    Secure Systems Research Group- FAU 1

    SCADA Software Architecture

    Meha GargDept. of Computer Science and Engineering

    Florida Atlantic University

    Boca Raton, FL, USADecember 18, 2008.

  • 7/26/2019 SCADA 121808 Final

    2/15

    Secure Systems Research Group- FAU 2

    Agenda

    Motivation

    Objective

    Introduction

    SCADA

    Use Cases and Application ofPatterns

    Questions

    Recommendations

  • 7/26/2019 SCADA 121808 Final

    3/15

    Secure Systems Research Group- FAU 3

    Motivation

    Critical Infrastructure systems like Supervisory, Controland Data Acquisition Systems (SCADA), Distributed

    Control System (DCS), used in Energy Industry and

    Process Industries are highly distributed and complex.

    It would be interesting to study SCADA using Use Casediagrams and applying various patterns Layers, Model

    View Controller, Web Services, Broker, etc., applying our

    secure software methodology

    This kind of work will help understanding of SCADAsystems and Cyber Physical Systems, apply Non

    Functional Requirements, and do model checking.

  • 7/26/2019 SCADA 121808 Final

    4/15

    Secure Systems Research Group- FAU 4

    Objective

    To discuss Use Case Diagram for SCADA, then

    define a software architecture using patterns

  • 7/26/2019 SCADA 121808 Final

    5/15

    Secure Systems Research Group- FAU 5

    Introduction

    SCADA (Supervisory Control and Data Acquisition) systems are used to monitor andcontrol a plant or equipment in industries such as telecommunications, water and wastecontrol, energy, oil and gas refining, and Transportation (airport, traffic control, rails)

    These systems encompass the transfer of data between a SCADA central hostcomputer and a number of Remote Terminal Units (RTUs) and/or Programmable LogicControllers (PLCs), and the central host and the operator terminals

    A SCADA system gathers information (such as where a leak on a pipeline hasoccurred), transfers the information back to a central site, then alerts the home stationthat a leak has occurred, carrying out necessary analysis and control, such asdetermining if the leak is critical, and displaying the information in a logical andorganized fashion

    These systems can be relatively simple, such as monitoring environmental conditionsof a small office building, or very complex, such as a system that monitors all theactivity in a nuclear power plant or the activity of a municipal water system

  • 7/26/2019 SCADA 121808 Final

    6/15

    Secure Systems Research Group- FAU 6

    Use Case Diagram for SCADA System

    Description: The goal is to supervise, control, monitor andacquire data for critical infrastructure systems, operate from

    remote end and ensure security and safety

    Actors:

    Field Devices Local Control Center (LCC)

    Remote Telemetry Units (RTU)

    Master / Central Control Terminal Unit (MTU)

    Operator

    Supervisor

  • 7/26/2019 SCADA 121808 Final

    7/15

    Secure Systems Research Group- FAU 7

    Use Cases

    1. System Shut Down / Startup2. Gather Field Information

    3. Perform Local Control

    4. Transfer Field Information

    5. Manage Field Information

    6. Perform Remote Control7. Analyze System State

    8. Schedule Task

    9. Balance Load

    10. Adjust Settings11. Check Status

    12. Manage Logging

  • 7/26/2019 SCADA 121808 Final

    8/15

    Secure Systems Research Group- FAU 8

    SCADA System

    Check

    Status

    Field Devices

    Local Control Center

    Remote Terminal Unit

    Transfer

    Information

    Perform

    Local

    Control

    Manage

    Field

    Information

    Analyze

    System

    StateSchedule

    Task

    Balance

    Load

    Central Control Terminal Unit

    System

    Startup/

    Shutdown

    Operator

    Gather Field

    Information

    Manage

    Logging

    AdjustSettings

    Perform

    Remote

    Control

    Supervisor

  • 7/26/2019 SCADA 121808 Final

    9/15

    Secure Systems Research Group- FAU 9

    Pre Conditions for SCADA

    System1. The operator is logged in.2. The system is real time system.

  • 7/26/2019 SCADA 121808 Final

    10/15

    Secure Systems Research Group- FAU 10

    Layers

    Hardware

    Layer

    Distribution

    Layer

    Communication

    System

    System Level

    Application

    Layer

    Field

    Devices

    Actuators SensorsField Device

    Units

    RTU IED Bay Control

    Units

    ModBus IEC 61850 DNP 3 Ethernet: TCP/IP Protocols

    HMIPrinters GPS RoutersSwitches

    Data

    Gathering

    Transport

    Layer

    System

    Startup/Shutdown

    Check Status Adjust Settings Perform Control

  • 7/26/2019 SCADA 121808 Final

    11/15

    Secure Systems Research Group- FAU 11

    Layer Pattern SCADA system being highly complex and distributed, it is important to

    understand SCADA in Terms of Layers for simplicity as shown in Figureabove. The intent, forces, advantages for the layer Patterns are the

    same. However here we apply this pattern on the real physical system.

    Layer 1: It is the field Units, considering the Generation, Transmission

    and Distribution at one place, we have all the process controls, I/Os,

    status, metering, measuring values, etc. It also includes local control.

    Layer 2: The field values, I/O analog, digital, measuring and other

    commands, operations, are taken to RTUs, IEDs, PLCs, BCUs, and

    other I/O cards to communicate to higher end.

    Layer 3: This includes all the communication cables, protocol

    architecture required for higher end communication interfaced with allfield signals. It is the backbone in the modern control centers, which has

  • 7/26/2019 SCADA 121808 Final

    12/15

    Secure Systems Research Group- FAU 12

    Layer Patternimmensely reduced physical wiring, big marshalling and increased the

    reliability and more improved quality signals. Today latest protocols likeIEC 61850, Modbus and other proprietary protocols are used.

    Layer 4: This includes the Control centre equipped with dynamic

    changing states of the system displayed on HMI, which is powerful to

    read values, prompt and diagnosis system change and with a click on

    HMI, to carry out operations.

    Layer 5: Connection with the outside world using Internet and various

    new technology related to mobile / cell phone operations.

  • 7/26/2019 SCADA 121808 Final

    13/15

    Secure Systems Research Group- FAU

    More Patterns

    We can app ly more patterns :

    Broker (Inter substation control)

    Client Sever Dispatch (Between Main

    system and operator console) Web Services (Internet Control)

    Model View Contro l ler (HMI)

    Three-tier

    Unif ied Phys ical Access Contro l to

    Bu i ld ings and inform at ion

    13

  • 7/26/2019 SCADA 121808 Final

    14/15

    Secure Systems Research Group- FAU 14

    Future Work

    Safety Monitor Implementation in SCADA System

    Unifying Safety with Security

    Implementing more patterns in SCADA

    Formalization of safety

  • 7/26/2019 SCADA 121808 Final

    15/15

    Secure Systems Research Group- FAU 15

    Recommendations and Questions

    Feedback: