Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information Technology HUB Ewing, Mercer County, N.J. Project No. A1298-00 STATE OF NEW JERSEY Honorable Philip D. Murphy, Governor Honorable Sheila Y. Oliver, Lt. Governor DEPARTMENT OF THE TREASURY Elizabeth Maher Muoio, Treasurer DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION Christopher Chianese, Director Date: February 4, 2019

Upload: others

Post on 20-Aug-2020

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

Document Format Revision 9-4-18

SCOPE OF WORK

Tier III Site Assessment and Master Plan

Office of Information Technology HUB Ewing, Mercer County, N.J.

Project No. A1298-00

STATE OF NEW JERSEY

Honorable Philip D. Murphy, Governor Honorable Sheila Y. Oliver, Lt. Governor

DEPARTMENT OF THE TREASURY

Elizabeth Maher Muoio, Treasurer

DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION

Christopher Chianese, Director

Date: February 4, 2019

Page 2: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 2

TABLE OF CONTENTS SECTION PAGE

I. OBJECTIVE .......................................................................................... 4

II. CONSULTANT QUALIFICATIONS ................................................ 4

A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS ........................................... 4

III. PROJECT BUDGET ............................................................................ 4

A. PROJECT COSTS .......................................................................................................................... 4 B. PROFESSIONAL COST ESTIMATOR ........................................................................................ 5 C. CONSULTANT’S FEES ................................................................................................................ 5

IV. PROJECT SCHEDULE ....................................................................... 5

A. SCOPE OF WORK DESIGN & CONSTRUCTION SCHEDULE ............................................... 5 B. CONSULTANT’S PROPOSED SCHEDULE ............................................................................... 6 C. CONSULTANT SCHEDULE ........................................................................................................ 6

V. PROJECT SITE LOCATION & TEAM MEMBERS ...................... 6

A. PROJECT SITE ADDRESS ........................................................................................................... 6 B. PROJECT TEAM MEMBER DIRECTORY ................................................................................. 6

1. DPMC Representative: ............................................................................................................... 7 2. OIT Representative: .................................................................................................................... 7

VI. PROJECT DEFINITION ..................................................................... 7

A. BACKGROUND ............................................................................................................................ 7 B. FUNCTIONAL DESCRIPTION OF THE BUILDING ................................................................. 8

VII. CONSULTANT RESPONSIBILITIES .............................................. 9

A. TIER III SITE ASSESSMENT ....................................................................................................... 9 B. PRE-ASSESSMENT CONFERENCE MEETING ...................................................................... 10

1. Project Directory: ...................................................................................................................... 10 2. Site Access: ............................................................................................................................... 10 3. Project Coordination: ................................................................................................................ 10 4. Existing Documentation: .......................................................................................................... 10

C. DATA GATHERING & INTERVIEWS...................................................................................... 11 D. SITE ASSESSMENT AND RECOMMENDATIONS ............................................................ 11 E. TIER III MASTER PLAN ............................................................................................................ 12 F. DESIGN MEETINGS & PRESENTATIONS.............................................................................. 13

1. Meetings:................................................................................................................................... 13

Page 3: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 3

2. Design Presentations: ................................................................................................................ 13

VIII. PERMITS & APPROVALS .............................................................. 14

A. REGULATORY AGENCY PERMITS & APPROVALS ........................................................... 14

IX. GENERAL REQUIREMENTS ......................................................... 14

A. SCOPE CHANGES ...................................................................................................................... 14 B. ENERGY INCENTIVE PROGRAM ........................................................................................... 14

X. SOW SIGNATURE APPROVAL SHEET ....................................... 15

XI. CONTRACT DELIVERABLES ...................................................... 16

XII. EXHIBITS ............................................................................................ 17

A. SAMPLE PROJECT SCHEDULE FORMAT B. PROJECT SITE LOCATION MAP C. SINGLE LINE DIAGRAM D. PROPOSED CONFIGURATION

Page 4: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 4

I. OBJECTIVE

The objective of this project is to complete a site assessment of the Office of Information Technology HUB Data Center to determine the improvements necessary to bring the facility up to Tier III standards as defined by the Uptime Institute, LLC. The assessment shall result in a Master Plan that includes an increase in power capacity, a phasing plan to complete the work, cost estimates and schedules showing expected durations of work for the improvements.

