scheduling capacity plant survey team visit february 28-march 1, 2013

23
Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Upload: lilliana-dods

Post on 31-Mar-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Scheduling Capacity

Plant Survey Team VisitFebruary 28-March 1, 2013

Page 2: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Classrooms/Labs Fall 2011 Utilization

• 110 Classroomso 72 Roomso Weekly Hours = 2,992

• Weekly Average = 42o Room Utilization = 104o Weekly Student Station Hours = 100,226o Station Util. Std. Room use= 118o Station Util. Actual Use = 65

• 210 Teaching Labso 42 Roomso Weekly Hours = 1,146

• Weekly Average = 27o Room Utilization = 1,434o Weekly Student Station Hours = 38,806o Station Util. Std. Room use= 154o Station Util. Actual Use = 91

Page 3: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Current TimeslotsMW or WF or TR

15 CRNsMW or WF and TR (22 x .70 = 15 CRNs)

M T W R F S

8-9:15 1 2 1; 1a 2 1a (19)

< 1% of CRNs

currently meet on

Saturdays

9:30-10:45 3 4 3; 3a 4 3a (19)

11-12:15 5 6 5; 5a 6 5a (20)

12:30-1:45 7 8 7; 7a 8 7a (20)

2-3:15 9 10 9; 9a 10 9a (21)

3:30-4:45 11 12 11; 11a 12 11a (21)

5-6:15 13 14 13; 13a 14 13a (22)

6:30-7:45 15 16 15; 15a 16 15a (22)

8-9:15 17 18 17; 17a 18 17a

Page 4: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Preliminary Conclusion

• Limited spaceo 1st week of Classeso Break-out sessionso Hybridso Current timeslots

• After add/dropo Faculty Meetingso Student Meetingso Maintenance

Page 5: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Projecting Space Needs

• Improve current modelo Currently using: MW or WF, TR, some S, plus 1x a week classes

• Optimized modelo MWF, TRo So Lengthen dayso Hybridso 1st week of classes

Page 6: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Projecting Space Needs

Following slides show results based on

proposed schedule(s)o 8:00am-9:50pm

MWF & TR16 CRNs

o 8:00am-9:50pm MWF & TR & S18 CRNs

o 7:30am-10:20pmMWF & TR & S20 CRNs• Without AB9 and With AB9

o 7:30am-10:20pmMWF or TR• Fall 2013-Fall 2017

o 7:30am-10:20pmMWF or TR or S• Fall 2014-Fall 2018

o Without AB9 and With AB9

Following slides show # of CRNs, Ave # of

students, and year – 110 Rooms

Page 7: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Proposed Timeslots8:00am-9:50pm

MWF & TR16 CRNs

MWF (14) Total (23) TR (9)M W F 23 x .70 = 16 T R

8-8:50 1 1 1 15 15 8-9:159-9:50 2 2 2

16 16 9:30-10:4510-10:50 3 3 3

11-11:50 4 4 4 17 17 11-12:1512-12:50 5 5 5

18 18 12:30-1:451-1:50 6 6 6

2-2:50 7 7 7 19 19 2-3:153-3:50 8 8 8

20 20 3:30-4:454-4:50 9 9 9

5-5:50 10 10 10 21 21 5-6:156-6:50 11 11 11

22 22 6:30-7:457-7:50 12 12 12

8-8:50 13 13 13 23 23 8-9:15

9-9:50 14 14 14

Page 8: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Proposed Timeslots8:00am-9:50pm MWF & TR & S

18 CRNs

MWF (14) Total (27) TR (9) S (4)

M W F 27 x .70 = 18

T R S

8-8:50 1 1 1 15 15 8-9:15

8-10:45

 

9-9:50 2 2 216 16 9:30-10:45

10-10:50 3 3 3

11-11:50 4 4 4 17 17 11-12:15

11-1:4512-12:50 5 5 518 18 12:30-1:45

1-1:50 6 6 6

2-2:50 7 7 7 19 19 2-3:15

2-4:453-3:50 8 8 820 20 3:30-4:45

4-4:50 9 9 9

5-5:50 10 10 10 21 21 5-6:15

5-7:456-6:50 11 11 1122 22 6:30-7:45

7-7:50 12 12 12

8-8:50 13 13 1323 23 8-9:15

 9-9:50 14 14 14

 

