1 18 3 June 17, 2020 Highway Segment where work is located. Refer to subsequent layout sheets for more specific locations. Orient - -I -- -- -- - -o--- - Polo ~=====::::===l 261=========: H Y DE I ' I MILLER o Miranda Rockham STATE OF SOUTH DAKOTA PROJECT P 0013153) TOTAL SHEETS STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION Plotting Date: 04/29/2020 PLANS FOR PROPOSED PROJECT P 0013(53) S.D. HIGHWAYS 20 & 26 HAND & SPINK COUNTIES CULVERT CLEANING & CURED IN PLACE CULVERT LINING PCN 06EJ 37 , Crandall Lily 0 Mellette =:::=====:===~------~20 ~==:ti Northville Brentford Conde ~Q _______________ _ I ' I Zell , Athol 0 281 o Ashton S P I N Turton K o Raymond Bradley Garden City 0 INDEX Sheet 1-3 Sheet 4-6 Sheet 7 Sheet 8-12 Sheet 13-15 Sheet 16-18 Wallace 25 I ~~=========!:;7=7r==~D~ol~an~d~=T=::::.::~=d212\;=@•):::======,~=!=== Frankfort CLARK 'Henry Burdette I 0 REDFIELD \ Tulare 37 CL A ' Carpenter R K Willow Lake ~:;:=~:=======~==:::::::::;:====128 I=====~ Bloo Bonilla I ' L __________ _ I \--- 0 Naples I 0 , H A I Vienna M I ' I Bryant _...J_ ___ _ OF SHEETS Title Sheet & Layout Maps Estimate of Quantities & Environmental Commitments Table of Culvert Repairs Plan Notes Traffic Control Standard Plates LIN --1. I Holabird HIGHMORE I =:::;:======lil•===::::::;::===-===/14 St. Lawrence 281 BE A D LE 5TQRM WATER PERMIT (None Required! 47 0 Ree Heights H A N D ' I Wessington Yale 0 Cavour Iroquois I ,O I Osceola 0 Bancroft Erwin 0 0 Badger KINGSBURY Desmet Hetland 0 Lake Preston w ::.: <I z >- 0 ...J Q. z 0 0 z 0 a: :::) I >- w w I "' w ...J >- >- / -, w lO IS) D z <I I / w ...J LL

Upload: others

Post on 04-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

1 18

3June 17, 2020

Highway Segment where work is located. Refer to subsequent layout sheets for more specific locations.

Orient - -I - - - - - - - -o--- -

Polo ~=====::::===l 261=========:

H Y DE I ' I

MILLER

o Miranda

Rockham

STATE OF SOUTH

DAKOTA

PROJECT

P 0013153)

TOTAL SHEETS

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION Plotting Date: 04/29/2020

PLANS FOR PROPOSED

PROJECT P 0013(53) S.D. HIGHWAYS 20 & 26

HAND & SPINK COUNTIES

CULVERT CLEANING & CURED IN PLACE CULVERT LINING

PCN 06EJ

37

, Crandall Lily 0

Mellette

=:::=====:===~------~20 ~==:ti Northville Brentford Conde

~Q _______________ _

I ' I

Zell ,

Athol 0

281

o Ashton S P I N

Turton

K

o Raymond

Bradley

Garden City 0

INDEX

Sheet 1-3

Sheet 4-6

Sheet 7

Sheet 8-12

Sheet 13-15

Sheet 16-18

Wallace

25 I

~ ~~=========!:;7=7r==~D~ol~an~d~=T=::::.::~=d212\;=@•):::======,~=!=== Frankfort CLARK 'Henry

Burdette I 0

REDFIELD

\ ~

Tulare ~

37

CL A

' Carpenter

R K

Willow Lake

~:;:=~:=======~==:::::::::;:====128 I=====~ Bloo

Bonilla I ' L __________ _

I

\---0 Naples

I

0 , H A I Vienna

M

I ' I

Bryant _...J_ ___ _

OF SHEETS

Title Sheet & Layout Maps

Estimate of Quantities &

Environmental Commitments

Table of Culvert Repairs

Plan Notes

Traffic Control

Standard Plates

LIN

--1. I Holabird HIGHMORE I =:::;:======lil•===::::::;::===-===/14 St. Lawrence 281

BE ~

A D LE

5TQRM WATER PERMIT (None Required!

47

0 • Ree Heights

H A N D

' I Wessington

Yale 0

Cavour Iroquois

I ,O

I Osceola

0 Bancroft

Erwin 0 0

Badger

KINGSBURY Desmet Hetland

0

Lake Preston

w ::.: <I z >-0 ...J Q.

z 0 0

z 0 a: :::) I

>­w w I

"' w ...J >-

>­/ -, w lO IS) D z <I I /

w ...J

LL

Page 2: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

2 18

a.

R 65 W

29 28 27

32 33 34

"' .,;

6 'e

5 "' z .,

I 155 ST "'

~ = >-

II 9 10

, 156 ST --=--

FAULK SPINK

COUNTY COUNTY

SD 20 between US 281 and Brentford Spink County

=----t-- J

26 25 30 CRESBARD I I 28 27

z POP. I 04

0 ~ >-

35 II 36 32 II 33 34

-----"'

., "' d d .;

~ r N

II 4 3 6 5 <O

4 ~II 3

z ;;:; N

~ J _JI

>- l I 1-11 II 9 10 II 12 II 8 9 II 10

" ~ ~ = ------u- ~ = --, R 68 W R 67 W

ldentlcol Points

Equation Sta 1100+45.9 BK = Sta oO+OO.O AH

26

35

II 12

R 64 W

~ ~ 32 t;' 33

" ~ NOR HVILLE

POP. 143 5 4

Sta. b35+21 MRM 322.00 +0.31 Culvert ID 21133

Sta. b40+48

II

M RM 322.00 +0.41 Culvert ID 147993

27

34

20

3

Equation

Sta 0210+82.5 BK Sta bO+OO.O AH

25 II 30 29

~II 36 31 32 II 0

MELLETTE II POP. 210 6 I

12

R 63 W

28 27

33 34

4

10

26 25 30

35 36 31

2 6

II 12

Sta. b168+72 MRM 324.00 +0.83 Culvert ID 21160

"' ,,; + ;!: "

26 25 30

35 36 31

2 6

II 12 7

,---

R 62 W

29 28

IL z

BRENT FORD 0 POP. 77 N

32 33 >-

,._ d

5 + '-i ,._ N z "'

- ~

1, >-

8 9

~

29

32

5

STATE OF SOUTH

DAKOTA

PROJECT

P 0013(53)

Plotting Date: 04/29/2020

28 27 26

33 1'1 34

2

l 9 10 II II

_ _J

R 66'W- 7

CHELSEA POP. 27

12

FAULK

COUNTY

z 0 ~ >-

TOTAL SHEETS

-----

>-

SPINK

N

w ::.: <I z >-0 ...J a.

z t'.)

□ -i ISl N □ (/)

>-w w I (/)

w ...J >->-/

w ...J

;;:

Page 3: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

3 18

9

To ..._ 26 POL

16 15

21 23

26

13

24

IZI

w > <[

25 N <..O rr)

18

i

19 □

30

SD 26 between SD 45 and Spink County Line Hand County

□ ISi 17 14 13

□ □

20 24

0

Sta. 549+84 MRM 264.00 +0.26 Culvert ID 22188

18 17

i

19 20 ['Ill

16

ii □

21

15

22

STATE OF SOUTH

DAKOTA

PROJECT

P 0013(53)

Plotting Date: 04/29/2020

14

2~3...--, 0 c...=-----' □

13

24

17

181 ST

20

29

TOTAL SHEETS

z Ul

f-

M

w ::.: <I z >-0 ...J Q.

z t:) D

(l) N 0 1/)

>­w w I 1/)

w ...J >-

>­/ -, w (l) IS) D z <I I /

w ...J

LL

Page 4: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

PROJECT STATE OF

SOUTH DAKOTA

P 0013(53)

SHEET

TOTAL SHEETS

Culvert ID 21133 – Alternate A

Culvert ID 21133 – Alternate B

Culvert ID 147993 – Alternate A

Culvert ID 147993 – Alternate B

Culvert ID 21160 – Alternate A

Culvert ID 21160 – Alternate B

Culvert ID 22188 – Alternate A

Culvert ID 22188 – Alternate B

SPECIFICATIONS Standard Specifications for Roads and Bridges, 2015 Edition and Required Provisions, Supplemental Specifications, and Special Provisions as included in the Proposal.

ESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTS 4 18

BID ITEM ITEM QUANTITY UNIT

NUMBER

009E0010 Mobilization Lump Sum LS

110E0500 Remove Pipe Culvert Ft BID ITEM BID ITEM

ITEM QUANTITY UNIT 2 ITEM QUANTITY UNIT -~ NUMBER NUMBER

110E0510 Remove Pipe End Section 4 Each -1- 450E9526 30" Cured in Place Pipe 61 Ft 110E1690 Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft - I- -

110E7500 Remove Pipe for Reset 18 Ft -1- f---

110E7510 Remove Pipe End Section for Reset 2 Each

450E5211 18" CMP Flared End, Furnish 4 Each

450E5212 18" CMP Flared End, Instal l 4 Each BID ITEM ITEM QUANTITY UNIT

BID ITEM ITEM QUANTITY UNIT -- -1- f--- NUMBER

I NUMBER * 450E8900 Cleanout Pipe Culvert 2 Each

-~ -450E8910 Cleanout for Culvert Treatment 4 Each 450E9718 18" Fold and Form PVC Liner Pipe 62 Ft 450E9726 30" Fold and Form PVC Liner Pipe 61 Ft

-1- f---

450E9000 Reset Pipe 18 Ft - I- -

450E9001 Reset Pipe End Section 2 Each - I-

634E0010 Flagging 75.0 Hour ~ f---

634E0110 Traffic Control Signs 356.0 SqFt - I-

634E0120 Traffic Control, Miscellaneous Lump Sum LS

734E0010 Erosion Control Lump Sum LS

734E0154 12" Diameter Erosion Contro l Wattle 200 Ft - -734E0602 Low Flow Silt Fence 200 Ft

734E0610 Mucking Si lt Fence 13 CuYd BID ITEM ITEM QUANTITY UNIT BID ITEM

QUANTITY ITEM UNIT 734E0620 Repair Silt Fence 50 Ft NUMBER NUMBER

* - Denotes Non-Participating 450E9518 18" Cured in Place Pipe 70 Ft 450E9524 24" Cured in Place Pipe 47 Ft

BID ITEM ITEM

NUMBER QUANTITY UNIT

BID ITEM ITEM

NUMBER QUANTITY UNIT

450E9718 18" Fold and Form PVC Liner Pipe 70 Ft 450E9724 24" Fold and Form PVC Liner Pipe 47 Ft

Page 5: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

PROJECT STATE OF

SOUTH DAKOTA

P 0013(53)

SHEET

TOTAL SHEETS

ENVIRONMENTAL COMMITMENTS The SDDOT is committed to protecting the environment and uses Environmental Commitments as a communication tool for the Engineer and Contractor to ensure that attention is given to avoid, minimize, and/or mitigate an environmental impact. Environmental commitments to various agencies and the public have been made to secure approval of this project. An agency with permitting authority can delay a project if identified environmental impacts have not been adequately addressed. Unless otherwise designated, the Contractor’s primary contact regarding matters associated with these commitments will be the Project Engineer. These environmental commitments are not subject to change without prior written approval from the SDDOT Environmental Office. Additional guidance on SDDOT’s Environmental Commitments can be accessed through the Environmental Procedures Manual found at: https://dot.sd.gov/media/documents/EnvironmentalProceduresManual.pdf For questions regarding change orders in the field that may have an effect on an Environmental Commitment, the Project Engineer will contact the Environmental Office at 605-773-3098 or 605-773-4336 to determine whether an environmental analysis and/or resource agency coordination is necessary. COMMITMENT B: FEDERALLY THREATENED, ENDANGERED, AND PROTECTED SPECIES COMMITMENT B2: WHOOPING CRANE The Whooping Crane is a spring and fall migratory bird in South Dakota that is about 5 feet tall and typically stops on wetlands, rivers, and agricultural lands along their migration route. An adult Whooping Crane is white with a red crown and a long, dark, pointed bill. Immature Whooping Cranes are cinnamon brown. While in flight, their long necks are kept straight and their long dark legs trail behind. Adult Whooping Cranes' black wing tips are visible during flight. Action Taken/Required: Harassment or other measures to cause the Whooping Crane to leave the site is a violation of the Endangered Species Act. If a Whooping Crane is sighted roosting in the vicinity of the project, borrow pits, or staging areas associated with the project, cease construction activities in the affected area until the Whooping Crane departs and immediately contact the Project Engineer. The Project Engineer will contact the Environmental Office so that the sighting can be reported to USFWS. COMMITMENT C: WATER SOURCE The Contractor will not withdraw water with equipment previously used outside the State of South Dakota or previously used in aquatic invasive species waters within South Dakota without prior approval from the SDDOT Environmental Office. Thoroughly wash all construction equipment to prevent and control the introduction and spread of invasive species into the project vicinity. The Contractor will not withdraw water directly from streams of the James, Big Sioux, and Vermillion watersheds without prior approval from the SDDOT Environmental Office.

Action Taken/Required: The Contractor will obtain the necessary permits from the regulatory agencies such as the South Dakota Department of Environment and Natural Resources (DENR) and the United States Army Corps of Engineers (USACE) prior to water extraction activities. Additional information and mapping of Aquatic Invasive Species in South Dakota can be accessed at: http://sdleastwanted.com/maps/default.aspx. COMMITMENT D: WATER QUALITY STANDARDS COMMITMENT D2: SURFACE WATER DISCHARGE The DENR General Permit for Temporary Discharge is required for temporary dewatering and discharges to waters of the state. The effluent limit for total suspended solids will be 90 mg/L 30-day average. The effluent limit applies to discharges to all waters of the state except discharges to waters classified as cold water permanent fish life propagation waters according to the ARSD 74:51:01:45. For discharges to waters of the state classified as cold water permanent fish life propagation waters, the effluent limit for total suspended solids will be 53 mg/L daily maximum. The permittee has the option of completing effluent testing or implementing a pollution prevention plan for compliance with this permit. If the permittee develops a pollution prevention plan instead of total suspended solids sampling, the plan must be developed and implemented prior to discontinuing total suspended solids sampling. Refer to section 3.0 of the permit. If any pollutants are suspected of being discharged, a sample must be taken for those parameters listed in section 2.2 of the permit. Refer to Commitment D1: Surface Water Quality for stream classification. Action Taken/Required: If construction dewatering is required, the Contractor will obtain the General Permit for Temporary Discharge Activities from the DENR Surface Water Program, 605-773-3351. http://denr.sd.gov/des/sw/swqformsandpermits.aspx The Contractor will provide a copy of the approved permit to the Project Engineer prior to proceeding with any dewatering activities. The approved permit must be kept on-site and as part of the project records. Effluent monitoring, as a result of dewatering activities, will be summarized for each month and recorded on a separate Discharge Monitoring Report (DMR) and submitted to DENR monthly. Additional information can be found at http://denr.sd.gov/des/sw/WhatisaDMR.aspx COMMITMENT E: STORM WATER Construction activities constitute less than 1 acre of disturbance.

Action Taken/Required: At a minimum and regardless of project size, appropriate erosion and sediment control measures must be installed to control the discharge of pollutants from the construction site. COMMITMENT H: WASTE DISPOSAL SITE The Contractor will furnish a site(s) for the disposal of construction and/or demolition debris generated by this project. Action Taken/Required: Construction and/or demolition debris may not be disposed of within the Public ROW. The waste disposal site(s) will be managed and reclaimed in accordance with the following from the General Permit for Construction/Demolition Debris Disposal Under the South Dakota Waste Management Program issued by the Department of Environment and Natural Resources. The waste disposal site(s) will not be located in a wetland, within 200 feet of surface water, or in an area that adversely affects wildlife, recreation, aesthetic value of an area, or any threatened or endangered species, as approved by the Environmental Office and the Project Engineer. If the waste disposal site(s) is located such that it is within view of any ROW, the following additional requirements will apply: 1. Construction and/or demolition debris consisting of concrete, asphalt concrete, or other similar materials will be buried in a trench completely separate from wood debris. The final cover over the construction and/or demolition debris will consist of a minimum of 1 foot of soil capable of supporting vegetation. Waste disposal sites provided outside of the Public ROW will be seeded in accordance with Natural Resources Conservation Service recommendations. The seeding recommendations may be obtained through the appropriate County NRCS Office. The Contractor will control the access to waste disposal sites not within the Public ROW with fences, gates, and placement of a sign or signs at the entrance to the site stating “No Dumping Allowed”. 2. Concrete and asphalt concrete debris may be stockpiled within view of the ROW for a period of time not to exceed the duration of the project. Prior to project completion, the waste shall be removed from view of the ROW or buried and the waste disposal site reclaimed as noted above. The above requirements will not apply to waste disposal sites that are covered by an individual solid waste permit as specified in SDCL 34A-6-58, SDCL 34A-6-1.13, and ARSD 74:27:10:06. Failure to comply with the requirements stated above may result in civil penalties in accordance with South Dakota Solid Waste Law, SDCL 34A-6-1.31. All costs associated with furnishing waste disposal site(s), disposing of waste, maintaining control of access (fence, gates, and signs), and reclamation of the waste disposal site(s) will be incidental to the various contract items.