II. CONSULTANT QUALIFICATIONS

A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS

The Consultant shall be a firm pre-qualified with the Division of Property Management & Construction (DPMC) in the following discipline(s):

• P001 Architecture

The Consultant shall also have in-house capabilities or Sub-Consultants pre-qualified with DPMC in: • P002 Electrical Engineering • P003 HVAC Engineering • P025 Estimating/ Cost Analysis

As well as, any and all other Architectural, Engineering and Specialty Disciplines necessary to complete the project as described in this Scope of Work (SOW).

III. PROJECT BUDGET A. PROJECT COSTS

The Consultant shall determine the construction cost estimate (CCE) and current working estimate (CWE) for the recommended facility improvements described in the assessment. Project cost items shall include, but not limited to: construction costs, Consultant design and construction administration fees, Construction Management Firm (CMF) fees (if recommended), testing costs, affirmative action, DPMC management fees, contingencies, permits, allowances, and escalation factors for the anticipated construction year of the facility improvements.

Page 5: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 5

B. PROFESSIONAL COST ESTIMATOR The Consultant or Sub-Consultant providing the cost estimates must be pre-qualified with DPMC in the Estimating/Cost Analysis Specialty Discipline. All cost estimates shall be adjusted for regional location, site factors, construction phasing, building use group, location of work within the building, temporary swing space, security issues, and inflation factors based on the year in which the work is to be performed. All cost estimates must be submitted on a DPMC-38 Project Cost Analysis form for each improvement recommended with a detailed construction cost analysis in CSI format for all appropriate divisions and sub-divisions.

C. CONSULTANT’S FEES The construction cost estimate for this project shall not be used as a basis for the Consultant’s design and construction administration fees. The Consultant’s fees shall be based on the information contained in this Scope of Work document and the observations made and/or the additional information received during the pre-proposal meeting.

IV. PROJECT SCHEDULE

A. SCOPE OF WORK DESIGN & CONSTRUCTION SCHEDULE The following schedule identifies the estimated design and construction phases for this project and the estimated durations. PROJECT PHASE ESTIMATED DURATION (Calendar Days) 1. Site Access Approvals & Schedule Design Kick-off Meeting 14

2. Preliminary Assessment Phase 50% Completion 60

• Project Team Review & Comment 14 3. Final Assessment Phase 100% Completion 21

• Project Team Review & Approval 14 4. Close-Out Phase 14 TOTAL 123

Page 6: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 6

B. CONSULTANT’S PROPOSED SCHEDULE

The Consultant shall submit a schedule with their technical proposal that is similar in format and detail to the schedule depicted in Exhibit ‘A’. The bar chart schedule developed by the Consultant shall reflect their recommended project phases, phase activities, activity durations. A written narrative shall also be included with the technical proposal explaining the schedule submitted and the reasons why and how it can be completed in the time frame proposed by the Consultant. This schedule and narrative will be reviewed by the Consultant Selection Committee as part of the evaluation process and will be assigned a score commensurate with clarity and comprehensiveness of the submission.

C. CONSULTANT SCHEDULE The Project Manager will issue the Consultant’s approved project schedule at the first kickoff meeting. This schedule will be binding for the Consultant’s activities and will include the start and completion dates for each activity. The Consultant and Project Team members shall use this schedule to ensure that all milestone dates are being met for the project. The Consultant shall update the schedule to reflect performance at each phase of the project for the Project Team review and approval. Any recommendations for deviations from the approved schedule must be explained in detail as to the causes for the deviation(s) and impact to the schedule.

V. PROJECT SITE LOCATION & TEAM MEMBERS

A. PROJECT SITE ADDRESS The location of the project site is: Office of Information Technology (OIT) HUB Building 1 Schwarzkopf Drive Ewing, New Jersey 08628 See Exhibit ‘B’ for the project site location map.

B. PROJECT TEAM MEMBER DIRECTORY The following are the names, addresses, and phone numbers of the Project Team members.

Page 7: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 7

1. DPMC Representative: Name: Richard Herrero, Project Manager Address: Division Property Management & Construction 20 West State Street, 3rd Floor Trenton, NJ 08608-1206 Phone No: 609-292-6558 E-Mail No: [email protected] 2. OIT Representative: Name: Yolanda Windom, Project Manager Address: Office of Information Technology 300 Riverview Plaza PO Box 212 Trenton, NJ 08625 Phone No: 609-826-3630 E-Mail No: [email protected]

