sc 18 – sc 11 report – field operating equipment chair: darrell copsey, john crane vice chair:...
TRANSCRIPT
SC 18 – SC 11 Report – Field Operating Equipment
Chair: Darrell Copsey, John CraneVice Chair: TBD
Secretary: Norman W. Hein, Jr. ,CONSOL Energy – CNX Gas
• References to Other API Standards– API 5B in 11AX and 11B
• Topics Potentially Used by Other SCs– Special ballot to include
welded beams to Spec 11E did not pass; new TG to be formed/New SR3 to add fabricated/welded beams to 11E, (welding , inspecting, welder qualifications, etc. along with specific requirements for rolled structural shapes are required) – SC20 assistance?
• Joint Topic Developments– None
• Unique Docs/Stds that May Impact Others– None
• Existing Std Changes Affecting the Monogram Program– 11B adding back upset
polished rods, polished rod liners, high strength sucker rods, high strength couplings, Plus developing new test procedures for polished rod stuffing box and polished rod liners to have both body/cavity pressure test plus new test on seal section
• Color Coding Requirements– API Spec 11AX: color
coding results resolved
• New TG/Standards– TG for structural design,
fabrication and rolled shapes to be included in 11E
• Stds That Need Assistance– 11S series on ESPs needs
SMEs– 11D3 on surface PCP
equipment needs Chair and SMEs