school
TRANSCRIPT
DNUP
9 10 12 13 14
BB
CC
D
E
F
51000
2875
1900
65.30 m²
STAGE11
9000
9000
9000
9000
36000
473.53 m²
GYMNASIUM102
30.34 m²
CHANGEROOM+W.R.
15
30.24 m²
CHANGEROOM+W.R.
16
27.84 m²
SHIPPING/RECEIVING
20
11.76 m²
OUTDOORSTOR
23
9.16 m²
ELECTRICAL27
4.46 m²
WASHROOM28
1924
31.03 m²
GARBAGE30
1924
9.69 m²
STORAGE31
4082
12.22 m²
CUSTODIALSERVICES
32
127.00 m²
MUSIC33
8
9.71 m²
INSTRUMENT34
14.80 m²
PRACTICE35
A
3802 3798
14.88 m²
ATHLETICSTORAGE
43
4493
9.80 m²
CARETAKERSOFFICE
44
2267
16939
27300
.
2662
9000
2500
11500
9.26 m²
SPRINKLER19
CORRIDOR
46
1574
1000
11.29 m²
ATHLETICSTORAGE
48
8500 8500 17000 8500 8500
10.1
4 m
²
CH
AIR
&T
AB
LE
47
G.P. ENTRY
51
10.1
4 m
²
CH
AIR
&T
AB
LE
52
1100
3.33 m²
JANITOR53
1
A401
2
A401
NORTH
2617
SUSTAINABLE DESIGN STRATEGIES
1. USE OF HIGH PERFORMANCE WINDOWS,THERMALLY BROKEN ALUMINUM FRAMESAND LOW E-COATING GLASS.
2. HIGH AN LOW OPERABLE WINDOWS FORPASSIVE NATURAL VENTILATION.
3. CLERESTORY WINDOWS ADMINTDAYLIGHTING TO PROVIDE AN 5%AVERAGE IN ALL GYMNASIUM.
4. DAYLIGHTING SENSORS AND SEPARATESWITCHES FOR LIGHTING FIXTURES NEARWINDOWS.
1A605
11
ENTRANCE
101
-
---
9.38 m²
BOILER+ELEVMACH.
(BASEMENT)125
-
---
-
---
-
---
SCALECHECKED BY
DATE
PROJECT Nº
DRAWN BY
3/9
/2016 3
:11:2
3 P
M
1 : 100
NORTH WING - GROUND FLOORCDELEMENTARY SCHOOL
"SIMON RODRIGUEZ"
MARCH 29TH,2016
PATRICK K.
A201CARLOS RADIC BIAZIK50 UPPER ROUGE TRAIL, SCARBOROUGH, ON
M1B 6K4
1 : 100
GROUND FLOOR NORTH WING1
UP
DNDNDN
1 2 3 4 5 6
G
H
J
20300
11600
8700
7
9000 9000 9000 9000 9000 6000
51000
75.78 m²
PRIMARY121
74.97 m²
PRIMARY2
74.97 m²
PRIMARY3
74.97 m²
PRIMARY4
74.97 m²
PRIMARY5
75.82 m²
PRIMARY6
75.02 m²
PRIMARY7
75.02 m²
PRIMARY8
75.02 m²
SPECIALEDUCATION
975.02 m²
PRIMARY10
2895
46.74 m²
RESOURCEROOM
14
7'
25.13 m²
ACADEMIC18
9000 9000 9000 9000 9000
51000
3
A402
6'
3350 2650
4
A402
TYP
8810
CORRIDOR
103
5
A402
TY
P
8510
NORTH
SUSTAINABLE DESIGN STRATEGIES
1. USE OF HIGH PERFORMANCE WINDOWS,THERMALLY BROKEN ALUMINUM FRAMESAND LOW E-COATING GLASS.
2. HIGH AN LOW OPERABLE WINDOWS FORPASSIVE NATURAL VENTILATION.
3. CLERESTORY WINDOWS ADMINTDAYLIGHTING TO PROVIDE AN 5%AVERAGE IN ALL GYMNASIUM.
4. DAYLIGHTING SENSORS AND SEPARATESWITCHES FOR LIGHTING FIXTURES NEARWINDOWS.
9.38 m²
BOILER+ELEVMACH.