VI. PROJECT DEFINITION

A. BACKGROUND The Office of Information Technology (OIT) facility known as the HUB Data Center is located on the campus of the New Jersey State Police Division Headquarters in West Trenton, NJ. The building was constructed in 1986 to house the State’s computer operations. The facility now serves as the State’s primary data center and supports the operation of distributed server applications for the State of New Jersey. The OIT is committed to bringing the HUB up to Tier III standards as defined by the Uptime Institute, LLC. They are seeking a full site assessment of the facility and a Master Plan for achieving it. A Tier III data center is concurrently maintainable, allowing for any planned maintenance activity of power and cooling systems to take place without disrupting the operation of computer hardware located in the data center. In terms of redundancy, Tier III offers N+1 availability. In addition to Tier III upgrades, OIT is seeking to increase power capacity to the HUB. It is understood that the facility requires a second power source to achieve Tier III standards. The current electrical configuration limits the HUB to a maximum of 3 MW of power. The projected power need is 5 MW.

Page 8: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 8

Under Executive Order 225 (available here https://nj.gov/infobank/circular/eocc225.pdf ), The Office of Information Technology is planning to consolidate other data center operations at the HUB. A plan for this consolidation will be provided to the Consultant as it becomes available. The State Police data center migration to the HUB from Building 15 (located on the same site) is expected to be completed in 2019, pushing the HUB closer to the 3 MW limit. Future demand for services is projected to exceed available power. Electrical power studies will be made available to the Consultant.

B. FUNCTIONAL DESCRIPTION OF THE BUILDING 1. General: The OIT HUB is a single story, masonry and concrete structure occupying approximately 48,000 square feet. The building was constructed in 1986 to house the State’s mainframe computer operations. The facility operates 24 hours a day, 365 days a year. The existing administration offices are located on the southeast perimeter of the building. The computer server racks occupy the inner core space. Two storage warehouses are attached to the facility. 2. Electrical: PSE&G delivers electrical power to the area with two (2) 13,200 volt distribution circuits that originate from their Fernwood and Lawrence substations. The Fernwood and Lawrence distribution circuits are brought to a PSE&G pad mounted automatic transfer switch located along Schwarzkopf Drive. This transfer switch serves the HUB and the New Jersey Public Health, Environment & Agricultural Laboratory (NJPHEAL). The OIT HUB has a single 2500kVA pad mounted transformer which provides power to the building. The 13,200 volt feed to this transformer is a single radial service from the automatic transfer switch. Both the transformer and radial feed represent a single point of failure in the normal power distribution. See Exhibit ‘C’ for a single line diagram. A description of the HUB electrical system from a study done by Gannett Fleming as part of DPMC Contract No. J0303-00 was completed in November 2017. An arc flash and coordination study was also completed under this project. The studies will be provided to the Consultant. 3. HVAC: The computer operations and network/communications are cooled by CRAC units located around the rooms. The CRAC units are supplied with chilled water from chiller units located outside the building. Cold air is fed to the computer/equipment racks through a raised floor serving as the supply plenum. The CRAC units capture the hot air via the open tops of the units.

Page 9: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 9

4. Existing Conditions: Under DPMC Project A1235-00, a printing area was recently removed from the building and this new area is being used for computer operations and network/communications functions. Under the same project, a new clean agent suppression system is being installed in the facility to protect the spaces under the raised floor, the space above the ceiling and the space from floor to ceiling. The expected completion date of this project is mid to late 2019. Excess office space located on the perimeter of the building can be removed to create room for future power equipment.

5. Proposed Conditions: PSE&G is in the process of upgrading service to 69kV in the West Trenton/Ewing area as part of a statewide initiative. Based on this, it will be assumed that 5 MW of power can be delivered to the site by PSE&G in the near future through a high tension or commercial service or some other option. The Consultant shall explore options with PSE&G to deliver this power. Another option to provide power to the site though the construction of a cogeneration facility or Combined Heat and Power (CHP) plant will be explored under a separate project. A proposed configuration for the HUB based on a Tier III standard, as developed by facility staff, is shown in Exhibit ‘D’.

VII. CONSULTANT RESPONSIBILITIES

A. TIER III SITE ASSESSMENT This section of the Scope of Work is intended as a guide for the Consultant to understand the overall basic requirements of the project and is not intended to identify each specific component of the site assessment. It will be the Consultant’s responsibility to provide all of the required detail necessary to complete a full site assessment and provide a Master Plan for bringing the HUB up to a Tier III standard, as defined by the Uptime Institute, with 5 MW of available power capacity. The assessment shall include a phasing plan to complete the work required, cost estimates for all work and a schedule showing the expected durations for the work.

