sFW Taylor devised a system for classifying motions into basic divisions called Therbligs
Comprehensive business strategy consists of corporate objectives
Inspection should be avoided prior to long run of a manufacturing stage as it becomes duplication of work and cost
regular lubrication with carefully selected lubricants is an essential factor in the maintenance of high grade machine tools working under continuous load
Three times estimates are transformed into expected time before using it into a network
Production activity control (PAC) is not related with shop floor control (sfc)
Quality cannot be incorporated into a product by inspection but it can be incorporated only while manufacturing
Cost of proactive maintenance and cost of quality planning are examples of appraisal cost
Japanese people call inventory as necessary evil
The concept of 'Annualised Hours' was used exclusively in Japan
Normal time can not be equated to the standard time
It would not affect the project completion time if non critical activities take longer time than planned
In JIT, it is not possible for each and every item help as inventory
variations in time during study can be reduced to some extent but can not be eliminated totally
Scheduling should be done on a daily basis of the company makes promises in days
aggregate plans are tactical plans
In case of forward computation, the earliest event time of the first event is zero
Maintenance function must be decentralised apart from the size of the manufacturing organisation for its better functioning
The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi automatic and completely manually operated machines require cent percent inspection
In case of backward pass computation, the latest event time of the burst event equals the smallest of the difference between the latest event time of the head event less duration of the activity converging on the head event
The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manually operated machines require cent percent inspection
Objective of work study is to improve productivity
root causes of many failures in meeting planned production can be attributed to poor medium / long range planning
The problems of congestion, bottlenecks and backtracking can not be visualised by using templates and models
The main purpose of kanban systems is to streamline manufacturing and procurement processes rather than relying on computer simulation to suggest when to order
Answer0
1
0
1
1
0
0
0
1
0
1
1
1
1
1
1
1
1
1
1
0
1
1
0
1
S.No1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Flow process chart (Materials) is also called as ______
The task of allocation of jobs to machines is carried out by the _____ in consultation with the shop foreman
The _____ is the probability that a good lot will be rejected by the sampling plan
_______ are used to create histograms such as shown on Pareto chart
American society of mechanical engineers and British standard institute have advocated _____ symbols for graphical method of recording in method study
a ______ is another typical chart which is used to record frequency of movements between work centers
_______ logic is used to support the order promising process
_______ is a series of time intervals that specifies what types of order changes are allowed
IN a hospital, inputs are ____ and outputs are cured patients
A _____ layout is one that reduces the material handling activities to minimum
_____ uses estimate arrival rates and serive rates to calculate an optimum staffing plan
Delay is indicated by _______ during recording for method study
_______ is computed by subtracting the sum of set up and processing times from the time remaining until the job's due date
The _____ is the maximum percentage defective that are for the purpose of sampling inspection can be considered satisfactory as a process average
REL chart exihibits relationship between ____ of departments in terms of degree of closeness desired
The term that refers to a complex web of thoughts, ideas, insights, experiences, goals, expertise, memories, perceptions and expectations that provides general guidance for specific actions in pursuit of particular ends is _____
____ is the card prepared by the dispatching section of PPC from the route laid down in the process sheet and is handed over to the operator as his authority to carry out the task specified therein
A ______ is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs
Material flow in process layout is
duration of each activity is referred to as _____
______ is a statistical methodology used for determining the cause and effect relationship between process variables (xs) and output variable (Y)
production control work is ______ in case of floor inspection as compared with the centralised inspection
______ shows the hypothized relationship between potential causes and the problems under study
The _____ is the probability that a bad lot will be accepted by the sampling plan.
The _______ technique builds the network from activities
_______ is normally set to cover a minimum of cumulative lead time plus time for lot sizing low-level components and for capacity changes of primary work
An operation is indicated by _____ during recording for method study
A _____ phase is the follow up phase after the implementation which serves as a monitoring and control mechanism during method study
______ of production management is viwed as the efficiency with which inputs are converted into output
An approach to scheduling that starts from the present time and schedules each job to start at the earliest possible moment, is known as _____
AnswerOperation process chart
scheduler
producer's risk
DMAIC
five
travel chart
Make to Order
Time fence
decision making
Patients
good
Queuing theory
job card
Letter Dee
slack
acceptable quality level
method study
pairs
discontinous
project duration
Design of experiments (DOE)
easier
cause and effect diagram
consumer's risk
Critical path method
planning horizion
Circle
critical examination
effectiveness
forward scheduling
S.No1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
QuestionsJIT needs a simple control system which is provided by
What do you understand by analysis of motions employed by workmen to perform a task
Which kind of preventative inspection detects some defects in moving parts, internal cracks and others when machine is under preplanned shutdown
Detachable tickets is the useful method of production feedback in case of
What do you understand by the timeframe for the maintenance needs of the equipment
What does tall of an arrow represent
The rule 'earliest due date (EDO) states
A way of scheduling the ordering or production of parts or raw materials so that they will be available when needed to meet the master schedule is known as
The process of changing inputs to outputs thereby adding some value to entity can be defined as
Previous on-hand inventory, minus the larger of next periods forecast to actual orders is termed as
Providing flexibility in plant layout means
Six sigma is a business strategy or approach for systematic improvement of business processes to achieve
The middle compartment of control board contains the copy / shop order of the item
A managerial statement of period by period (time phased) production rates, work force levels and inventory investment, given customer requirements and capacity limitations is referred to as
The diagram that focuses on efforts or problems that have the greatest potential for improvement by showing relative frequency and / or size in a descending bar graph is known as
The element governing operation of business and its contacts and relationships with society at large, customers, suppliers, employees, local community and other stakeholders is termed as
traditional manufacturing stresses "getting hands dirty" while JIT manufacturing emphasises "cleanliness and systematic work place improvement" for which Japanese recommend use of
Main objective of a good plant layout is
What do you mean by the study of repetitive short cycle which involve quick hand / feet motions
What is represented by an arrow in a network
What do you unerstand by the selection of the job for the method on the basis of money saving potential of the job
The common form of JIT layout is
PERT is
As the precursor to developing strategic plan, it is desirable to conduct
The rule Random R states
What does tail of an arrow represent
What do you understand by totality of features and charecteristics of a product or service that bears on its ability to satisfy the customer
An approach to scheduling that starts from the present time and schedules each job to start at the ealriest possible moment is known as
Production planning includes
How to obtain the elemental time in case of fly back method
In management coefficient model, workforce in the previous period, ending inventory for previous period and forecast demand for the next period are brought togat
The dispatching function can be performed conveniently through the use of what is called as (?)