(BASEMENT)125
-
---
SCALECHECKED BY
DATE
PROJECT Nº
DRAWN BY
3/9
/2016 3
:11:2
3 P
M
1 : 100
WEST WING - GROUND FLOORCDELEMENTARY SCHOOL
"SIMON RODRIGUEZ"
MARCH 29TH,2016
PATRICK KUSMIDER
A203CARLOS RADIC BIAZIK50 UPPER ROUGE TRAIL, SCARBOROUGH, ON
M1B 6K4
1 : 100
GROUNND FLOOR WEST WING1
GROUND FLOORT.O. SLAB
0
SECOND FLOORT.O. SLAB
4000
FOOTINGSB.O. FOUND W.
-1500
BCDEF
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
PARAPET 2NDFLOOR
4500
A
?? ??
800
500
3500
500
4000
1500
8500
3180
OPENINGS/WALL SURFACE RATIOS:
FLOOR:GROUND FLOOR:SECOND FLOORTOTAL:
WALL AREA (M2): 156 138 294
OPENING AREA (M2):6WX3+2DX4.1X=26.20 9X1.15=10.35 .=36.55
WIND/WALLRATIO:12.50%
?? ??
GROUND FLOORT.O. SLAB
0
SECOND FLOORT.O. SLAB
4000
FOOTINGSB.O. FOUND W.
-1500
910121314
ROOF T.O.SLAB/DECK
8000
8
PARAPETROOF
8500
PARAPET 2NDFLOOR
4500
?? ??
1005
2300
500
3500
500
4000
1500
OPENINGS/WALL SURFACE RATIOS:
FLOOR:GROUND FLOOR:SECOND FLOORTOTAL:
WALL AREA (M2): 206 61 267
OPENING AREA (M2): 4.5WX1.15+1X3.00= 8.23 4X1.15= 2.30 .=10.53
WIND/WALLRATIO:
5%
?? ??
11
SECOND FLOORT.O. SLAB
4000
FOOTINGSB.O. FOUND W.
-1500
G H J
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
PARAPET 2NDFLOOR
4500
BASEMENTT.O. SLAB
-2200
2409
500
3500
500
4000
1500
700
8500
2200
WEST SIDE NO WINDOWS
SCALECHECKED BY
DATE
PROJECT Nº
DRAWN BY
3/9
/2016 3
:11:2
3 P
M
1 : 100
ELEVATIONS 3-5CDELEMENTARY SCHOOL
"SIMON RODRIGUEZ"
MARCH 29TH,2016
PATRICK KUSMIDER
A302CARLOS RADIC BIAZIK50 UPPER ROUGE TRAIL, SCARBOROUGH, ON
M1B 6K4
1 : 100
NORTH-EAST ELEVATION4
1 : 100
NORTH-WEST ELEVATION5
1 : 100
WEST ELEVATION (WEST WING)3
GROUND FLOORT.O. SLAB
0
SECOND FLOORT.O. SLAB
4000
FOOTINGSB.O. FOUND W.
-1500
G H J
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
PARAPET 2NDFLOOR
4500
3
A402
BASEMENTT.O. SLAB
-2200
500
3500
500
4000
1500
700
8500
2200
3635
3625
INTERMEDIATE
37
PRIMARY
6
PRIMARY
121
CORRIDOR
103
CORRIDOR
103
1A501
150 GROUND FLOOR
T.O. SLAB0
SECOND FLOORT.O. SLAB
4000
FOOTINGSB.O. FOUND W.
-1500
G H J
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
PARAPET 2NDFLOOR
4500
????