Page 10: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 10

B. PRE-ASSESSMENT CONFERENCE MEETING Prior to the start of the assessment, the Consultant shall meet with the members of the Project Team to coordinate the following items: 1. Project Directory:

Develop a project directory that identifies the name and phone number of key designated representatives who may be contacted during the design and construction phases of this project. 2. Site Access: Develop procedures to access the project site and provide the names and phone numbers of approved escorts when needed. Obtain copies of special security and policy procedures that must be followed during all work conducted at the facility and include this information in Division 1 of the specification. 3. Project Coordination: Review and become familiar with any current and/or future projects at the site that may impact the assessment and/or scheduling requirements of this project. Incorporate all appropriate information and coordination requirements in the Master Plan. 4. Existing Documentation: Copies of the following documents will be provided to each Consulting firm at the pre-proposal meeting to assist in the bidding process. • DPMC Contract No. J0303-00, Power System Analysis, November 2017, Gannett Fleming. • DPMC Contract No. J0303-00, 2017 Arc Flash Hazard Study, November 2017, Gannett

Fleming. • DPMC Contract No. J0303-00, Electrical System Observations and Recommendations,

November 2017, Gannett Fleming. • DPMC Project A1156-00: Campus Wide Electric Study Final Report, December 2, 2013,

Gannett Fleming. Review these documents and any additional information that may be provided at a later date such as reports, studies, surveys, equipment manuals, as-built drawings, etc. The State does not attest to the accuracy of the information provided and accepts no responsibility for the consequences of errors by the use of any information and material contained in the documentation provided. It shall be the responsibility of the Consultant to verify the contents and assume full responsibility for any determination or conclusion drawn from the material used. If the information provided is

Page 11: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 11

insufficient, the Consultant shall take the appropriate actions necessary to obtain the additional information required. All original documentation shall be returned to the provider at the completion of the project. 5. Scope of Work: Review the assessment requirements contained in this document with the Project Team members to ensure that all parties agree with the scope of the work. 6. Project Schedule: Review and update the project schedule with the Project Team members.

C. DATA GATHERING & INTERVIEWS The Consultant shall meet with the Project Team Members and representatives of the Office of Information Technology to schedule the site visits and approve the procedures necessary to assess the site, building utilities, mechanical equipment, interior spaces, and interview the building manager. A structured process shall be developed that will document the condition of each facility component assessed.

D. SITE ASSESSMENT AND RECOMMENDATIONS

1. Power:

The Consultant shall contact PSE&G to determine their requirements for delivering 5 MW of power capacity to the HUB. Investigate options such as High Tension Service (HTS) and commercial service. Provide an assessment and recommendations, with cost estimates, for delivery of 5 MW of power capacity to the HUB. Include equipment requirements such as substations, switchgear, transformers, etc. Identify points of demarcation, responsibility and ownership between the State and PSE&G equipment. 2. HUB: Provide an assessment of the existing building utilities, operational systems and constraints such as power, cooling and space. Recommend upgrades for each utility and operational system and prepare a table that will list them by priority based on the need to achieve Tier III standards, as defined by the Uptime Institute. Bearing in mind that vacated perimeter office space is available for equipment use, recommend any changes to the floor space or layout that will facilitate Tier III upgrades. All recommended upgrades shall have associated costs. The costs shall be all

Page 12: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 12

inclusive and shall include construction costs, A/E fees, DPMC fees, contingencies, allowances, permit fees, and escalation factors. 3. Site Planning: The Consultant shall identify possible locations for power equipment such as substations, switchgear, transformers, etc. as may be required to deliver power to the HUB. Identify requirements to deliver power from said PSE&G equipment to the HUB such as routing, overhead or underground, trenching, etc.