The scheduling chart with horizontal rows representing jobs or resources to be scheduled and vertical divisions representing time periods is known as
MPS balances demand with
The two aspects viz. allocation of resources and timing of resources are pertaining to
Selection of site among alternative locations is based on
What do you mean by planned corrective maintenance which provides an oppportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns
The middle compartment of control board contains the copy of work order / shop order of the item
_______ is the application of statistical methods to analyze data, study and monitor process capabilities and performance
276Kanban
production plan
Method study
Internal inspection
Pareto Diagram
multiple production
maintenance inspection schedule
Start of an activity
The job with earlier due date goes first
Materials requirement planning
Values
operation
5 S technique
Projected on hand inventory
layout can be changed without much cost if required
bottom line profitability
to be processed next on the machine
reduce material handling cost
micro motion study
activity
economic consideration
design-out maintenance
U-line
project evaluation and review technique
SWOT analysis
pick up any job in the queue with equal probability
Start of an activity
Quality
forward scheduling
predetermination of manufacturing requirements
by judgement of observer
production rate
Gantt Chart
Load chart
supply
scheduling
Total investment (?)
to be processed next on the machine
statistical process control
S.No1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
QuestionsScale model used for layout analysis have following advantages
The purpose of MPS can be stated in the following lines
The process of production planning and control includes
Which are the advantages of work sampling over time study
JIT purchasing is based on the following fundamental principles
IN an organisation there may not be a formal PPC department if
the work involved in production activity control (PAC) are
Which are the factors on which the structure of transportation cost depends
Which three of the following options can be used to reduce the duration of activity during project crashing
IN management prospective, Kanban is a visual indicator that triggers replenishment of item such as
How work measurement is useful to figure out better method
DMAIC and DMADV are both
According to Bauer, functions of PAC are as follows
Quality is a customer satisfaction aimed at meeting the following
MPS is stated in end items. It has three parts
Value addition to an entity can be done by the following
In MPS, the following need to be clearly understood about the quantities
Which of the following is not the characteristic of project production
The cost of quality can be divided into the following areas
External factors affecting scheduling are
which of the following are types of non-destructive testing
Components of production management include
Which of the following are regional factors which govern the selection of plant location
Aggregate planning has certain prerequired inputs which are inevitable. They include
The most typical causes of innovations that shift competitive advantage are as follows
The SMED can be implemented through stages which
Which of the work measurement techniques involve the direct observations
Which of the following situations highlights the need of proximity of plant location to sources of raw material
Effective scheduling leads to meeting customer requirements through
Important improvements in manufacturing performance can be gained by introducing flexibility in scheduling,
Machining cells in place of conventional batch system result in
Which of the following work measurement techniques involve the direct observsations
157Nontechnical person finds it easy to comprehendoverhead facilities can be shownmodels can be shifted easily
to establish the production schedule for the specific models/ options of productsto provide the schedule input for the MRP processto provide the schedule used by order processing to acknowledge delivery dates for the current and new orders
release production orderfollow up progresspurchase material
The observer need not be present at place of work for a longer timeWork sampling study can be interrupted at any time without affecting the resultswork sampling study gives unbiased results
suppliers facilities are an extension of buyer's own facilitiesdelivery lot size should be just enough to satisfy immediate higher level requirementrejections interrupt supply and hence must be eliminated
work is highly repetitive in natureplanning activities are performed by the line staffnumber of workmen is not large
To have activities performed as plannedTo report on operating resultsTo revise plan to achieve desired results
Medium of shipmentcharacteristics of the commodityaverage distance of shipment
allocating more manpower and machines than originally plannedworking additional shifts or overtimeawarding work to vendors who charge extra but expedite deliveries
Cardbinrack
It identifies elements which consumes excessive timeit points out wasted motionsit draws attention to unnecessary work
Six Sigma methodologies used to drive defects to less than 3.4 per million opportunities.
Data intensive solution approaches.
Intuition has no place in Six Sigma -- only cold, hard facts.
Implemented by Green Belts, Black Belts and Master Black Belts.
Ways to help meet the business/financial bottom-line numbers.