BASEMENTT.O. SLAB
-2200
500
3500
500
4000
1500
700
8500
2200
3635
3625
415
SCIENCE ROOM
205
RESOURCE ROOM
14
BOILER + ELEV MACH
78
ACADEMIC
18
????
2A501
3690
310
4A501
GROUND FLOORT.O. SLAB
0
SECOND FLOORT.O. SLAB
4000
FOOTINGSB.O. FOUND W.
-1500
1 2 3 4 5 6 7
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
PARAPET 2NDFLOOR
4500
? ?? ?
BASEMENTT.O. SLAB
-2200
500
3500
500
4000
1500
700
8500
2200
PRIMARY
6
INTERMEDIATE
37
INTERMEDIATE
38
PRIMARY
7
INTERMEDIATE
39
PRIMARY
8
INTERMEDIATE
40
SPECIAL EDUCATION
9
SCIENCE ROOM
205
PRIMARY
10
RESOURCE ROOM
14
? ?? ?
SCALECHECKED BY
DATE
PROJECT Nº
DRAWN BY
3/9
/2016 3
:11:2
3 P
M
1 : 100
SECTIONS 3-5CDELEMENTARY SCHOOL
"SIMON RODRIGUEZ"
MARCH 29TH,2016
PATRICK KUSMIDER
A402CARLOS RADIC BIAZIK50 UPPER ROUGE TRAIL, SCARBOROUGH, ON
M1B 6K4
1 : 100
SECTION 24
1 : 100
SECTION 15
1 : 100
Section 53
GROUND FLOORT.O. SLAB
0
SECOND FLOORT.O. SLAB
4000
FOOTINGSB.O. FOUND W.
-1500
H
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
EXTERIOR
1A603
2A607
CELLING
W5
P3
PRIMARY
CORRIDOR
CORRIDOR
3000
600
R2
F2
F1
3000
583
533
SPRAY FIREPROOFING ONSTRUCT. STEEL MEMBERS
50mm CONTINOUS RIGID INS
627
415
W33838
512
3635
DUCTS
6A601
7A601
GROUND FLOORT.O. SLAB
0
SECOND FLOORT.O. SLAB
4000
FOOTINGSB.O. FOUND W.
-1500
J
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
R2
F2
F1
3.3%
EXTERIOR
RESOURCE ROOM
SCIENCE ROOM
W2
150
615
1700
780
670
615
1700
780
670
600
80
15
80
15
CLERESTORY WINDOWS
P1
W2
223
627
3585
415
3635
2A602
1A602
----
GROUND FLOORT.O. SLAB
0
SECOND FLOORT.O. SLAB
4000
FOOTINGSB.O. FOUND W.
-1500
12
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
? ?? ?
? ?? ?
3A603
1A607
GYMNASIUM
102
R1
F1
3.3%
W1
P1
EXTERIOR
15
6710
406
3A601
5A601
GROUND FLOORT.O. SLAB
0
SECOND FLOORT.O. SLAB
4000
G
PARAPET 2NDFLOOR
4500
????
BASEMENTT.O. SLAB
-2200
????
W2
P1
FD1
FD1
1.9%
BOILER+ELEVMACH.
(BASEMENT)
BOILER + ELEVMACH
EXTERIOR
R3
1A604
W2
2A604
SCALECHECKED BY
DATE
PROJECT Nº
DRAWN BY
3/9
/2016 3
:11:2
3 P
M
1 : 25
TYPICAL WALL SECTIONSCDELEMENTARY SCHOOL
"SIMON RODRIGUEZ"
MARCH 29TH,2016
PATRICK KUSMIDER
A501CARLOS RADIC BIAZIK50 UPPER ROUGE TRAIL, SCARBOROUGH, ON
M1B 6K4
1 : 25
WALL SECTION 11
1 : 25
WALL SECTION 22 1 : 25
WALL SECTION 33
1 : 25
WALL SECTION 44
4
5
6
F
11
49 344
393
129
61
190
ENTRANCE
101
EXTERIOR
GYMNASIUM
102
190mm CMU190mm CMU?