Page 9: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Proposed Timeslots7:30am-10:20pmMWF & TR & S

20 CRNs

MWF

Total (29) x .70% = 20 CRNs per

week

TR S (4)

M W F T R S

7:30-8:20 1 1 1 16 16 7:30-8:45

26 8-10:458:30-9:20 2 2 217 17 9:00-10:15

9:30-10:20 3 3 3

 

10:30-11:20 4 4 4 18 18 10:30-11:45

27 11-1:4511:30-12:20 5 5 519 19 12:00-1:15

12:30-1:20 6 6 6

1:30-2:20 7 7 7 20 20 1:30-2:45

28 2-4:452:30-3:20 8 8 821 21 3:00-4:15

3:30-4:20 9 9 9

4:30-5:20 10 10 10 22 22 4:30-5:45

29 5-7:455:30-6:20 11 11 1123 23 6:00-7:15

6:30-7:20 12 12 12

7:30-8:20 13 13 13 24 24 7:30-8:45

 

8:30-9:20 14 14 1425 25 9:00-10:15

9:30-10:20 15 15 15

Page 10: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

110 Rooms

Ave # of CRNs

% Ave Utilizatio

n

Ave # of Stu

201208

Current # of CRNs

13 57 34.51

14 62 38.20

Max Ave if nothing changes (70%)

15 66 40.20

16 71

17 75

18 79

19 84

20 88

Ave # of CRNs

% Ave Utilizatio

n

Ave # of Stu

201208

Current # of CRNs

13 48 34.51

14 51 37.70

15 55 39.70

16 59 41.70

Max Ave if using new hours (70%)

17 62 46.20

18 66 48.60

19 70 51.10

20 73 53.70

Fall 2012 Raw DataHours: 8:00am-9:15pm

MW or WF or TR & some S

Information on Proposed HoursHours: 7:30am-10:20pm

MWF or TR or S

Page 11: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Information based on Proposed Hours

Hours: 7:30am-10:20pmMWF or TR110 Rooms

Fall

2013 2014 2015 2016 2017

Ave # of

CRNsAve # of Students

Ave # of

CRNs

Ave # of

Students

Ave # of

CRNs

Ave # of Student

s

Ave # of

CRNs

Ave # of

Students

Ave # of

CRNs

Ave # of

Students

14

36.3

14

38.2

15

40.2

16

42.3

17

44.5

Page 12: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Information based on Proposed Hours

Hours: 7:30am-10:20pmMWF or TR or S

110 RoomsFall

2014 2015 2016 2017 2018

Ave # of

CRNsAve # of Students

Ave # of

CRNs

Ave # of

Students

Ave # of

CRNs

Ave # of Student

sAve #

of CRNs

Ave # of

Students

Ave # of

CRNs

Ave # of

Students

14 38.2

15 40.2

16

42.3

17 44.5

18 46.8

Page 13: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

210 Rooms

Fall 2012 Actual InformationHours: 8:00am-9:15pm

MW or WF or TR

Information on Proposed HoursHours: 7:30am-10:20pm

MWF or TR

This information changes because the # of students per

CRN will increase

Ave # of

CRNs% Ave

Utilization

Ave # of Stu

201208

Current Ave

7 48 26.40

8 55 30.70

9 62

Max Ave if nothing changes (765)

10 69

11 76

12 83

13 90

14 97

15 1.04

16 1.11

17 1.18

18 1.24

This information changes because the # of students per CRN will increase

Ave # of

CRNs% Ave

Utilization

Ave # of Stu

201208

Current Ave

7 38 26.40

8 43 31.50

9 49 10 54

11 60

Max Ave if using new hours (67%) 12 65

13 71

14 76

15 81

16 87

17 92

18 98

19 1.03

20 1.09

Page 14: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Information based on Proposed Hours

Hours: 7:30am-10:20pmMWF or TR210 Rooms

Fall

2013 2014 2015 2016 2017

Ave # of

CRNsAve # of Students

Ave # of

CRNs

Ave # of

Students

Ave # of

CRNs

Ave # of Student

sAve # of

CRNs

Ave # of

Students

Ave # of

CRNs

Ave # of

Students

7

27.8 7 29.2 8 30.7 8 32.3 9 34.0

Page 15: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Projecting Space Needs