Implemented with the support of a champion and process owner
schedulingmonitoringdispatching
stated needsunstated needsexpectations
master scheduleavailable to promise
alterationtransportinspection
The quantities represent production not demandthe quantities may consist of combination of customer order and demand forecaststhe quantities represent what needs to be produced and not what can be produced
continuous flow of materialhighly mechanised material handlingvirtually zero manufacturing cycle time
appraisal costprevention costfailure and hidden cost
customers demandcustomers delivery dates
visual testingeddy currentmagnetic flow detectors
capacity planningjob designproduction planning
proximity to marketclimatic conditionindustrial and taxation laws
information about resources and facilities availableDemand forecast for the period for which the planning has to be donecost of various alternatives and resources
new technologies and quality practicesnew or shifting buyer needsemergence of new industry segment
Convert internal setup to external setupstreamline all aspects of setup operations time studyproduction studywork sampling
If raw materials are of perishable natureIf raw materials are expensive transport
If weight of raw materials is substantially reduced after processing
Improved delivery performancemeeting company's customer service goalsreducing production lead time
use of alternate routingsadjustments in labour assignmentsoverlap scheduling
simplification of material flowincreased material movement
time studyproduction studywork sampling
S.No MTF1 Voice of customer
Critical to qualityDefectStable Operation
2 Store issue orderMove order
Machine setup orderForwarding Note
3 DispatchingBackward scheduling
tool order
inspection order
4
Master production schedule
manufacturing resource planing (MRP II)
capacity requirements planning (CRP)planning horizon
5 QuestionCrash cost of an activity
Normal time of an activity
Crash time of activity
Normal cost of an activity
QuestionInterruption for machine utilisation
Input for scheduling
Technique of scheduling
Scheduling Device
QuestionTemperature of motor
Exhaust gas
Air leakage
Corrosion
QuestionForcasting requirement for indirect material
Inventory control by classification
Structure of the product
Material Planning for dependent demand
QuestionFirst off inspection
Critical operation inspection
Patrolling inspection
Key operation inspection
QuestionTemplate
REL chart
Flow diagram
Travel chart
QuestionToung
Eye
Nose
Ear
Questionunit production of very large product
High production volume low variety
Low production volume high variety
Grouping into families of similar product
QuestionEmerson Efficiency Plan
Craft
Work Sampling
Gantt Chart
QuestionCommunity Facilities
Proximity to market
Industrial and labour attitude
Legislation and taxation
QuestionChange in chemical characteristic
Consumption of effort
Information given
Subtraction
QuestionBottom compartment of control board
Control board
Top compartment of control board
Middle compartment of control board
QuestionScale model
Factor Analysis
Minimization of production delays
Maximum visibility
QuestionFixation of inventory level
Symptom of ill planned purchasing
Factor influencing material planning
Net requirement of material under MRP
QuestionTable lubrication
Draining and refilling of oil reserviors of plunger pump
Parts lubricated with oil nipple
Tools and slideways
Question
Pessimistic time
Expected time
Optimistic time
Most likely time
QuestionWhen to inspect
What to inspect
How to inspect
How much to inspect
QuestionFixed Position Layout
Product Layout
Process Layout
Combined Layout
Question
Two machines & processing time depends on sequence of job loading
Sufficient orders and resonable choice of machines
Production plan
Staffing plan
search decision rule
Dell
Capacity plan
Aggregate plan
Master production scheduleshort-term schedule
Scheduling of interrelated activities of small projects with consideration of uncertainty of duration of activities.
Time relationship between when a product is required and when it can be made available
27
What your process can deliverAttributes most important toFailing to deliver what customerEnsuring consistant, predictable processes
Instructs stores department to conduct inventory of scrap materialInstructs workmen for movement of material from manufacturer to stockist
Instructs settlers to set up machine tools mentioned therein
execution of current production schedule relative to the current state of the production systemAn approach to scheduling that starts from a desired due date and works backward
instructs to keep necessary tools ready for issue
One for each stage of inspection
information about resources and facilities availablenormally set to cover a minimum of cumulative lead time
Correct Answer
Cc
Tn
Tc
Cn
Correct Answer
Preventive maintenance
Overlapping of operations
Critical Path Analysis
Strings
informs dispatch / finish parts stores regarding the description of the goods accompanying the note
A specific statement of exactly what, usually in terms of individualend terms or product models, will be produced in each time period
provides simulation capabilities and cost information for other functional areas of business
Correct Answer
Body
Smell
Listen
Watch
Correct Answer
Past consumption analysis technique
ABC Analysis
BOM
MRP
Correct Answer
First piece produced after tool change
After whose no rework is possible
Inspection at the place of actual production
Costlier operation
Correct Answer
Two dimensional cutouts
Degree of closeness
Tracing movements
Distance and frequency of movements
Correct Answer
Sweet
Crack
Burnout
Impact
Correct Answer
Fixed Position Layout
Product Layout
Process Layout
Cellular Layout
Correct Answer
Wage Payment
Facilities Planning
Machine utilization
Production Scheduling
Correct Answer
Educational facility
Fragile product
Productivity of labour
Licenses
Correct Answer
Chemical reaction
Posting a ledger
Giving directions or instructions
Removal of worn-out part from a machine
Correct Answer
Bunch of work orders arranged in a sequence in which they are to be processed.
Pictorial view of machine loading activity
Work order of item currently being worked on the machine
Work order of item to be processed next on the machine
Correct Answer
Layout analysis
Method to evaluate layouts
Objective of good layout
Principles of good layout
Correct Answer
Reorder level
Over ordering
Lead time
Stock on hand
Correct Answer
Weekly
Yearly
Daily
two to three times a day
Correct Answer
b
Te
a
m
Correct Answer
Stages of inspection
Specification
Inspection devices
Sampling or cent percent inspection
Correct Answer
Project Layout
Line Layout
Functional Layout
Mixed Layout
Correct Answer
Critical Path Analysis
Johnson's Two Machine Algorithm
Index Method
Critical Ratio Scheduling
Linear decision rule
service aggregate plan
manufacturing aggregate plan
depend upon aggregate
Which makes sure that there is enough
execution of current production schedule relative to the current state of the production system
Production & Operational Management
Select The Blank
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Select The Blank
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Select The Blank
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Select The Blank
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Select The Blank
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Select The Blank
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Select The Blank
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Select The Blank
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Select The Blank
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
Multiple Choice Multiple Answer
Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer
Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
Multiple Choice Multiple Answer Question
Correct Answer
True/False Question
Correct Answer
Multiple Choice Single Answer Question
Correct Answer
Production & Operational Management
Unexpected
Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
Unidirectional
Which kind of natural delays and interruptions are considered during estimation of activity time?