5 18

Page 6: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

PROJECT STATE OF

SOUTH DAKOTA

P 0013(53)

SHEET

TOTAL SHEETS

COMMITMENT I: HISTORICAL PRESERVATION OFFICE CLEARANCES The SDDOT has obtained concurrence with the State Historical Preservation Office (SHPO or THPO) for all work included within the project limits and all department designated sources and designated option material sources, stockpile sites, storage areas, and waste sites provided within the plans. Action Taken/Required: All earth disturbing activities not designated within the plans require a cultural resource review prior to scheduling the pre-construction meeting. This work includes, but is not limited to: Contractor furnished material sources, material processing sites, stockpile sites, storage areas, plant sites, and waste areas. The Contractor will arrange and pay for a record search and when necessary, a cultural resource survey. The Contractor has the option to contact the state Archaeological Research Center (ARC) at 605-394-1936 or another qualified archaeologist, to obtain either a records search or a cultural resources survey. A record search might be sufficient for review if the site was previously surveyed; however, a cultural resources survey may need to be conducted by a qualified archaeologist. The Contractor will provide ARC with the following: a topographical map or aerial view of which the site is clearly outlined, site dimensions, project number, and PCN. If applicable, provide evidence that the site has been previously disturbed by farming, mining, or construction activities with a landowner statement that artifacts have not been found on the site. The Contractor will submit the cultural resources survey report to SDDOT Environmental Office, 700 East Broadway Avenue, Pierre, SD 57501-2586. SDDOT will submit the information to the appropriate SHPO/THPO. Allow 30 Days from the date this information is submitted to the Environmental Engineer for SHPO/THPO review. In the event of an inadvertent discovery of human remains, funerary objects, or if evidence of cultural resources is identified during project construction activities, then such activities will immediately cease and the Project Engineer will be immediately notified. The Project Engineer will contact the SDDOT Environmental Office to determine an appropriate course of action. SHPO/THPO review does not relieve the Contractor of the responsibility for obtaining any additional permits and clearances for Contractor furnished material sources, material processing sites, stockpile sites, storage areas, plant sites, and waste areas that affect wetlands, threatened and endangered species, or waterways. The Contractor will not utilize a site known or suspected of having contaminated soil or water. The Contractor will provide the required permits and clearances to the Project Engineer at the preconstruction meeting.

COMMITMENT N: SECTION 404 PERMIT The SDDOT has obtained a Section 404 Permit from the USACE for the permanent actions associated with this project. Action Taken/Required: The Contractor will comply with all requirements contained in the Section 404 Permit. The Contractor will also be responsible for obtaining a Section 404 Permit for any dredge, excavation, or fill activities associated with material sources, storage areas, waste sites, and Contractor work sites outside the plan work limits that affect wetlands, floodplains, or waters of the United States.

6 18

Page 7: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

Culvert

Length

Drain-

age

Area

Culvertfor

Reset

End

Section

End

Section

for

Reset

18" CMP Flared

End

(Ft) Acre (Ft) (Ft) (Each) (Each) (Each) (Ft) (Each) (Each) (Each) (Ft) (Ft) (Ft)

L Flared 1 1

R Flared 1 1

L Flared 1 1 1

R Flared 1 1 1

L Flared 6 1 6 1

R Flared 12 1 12 1

L Flared

R Flared

2 18 4 2 4 18 2 2 4 132 47 61

SD 20 From US 281 East to Brentford

SD 26 From SD45 East to Spink Co Line

2" on 10-16-19. 2" Clean and install liner.47

Undetermin-

able

Reset barrel sections and Flared

Ends. Clean and Install Liner.1 1 61

549+84 24" RCP 42 South 35

2

2

1

8

8

264.00 0.26 1

168+72 30" RCP 57 South 712' of water in culvert

on 10-18-19.

2

1

1

6

0

324.00 0.83 b

Undetermin-

able

Cut off 1' of damaged end of

barrel section. Clean, replace

end treatment and install liner.

1 1 70Pipe submerged on 10-

18-19.18" CMP 70 20

1

4

7

9

9

3

322.00 0.41 b 40+48

1 624" of water in culvert

on 10-18-19.None

Clean, replace end treatment

and install liner.North 24

2

1

1

3

3

322.00 0.31 b 35+21 18" CMP 62

Culvert

End

Type

Direction of

Flow

Remove Pipe Furnish and Install

Reset

Pipe

Reset

Pipe

End

Section

TOTAL

18"

CIPP or

FFPP

Liner

24"

CIPP or

FFPP

Liner

30"

CIPP or

FFPP

Liner

TABLE OF MAINLINE PIPE CULVERT REPAIRSC

u

l

v

e

r

t

#

MRM + Disp Station Side

Per Original Plans

Approximate Water Level in

Culvert Comments

Approximate Debris

Level in Culvert

Comments Repair Comments

Cleanout

Pipe

Culvert

Cleanout

for Culvert

TreatmentIn Place Culvert

Size and Type

7 18

STATE OF I PROJECT I SHEEl I TOTAL

SOUTH I NO. SHEETS

DAKOTA p 0013(53) I l

..,__

..,__

'---

'---

g " ~ a: >-

~ a: LL

fi: >-t [.

Page 8: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

PROJECT STATE OF

SOUTH DAKOTA

P 0013(53)

SHEET

TOTAL SHEETS

SCOPE OF WORK Work on this project involves removing pipe culvert sections and ends, resetting pipe culvert sections and ends, and cleaning and inspection of pipe culverts. Subsequent to the cleaning and inspection additional repairs are anticipated which include lining of the pipe culverts. UTILITIES Utilities are not planned to be affected on this project. If utilities are identified near the improvement area through the SD One Call Process as required by South Dakota Codified Law 49-7A and Administrative Rule Article 20:25, the Contractor will contact the Project Engineer to determine modifications that will be necessary to avoid utility impacts. SEQUENCE OF OPERATIONS The Contractor will submit to the Area Engineer a minimum of 1 week prior to the Preconstruction Meeting, a detailed plan of how the pipe culvert cleaning and inspection will be staged. The plan will show how the Contractor is going to maintain traffic at each pipe culvert site, where equipment is going to be stored, the total length of the work space if a lane of traffic needs to be closed to traffic, and the methods used to prevent material removed from the pipe culverts from entering the waterway. These plans will be approved by the Area Engineer prior to starting work on the pipe culvert cleaning and inspection. TRAFFIC CONTROL The roadways will remain open to traffic at all times. One lane of traffic may be closed during work hours, with traffic control being handled with the use of Flaggers as per Standard Plate 634.23. The length of a work zone will be limited to 1 culvert site and there will be a minimum of 1000 Ft between work zones. If 2 culverts are within 200 Ft of each other it can be considered 1 work site. If work can safely be performed from the shoulder of the roadway or beyond the shoulder, traffic control will be as per Standard Plates 634.03. Flaggers and FLAGGER symbol signs will be in place when work activities or equipment present a hazard to workers, through traffic, or encroaches into driving lanes open to traffic. Traffic control devices will be placed beyond the surfaced edge of the roadway when not in use. Removing, relocating, covering, salvaging and resetting of existing traffic control devices, including delineation, will be the responsibility of the Contractor. Cost of this work will be incidental to the various contract items unless otherwise specified in the plans. Delineators and signs damaged or lost will be replaced by the Contractor at no cost to the State. Work activities during non-daylight hours are subject to prior approval.