E. TIER III MASTER PLAN

The assessment shall result in a Master Plan for the HUB that includes an increase in power capacity to 5 MW, an upgrade to Tier III standards, a phasing plan to complete the work, cost estimates and schedules showing expected durations of work for the improvements. The Master Plan shall be a compilation of all the information requested in this Scope of Work and identified in Section XI of this document entitled "Contract Deliverables". It is suggested that the document be divided into the following sections:

Executive Summary Purpose, Limitations and Process Site Assessment & Recommendations Power Requirements HTS, Commercial Service, Other Options HUB Constraints (i.e., power, cooling, space) Utilities (as applicable to Tier III upgrade requirements) Electrical Systems Plumbing Systems Heating, Ventilation and Air Conditioning Systems Fire Protection Systems Gas Distribution Systems Water Distribution Systems Site Planning Power Equipment Locations Space Planning Floor Plan Electrical Plan Construction and Project Budget Estimates Construction Bar Charts Exhibits & Addendums Site Location Maps Cost Calculations Photographs

Page 13: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 13

Existing Floor Plans Utility System Schematic Drawings

The document shall contain a narrative of the surveys, inspections, and investigations conducted for each item listed. Recommendations to replace, repair and/or upgrade each building component shall be described and prioritized based on Tier III upgrade and power requirements. All recommendations shall include estimates of costs. All floor plan drawings, surveys, utility schematics and colored photographs related to the building and components shall be included for reference. The Consultant shall make an oral presentation of the Tier III Master Plan to the Project Team members at the preliminary and final assessment phase. All evaluations and recommendations shall be discussed at each presentation.

F. DESIGN MEETINGS & PRESENTATIONS 1. Meetings: Conduct the appropriate number of review meetings with the Project Team members during each phase of the project so they may determine if the project meets their requirements, question any aspect of the contract deliverables, and make changes where appropriate. The Consultant shall describe the philosophy and process used to meet the project objectives. Special considerations shall also be addressed such as: site access limitations, schedule requirements, security restrictions, etc. It shall also be the responsibility of the Consultant to arrange and require all critical Sub-Consultants to be in attendance at the design review meetings. Record the minutes of each design meeting and distribute within seven (7) calendar days to all attendees and those persons specified to be on the distribution list by the Project Manager. 2. Design Presentations: The minimum number of design presentations required for each phase of this project is identified below for reference: Preliminary Assessment Phase: One (1) oral presentation at phase completion. Final Assessment Phase: One (1) oral presentation at phase completion.

Page 14: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 14

VIII. PERMITS & APPROVALS A. REGULATORY AGENCY PERMITS & APPROVALS

Identify all State and Federal Regulatory Agency approvals and permits that will govern and affect the work proposed in the assessment. An itemized list of these approvals and permits shall be included and the total amount of the application fees should be included as part of the CWE.

IX. GENERAL REQUIREMENTS

A. SCOPE CHANGES The Consultant must request any changes to this Scope of Work in writing. An approved DPMC 9d Consultant Amendment Request form reflecting authorized scope changes must be received by the Consultant prior to undertaking any additional work. The DPMC 9d form must be approved and signed by the Director of DPMC and written authorization issued from the Project Manager prior to any work being performed by the Consultant. Any work performed without the executed DPMC 9d form is done at the Consultant’s own financial risk.

B. ENERGY INCENTIVE PROGRAM The Consultant shall review the programs described on the “New Jersey’s Clean Energy Program” website at: http://www.njcleanenergy.com to determine if any proposed upgrades to the mechanical and/or electrical equipment and systems for this project qualify for “New Jersey Clean Energy Program” rebates and incentives such as SmartStart, Pay4Performance, Direct Install or any other incentives.

Page 15: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information
Page 16: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 16

XI. CONTRACT DELIVERABLES The following is a listing of Contract Deliverables that are required at the completion of each phase of this project. The Consultant shall refer to the DPMC publication entitled, “Procedures for Architects and Engineers,” Volumes I and II, 2nd Edition, dated January, 1991 to obtain a more detailed description of the deliverables required for each item listed below. The numbering system used in this “Contract Deliverables” section of the scope of work corresponds to the numbering system used in the “Procedures for Architects and Engineers” manual and some may have been deleted if they do not apply to this project. TIER III MASTER PLAN Executive Summary

Purpose, Limitations and Process Site Assessment & Recommendations Power Requirements HTS or Commercial Service HUB Constraints (i.e., power, cooling, space) Utilities (as applicable to Tier III upgrade requirements) Electrical Systems Plumbing Systems Heating, Ventilation and Air Conditioning Systems Fire Protection Systems Gas Distribution Systems Water Distribution Systems Site Planning Power Equipment Locations Space Planning Floor Plan Electrical Plan Construction and Project Budget Estimates Construction Bar Charts Exhibits & Addendums Site Location Maps Cost Calculations Photographs Existing Floor Plans Utility System Schematic Drawings

SUBMISSIONS, COPIES AND PRESENTATIONS

Preliminary Assessment Study Phase Submission (20 Copies) Oral Presentations

Page 17: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

PROJECT NAME: Tier III Site Assessment and Master Plan PROJECT LOCATION: Office of Information Technology HUB PROJECT NO: A1298-00 DATE: February 4, 2019

PAGE 17

Final Assessment Study Phase (20 copies) Oral Presentation Copy of Electronic Data

PROJECT CLOSE-OUT PHASE 11.1 Responsibilities: Plan, Schedule and Execute Close-Out Activities 11.2 Commencement: Initiate Close-Out w/DPMC 20A Project Close-Out Form 11.5 Determination of Substantial Completion 11.7 Initiation of Final Contract Acceptance Process 11.9 Final Payment 11.9.2 A/E Invoice and Close-Out Forms for Final Payment 11.10 Final Performance Evaluation of the A/E 11.12 Submission Forms Figure 11.2 Project Close-Out Documentation List DPMC 20A Figure 11.3-a Certificate of Substantial Completion DPMC 20D Figure 11.3-b Final Acceptance of Consultant Contract DPMC 20C Figure 11.5 Request for Contract Transition Close-Out DPMC 20X Figure 11.7 Final Contract Acceptance Form DPMC 20 Figure 11.8.3-a Final Cost Analysis Figure 11.8.3-b Insurance Transfer Form DPMC 25 Figure 11.8.4 Submission Checklist

XII. EXHIBITS The attached exhibits in this section will include a sample project schedule, and any supporting documentation to assist the Consultant in the design of the project such as maps, drawings, photographs, floor plans, studies, reports, etc.

END OF SCOPE OF WORK

Page 18: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

February 7, 1997Rev.: January 29, 2002

Responsible Group Code Table

The codes below are used in the schedule field “GRP” that identifies the group responsible for theactivity. The table consists of groups in the Division of Property Management & Construction(DPMC), as well as groups outside of the DPMC that have responsibility for specific activities ona project that could delay the project if not completed in the time specified. For reportingpurposes, the groups within the DPMC have been defined to the supervisory level ofmanagement (Le., third level of management, the level below the Associate Director) to identifythe “functional group” responsible for the activity.

CODE DESCRIPTION REPORTS TO ASSOCIATE DIRECTOR OF:

CM Contract Management Group Contract Management

CA Client Agency N/A

CSP Consultant Selection and Technical ServicesPrequalification Group

NE Architect/Engineer N/A

PR Plan Review Group Technical Services

CP Construction Procurement Planning & Administration

CON Construction Contractor N/A

FM Financial Management Group Planning & Administration

OEU Office of Energy and N/AUtility Management

PD Project Development Group Planning & Administration

EXHIBIT ‘A’

Page 1 of 4

Page 19: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

Act

ivity

Ix

tesc

ar.p

ti.n

ii,,

ni

,,,,u.in,,,,,

i,a

it,i

pi.

agn.

;..itu.n

.ii

i.

iiii

,i

in.

mii

i...

..

ii.

Iq

uin

tnin

imi

IH

tiii

.,.u

i.p..

.ini

,nni,

nrn

ii,.in

.ni

ii

h Des

CV

3)l

Sche

dule

/Con

duct

Predesign/P

roject

Kic

kO

ffM

tgC

M

CV

3020

Prep

are

Program

Phas

eSu

bmitt

alA

E

CV

3021

Dis

trib

ute

Prog

ram

Subm

ittal

for

Rev

iew

CM

CV

3OZI

Prep

are

&Su

bmit

Prbj

ect

Cos

t Analy

sis

(DPM

C38

)C

M

CV

3022

Rev

iew

&A

pprove

Program

Subm

ittal

CA

CV

3023

Revie

w&

Approve

Program

Subm

ittal

PR

CVSO

24R

evie

w&

Approve

Program

Subm

ittal

CM

CV

3025

Con

solid

ate

&R

etur

nPr

ogra

mSu

bmitt

alC

omm

ents

CM

CV

3030

Prep

are

Sche

mat

icPh

ase

Subm

ittal

AE

CV

3031

Dis

trib

ute

Sche

mat

icSu

bmitt

alfo

rR

evie

wC

M

CV

3037

Prep

are

&Su

bmit

Proj

ect

Cos

tAna

lysi

s(D

PMC

38)