Shop efficiency , Breakdowns , Absenteeism
Which of the following aspects are essential to ensure quality of purchased items?
1
Which characteristics are verified in cent percent sampling?All important characteristics
Storage , Delay , Transport
One
Where the ignorance towards the degradation of machine leads to?Eventual breakdown
Which are three different bases to establish an activity time?Past experience , Judgement , Historical data
What are the uses of failure statistics analysis?
One detachable ticket is prepared for each ________.Operation
The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions.
Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system?
One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be
Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements
An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill.
Which of the following symbols are used in flow process chart but not used in operation process chart?
OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________.
To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection
Micromotion study
Inspection order
Condition monitoring
0
Merge event
Quality control
Which of the following is a cause of plant breakdown?Overloading of machines
Who prepares the daily production report?Shop Supervisor
Why graphical method of recording is preferred over the descriptive method during method study?
Delivery performance
Rectangular
With a general OC curve, probability of acceptance of lots of good quality is never unity.
1
What do you mean by the study of repetitive short cycle operations which involve quick hand / feet motions?
The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company.
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity.
What do you mean by a single event which represents the joint completion of more than one activities?
The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable.
It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective
Capacity decisions have a direct influence on performance of production system in respect of ________
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .
What do you understand by identification of defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives?
Preventive function
What is the nature of the sampling plan for critical defects?Tight
The steeper the OC curve, the better is the discrimination between good and bad lots.
1
Systematic maintenance system can completely eliminate the wear and tear of machines.
0
Operation Process Chart provides information on time and distances0
The event numbers as far as possible reflect the logical relationships of the activities.
1
Quality control system
easier
What is the relation between duration of an activity and length of an arrow?No relation
Process Sheets for parts in batch production are not maintained as standard process sheet
0
Three time estimates are transformed into expected time before using it into a network.
1
Specifications
Which of the following situations demand the technical consideration while selecting a job for method study?
Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work
The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm.
Production control work is ________ in case of floor inspection as compared with the centralised inspection.
The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product.
Which of the following situations demand that the human consideration should be given preference over other considerations?
Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards
Which of the following are examples of specifications?Commercial standards , Assembly and testing instructions , Bill of material
Activity cost slope
Document raised by Sales department for goods manufactured to stock is calledShipment order
How many of the following are types of specification?Material specifications , Dimensional specifications , Performance specifications
Which of the following are activities of corrective maintenance?Modifications and improvements , Overhauling , Emergency repairs
Scrap allowance is added to net requirement of material while ordering for material1
A properly designed sampling plan can control sampling errors and completely eliminate them.
0
Which of the following cases indicated that the operation has occurred?
Which manufacturing method is ideal for the use of air gauges as inspection device?
Mass
Cost effective method
Any premise in which persons are employed for purpose of making any product/s is called
Factory
Cent percent inspection does not mean inspection of component for 100% quality characteristics.
1
How to reveal the capability of the sampling plan to discriminate between good lots and bad lots?
Operating characteristics curve ( OC )
Which of the following may be the objectives of project crashing?
What does the additional cost incurred to reduce the duration of an activity by one unit of time represent?
Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools
Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be
To achieve uniformity in requirement of resources , To complete the project in the least possible time , To reduce project cost below it's normal cost
Acceptable quality level
Which are the different methods of recording actual progress of work?Display boards , Progress cards , Network updating
Provision of drainage facilities is important for the following type of industryChemical Process
0
Lubrication survey should never be done for a new machine.0
Which are the subtasks of the maintenance phase of the method study?Monitoring and control , Performance appraisal , Audit on savings
Material specifications
Who is responsible for return of surplus material?Dispatcher
The ratio of output to input of a production system is commonly known asProductivity
Which of the following information is available in summary of part in a chart during methods study?
Frequency of each symbol , Total time for each symbol , Total distance travelled by the object
Bending , Positioning , Unloading
Which of the following causes can be responsible for derailing the production schedule in a factory?
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Which is the ideal place to write a description of an activity in a network?Above the arrow
Which of the following cases indicates change in physical characteristic?Turning , Grinding , Drilling
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average.
Under MRP system for common items order for procurement is placed based on requirement for each product
What do you understand by the metallergical aspects of product which forms the vital part of engineering function?
Which of the following are examples of consumption of physical effort during recording for method study?
Objective of Work Study is to improve Productivity1
Which are the major types of defects?Minor , Major , Critical
A ________ is another form of subcontracting.Hiring capacity
Equipment history card
Work measurement
Concurrent activities
Which of the following products should be produced by using mass production?Refrigerator , Tyre for automobile , Television Set
Control board
A good maintenance system is not a luxary but a ________.Necessity
Production Planning is a centralised activity which includes functions such as ________
Scheduling
The process of changing inputs into outputs thereby adding some value to entity can be defined as
Operation
1
As a general rule, the number of tail event of an activity is more than that of it's head event.
0
Which of the following concepts must be understood for the achievement of quality?
Quality of conformance , Purpose of product , Quality of design
An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service.
What do you understand by the measurement of work to establish allowed time for a job for the defined method?
Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish?
A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine.
The problems concerning movements can be better visualized by drawing a diagram, either, flow diagram or string diagram.