The bottom of signs on portable or temporary supports will not be less than seven feet above the pavement in urban areas and one foot above the pavement in rural areas. Portable sign supports may be used as long as the duration is less than 3 days. If the duration is more than 3 days the signs will be on fixed location, ground mounted, breakaway supports. Traffic Control Signs, as shown in the Estimate of Quantities, are estimates. Contractor’s operation may require adjustments in quantities, either more or less. Payment will be for those signs actually ordered by the Engineer and used. Fixed location signing placed more than 4 calendar days prior to the start of construction will be covered or laid down until the time of construction. The covers must be approved by the Engineer prior to installation. The cost of materials, labor, and equipment necessary to complete this work will be incidental to other contract items. No separate payment will be made. All fixed location signs, sign posts, and breakaway bases will be removed within 7 calendar days following pavement marking. Traffic will be maintained on the driving lanes. Use of the shoulder as a driving lane will not be permitted. Any damage to the shoulder due to rerouted traffic or Contractor’s equipment will be repaired at no expense to the Department. The Contractor will be responsible for maintaining all existing traffic control signing for the safety of the traveling public. The Contractor will accommodate vehicles up to 16 feet wide through the work area at all times. TRAFFIC CONTROL SIGNS Sufficient traffic control devices have been included in these plans to sign two workspaces as per Standard Plate 634.03 and two workspaces as per Standard Plate 634.23. If the Contractor elects to work on additional locations simultaneously, the cost for additional traffic control devices will be incidental to the contract unit price per square foot for TRAFFIC CONTROL SIGNS. CLOSED-CIRCUIT TELEVISION (CCTV) CAMERA The CCTV camera will be mounted on a crawler. The crawler will be capable of traveling the entire length of the pipe culvert. If unable to travel through the culvert due to an obstacle or large void, then the CCTV camera will be run from both ends of the culvert as far as possible. The CCTV camera will travel through the culvert at a speed not exceeding 30 feet per minute. The CCTV camera will be equipped with an accurate working footage counter that shows accurate distances on the video recordings.

The CCTV camera will have the ability to pan and tilt. Lighting for the CCTV camera will be suitable to allow a clear picture of the entire periphery of the pipe. The CCTV monitor and other components of the CCTV system will be capable of producing a clear color picture/CCTV image. A DVD recording of each CCTV camera inspection of each pipe culvert will be provided to the Engineer. Other methods of transferring video recordings may be considered and approved by the Engineer. All defects such as holes, cracks, open joints will be fully documented when doing the CCTV inspections. CLEANOUT PIPE CULVERTS The contract item CLEANOUT PIPE CULVERT is included in this contract for use at those locations where water and sediment levels did not allow for any type of visual inspection inside of the culvert. The Table of Pipe Culvert Repairs indicate locations where this contract item will be utilized. Cleanout of pipe culverts will be done in advance of pipe culvert repair operations, as indicated in the Table of Mainline Pipe Culvert Repairs. Following cleaning, pipe inspection will be completed with a CCTV camera. The inspection will determine any deviations in the vertical and horizontal alignments, location and size of any gaps in joints, and location of any damage. The pipe culvert cleaning and inspection will be scheduled such that there is adequate time to evaluate what repairs are required and allow for ordering and delivery of pipe culvert repair materials. Material in all existing pipe culverts will be cleaned out by water flushing or other approved methods. Material removed from the pipe culverts will become the property of the Contractor for disposal. The Contractor will implement appropriate sediment control measures prior to water flushing in order to prevent discharges from the project boundaries. Pipe culverts may need to be dewatered to allow for CCTV inspection. The pipe culvert will be cleaned to the satisfaction of the Engineer and the cleaning will be adequate to determine pipe condition and potential repair techniques. All costs to dewater, clean pipes, dispose of removed materials and CCTV camera inspect pipe culverts will be incidental to the contract unit price per each for CLEANOUT PIPE CULVERT. The contract item CLEANOUT PIPE CULVERT will be paid for a maximum of one time for each pipe culvert. When the contract item CLEANOUT PIPE CULVERT is indicated at a culvert site, the SDDOT will not be responsible for any materials that were ordered prior to the culvert being cleaned and CCTV inspected.

8 18

Page 9: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

PROJECT STATE OF

SOUTH DAKOTA

P 0013(53)

SHEET

TOTAL SHEETS

Rev. 5-12-20 SLS

CLEANOUT FOR CULVERT TREATMENT Cleanout of pipe culverts will be done in advance of pipe culvert repair operations. Following cleaning, pipe inspection will be completed with a CCTV camera. The inspection will determine any deviations in the vertical and horizontal alignments, location and size of any gaps in joints, and location of any damage. Material in all existing pipe culverts will be cleaned out by water flushing or other approved methods. Material removed from the pipe culverts will become the property of the Contractor for disposal. The Contractor will implement appropriate sediment control measures prior to water flushing in order to prevent discharges from the project boundaries. Pipe culverts may need to be dewatered to allow for CCTV inspection. The pipe culvert will be cleaned to the satisfaction of the Engineer and the cleaning will be adequate to determine pipe condition and potential repair techniques. All costs to dewater, clean pipes, dispose of removed materials and CCTV camera inspect pipe culverts will be incidental to the contract unit price per each for CLEANOUT FOR CULVERT TREATMENT. The contract item CLEANOUT FOR CULVERT TREATMENT will be paid for a maximum of one time for each pipe culvert. The contract item CLEANOUT FOR CULVERT TREATMENT will not be paid for if during the contract work item CLEANOUT PIPE CULVERTS, it is determined that culvert lining is not possible. In addition, the contract item CLEANOUT FOR CULVERT TREATMENT will not be paid if after the initial cleanout (paid as CLEANOUT PIPE CULVERTS) a 2nd cleanout effort is not necessary to line the pipe. RCP AND CMP CULVERT REPAIRS FOR MAINLINE PIPE CULVERTS Resetting and replacement of RCP and CMP will be completed prior to culvert lining. All pipe and end treatments designated for removal will become the property of the Contractor for his disposal. Tie bolts will be installed at all joint locations where existing pipe sections and end treatments are being reset or installed new. This may require drilling holes into the existing pipe sections and end treatments. Tie bolts will be installed in accordance with Standard Plate No. 450.18. When necessary to remove end sections of CMP culverts, they may be cut with a torch. If the pipe culvert is cut the damaged area will be painted with a galvanizing paint approved by the Engineer. All costs associated with cutting and painting will be incidental to the various contract items. The Contractor is advised of the risk of lead exposure when cutting galvanized paint. The Contractor should plan his/her operations accordingly, and inform employees of hazards of lead exposure.

CORRUGATED METAL PIPE Corrugated metal pipes will have 2 ⅔-inch x ½-inch corrugations for 42-inch and smaller round pipe and 48-inch and smaller arch pipe unless otherwise stated in the plans. Corrugated metal pipes will have 3-inch x 1-inch or 5-inch x 1-inch corrugations for 48-inch and larger round pipe and 54-inch and larger arch pipe unless otherwise stated in the plans. The gauge of the corrugated metal ends will match the thickest gauge of corrugated metal pipe it is connected to. When connecting to an existing culvert, the gauge of the corrugated metal ends will be 14 gauge. TABLE OF MAINLINE PIPE CULVERT REPAIR Pipe culvert lengths shown in the Table of Mainline Pipe Culvert Repairs were obtained from the original grading plans and were not verified in the field. It is the Contractors responsibility to investigate each pipe culvert pipe repair site to determine the pipe culvert size and length, along with other information needed to prepare a bid. SEDIMENT CONTROL Sediment control may be required if water is flowing through the pipe culvert at the time of cleaning. Otherwise sediment control is not anticipated. The Contractor will implement appropriate sediment control measures prior to water flushing in order to prevent discharges beyond the project boundaries. Wattles and Silt Fence have been provided in the Estimate of Quantities and will be used to capture pipe cleanout material. Placement of the wattles and Silt Fence will be as directed by the Engineer. EROSION CONTROL WATTLE Erosion control wattles for restraining the flow of runoff and sediment will be installed at locations determined by the Engineer during construction. Refer to Standard Plate 734.06 for details. The Contractor will provide certification that the erosion control wattles do not contain noxious weed seeds. Erosion control wattles will remain on the project to decompose. An additional quantity of 12” Diameter Erosion Control Wattles has been added to the Estimate of Quantities for temporary erosion and sediment control in highway ditch channels and as an alternative to low flow or high flow silt fence at wetland areas adjacent to the highway. The erosion control wattle provided will be from the approved product list. The approved product list for erosion control wattle may be viewed at the following internet site: http://apps.sd.gov/HC60ApprovedProducts/main.aspx

