ite m Main equipment QTY activity 1- Transformers 11kv/0.4 kv (1,2,2.5 &3.125)MVA 28 1-ratio test 2-winding resistance 3-vector group 4- phase difference 5-excitation 2- Transformers 11kv/6.6kv 7.5MVAx4+25MVAx2 6 1- oil BDV 2- oil moisture content 3-oil filtration and filling 4- ratio 5- winding resistance 6- vector group 7- phase shift 8- oil tanδ 9-winding insulation tanδ 3- 11kv switch gear/6.6kv switchgear each switch gear has approximately 13 C.B or contactors 6 1-AC with stand 2-primary injection for protection relay stability (16 loop) 4- AC UPS commissioning (60kva- 100kva)including NI- CD battery capacity test 3 commissioning 5- DC 125 V commissioning including NI-CD battery capacity test 6 commissioning 6- Primary injection over load test For 400vac C.B 40 Primary injection

Upload: khaldoon-alnashi

Post on 25-Dec-2015

3 views

Category:

Documents


1 download

DESCRIPTION

test

TRANSCRIPT

Page 1: Scope of Work

item Main equipment QTY activity1- Transformers 11kv/0.4 kv

(1,2,2.5 &3.125)MVA 28 1-ratio test

2-winding resistance3-vector group4- phase difference5-excitation

2- Transformers 11kv/6.6kv7.5MVAx4+25MVAx2

6 1- oil BDV2- oil moisture content3-oil filtration and filling4- ratio5- winding resistance6- vector group7- phase shift8- oil tanδ9-winding insulation tanδ

3- 11kv switch gear/6.6kv switchgear each switch gear has approximately 13 C.B or contactors

6 1-AC with stand2-primary injection for protection relay stability (16 loop)

4- AC UPS commissioning (60kva-100kva)including NI-CD battery capacity test

3 commissioning

5- DC 125 V commissioning including NI-CD battery capacity test

6 commissioning

6- Primary injection over load testFor 400vac C.B

40 Primary injection