screentec, pump station bar screen - aqualitec...screentec, the pump station bar screen lift station...
TRANSCRIPT
1www.aqualitec.comwww.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
2www.aqualitec.comwww.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Lift Station 162 – City of Pembroke Pines, FL Scope of Work Solution Installation of Screentec Conclusion
3www.aqualitec.com
Scope of work
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
SPACE REQUIREMENTS - FOOTPRINT
Depth: 18’
Equipment Length: 25’ – 3”
Equipment Width: 1’ –3"
Height of discharge: 3’ – 11’’
Bar spacing: ½’’
Installation angle: 90°
Weight: 1,430 lbs
HYDRAULIC CONDITIONS
Influent: Raw Municipal
Peak flow: 600,000 GPD
Maximum Design flow: 2 MGD
4www.aqualitec.com
Scope of work Retrofit with minimal structural changes
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
5www.aqualitec.com
Scope of work Retrofit with minimal structural changes
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
6www.aqualitec.com
Scope of work No more expensive, manual and unsafe maintenance
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
- Remove rags, flushable wipes,towels, bed sheets…..
7www.aqualitec.com
Scope of work Protects pumps from debris
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
8www.aqualitec.comwww.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Lift Station 162 – City of Pembroke Pines, FL Scope of Work Solution Installation of Screentec Conclusion
9www.aqualitec.com
Screentec Solution
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
10www.aqualitec.com
Screentec Solution
Screentec, Bar Screen Solution Vertical design Integrated by pass – Lateral flanges Retrofit any structure No moving part under grade level
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
11www.aqualitec.com
Screentec Solution
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
12www.aqualitec.comwww.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Lift Station 162 – City of Pembroke Pines, FL Scope of Work Solution Installation of Screentec Conclusion
Installation of Screentec
13www.aqualitec.comwww.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Installation of Screentec
14www.aqualitec.comwww.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Installation of Screentec
15www.aqualitec.comwww.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Installation of Screentec
16www.aqualitec.comwww.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Installation of Screentec
17www.aqualitec.com
Previous
Current
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
18
WASTEWATER TREATMENT EQUIPENT
www.aqualitec.com
Significant savings with a small investment
SCREENTEC, THE PUMP STATION BAR SCREEN
Expensive labor Pumps are protected Unsafe environment (H2S) No below-grade maintenance Structural constraints No structural changes
19www.aqualitec.comwww.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Lift Station 162 – City of Pembroke Pines, FL Scope of Work Solution Installation of Screentec Conclusion
20www.aqualitec.com
Screentec allows wastewater operators to protect expensive pump equipment from non-dispersible debris.
Screentec’s versatile design fits almost any application with minimal retrofit.
Screentec’s automatic operation frees operators from costly and dangerous manual maintenance.
Screentec’s simple, versatile design makes it affordable, effective, and reliable.
Keep It Simple.
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Erwan Ouattara (310) 926-3118 [email protected]
Olivier Monfort(310) 703-2174 [email protected]
21www.aqualitec.com
Keep It Simple.
www.aqualitec.com
SCREENTEC, THE PUMP STATION BAR SCREEN
Contact Information