LOW FLOW SILT FENCE The low flow silt fence fabric provided will be from the approved product list. The approved product list for low flow silt fence may be viewed at the following internet site: http://apps.sd.gov/HC60ApprovedProducts/main.aspx Low flow silt fence will be placed at locations determined by the Engineer and at locations that will minimize siltation of adjacent streams, lakes, dams, or drainage areas as determined by the Engineer during construction. Refer to Standard Plate 734.04 for details. EROSION CONTROL The areas to be seeded consist of areas at pipe culvert locations where resetting or replacement of pipe culvert sections or end treatments are required. In addition, any location where vegetation was destroyed, such that quick revegetation is not expected will be reseeded. The estimated area requiring erosion control is 0.1 acres at locations where pipe culvert section and ends were reset or replaced. All costs for the erosion control work for furnishing, placing, and maintaining erosion control including equipment, labor, and seeding will be incidental to the contract lump sum price for EROSION CONTROL. The limits of erosion control work will be determined by the Engineer during construction. Type C Permanent Seed Mixture will be used on this project. Application of fertilizer will not be required on this project. Type C Permanent Seed Mixture will consist of the following:

Grass Species

Variety

Pure Live Seed (PLS)

(Pounds/Acre)

Western Wheatgrass Arriba, Flintlock, Rodan, Rosana, Walsh

16

Canada Wildrye Mandan 2

Total: 18

9 18

Page 10: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

CURED-IN-PLACE PIPE (CIPP) PROJECT STATE OF

SOUTH DAKOTA

P 0013(53)

SHEET

TOTAL SHEETS

A. CIPP LINER MATERIAL The CIPP liner will be manufactured in accordance to ASTM F2019. In addition, the liner will meet the following requirements: 1. fit the host pipe tightly 2. have a maximum thickness of ½ inch 3. provide a continuous lining of the host pipe 4. use a nontoxic curing process 5. is nontoxic when cured 6. have a minimum 50-year design life. CIPP liner will be shipped, stored, and handled in a manner consistent with written recommendations of the manufacturer. B. CIPP LINER SUBMITTALS For each host pipe to be lined the Contractor will submit the following to the Area Engineer a minimum of 2 weeks before the preconstruction meeting for their approval. Information will be provided into the category breakdown as shown below: 1. Liner Data The following information will be provided with the CIPP liner structural data: a. pipe liner material type and trade name b. nominal inside and outside pipe liner diameters c. manufacturer’s recommended maximum and minimum fill heights for the identified liner d. certification that liner meets specifications e. include calculations showing that the liner is designed for AASHTO HL-93 live loading when the pipe is considered to be fully deteriorated Provide copy of engineering drawing and calculations, signed and sealed by a Professional Engineer registered in the state of South Dakota. As an alternate to designing to AASHTO HL-93, design for ASTM F2019 based upon a fully deteriorated pipe. ASTM F1216 will be the basis of furnished calculations and engineering drawing. 2. Work Area Plan Provide work area plans that includes the following: a. the work area required for the liner installation b. method of preventing water from interfering with the installation c. a site restoration plan 3. Pipe Cleaning Provide a plan that includes the cleaning of the host pipe and disposal of the debris 4. Liner Installation Provide a liner installation plan which will include the following: a. method of liner installation b. curing method identifying required cure times, temperatures, and pressures c. containment plan for collection of contaminated water d. management and disposal plan for contaminated materials resulting from the liner installation

5. Training Certification and Experience Provide written proof that at least 1 member of the installation team has attended training and been certified by the manufacturer on the liner material being installed. The installer must supply the Engineer with 5 prior job references of projects where they have successfully installed CIPP liners.

C. HOST PIPE PREPARATION AND INSPECTION The host pipe will be thoroughly cleaned using a high-pressure water jet or hydro-mechanical methods. The cleaning method will produce a clean, sound surface that demonstrates no evidence of loose material, debris or contaminates. The host pipe will be cleaned just prior to insertion of the CIPP liner. The Contractor will implement appropriate sediment control measures prior to cleaning in order to prevent discharges from the project boundaries to comply with the Storm Water Permit. Host pipe inspection will be completed with a CCTV camera. A DVD recording of the inspection will be provided to the Engineer. The inspection will determine the suitability of the liner for the host pipe including such items as the horizontal and vertical alignments, location of gaps in the joints and pipe damage. The Engineer will be notified if any pipe sections are impassible or the pipe cannot be lined. Any intrusions into the pipe will be cut or ground off flush with the host pipe interior wall before installing the liner. Cut off existing pipe tie bolts flush with the nut or as per the manufacturer’s recommendation, if manufacturer’s recommendations are more stringent. Control groundwater infiltration that will interfere with installation of the CIPP liner. Dewatering may be necessary. Host pipe will be in a dry condition as prescribed by the CIPP liner manufacturer. The Engineer shall inspect host pipes prior to lining to determine the pipes acceptance for lining including if additional cleaning is required. The host pipe will be clean and in a dry condition prior to commencing the lining process. D. PIPE LINER INSTALLATION The manufacturer’s representative will be on site to provide training to Contractor’s staff. A manufacturer’s representative will be present for at least one complete liner installation and until the Engineer is satisfied that the Contractor’s staff is competent in performing this work. A manufacturer’s representative will also provide education to the Engineer on the liner installation and curing process. Prior to inserting the CIPP liner, a sliding foil protector will be pulled into the host pipe to protect the CIPP liner from damage. Installation of the liner into the host pipe will be in accordance with ASTM F2019. CCTV camera inspection will be completed after inflation and prior to curing. The cured CIPP liner will be continuous over the entire length of an installation run and be free of material defects. The lining will be impervious and free of any leakage from the pipe to the surrounding ground or from the ground to inside the lined pipe.

Trim the liner to length according to the manufacturer’s recommendations. The liner will provide a smooth transition taper at each end of the pipe. There will not be any gaps between the liner and the host pipe. The ends will be sealed with an epoxy or resin mixture compatible with the liner and resin system, providing a watertight seal between the host pipe and the CIPP liner. E. FINAL ACCEPTANCE AND PAYMENT Host pipe inspection will be completed with a CCTV crawler after the liner has been cured. A DVD recording of the inspection will be provided to the Engineer. Defects which will or could affect the structural integrity, strength, capacity, or future maintenance of the installed CIPP liner will be repaired at the Contractor’s expense, in a manner approved by the Engineer. Any disrupted areas will be restored and stabilized to the satisfaction of the Engineer. All costs for equipment, material and labor for the CIPP liner work will be incidental to the contract unit price per foot for the various sizes of CURED IN PLACE PIPE.

10 18

Page 11: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

FOLD AND FORM PVC PIPE (FFPP) PROJECT STATE OF

SOUTH DAKOTA

P 0013(53)

SHEET

TOTAL SHEETS

A. FFPP LINER MATERIAL The FFPP liner will be manufactured in accordance to ASTM F1504. The pipe will be made from PVC compound meeting all the requirements for cell classification 12334 as defined in specification D1784 and with minimum physical properties:

Tensile Strength Test Method D638 6,000psi Tensile Modulus Test Method D638 320,000psi Flexural Strength Test Method D790 6,000psi Flexural Modulus Test Method D790 320,000psi Heat Deflection Temperature Test Method D648 115°F Tested @ 264psi (2MPa) The impact strength of rounded pipe will not be less than the values in Table 1 when tested in accordance with test method D2444 as referenced in ASTM F1504.

Table 1: Minimum Impact Strength at 73°F (23°C) Pipe size, in. Impact strength, ft-lb f

18 220 24 220 30 220

Values for pipe stiffness for the rounded pipe will comply with Table 2 when tested in accordance with test method D2412 as referenced in ASTM F1504.

