schneider electric 1 - division - name – date ultra terminal domain 5. installation guidelines

6
Schneider Electric 1 - Division - Name – Date Ultra Terminal Domain 5. Installation guidelines

Upload: melissa-barton

Post on 15-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Schneider Electric 1 - Division - Name – Date Ultra Terminal Domain 5. Installation guidelines

Schneider Electric 1- Division - Name – Date

Ultra Terminal Domain

5. Installation guidelines

Page 2: Schneider Electric 1 - Division - Name – Date Ultra Terminal Domain 5. Installation guidelines

Schneider Electric 2- Division - Name – Date

Ultra Terminal Domain

Always check for packaging’s condition (closed, unbroken, …)

Store on adapted support

Have a visible/apparent document with product’s references

Climate conditions

Keep open packages protected

Product storage conditions

Closed Unbroken

Product’s condition

Check for SE technical datasheet for temperatures

How to ensure optimal quality for your network through the respect of basic and simple procedures ?

Installation guidelines

Page 3: Schneider Electric 1 - Division - Name – Date Ultra Terminal Domain 5. Installation guidelines

Schneider Electric 3- Division - Name – Date

Ultra Terminal Domain

Use forklifts or pallet-trucks

Use shims to maintain the packages motionlesse while transporting

Handle the packages with protection gloves

Packaging handling

DO NOT CARRY the drums and large

boxes

Installation guidelinesInstallation guidelines

Page 4: Schneider Electric 1 - Division - Name – Date Ultra Terminal Domain 5. Installation guidelines

Schneider Electric 4- Division - Name – Date

Ultra Terminal Domain

Cable handling - Reeling

Ambient temperature limitations

Use fluid and simple moves

Use the Unreeling technique to pull the cables

OK Not OK

Installation guidelinesInstallation guidelines

Page 5: Schneider Electric 1 - Division - Name – Date Ultra Terminal Domain 5. Installation guidelines

Schneider Electric 5- Division - Name – Date

Ultra Terminal Domain

Cable handling - laying

Use mechanized help to tow the cable

• Max pulling force resistance• Min. bending radius• Cable stress because of suspended pathways

Respect the mechanical limitations of the cable

Use pulley (Rad. > 8x cable rad.) for angles (eq. dynamic turns)

Max pulling force

Min. bend radius

Copper cable

392 N

Static 4x diameter

Dynamic 8x diameter

Fiber cable

1500 N

Static 10x diameter

Dynamic 20x diameter

Installation guidelines

Page 6: Schneider Electric 1 - Division - Name – Date Ultra Terminal Domain 5. Installation guidelines

Schneider Electric 6- Division - Name – Date

Ultra Terminal Domain

Cable handling - Implementation

Stripping conditions (“8” tech, not in circle to avoid twists)

Cowling of cables’ extremities and cables protection

Dual Cables handling (Cat 5e / 6 only)

• Cat 6a and 10GBase-T Alien crosstalk• Diverse EMI• Power / Data cables cohabitation

Take into account the potential interference sources

OKNot OK

Installation guidelines