magnetogram from Sun Test
Page 16SDO Independent Annual Assessment – June 28-29, 2006 SDO Project