Table 2: Minimum Pipe Stiffness at 5% Deflection Pipe Size, in. Pipe Stiffness, psi Dimension Ratio, (DR)

18 6 66 24 6 66 30 6 66

In addition, the liner will meet the following requirements: 1. fit the host pipe tightly 2. have a maximum thickness of ½ inch 3. provide a continuous lining of the host pipe 4. use a nontoxic curing process 5. is nontoxic when cured 6. have a minimum 50-year design life. FFPP liner will be shipped, stored, and handled in a manner consistent with written recommendations of the manufacturer. FFPP liner will be clearly marked as follows at intervals of 5ft.or less: • Manufacturer’s name or trademark and code • Nominal outside diameter • The PVC cell classification, for example “12334” • The legend “DR XX FOLDED PVC PIPE” • The designation “Specification ASTM F1504”

B. FFPP LINER SUBMITTALS For each host pipe to be lined the Contractor will submit the following to the Area Engineer a minimum of 2 weeks before the preconstruction meeting for their approval. Information will be provided into the category breakdown as shown below: 1. Liner Data The following information will be provided with the FFPP liner structural data: a. pipe liner material type and trade name b. nominal inside and outside pipe liner diameters c. material cell classification d. manufacturer’s recommended maximum and minimum fill heights for the identified liner e. certification that liner meets specifications f. include calculations showing that the liner is designed for AASHTO HL-93 live loading when the pipe is considered to be fully deteriorated Provide copy of engineering drawing and calculations, signed and sealed by a Professional Engineer registered in the state of South Dakota. 2. Work Area Plan Provide work area plans that includes the following: a. the work area required for the liner installation b. method of preventing water from interfering with the installation c. a site restoration plan 3. Pipe Cleaning Provide a plan that includes the cleaning of the host pipe and disposal of the debris 4. Liner Installation Provide a liner installation plan which will include the following: a. method of liner installation b. curing method identifying required cure/cool down times, temperatures, and pressures c. containment plan for collection of contaminated water d. management and disposal plan for contaminated materials resulting from the liner installation 5. Training Certification and Experience

Provide written proof that at least 1 member of the installation team has attended training and been certified by the manufacturer on the liner material being installed. The installer must supply the Engineer with 5 prior job references of projects where they have successfully installed FFPP liners.

C. HOST PIPE PREPARATION AND INSPECTION The host pipe will be thoroughly cleaned using a high-pressure water jet or hydro-mechanical methods. The cleaning method will produce a clean, sound surface that demonstrates no evidence of loose material, debris or contaminates. The host pipe will be cleaned just prior to insertion of the FFPP liner. The Contractor will implement appropriate sediment control measures prior to cleaning in order to prevent discharges from the project boundaries to comply with the Storm Water Permit. Host pipe inspection will be completed with a CCTV camera. A DVD recording of the inspection will be provided to the Engineer. The inspection will determine the suitability of the liner for the host pipe including such items as the horizontal and vertical alignments, location of gaps in the joints and pipe damage. The Engineer will be notified if any pipe sections are impassible or the pipe cannot be lined. Any intrusions into the pipe will be cut or ground off flush with the host pipe interior wall before installing the liner. Cut off existing pipe tie bolts flush with the nut or as per the manufacturer’s recommendation, if manufacturer’s recommendations are more stringent. Control groundwater infiltration that will interfere with installation of the FFPP liner. Dewatering may be necessary. Host pipe will be in a dry condition as prescribed by the FFPP liner manufacturer. The Engineer shall inspect host pipes prior to lining to determine the pipes acceptance for lining including if additional cleaning is required. The host pipe will be clean and in a dry condition prior to commencing the lining process. D. PIPE LINER INSTALLATION The manufacturer’s representative will be on site to provide training to Contractor’s staff. A manufacturer’s representative will be present for at least one complete liner installation and until the Engineer is satisfied that the Contractor’s staff is competent in performing this work. A manufacturer’s representative will also provide education to the Engineer on the liner installation and curing process. Installation of the liner into the host pipe will be in accordance with ASTM F1947. The cured FFPP liner will be continuous over the entire length of an installation run and be free of material defects. The lining will be impervious and free of any leakage from the pipe to the surrounding ground or from the ground to inside the lined pipe. Trim the liner to length according to the manufacturer’s recommendations, allowing for possible shrinkage during further cooling. The liner will provide a smooth transition taper at each end of the pipe. There will not be any gaps between the liner and the host pipe. The ends will be sealed with an epoxy or resin mixture compatible with the liner system, providing a watertight seal between the host pipe and the FFPP liner.

11 18

Page 12: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

FOLD AND FORM PVC PIPE (FFPP) PROJECT STATE OF

SOUTH DAKOTA

P 0013(53)

SHEET

TOTAL SHEETS

E. FINAL ACCEPTANCE AND PAYMENT Host pipe inspection will be completed with a CCTV crawler after the liner has been cured and cooled below 90°F. A DVD recording of the inspection will be provided to the Engineer. FFPP will be inspected for visible cracks, holes, foreign inclusions or other injurious defects. Defects which will or could affect the structural integrity, strength, capacity, or future maintenance of the installed FFPP liner will be repaired at the Contractor’s expense, in a manner approved by the Engineer. Any disrupted areas will be restored and stabilized to the satisfaction of the Engineer. All costs for equipment, material and labor for the FFPP liner work will be incidental to the contract unit price per foot for the various sizes of FOLD AND FORM PVC LINER PIPE.

12 18

Page 13: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

13 18

<I

WORK SPACE

Published Date: 2nd Dtr. 2020

s D D 0 T

t Posted Spacing of Speed Advance Warning

Prior to Signs Work (Feet)

(M.P.H.) (A) 0 - 30 200

35 - 40 350 45 500 50 500 55 750

60 - 65 1000

■ Channelizing Device

END ROAD WORK

G20-2

Spacing of Toper Channelizing

Length Devices (Feet) (Feet)

(l) (G)

180 25 320 25 600 25 600 50 660 50 780 50

The channelizing devices shall be drums or 42" cones if traffic control must r emain overnight.

For short durat ion operations (I hour or less) all channelizing devices may be eliminated if a vehicle with an activated flashing or revolving yellow light is used.

Worker signs (W21-I or W21-lo) may be used instead of SHOULDER WORK signs.

A SHOULDER WORK sign should be placed on the left side of a divided or one-way roadway only if the left shoulder is affected.

The SHOULDER WORK sign on on intersecting roadway is not required if drivers emerging from that roadway will encounter another advance warning sign before they reach a work act ivity area.

WORK SPACE

...Jlf"l

<I

<I

June 3, 2016

GUIDES FOR TRAFFIC CONTROL DEVICES WORK ON SHOULDERS

PLATE NUMBER

634.03

Sheet I of I

Posted Spacing of Spacing of Speed Advance Warning Channelizing

Prior to Signs Devices Work (Feet) (Feet)

(M.P.H.) (A) (G) 0 - 30 200 25 35 - 40 350 25

45 500 25 50 500 50 55 750 50

60 - 65 I 000 50

_______. F I a g g er

■ Channelizing Device

For low-volume traffic situations with short work zones on straight roadways where the flogger is visible to rood users approaching from both directions, a s ingle flogger may be used.

The ROAD WORK AHEAD ond the END ROAD WORK signs may be omitted for short duration operations (I hour or less).

For tack and / or flush seal operations, when floggers ore not being used, the FRESH OIL sign (W21-2) shall be displayed in advance of the liquid asphalt areas.

Flashing warning lights and / or flags may be used to coll attention to the advance warning signs.

The channelizing devices shall be drums or 42" cones.

Channelizing devices ore not required along the centerline adjacent to work area when pilot cars are utilized for escorting traffic through the work area.

ll!IOM 01/0!1 ON3

Channelizing devices and floggers shall be used at intersecting roads to control intersecting rood traffic as required.

The buffer space should be extended so that the two-way traffic toper is placed before a horizontal or vertical curve to provide adequate sight distance for the flogger and queue of stopped vehicles.

The length of A may be adjusted to fit field conditions.

STATE OF SOUTH

DAKOTA

PROJECT

P 0013(53)

Plottino Date: 04/29/2020

Warning sign sequence ~ in opposite direction same as below.

>, 0 :i' L

l I Cl) 0 Co.