Which of the following factors affect the quality control function?Quality of workmanship , Production aids , Manufacturing facilities
Which portion of the perforated route sheet should be signed by the operator or supervisor?
Lower portion
Work study is also called ________ studyTime and Motion
Which are the factors on which the structure of the transportation cost depends?Average distance of shipment , Characteristics of the commodity , Medium of shipment
Design tolerance
Quality can not be inspected into a product, it must be manufactured into it by the supplier.
1
A good plant layout helps inReducing handling costs
0
Forwarding note
1
Which of the following are characteristics of an operating characteristics curve?Producer risk , Consumer Risk , Acceptable Quality Level
Technique of Value Engineering can be effectively employed in design of a product to
To meet the intended function at lowest cost
Technique which can help an organization to reduce inventory is calledMRP
Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero."
1
What do you understand by the difference between the specification limits within which manufacturing process is expected to produce?
Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled.
Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference.
In case of two handed process chart, inspection symbol is used when check by touch or feel is involved.
A sampling plan which perfectly discriminates will have vertical OC curve.1
Which of the following are examples of gross materials?Timber , Iron ore , Sugar cane
The time chart, if necessary, may be modified considering the limitations of resource.
1
The ________ is the probability that a good lot will be rejected by the sampling plan.
Producer's risk
What are the benefits of inspection and quality control?
Preventive Maintenance
Inadequate production capacity ultimately leads toPoor Customer Service
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Consumer's risk
Which document is used for returning the surplus material?Stores Return Note
Tolerance
How should a dummy activity be represented in a network?By dotted line
When should operator or supervisor is supposed to sign the perforated route sheet?After completion of operation
Which of the following observations are expected from the preventive maintenance person?
Wrong allignments , Overheating defects , Excessive play
Route Sheet generally contains following informationMaterial Specification , Sequence of operation , Skill of Labour
Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work
The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive
The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts.
1
In case of Batch Production which kind of labour is expected?Skilled in one specific Manufacturing Process
Following are some of the factors considered for evaluation of alternative layoutsFlow of Material , Equipment utilization , Ease of supervision
Material Planning is an integral part ofProduction Planning
What is the meaning of surplus material in context with stores issue order?Materials issued are not fully consumed
Which are the subfactors of community facilities or social infrastructure?Accomodation , Educational , Entertainment
Environmental specifications
Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ?
Graphical approach
Shop order is one of the subsidiary order1
Overtime working
Which symbol is used to represent event in a network ?Circle
Data from Process Sheet can be used toPrepare load and schedule charts
Which three of the following are causes of continuous upward pattern of Xbar-R control chart?
Wear of tool , Abnormal rise in temperature , Accumulation of dirt
The operator should not stop production if first piece is not approved by the inspector.
0
What are the advantages of templates over diagrams?
In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event.
The ________ pertain to the climatic conditions which the component , product or material should withstand.
The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.
Can be conveniently moved on the graph paper , Less laborious , Saves time
Chart
Site selection should also take into account topography and soil structure of the land.
1
Which are the different types of flow process charts used for method study?Equipment type , Man type , Material type
Which of the following method can be used to record the facts during the method study?
Micromotion study , Cyclegraph , Chronocyclegraph
Which are the distinguished features of TQM ?
Which of the following possibilities can be explored by using flow process chart?
It pays in the long run to inform the customer regarding expected delays in the deliveries.
1
Which are the basic requirements of the " Quality of Design "?
Which of the following technique is event oriented ?Project Evaluation & Review Technique
Following is not a function of PPCProduct Planning
Product layout offer following advantagesThere is economy in manufacturing time
1
Tool breakage has got nearly zero chances in case of eventual breakdown.0
Technical consideration
What is the name of the document on which details of the process are recorded by the symbols and charting conventions?
Covers all kinds of industries , Gradual removal of interdepartmental barriers , Continuous improvement
Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses
Identification of right product , Selection of appropriate features , Ensure that product renders satisfactory service to customer
Quality control determines what, when, and how much to inspect while inspection actually conducts examination of goods.
What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties?
Which kind of labour force is required in case of Jobbing Production?Highly Skilled
A set of activities to keep an equipment in the specified condition is called as ________.
Maintenance
Sampling inspection suffice to check the work of line inspectors and stage inspectors.
1
Which of the following can be subtypes of corrective maintenance?Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
What do you understand by the quality specified by the designer on behalf the customer?
Quality of design
Scale model used for layout analysis have following advantages
Following are the commonly used factors considered for evaluation of layout in factor analysis method
Flow of material , Equipment utilization , Working condition
Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses.
1
Work Sampling Studies
Order preparation process for products manufatured to order requires following documents
Sales Order , Work order , Shop order
What are uses of diagrams in method study?
How to exercise control over quality?
1
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily
Which of the following techniques is used by industrial engineering department to obtain the utilisation index?
Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.
Periodical analysis of inspecting reports to establish causes of rejections , Preperation of quality standard and specifications , Exercising control over inputs
In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework.
The ________ must ensure that the product satisfy the functional requirements of it's usage.
Quality of design
1
Which of the following is not the characteristic of Project Production?
What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart?
Following is one of the tasks of Production ControlActual issue of forms and documents
Which are the three basic types of control chart by attribute?p-chart , c-chart , np-chart
Status of PPC department in an organization depends on following factormanufacturing process
In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
0.01 to 10%
What does tail of an arrow represent?Start of an activity
Which rule is used for numbering of events?Fulkerson's Rule
MRP is based on the concept of inventory demand which is of following typeDependent and independent
Which varaible is taken along the abscissa or X axis?Time
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
0
What do you mean by the project duration for which the total cost is minimum?Optimum duration
Regular lubrication with carefully selected lubricants is an essential factor in the maintenance of high grade machine tools working under continuous load.
Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time
Biases in measurements , Recording done without actual measurements , Improper selection of samples
1
As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion.
Process planning is the process ofestablishing shortest and most economic path of production
The term ________ emplies the foregone profit due to inability of company to produce.
Opportunity cost
Latest finishing date is the latest event time of the tail event.0
Which are the distinct functions of scientific quality control?Acceptance function , Preventive function , Assurance function
1
For p-chart, "Inspection by variables" is much faster than "Inspection by attributes"0
Shutdown Maintenance
Which of the following industries justify the use of move order?Power plant , Steel plant , Heavy machinery manufacturing
Which of the following is the most popular technique for Project Production?PERT & CPM
Fixed position layout is adopted whenproduct is very heavy involving assembly of large number of parts
Plant location decisions concern following type of organizationsManufacturing and service organizations
Product layout is suitable whenProducts have reasonable stable demand
1
Which utilities are considered as infrastructural requirements?Disposal of waste , Power , Water
0
Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout
The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines.
While numbering as per Fulkerson's rule, arrows emerging from the initial event are deleted so as to create one or more initial events.
The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.
Prevailing wage pattern , Productivity of labour , Industrial relations
Exemption from excise duty , Soft loans , Subsidy in electrical charges
Which details are recorded in columns when each square of progress card is split up into columns?
Date , Shift , Quantity produced
Economic consideration
Who has introduced the useful concept of control chart in 1931?Walter Shewhart
A network can have more than one starting event but completion event must be only one.
0
Need for change in layout can occur due to following reasonintroduction of new product
An activity can share the same tail event and same head event with any other activity.
0
Network
Inspection
The ________ is the defect level for which lots are regarded as bad lots.Lot Tolerance Percentage Defective
How non-critical activities are shown in the time chart during project scheduling?Thin lines
Every network does not necessarily have a critical path.0
Backward pass computation
Which of the following factors related to the labour and wages are considered while deciding the plant location?
Which of the following are examples of incentives offered by the Central and State Governments for setting up industries in particular locations?
What do you understand by the selection of the job for the method study on the basis of money saving potential of the job?
What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved?
What do you mean by the verification of object against predetermined standards of quality or quantity or both?
Which method of critical path determination begins with the end event and moves backward to the start event of the project network?
1
1
Reconditioning
Flow process charts do record movements as well as visual pictures.0
0
What is the meaning of " Product features" according to J.M.Juran?Quality of design
Quality assurance
Following are some of the Principles of Management advocated by F W Taylor
How the concept of float is helpful to planners?
Which kind of defect can be called as minor defect?Which does not reduce the usability of the product for its intended use
1
Which element of a network represents a task which has got a definite beginning and definite end?
Activity
Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.
It would not affect the project completion time if non-critical activities take little loner time than planned.
The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies.
Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting customer demand
Which three of the following options can be used to reduce the duration of activity during project crashing?
Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Which is the next stage to the inspection based quality control in the historical development of quality management.
Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen
To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources
Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the acceptance of a defective part.
Material composition , Dimensions , Any heat treatment if required
1
0
Theoretical capacity equals number of normal working hours of that machine.1
Labour laws , Building codes , Policies regarding issue of licences
Skill of labour force in a product type layout is usually higher than in the process type of layout
0
What is the base for considering activity time as single time estimate or three time estimate?
Level of uncertainty
Product layout is employed for manufacturing following productsrefrigirators
Diversified labour is adequately available in rural area as compared to urban area.0
Which of the following technique makes three time estimates for each activity?Project Evaluation & Review Technique
Suburban location provides the compromise netween rural and urban locations.1
Latest allowable time for each event
1
Kanban system is essentially a computer based system for production scheduling and control
Which features should be covered by the specifications of materials while defining the qualitative requirement?
In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better functioning.
Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view?
Which time is determined by the backward pass computation method of determination of critical path ?
Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations.
0
Which of the following are the major steps of making of the X bar-R control chart?
For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives.
0
Extrernal inspection
Delivery time is less
How dummy activities are shown in the time chart during project scheduling?Vertical lines
1
Which are the advantages of suburban location?
What do you understand by the timeframe for the maintenance needs of the equipment?
Maintenance inspection schedule
Which of the following are assignable cause?Large varaitions in hardness of material , Tool wear , Errors in setting
Which of the following policies is advisable in case of low product variety and large volumes?
Low Skilled Labour & Special Purpose Machines
Critical examination
Gross requirement of finished product is determined on the basis of followingForecasted sales , Pending sales order , Management decision to stock
Main objective of a good plant layout isReduce material handling cost
Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart
Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation?
Process Engineer does not get sufficient time for designing tooling for most economic production run when
The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report.
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction
Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods?
Multiple Choice Single Answer
Which of the following are important considerations concerning activity times?
All activities must not be tied up into the network0
Normal cost
In an organization there may not be a formal PPC department if
Which of the following cases can be treated as delay during recording of method study?
0
Cent percent inspection is often more practical and economical than sampling inspection.
0
A load chart specifies the work to be carried out by each person of company during shift hours.
0
Cellular layout is based on the concept of Group Technology1
Expediting function is concerned with following activities
What is represented by an arrow in a network?Activity
Independent float either affects the float of preceding activities or that of succeeding activities.
0
Work Order
Multiple Choice Multiple Answer
Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.
Multiple Choice Single AnswerWhat do you mean by lowest possible direct cost required to complete an activity within it's normal time?