?
25mm AIR SPACE
W4
145
WRB
398
90mm CLAY BRICK
5mm DOUBLE PANEL GLASSAND LOW-E COATING
STOREFRONT JAMB AT FINISH -DOUBLE GLAZED
W1
W5
W2
443
61
179
203
97METAL FLASHINGSILICONE CAULKINGSILICONE CAULKING
GROUND FLOORT.O. SLAB
0
FOOTINGSB.O. FOUND W.
-1500
T.O. Footing-1800
12
150
3.3%
901
61 179 203
456
GYMNASIUM
EXTERIOR
90mm CLAY BRICK
25mm AIR SPACE
75mm RIGID INSULATION
WRB
240mm CMU100
50
200
15
RUBBER/VYNILCOVERBASE
TERRAZO FLOORING
CONCRETE
75mm RIGID INSULATION
EXPANSION JOINT FILLER
METAL FLASHING
BRICK VENT @ 600 mm
CEMENT SETTING BED
50mm (2")RIGID INSULATION
DAMPPROOFING
G
9
6'
BOILER+ELEV MACH.(BASEMENT)
125
393
EXTERIOR W2
W2
W5
393
145.00°
90mm CLAY BRICK
25mm AIR SPACE
190mm CMU
190
203
203 190
CORRIDOR
FOUNDATION BELOW
12
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
CRUSHED STONE/GRAVELEPDM ROOF MEMBRANE
BITUMEN ROOF CAPPROTECTOR BOARD
75mm RIGID INSULATION38mm STEEL DECK
PRECAST CONCRETE CAP
90mm CLAY BRICK
25mm AIR SPACE
WRB
41 179 215
435
600
204
150mm (6") METAL STUD FRAMING
H
ROOF T.O.SLAB/DECK
8000
PARAPETROOF
8500
SQUARE EDGE (3/4 X 12 X 18)
DUCTS
CORRIDOR
EXTERIOR
600
223
ALUMINUM PANEL
25mm AIR SPACE
75mm RIGID INSULATION
BITUMEN ROOF CAPEPDM ROOF MEMBRANEBONDED GLASS FIBER BOARDWRB
HOLLOW-CORE CONCRETESLAB
190mm CMU
127 187 34
347
SECOND FLOORT.O. SLAB
4000
H
PARAPET 2NDFLOOR
4500
DUCTS
127 187314
162
350
512
65
350 415
ALUMINUM PANEL75mm RIGID INSULATION
190mm CMU25mm AIR SPACE
COVE TRIM
TERRAZO FLOORING
PRECAST CONCRETE CAP
HOLLOW-CORE CONCRETESLAB
HOLLOW-CORE CONCRETESLAB
EPDM ROOF MEMBRANEBONDED GLASS FIBER BOARD
75mm RIGID INSULATION
WRB
635
12mm GYP BDBULK HEAD
SPRAY FIREPROOFING ONSTRUCT. STEEL MEMBERS
67
414
SQUARE EDGE (3/4 X 12 X 18)
SCALECHECKED BY
DATE
PROJECT Nº
DRAWN BY
3/9
/2016 3
:11:2
3 P
M
1 : 10
DETAILSCDELEMENTARY SCHOOL
"SIMON RODRIGUEZ"
MARCH 29TH,2016
Checker
A601Author50 UPPER ROUGE TRAIL, SCARBOROUGH, ON
M1B 6K4
1 : 10
DOUBLE HIGHT CMU WALL ANDCOURTAIN WALL ITERSECTIONCopy 12
1 : 10
GYMNASIUM FOUNDATION Copy 13
1 : 10
NORTH-WEST EXTERIOR/IN-TERIOR WALL INTERSECTIONCopy 14
1 : 10
PARAPET 2 Copy 15
1 : 10
PARAPET 3 Copy 16
1 : 10
ROOF/FLOOR INTERSECTIONCopy 1
7