■ 3' 0

■ 011-1-■ OjCD.Q 0

N ■ - - C4-0 4-

...J 0 L

Cl) I-C 0

<I

t <I

~

t

<Optionoll

June 3, 2016

Published Date: 2nd Dtr. 2020

s D D 0 T

GUIDES FOR TRAFFIC CONTROL DEVICES LANE CLOSURE WITH FLAGGER PROVIDED

PLATE NUMBER

634.23

Sheet I of I

SHEET TOTAL

SHEETS

... w :::,: ([ z t­o ...J D..

z 0 D

C"i N ... M tD

I ail

I M IS) ... M tD / -, w tD IS) D z ([ I / -, a: D.. /

w ...J

LL

Page 14: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

14 18

6' to 12'

E E ::J E ::J

·c E ·c ~ ~ LCI r:--

RURAL DISTRICT

* C E

:::J :::;: E r:-- C Walkway

:::;:

Lfl

URBAN DISTRICT • If the bottom of supplemental plate is

mounted lower than 7 feet above a pedestrian walkway , the supplemental plate should not project more than 4" into the pedestrian facility.

6' to 12'

RURAL DISTRICT WITH SUPPLEMENTAL PLATE

RURAL DISTRICT 3 DAY MAXIMUM

E ::J E

E E :::J :::J -~ E E ·c C

:::;: ~

:::;: Lfl r:--v

Sign shall be le vel,

CNot applicable to regulatory signs)

September 22, 2014

Published Date: 2nd Dtr. 2020

s D D 0 T

CRASHWORTHY SIGN SUPPORTS (Typical Construction Signing)

PLATE NUMBER

634.85

Sheet I of I

Examples of~ ,/ 60" Chord Line \\/

Clearance Checks /

' ' \

\

\

STATE OF SOUTH

DAKOTA

1------P_RO_J_EC_T ___ ---I SHEET

P 0013(53)

Plottino Date: 04/29/2020

__ ___ ___ ____ _ r-Anchor Post or Slip Base ,, - .,,,,.... - -..... .. .. 1....

/ '

\

\

' I

I ,'

/

- ------ --

,,/"-.__ 120" Diameter ..,,- ,,, !Perimeter of stub height

clearance checks)

PLAN VIEW !Examples of stub height clearance checks)

Top of Anchor Post or Slip Base

Chord Line_/

Ground Line

ELEVATION VIEW GENERAL NOTES:

The top of anchor posts and slip bases SHALL NOT extend above o 60" chord line within a 120" diameter circle around the post with ends 4" above the ground.

At locations where there is curb and gutter adjacent to the breakaway sign support, the stub height shall be a ma x imum of 4" above the ground I ine at the localized area adjacent to the breakaway support stub.

The 4" stub height clearance is not necessary for U-channel lap splices where the support is designed to yield (bend) at the base.

Published Date: 2nd Dtr. 2020

s D D 0 T

BREAKAWAY SUPPORT STUB CLEARANCE

July I, 2005

PLATE NUMBER

634.99

Sheet I of I

TOTAL SHEETS

Ill

w :::,: <I z t­o ...J a.

z 0 D

rr rr ... M tD

I ail

I Ill ro ... M tD / -, w tD IS)

D z <I I / -, a: a. /

w ...J

LL

Page 15: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

ITEMIZED LIST FOR TRAFFIC CONTROL SIGNS

CONVENTIONAL ROAD

SIGN

CODE SIGN DESCRIPTION NUMBER SIGN SIZE

SQFT

PER SIGNSQFT

0.000001

W20-1 ROAD WORK AHEAD 8 48'' x 48'' 16.0 128.0

W20-4 ONE LANE ROAD AHEAD 4 48'' x 48'' 16.0 64.0

W20-7 FLAGGER (symbol) 4 48'' x 48'' 16.0 64.0

W21-5 SHOULDER WORK 4 48'' x 48'' 16.0 64.0

G20-2 END ROAD WORK 8 36'' x 18'' 4.5 36.0 0.000001

CONVENTIONAL ROAD

TRAFFIC CONTROL SIGNS SQFT356.0

1

15 18

STATE OF I PROJECT I SHEEl I TOTAL

SOUTH I NO. SHEETS

DAKOTA p 0013(53) I l

g " ~ a: >-

~ a: LL

fi: >-t [.

Page 16: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

16 18

Wall "t" Rod Dia. (in.) (in.)

~ 31/4 ¾ 31f2-61/2 %

~ 7 I

Pipe Sleeve or Welded Eye

ASTM FI554 Grade 36 or ASTM A36 Rod with Heavy Hex Nut and Wosher

Pipe

t. Hole

Sleeve (nominall

% I

l'j4

16"

Dia.

Outside Edge of Joint

t. Hqle

16"

32" (±-1 ½") .I

GENERAL NOTES:

Tie bolts shall conform to ASTM Fl 554 Grode 36 or ASTM A36. Nuts shall be heavy hex conforming to ASTM A563. Washers shall conform to ASTM F436.

Pipe Sleeve shal I conform to ASTM A500 or A53, Grode B.

Galvanize odjustible eye bolt tie assembly in accordance with ASTM Al 53.

ASTM Fl554 Grode 36 or ASTM A36 Tie Bolt with 2 Heavy Hex Nuts and 2 Washers

ADJUSTABLE EYE BOLT TIE

Pipe Dia. "L" Bolt Dia. (in.l (in,) (in.)

~ 48 4 % > 48 6 I

L6" x

• I!!,,, • • • :., • ' -4 • • : 4

• • • • • I!!,,,

9"

ANGLE AND BOLT TIE

ASTM A307 Bolt with Heavy Hex Nut and 2 Washers

Bolts may be reversed

GENERAL NOTES:

GENERAL NOTES:

Angles shall conform to ASTM A36.

Bo! ts shall conform to ASTM A307. Nuts shall be heavy hex conforming to AS TM A563. Wosher s shal I conform to ASTM F436.

Galvanize angles, bolts, nuts, and washers in accordance with ASTM Al53.

Ofi In lieu of the tie bolts detailed above other types of tie bolt connect ions may be installed as approved by the Office of Bridge Design.

All pipe sections of R.C.P. and R.C.P. Arch shall be tied with tie bolts e xcept for pipe located between drop inlets, manholes, and junction boxes. All pipe sections of pipes that only enter or e x it drop inlets, manhole, and junction boxes shall be tied with tie bolts.

There will be no separate measurement or payment for the tie bolts. The cost for furnishing and installing the tie bolts shall END VIEW

"CIRCULAR"

Published Date: 2nd Dtr. 2020

END VIEW "ARCH"

s D D 0 T

be incidental to the contract unit price per foot for the corresponding bid item for R.C.P. or R,C.P. Arch.

TIE BOLTS FOR R.C.P. AND R.C.P. ARCH

February 28, 2013

PLATE NUMBER

450.18

Sheet I of I

Alternate Type Connector Sections may be used with approval of the Engineer.

1· D Dimple Bond Collar

Reinforced Edge

Galvanized Metal

4 -'

APRON

I A I, w PLAN

ELEVATION

NOTE:

STATE OF SOUTH

DAKOTA

PROJECT

P 0013(53)

Plottino Date: 04/29/2020

Dia. DIMENSIONS Cin.l Appro x. D Go. A B H L w Slope Body

Cin.) 12 6 6 6 6 21 24 21/2:I I Pc. 15 6 7 8 6 26 30 2½: I I Pc. 18 6 8 10 6 31 36 2½: I I Pc.

21 6 9 12 6 36 42 2½: I I Pc. 24 6 10 13 6 41 48 2½: I I Pc. 30 4 12 16 8 46 60 2½: I I Pc. 36 4 14 19 9 51 72 2½: I 2 Pc. 42 2 16 22 II 60 84 2½: I 2 Pc. 48 2 18 27 12 69 90 21/4:I 2 Pc. 54 2 18 30 12 78 102 2:1 3 Pc, 60 2 18 33 12 84 114 13/4:1 3 Pc. 66 2 18 36 12 87 120 !½:I 3 Pc. 72 2 18 39 12 87 126 l'/3:I 3 Pc. 78 2 18 42 12 87 132 11/4:I 3 Pc, 84 2 18 45 12 87 138 11/ 6:1 3 Pc.

STANDARD CONNECTIONS Threaded ¾" Dia. Rod over Top of culvert Pipe

For 30"through 84'

Bolted on Side Lug

Dimple Bond Col lor bolted to end sect ion with 1/a" bolts

Tubing is slipped over

¾" x ½" Gal. Buttonheod Rivets spaced 6"C.to ~Overall length of rivets=O. 78"

the sheet and rivets or lugs prior to forming operations of the apron.