CM

CVSO

3ZR

evie

w&

App

rove

Sche

mat

icSu

bmitt

alC

A

CV

3033

Rev

iew

&A

ppro

veSc

hem

atic

Subm

ittal

PR

Rev

iew

&A

ppro

veSc

hem

atic

Subm

ittal

CM

CV

3035

Con

solid

ate

&R

etur

nSc

hem

atic

Subm

ittal

Com

men

tC

M

CV

3040

Pre

pare

Des

ignD

evel

opm

entP

hase

Sub

mit

tal

AE

CV3O

S1D

istr

ibut

eD

DSu

bmitt

alfo

rR

evie

wC

M

C’O

47Pr

epar

e&

Subm

itPr

ojec

tCos

t Ana

lysi

s(D

PMC

38)

CM

CV

3042

Rev

iew

&A

ppro

veD

esig

nD

evel

opm

ent S

ubm

ittal

CA

CV

3043

Rev

iew

&A

ppro

veD

esig

nD

evel

opm

ent S

ubm

ittal

PRC

’130

44R

evie

w&

App

rove

Des

ign

Dev

elop

men

tSu

bmitt

alC

MCV

SO45

Con

solj

date

&R

etum

DD

.Sub

mit

talC

omm

ents

CM

Prep

are

Fina

lD

esig

nPh

ase

Subm

ittal

AE

CV3O

SID

istr

ibut

eFi

nal

Des

ign

Subm

ittal

for

Rev

iew

CM

CV

3052

Rev

iew

&A

ppro

veFi

nal

Des

ign

Subm

ittal

CA

CV

3053

Rev

iew

&A

ppro

veFi

nal

Des

ign

Subm

ittal

PRC

V30

54R

evie

wFi

nal

Des

ign

Subm

itifo

rC

onst

ruct

abili

tyO

CS

:N

OT

E:

DB

cA.T

FS

TS

heti

of3

Ref

erto

sect

ion

“IV

Pro

ject

Sch

edul

e”of

the

Bur

eau

ofD

esig

n&

Con

stru

ctio

nS

ervi

ces

Sco

peof

Work

for

contr

act

phas

edu

rati

ons.

Rou

tine

Pro

ject

IX

h1b

it‘

iS0

Prl

mav

era

Sys

tem

s,In

c.

Page 2 of 4

Page 20: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

Act

ivit

y.

II)

L)e

seri

pti

on

‘R

evie

w&

App

rove

Fina

lD

esig

nSu

bmitt

alC

M

‘3

0C

onso

lidat

e&

Ret

urn

Fina

lDes

ign

Com

men

tsC

M

Prep

are

&Su

bmit

Perm

itA

pplic

atio

nD

ocum

ents

AE

CV

3068

Prep

are

&Su

bmit

Bid

ding

Cos

tAna

lysi

s(D

PMC

38)

CM

Pla

nR

evie

w-P

ernz

ztA

cgw

stho

nC

V40

0iR

evie

wC

onst

rD

ocum

ents

&Se

cure

UC

CPe

rmit

PR

CV4O

1OPr

ovid

eFu

ndin

gfo

rC

onst

ruct

ion

Con

trac

tsC

A

CV

4020

Secu

reB

idC

lear

ance

CM

Adv

ertis

e-B

id-A

war

dC

V50

0IA

dver

tise

Proj

ect&

Bid

Con

stru

ctio

nC

ontr

acts

CP

CV5O

IOO

pen

Con

stru

ctio

nB

ids

CP

CVSO

II

Eva

luat

eB

ids

&Pr

epR

ecom

men

datio

nfo

rA

war

dC

M

CV

5Oi2

Eva

luat

eB

ids

&Pr

epR

ecom

men

datio

nfo

rA

war

dA

E

CV

5Oi4

Com

plet

eR

ecom

men

datio

nfo

rAw

ard

CP

CV

5020

Aw

ardC

onst

ruct

ionC

ontr

acts

/lss

ueN

TP

CP

:

