scully mine update graham letto community & gov’t ... · 9/18/2019 · scully mine update 18...
TRANSCRIPT
WWW.TACORARESOURCES.COM
Graham LettoCommunity & Gov’t Relations Manager
Scully Mine Update18 September 2019
2 Source: Feasibility Study
Scully Mine operated as Wabush Mines from 1965 to 2014, making iron ore concentrate that was pelletized at Pointe Noire, QC
Current Life of Mine > 26 years, Tailings Area > 16 years
Cargill committed for 100% of mine production for 15 years
Overview
(2)
3
Highlights
Employment2
Industry Dynamics1
Production3
Schedule5
Future Growth Opportunities6
Financial Impact4
6
0.0% 0.5% 1.0% 1.5% 2.0% 2.5%
Alumina (%)
0.2%
0.00% 0.03% 0.05% 0.08% 0.10%
Phosphorus (%)
0.007%
0.5% 2.0% 3.5% 5.0% 6.5% 8.0%
Silica (%)
2.58%
57% 59% 61% 63% 65% 67%
Tacora
Canada
Brazil
Australia
Iron (%)
65.9%
Source: AME, Feasibility Study
Tacora
Worse Better Worse Better Worse Better Worse Better
Iron (%) Silica (%) Alumina (%) Phos. (%)
Note: Country grades are estimated as the average of current production from each country.
Canada
Brazil
Australia
% of Global Production
0.3%
3%
23%
45%
Canadian Mines Provide High Grade Specialty Ore Feeds1
Median Median Median Median
Tacora offers an above-standard product in terms of Fe grade as well as other key characteristics
Silica, Alumina, Phosphorus and LOI (loss on ignition) are deleterious to iron ore and Tacora ore is uniquely low in all of these elements
The installation of Mn reduction circuits as part of the restart along with marketing the Scully concentrate as a sinter feedaddresses the historical Mn challenge
Tacora’s concentrate is zero moisture, versus approximately 8.0% for the rest of the world, which means it can be shipped year round without risk of freezing
LOI is a key driver of value in use — benchmark 4-10% LOI means 4-10% of the weight purchased is lost to the off-gas in the sintering process compared to just 0.8% for Tacora
COMMENTARY
LOI
Low
Low
Medium
High
0.8%
7
Employment2
ZERO safety incidents through August 31, 2019
Scully Mine Team Members May 2019 = 52
June 2019 = 117
July 2019 = 158
August 2019 = 180
Total employment ~260 team members
Open Positions Chief Mine Engineer
Operations Supv. – Concentrator
Electrical supv. – Concentrator
Maintenance Planners
Warehouse
Heavy Duty Equipment Tech – Mine
0
5000
10000
15000
20000
25000
30000
January February March April May June July August
Tacora FTE Hours
8
Payroll2
Earned in Labrador West
Competitive base wage rates
Monthly production bonus Paid 2 weeks after month end
everyone measured against the same goal
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
1,800,000
Jan Feb Mar Apr May Jun Jul Aug Sept*
Scully Payroll
pay bonus benefits
All values are in Canadian Funds
* Sept wage estimated for month end
9 Source: Tacora Records
Production Milestones3
First ore to crusher – May 25
First Mill startup – May 28
10 Source: Tacora Records
Production Milestones3
Wet concentrate – June 2
First mine blast – June 25
First train loaded – June 25
11 Source: Tacora Records
Production Milestones3
Three mill operations – July 17
Four mill operations - August 9
First vessel shipment – August 26
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
Jun Jul Aug
Tonn
es
Concentrate Production
On Spec Off Spec
12
Canada 152,496,233
US 12,648,674
Source: Tacora records
Financial Impact (January ~ August 2019)4
All values are in Canadian Funds
These values reflect the amounts paid, they do not include ongoing commitments
$165.1mm total, 93% spent in Canada
Includes Canadian payroll of approximately $1.5mm per month
13 Source: Tacora records
4
All values are in Canadian Funds
Largest portions of QC expense is for Pointe Noire and QNS&L rail
Equipment, contractors, supplies
Financial Impact (January ~ August 2019)
QC79,244,095
NL55,367,688
other CA8,949,255
ON4,565,262
NS4,123,337
0
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
70,000,000
80,000,000
90,000,000
Canada
14 Source: Tacora records
Financial Impact (January ~ August 2019)4
All values are in Canadian Funds
49,762,252
5,605,437
0
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
Labrador Newfoundland
Provincial
93% Labrador; contractors, supplies, payroll
39% of Newfoundland is electrical utility expense
Does not include miscellaneous food, lodging
15
Mn reduction installation Additional storage capacity Concentrator upgrades
Improve material handling equipment at Pointe Noire
2018 2019
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Ramp up production to 6 MTPA of iron ore
Complete fund raising for restart
Project detailed engineering
Commence pit dewatering
Mn reduction engineering
Q2 2019 to 2021
Concentrator commissioning Resume mining
Schedule5
Delivery of new mining equipment
16
Future Growth Opportunities6
Future
2019
Short to Medium Term
Improve Fe recovery; currently at 65.9%; improve mill uptime
A
Medium Term
Potential investment to produce DRI grade concentrate
Substantial resource upside with M&I conversion potential
B
Medium to Long Term
Potential to expand offering to manganese ore production and ferromanganese production
C
WWW.TACORARESOURCES.COM
Questions?