TUBING ATTACHMENT DETAILS SECTION A-A

Finish Earth Slope as Required

L

Slope

For 12" through 24" only

Half Punches (lugs)

SECTION A-A (alternate)

Coupling Bond

Q-r2" I.D. ___LMetol Edge)

TYPICAL CROSS-SECTION GENERAL NOTES: SECT ION A-A (al ternatel Al I 3 pc. bodies shol I hove 12 Go. sides and IO Go. center panels. Width of center panels shol I be greater than 20% of the pipe periphery. Multiple panel bodies to hove lop seams tightly joined by 1/a" Dia. galvanized rivets or bolts.

For 60" through 84" sizes, reinforced edges shall be supplemented with oolvonized stiffener angles. The angles will be 2' x 2" x 1/ 4 " for 60" through 72" diameters and 2½" x 2½• x1/ 4" for 78" and 84" diameters. The angles shall be attached by ¾" diameter galvanized nuts and bolts.

Rivets and Bolts shall be ¾" Dia, Min. for IO Go. and 12 Go. sheet, and ~fa• Dia. Min. for 14 Go. and 16 Go. sheets. Tighten nuts with torque wrench to 25 lbs. torque.

Published Date: 2nd Dtr. 2020

s D D 0 T

C.M.P. FLARED ENDS

Morch 31, 2000

PLATE NUMBER

450.35

Sheet I of I

SHEET TOTAL

SHEETS

I.!)

w :::,: <I z t­o ...J a.

z 0 D

IO M lSl IO ...

I ail

I (X)

lSl IO ... / -, w I.!) lSl D z <I I / -, a: a. /

w ...J

LL

Page 17: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

17 18

MANUAL LOW FLOW SILT FENCE INSTALLATION

~

~~ CD EXCAVATE TRENCH @ DRIVE STEEL T FENCE POSTS @ ATTACH 26" WOVEN WIRE

FENCE TO POSTS

Fabric for silt fence will be 36" (Min.) width.

<(

Fabric that overlaps the top of fence will be placed between the posts and the woven wire fence.

Detail B

2" (Min.) Fabric Overlap

@ATTACH SILT FENCE FABRIC

Silt Fence Fabric 8" staples will be placed at each post to secure

Attach the silt fence fabric with plastic ties, wire ties, or hog rings at 12" (Max.) horizontal spacing on the top and bottom wires of the woven wire fence and with plastic or wire ties at 12" (Max.) vertical spacing on the posts.

Wheel Compact Soil

Steel T Fence Posts

@ BACKFILL TRENCH AND WHEEL COMPACT SOIL

the silt fence fabric to Steel T Fence Post the bottom of the trench.

=--~li

Published Date: 2nd Dtr. 2020

s D D 0 T

26" Woven Wire Fence The elevation at these locations will be, at a minimum, higher than the top of the silt fence fabric at its lowest elevation.

February 14, 2020

LOW FLOW SILT FENCE AND SILT TRAP

PLATE NUMBER

734.04

Sreet t of 2

STATE OF SOUTH

DAKOTA

1------PR_O_JE_CT ___ ---I SHEET

P 0013(53)

Plottino Date: 04/29/2020

MACHINE SLICED LOW FLOW SILT FENCE INSTALLATION Roll of Silt Fence Fabric

Operation

~ .c

C 0.. - Q) -o Cl g.g C/) -g

LI..

Silt fence fabric will be overlapped a minimum of 2" at top of woven wire fence.

Silt Fence Fabric 26" Woven Wire Fence Bend at base as necessary to provide for a minimum of 2" of silt fence fabric ove,lap. <\>!~ =-- '-- 5 \Sill T,ap

I ... 6' (Min.) I 4•+ I ;,. :E ;,.

~<n 0

ai c.. N .SJ ~

C/) C

i:o if

Silt Fence Fabric

Attach the silt fence fabric with plastic ties, wire ties, or hog rings at 12" (Max.) horizontal spacing on the top and bottom wires of the woven wire fence and with plastic or wire ties at 12" (Max.) vertical spacing on the posts.

5' Steel T Fence Posts

@ATTACH 26" WOVEN WIRE FENCE TO POSTS AND ATTACH SILT FENCE FABRIC.

A silt trap will be provided when specified by a plan note. All costs for constructing the silt trap will be incidental to the contract unit price per cubic yard for "Silt Trap".

If a trench can not be dug or the silt fence fabric can not be sliced in due to the type of earthen material (such as rock), then a row of 30 to 40 pound sandbags butted end to end will be provided on top of the extra length of silt fence fabric to prevent underflow. February 14, 2020

Published Date: 2nd Dtr. 2020

s D D 0 T

LOW FLOW SILT FENCE AND SILT TRAP

PLATE NUMBER

734.04

Sreet 2 of 2

TOTAL SHEETS

w :::,: <I z t­o ...J a.

z 0 D ..,. CSl ..,. M

" I ail

I ..,. CSl ..,. M

" / .., w 1.0 CSl D z <I I / .., a: a. /

w ...J

LL

Page 18: S.D. HIGHWAYS 20 26apps.sd.gov/HC65C2C/EBS/lettings/electronicplans/06EJ_NonSection.pdf110E1690 -1-Remove Sediment 2.0 CuYd 450E9518 18" Cured in Place Pipe 62 Ft 450E9526 30" Cured

18 18

ELEVATION VIEW (Cut or Fill Slope Installation)

Excavated Material from Trench

Point A

ISOMETRIC VIEW (Ditch Installation)

DITCH INSTALLATION

Grade Spacing

(Ft.)

2% 150 3% 100 4% 75 5% 50

Published Date: 2nd Dtr. 2020

s D D 0 T

CUT OR FILL SLOPE INSTALLATION

Slope Spacing (Ft.)

1 :1 10 2:1 20 3:1 30 4:1 40

6"

6"7 r -=-j r,

Ends of Erosion --.........LJL­

Control Wattles

Wood Stake

DETAIL C (See General Notes)

PLAN VIEW (Ditch Installation)

SECTION A-A

EROSION CONTROL WATTLE

February 14, 2020

PLATE NUMBER

734.06

Sreet t of 2

GENERAL NOTES:

STATE OF SOUTH

DAKOTA

1------PR_O_JE_CT ___ ---I SHEET

P 0013(53)

Plottino Date: 04/29/2020

At cut or fill slope installations, wattles will be installed along the contour and perpendicular to the water flow.

At ditch installations, point A must be higher than point B to ensure that water flows over the wattle and not around the ends.

The Contractor will dig a 3" to 5" trench, install the wattle tightly in the trench so that daylight can not be seen under the wattle, and then compact the soil excavated from the trench against the wattle on the uphill side. See Detail B.

The stakes will be 1 "x2" or 2"x2" wood stakes, however, other types of stakes such as rebar may be used only if approved by the Engineer. The stakes will be placed 6" from the ends of the wattles and the spacing of the stakes along the wattles will be 3' to 4'.

Where installing running lengths of wattles, the Contractor will butt the second wattle tightly against the first and will not overlap the ends. See Detail C.

The Contractor and Engineer will inspect the erosion control wattles in accordance with the storm water permit. The Contractor will remove, dispose, or reshape the accumulated sediment when necessary as determined by the Engineer.

Sediment removal , disposal, or necessary shaping will be as directed by the Engineer. All costs for removing accumulated sediment, disposal of sediment, and necessary shaping will be incidental to the contract unit price per cubic yard for "Remove Sediment".

All costs for furnishing and installing the erosion control wattles including labor, equipment, and materials will be incidental to the contract unit price per foot for the corresponding erosion control wattle contract item.

All costs for removing the erosion control wattle from the project including labor, equipment, and materials will be incidental to the contract unit price per foot for "Remove Erosion Control Wattle".

Published Date: 2nd Dtr. 2020

s D D 0 T

EROSION CONTROL WATTLE

February 14, 2020

PLATE NUMBER

734.06

Sreet 2 of 2

TOTAL SHEETS

(D

w :::,: <I z t­o ...J a.

z 0 D .., CSl ... M

" I ail

I .., CSl ... M

" / -, w .., CSl D z <I I / -, a: a. /

w ...J

LL