• AB9o 20 (110) rooms

• 4 (25 seats)• 1 (30 seat)• 6 (50 seat)• 1 (70 seat)• 6 (100 seat)• 1 (200 seat)

o This is a gain of 1,360 seats

o 4 (210 rooms)• 2 (36 seat)• 1 (54 seat)• 1 (72 seat)

o This is a gain of 198 seats

Page 16: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Without AB9 With AB9

• 110 Rooms

o With proposed meeting days/times, including Saturdays • Average of 38 students in

2018• Potential of 20 CRNs

• 110 Roomso With current meeting

days/times• Average of 38 students in

2014• 15 CRNs in 201508

o With proposed times, including Saturdays• Average of 38 students in

2014• 18 CRNs in 2018

Page 17: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Without AB9 With AB912

13

14

15

16

17

18

19

20

21

14 14

18

20

Quantity of CRNs We Anticipate in 2018

Quantitiy of CRNs We Can Fit in 2018

CLASSROOMS (110)Quantity of CRNs We Can Schedule Five Years From Now

Satu

rday

s N

eces

sary

Page 18: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Without AB9 With AB930

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

38 38

49

38

Average Number of Students Per CRN in 2014

Average Number of Students Per CRN in 2018

CLASSROOMS (110)Average Number of Students per Class In Order to Meet Demand

2014

2018

2018

2014

Page 19: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Without AB9 With AB9

• 210 Rooms

o With proposed times, including Saturdays • Average of 32 students in

2017• 8 CRNs in 2017• Potential of 11-13 CRNs

• 210 Roomso With current meeting

days/times• Average of 31 students in

2015• 9 CRNs in 2017

o With proposed times, including Saturdays • Average of 32 students in

2016• 9 CRNs in 2017

Page 20: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Without AB9 With AB96

7

8

9

10

11

12

13

14

9 99

13

Quantity of CRNs We Anticipate in 2017

Quantitiy of CRNs We Can Fit in 2017

Teaching Labs (210)Quantity of CRNs We Can Schedule

Four Years From Now

Wit

h S

atu

rday

Wit

h Sa

turd

ay

Wit

h Sa

turd

ay

34 S

tud

ents

??

Page 21: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Final Conclusion – 110

(does not include unknown increase factors for maintenance and other Academic & University Activities)

• With no changeso Average of 38.2 students in

2014o 15 CRNs in 2015

• With extended timeso Average of 38.2 students in

2014o 18 CRNs in 2018

• With extended times and Saturdayso Average of 38.2 students in

2014o 18 CRNs in 2018

• With extended times and AB9o Average of 37.7 students in

2018o 14 CRNs in 2018

• With extended times, including Saturdayso Average of 37.7 students in

2018o 14 CRNs in 2018o Potentially to reach 20 CRNs

With extending our meeting days/times and incorporating AB9, we could accommodate student growth for at least five more

years.

Page 22: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Final Conclusion – 210

(does not include unknown increase factors for maintenance and other Academic & University Activities)

• With no changeso Average of 30.7 students in 2015o 9 CRNs in 2017

• With extended timeso Average of 30.7 students in 2015o 9 CRNs in 2018

• With extended times and AB9o Average of 31.5 students in 2017o 8 CRNs in 2018

• With extended times and AB9, including Saturdayso Average of 31.5 students in 2017o 8 CRNs in 2018

• Potential to reach 11-13 CRNsWith extending our meeting days/times and incorporating AB9,

we could accommodate student growth for at least five more years.

Page 23: Scheduling Capacity Plant Survey Team Visit February 28-March 1, 2013

Final Conclusion• Increase space utilization

o Break-out sessions• Different location

o Hybrids• Effectively share rooms• Off-campus• Non-traditional space• Saturdays

o Current timeslots• Meeting times extended –additional Saturday sections

o Gain from current average of 13 to 18-20 CRNs in 110 roomso Gain from current average of 7 to 10-13 CRNs in 210 rooms

• After add/dropo Faculty Meetingso Student Meetingso Maintenance

• Find alternate meeting location to allow an additional increase in the # of CRNs we could offer in each room