Multiple Choice Multiple Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large
Multiple Choice Multiple Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn
Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.
Multiple Choice Multiple Answer
Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule
Multiple Choice Single Answer
Multiple Choice Single AnswerThe document raised by PPC which authorises different functions to take action as per instruction is called
Proportion of Cubic volume space utilized
Following are some of the factors which influence process planningOrder Quantity , Process capability of machine , Delivery Dates
1
Which of the following are examples of pure materials?Bakeries , Ice factories , Woolen
Which of the following are steps to identify the critical path in a small network?
Which are the three types of float?Total float , Independent float , Free float
Which of the following are major inputs to scheduling?Overlapping of operations , Effective Capacity per work centre , Performance standards
How to calculate activity cost slope?Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )
Which of the following are minimum requirement for a good quality of design?Resonable cost , Resonable procurement time , Resonable manufacturing time
0
Production Planning includesPredetermination of manufacturing requirements
How does the control chart of statistical quality control helps the operating personnel?
Identify the presence of an assignable cause before it develops
What can be the worst effect due to excessive vibration?Breakdown
Which of the following activities are used while recording for method study?Delay , Operation , Inspection
Multiple Choice Single AnswerA good layout makes effective use of space. Utilization of space for a department like Stores can be measured by
Multiple Choice Multiple Answer
Availability of training schools, colleges and management institutes reduces the company's internal training needs.
Multiple Choice Multiple Answer
Multiple Choice Multiple Answer
Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path.
Multiple Choice Multiple Answer
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Multiple Choice Multiple Answer
In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small.
Multiple Choice Single Answer
Multiple Choice Single Answer
Multiple Choice Single Answer
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Product cost
Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence
1
An ideal OC curve is never possible only with cent percent inspection.0
For p-chart, the central line of fraction defectives is determined by average percentage defectives.
1
What are the benefits of reconditioning?
Transport , Delay , Storage
Which is the zone beyond LTPD in case of Oc curve of a general plan?Zone of rejection
Grouping of machines gives a lot of flexibility in loading and scheduling1
A lot declared rejected in sampling inspection should not be inspected 100% in any case.
0
Which of the following are the basic requirements of quality standard?Deifinite , Undesrstandable , Economically viable
1
Which of the following three methods used to select the qualified supplier?By vendor plant surveys , By reputation , By experience
Operation Layout generally contains following informationPart Sketch , Standard Time , Jigs and fixtures
Where does the SPC exercises the control to prevent the occurances of defectives?
On manufacturing process
Cyclograph
The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection.
Multiple Choice Multiple Answer
Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares
Multiple Choice Multiple AnswerWhich of the following processes or activities are denoted by using symbols while recording in method study?
Multiple Choice Single Answer
Multiple Choice Multiple Answer
The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship.
Multiple Choice Multiple Answer
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Multiple Choice Single AnswerWhich photographic technique is used to record path of motions of the members of the body during method study?
1
Floor inspection promotes tendency of machines to drift out of limits and produce defectives.
0
Which are the different methods to record details of the existing method during method study?
Charts , Diagrams , Templates or models
Gross requirement of products is determined on the basis ofBoth forecast and pending orders
Crash cost
What do you understand by the extent the products manufactured conforms to the laid down design?
Quality of conformance
Which kind of possible defectives can be reduced due to first off inspection?Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up
Cent percent inspection is required on WIP prior to the key, critical or costly operation.
1
Why stores issue order should not be issued as soon as it is prepared?Material may or may not be available at the time of preparation
Plant layout facilitates processing of products in most effective manner through the following
Shortest possible distance , Shortest processing time , Minimum movement
0
Operational layouts , Move orders , Pre-filled stores issue orders
Specifications is the basic tool of inspection.1
How is the probability of acceptance in case of Acceptable Quality Level (AQL )?Very high
In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres.
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Multiple Choice Single AnswerWhat do you mean by lowest possible direct cost required to complete an activity within it's crashed time?
Multiple Choice Single Answer
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Multiple Choice Multiple Answer
After goods have been manufactured, route sheets and operation layouts should not be collected back.
Multiple Choice Multiple AnswerWhich of the following is a part of preparing manufacturing order set as a primary function of dispatching?
Multiple Choice Single Answer
The dispatching function is of very importance in flow and mass production units.0
Proper care and storage is not an essential part of a well planned lubrication system.
0
Management often fails to realize the importance of efficient layout due to following reason
losses resulting from poor layout are not directly shown in the financial statements
Complexity and difficulty of Planning is influenced by types of layout1
MRP utilises the following informationMaster production schedule , Product structure , Lead time for procurement/manufacturing
Which of the following are types of non-destructive testing?Visual Testing , Eddy current , Magnetic flow detectors
Providing flexibility in plant layout meansLayout can be changed without much cost if required
Which of the following are scheduling techniques?Critical Path Analysis , Index Method , Johnson's two machine algorithm
A network should be progression of activities always moving forward.1
Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit?Separate inspection room
Which of the following are types of sampling plan?Single sampling plan , Double sampling plan , Multiple sampling plan
Which of the following are ideal situations for the preventive inspection?Weekly off and holidays , Non-production hours , Stand-up equipment
Operation process chart
Multiple gauging
Multiple Choice Single Answer
Multiple Choice Multiple Answer
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Multiple Choice Multiple Answer
Multiple Choice Multiple Answer
Multiple Choice Single AnswerWhat do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process?
Multiple Choice Single AnswerWhich kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize?
Components of Production Management includeCapacity Planning , Job Design , Production Planning
Which of the following is the criteria for the percentage defectives in the zone of the indecision?