Con

sfru

ctio

nC

’P

roje

ctC

onst

ruct

ion

Slar

tfls

sue

NT

PC

M

CV

6mi

Con

trac

tSta

rtlC

ontr

actW

ork

(25%

)C

ompl

ete

CO

N

CV

tOO

2Pr

econ

stru

cuon

Mee

ting

CM

CV

t()03

Beg

inPr

econ

stru

ctio

nSu

bmitt

als

CO

N

CVI5

004

Lon

gest

Lea

dPr

ocur

emen

tIte

mO

rder

edC

ON

CVtO

OS

Lea

dT

ime

for

Lon

gest

Lea

dPr

ocur

emen

tIt

emC

ON

Prep

are

&Su

bmit

Shop

Dra

win

gsC

ON

CV

6007

Com

plet

eC

onst

ruct

ion

Subm

ittal

sC

ON

CVSO

I IR

ough

ing

Wor

kSt

art

CO

N

CV

eoia

Perf

orm

Rou

ghin

gW

ork

CO

N

CVSO

IOC

ontr

actW

ork

(50%

+)C

ompl

ete

CO

N

CV

tOt3

Lon

gest

Lea

dPr

ocur

emen

tIte

mD

eliv

ered

CO

N

“°

Con

trac

tW

ork

(75%

)C

ompl

ete

CO

N

NO

TE

:D

BC

AT

ES

TSl

ieet

2or3

Ref

erto

sect

ion

“IV

Pro

ject

Sche

dule

”of

the

Bur

eau

ofD

esig

n&

Con

stru

ctio

nSe

rvic

esSc

ope

ofW

ork

for

cont

ract

phas

edu

rati

ons.

Rou

tine

Pro

ject

1xli

i I)i

t@

Pil

mav

era

Syst

ems,

Inc.

Page 3 of 4

Page 21: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

Act

ivity

11)

-

t)es

crip

tion

si)r

.C

VO

14R

ough

ing

Wor

kC

ompl

ete

CO

N

CV

6021

Inte

rior

Fini

shes

Star

tC

ON

CV

)22

Inst

all

Inte

rior

Fini

shes

CO

N

CV

O3O

Con

trac

tWor

kto

Subs

tant

ialC

ompl

etio

nC

ON

(DV

O3l

Subs

tant

ialC

ompl

etio

nD

ecla

red

CM

CVC’

075

Com

plet

eD

efer

red

Punc

hL

ist)

Seas

onal

Act

iviti

esC

OI4

CV

6079

Proj

ectC

onst

ruct

ion

Com

plet

eC

M:

CV60

84)

Clo

seO

utC

onst

ruct

ion

Con

trac

tsC

M

CV

6O&

Con

stru

ctio

nC

ontr

acts

Com

plet

eC

M

CV6O

SOC

lose

Out

A/E

Con

trac

tC

M

CV

6092

Proj

ectC

ompl

etio

nD

ecla

red

CM

NO

TE

:D

BC

AT

ES

TS

hee

t3of3

Ref

erto

sect

ion

“IV

Pro

ject

Sche

dule

”of

the

Bure

auof

Des

ign

&C

onst

ruct

ion

Ser

vic

esSc

ope

ofW

ork

for

cont

ract

phas

edu

ratio

ns.

Routi

ne

Pro

ject

Ixli

i bit

©P

rim

aver

aS

yste

ms,

Inc.

Page 4 of 4

Page 22: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

Site Location Map - OIT HUB

EXHIBIT ‘B’

Page 23: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

EXHIBIT 'C'

Page 24: SCOPE OF WORK Tier III Site Assessment and Master Plan · 2019. 6. 10. · Document Format Revision 9-4-18 SCOPE OF WORK Tier III Site Assessment and Master Plan Office of Information

5MW Switchgear

5MWTransformer

Emergency Generators

5MW Switchgear

ATS(Automatic Transfer

Switches)

UtilityFernwood

Substation

UPS 11.1MW

UPS 21.1MW

UtilityLawrence

Substation

5MWTransformer

ATS(Automatic Transfer

Switches)

Emergency Generators

Bypass Module

Static Bypass

UPS 31.1MWFuture

UPS 41.1MWFuture

Bypass Module

Static Bypass

UPS 11.1MW

UPS 21.1MW

Bypass Module

Static Bypass

UPS 31.1MWFuture

UPS 41.1MWFuture

Bypass Module

Static Bypass

Maintenance Bypass

Maintenance Bypass

Maintenance Bypass

Switchboard #1

750KW

Switchboard #2

750KW

Maintenance Bypass

Switchboard #3

750KW

Switchboard #4

750KW

Switchboard #1

750KW

Switchboard #2

750KW

Switchboard #3

750KW

Switchboard #4

750KW

RPP s1-8

Side 1

RPP s9-16

Side 1

RPP s1-8

Side 2

RPP s9-16

Side 2

RPP s1-8

Side 1

RPP s9-16

Side 1

RPP s1-8

Side 2

RPP s9-16

Side 2

A side B side

Hub Enterprise Data CenterProposed Configuration

EXHIBIT 'D'