Lots having the percentage defective more than AQL but less than LPTD
Which of the following are examples of addition during recording for method study?Brazing , Welding , Riveting
1
The document which incorporates details of process planning for a job is calledRoute Sheet
0
Which of the following cases can be referred as operation in method study recording?
Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic
Site factors for plant location includeSuitability of land
Which of the following defects can be observed during preventive inspection by using human senses?
Deviation from normal sound , Excessive Vibration , Leakage of a gas
Lack of material planning results in the followingOver ordering , under ordering , stockouts
Following is one of the techniques used for Material Planning for high value materialMRP
Quality
Which are the sources of information to update the progress card daily?Detachable ticket , Daily production report , Job Card
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Multiple Choice Multiple Answer
Multiple Choice Multiple AnswerWhich of the following situations demand the economic consideration while selecting a job for method study?
Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section
During set up of X bar-R control chart, control limts should be practically revised from time to time as additional data is accumulated.
Multiple Choice Single Answer
Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams.
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Multiple Choice Multiple Answer
Multiple Choice Multiple Answer
Multiple Choice Single Answer
Multiple Choice Single AnswerWhat do you understand by totality of features and characteristics of a product or service that bears on it's ability to satisfy the customer?
Multiple Choice Multiple Answer
Major contributors in the development of Control Charts, Sampling plan areF H Dodge , H G Roming , Walter Schewhart
0
Operation process charts though indicates the sequence of events but do not show movements.
1
0
Random variability
Plant Layout decisions are considered to beStrategic
What are the uses of the instruction manual provided by the manufacturer of a machine?
One of the sophisticated operations research techniques used in material planning is
Dynamic programming
Job life is one of the factors that influence Process Planning1
Material Requirement Planning is very useful in following situationsLong Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle
Both, preventive and breakdown maintenance work must be assigned to the same team.
0
Job Schedule
Which of the following factors decide the choice between the cent percent and sampling inspection?
Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating
Multiple Choice Multiple Answer
Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled.
One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities.
Multiple Choice Single AnswerWhat is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control?
Multiple Choice Single Answer
Multiple Choice Multiple Answer
It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication
Multiple Choice Single Answer
Multiple Choice Multiple Answer
Multiple Choice Single AnswerWhat is the specific name for the Gantt chart when it shows at a glance the scheduling of various operations involved in a job?
Multiple Choice Multiple Answer
Which of the following are examples of attributes?Cracks , Burrs , Texture
Sales Programme
Which are major benefits of identifying the critical path?
Shape od an OC curve is a function of sample size and the acceptance number.1
Process type layout is suitable whenthere is wide variation in processing time of operations
1
Which of the following activities can become a part of a preventive maintenance system?
Condition monitoring , Planned Lubrication , Preventive inspection
Use of optimum speeds and feeds , Subcontracting , Job splitting
1
How to calculate float?Parallel critical path time minus Non-critical path time
What is the cause of inherent variation or internal variation?Cumulative effect of number of chance causes
Originating process of raw material influence Process Planning1
Planned lubrication is said to be the nervous system of the equipment.1
Which of the following can be termed as operation while recording for method study?
Multiple Choice Multiple Answer
Multiple Choice Single AnswerIn mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of
Multiple Choice Multiple Answer
It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception".
Multiple Choice Single Answer
In case of backward pass computation, the latest event time of the burst event equals the smallest of the difference between the latest event time of the head event less duration of the activity converging on the head event.
Multiple Choice Multiple Answer
Multiple Choice Multiple AnswerWhich of the following method can be adopted to overcome the problem of rushing up a job for it's timely completion?
In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.
Multiple Choice Single Answer
Multiple Choice Single Answer
Multiple Choice Multiple Answer
Information received , Addition or subtraction , Information given
Nuclear power plant
Which are reason due to which the progress of work is rarely in line with its plan?
Any proposed change must not be intimated to workers in advance.0
Inclusion of certain tolerance on the basic dimensions in the drawing
Where does the central line is located in case of p-chart? at p bar
The product layout has following disadvantage Layout is not flexible
Inspection Order can be a verbal order True
How to claculate the producer risk in the OC Curve? Probability that a good lot will be rejected by the sampling
Fixed cost is lower in case of continuous production than intermittent production. False
True
True
Which of the following is the most popular technique for Project Production? PERT & CPM
Multiple Choice Single AnswerWhich industry out of the following industries require maximum consideration for safety factor while selecting plant location?
Multiple Choice Multiple Answer
Absenteeism , Machine breakdowns , Substandard performance against prefixed production standards
Multiple Choice Single AnswerHow industry has responded to the fact of existence of inherant variability of the manufacturing process?
Multiple Choice Single Answer
Multiple Choice Single Answer
Multiple Choice Single Answer
While making X bar-R-chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet.
In case of X bar, if the pocess is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
Multiple Choice Single Answer
Multiple Choice Multiple AnswerWhich of the following are the most suitable cases where we can use CPA as effective technique of scheduling?
Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft.
Sample sizes for the construction of p-chart are typicaly larger that for Xbar-R-charts.
True
What is the location of lower control limit in the X bar-R control chart? 3 standard deviations below central line
What is the basic philosophy of statistical process control? Prevention is better than cure
1
Which are the first three steps of Critical Path Analysis technique?Activity relationships , Activity identification , Network construction
Plant Layout is concerned with optimum arrangement of the followingStorage space , Machines , Material Handling Equipment
Planned lubrication is said to be the nervous system of the equipment.1
Which kind of inspection is followed in case of product layout?Pilot inspection
Multiple Choice Single Answer
Multiple Choice Single Answer
Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date.
Multiple Choice Multiple Answer
Multiple Choice Multiple Answer