sbs-25 25' high soccer ballstopper system specification · cleat hardware (stainless steel)...

12
® Aluminum Athletic Equipment 1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378 www.AAEsports.com 1 of 12 SBS-25 25' High Soccer BallStopper System Specification

Upload: others

Post on 14-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com1 of 12

SBS-2525' High Soccer BallStopper System

Specification

Page 2: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

DATE:CATEGORY:

CAD FILE:DWN. BY:

MODEL:

NOTE:

DESCRIPTION:

N.R.CCopyright 2011 Aluminum Athletic Equipment Co.

D

C

B

A

6 5 4 3 2 1

D

C

B

A

8 7 6 5 4 3 2 1

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

20'-0"240"MAX

20'-0"240"MAX

20'-0"240"MAX

Refer to AssociationGuidlines for

Placement Distance

Post Spacing Distance is not to Exceed Specification

Field of Play

End Line

Left EndPost

Inner Post Inner Post Right EndPost

SBS-25 Specifications

4/13/2018SBS-25

25' HIGH BALLSTOPPER SYSTEM

CUSTOMERDWG. NO.

SBS-25-C-0022 of 12

SBS-25Specifications

Concrete Footing Placement Specification

Page 3: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

25'-6"(REF)

A

C

D

B

Net(height varies depending on system height and attachment method)

DETAIL A

PostCap

Eyebolt(Stainless Steel)

Hanging Pulley(Galvanized Steel)

Pear Clip(Stainless Steel)

Cable Clamp(Galvanized Steel)

Net with integrated Clear Vinyl Coated (Galvanized Steel) Cable

Heavy DutyBraided NylonRope (Black)

O-Ring(Brass)

DETAIL C

Cleat(Galvanized Steel)

Clear Vinyl Coated (Galvanized Steel)

Vertical Attachment Cable

Cleat Hardware(Stainless Steel)

Pear Clip(Stainless Steel)

DETAIL D

Tensioner Kit(Galvanized Steel)

DETAIL B

Open Eyebolt(Stainless Steel)

(End Posts Only)

SBS-25 SpecificationsPost (Aluminum):

- 4" x .226" wall aluminum tube (Mill Aluminum 6061T6)

- 29'-0" Overall Length (25'-6" out of ground sleeve)

- Weight = 117lbs./ea.- All Hardware is RUSTPROOF

Netting:- Net: #AAE N367, 3-1/2" Sq. Knotted Nylon, FR,DBB, length to vary, 1/4" MFP Rope Border, UVprotected and 1/4" cable hog tied to top of net

A

B

C

D

DRAWN BY: CAD FILE:

MODEL: DATE:

NOTE:

SBS-25 Specifications

3/27/2019SBS-25

NR

Upright Assembly Specification

DESCRIPTION

123456

A

B

C

D

12345678

CATEGORY:

CUSTOMER

SBS-25 Upright Specification

DWG. NO.

SBS-25-C-003Copyright 2011 Aluminum Athletic Equipment Co.C

SBS-25Upright Specification

3 of 12

Page 4: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

2'-6"30"

HoleDiameter

4"

5'-3"63"

HoleDepth

4'-9"57"

SleeveLength

6"

3'-6"42"to

Stop Bolt

6" Grass

Compacted Subgrade

Grass

Concre

te

Concre

te

Crushed Stone

Natural Grass FieldFooting Specification

Top of post sleeve should be even with soil.2

6"

5'-3"63"

HoleDepth

2'-6"30"

HoleDiameter

4'-9"57"

SleeveLength

4" 6"

3'-6"42"to

Stop Bolt

Stabilzed Subgrade

Crushed Stone

Concre

te

Concre

te

AggregateAggregate

Artificial Grass FieldFooting Specification

TurfTurf

Top of post sleeve should be even with aggregate.2

A

B

C

D

DRAWN BY: CAD FILE:

MODEL: DATE:

NOTE:

SBS-25 Specifications

4/13/2018SBS-25

N.R.

Grass & Turf Footing Specification

DESCRIPTION

123456

A

B

C

D

12345678

CATEGORY:

CUSTOMERDWG. NO.

SBS-25-C-004Copyright 2011 Aluminum Athletic Equipment Co.C

SBS-25Concrete FootingSpecification

Note: **Consult Local Codes4 of 12

Concrete Footing Specification

Page 5: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

Lower End PostLower Horizontal Cable

"Tensioner"Collar Assembly

Note: Hardware denoted with "A" is included in item

#12 "tensioner kit"

14

15

16

11

A

Right End PostLower Horizontal Cable

"Anchor Shackle"Collar Assembly

1114

1615

Cable loop end show for reference only(not pre-installed)

When installingcable, clamploop goes on cutside.

A

AA

A

Left & Right End PostUpper Vertical Cable

"Anchor Shackle"Collar Assembly

16

15

1411 When

installing cable, clamp loop goes on cut side.

Left & Right End PostLower Vertical Cable

"Tensioner"Collar Assembly

Cable loop end show for reference only(not pre-installed)

A

Note: Hardware denoted with "A" is included in item

#12 "tensioner kit"

11

16

15

14

A

Inner PostLower Horizontal Cable

"Pear Clip"Collar Assembly

14

1315 16

11

1819

17

20 21

Left & Right End PostMid Vertical Cable

"Open Eyebolt"Collar Assembly

A

B

C

D

DRAWN BY: CAD FILE:

MODEL: DATE:

NOTE:

SBS-25 Specifications

4/13/2018SBS-25

NR

Various Collar Assemblies

DESCRIPTION

123456

A

B

C

D

12345678

CATEGORY:

CUSTOMER

SBS-25 Assembly Instructions

DWG. NO.

SBS-25-C-005Copyright 2011 Aluminum Athletic Equipment Co.C

SBS-25Cable Collar Assembly Diagrams 5 of 12

Page 6: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

Model No. SBS-25Parts List

6 of 12

Page 7: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

3'-6"42"

(REF)

10'-0"120"

15'-6"186"

Debris Ring(Optional)

If not presentMake sure

lower collarsare positioned

accordingly.

Net Pulley System

RightView

Post Cappre-installed

Lower Horizontal Cable Collarw/ TensionerAssembly

Lower VerticalCable Collarw/ TensionerAssembly(see collar orientationdetail)

Upper VerticalCable CollarAssembly (see collar orientationdetail)

FrontView

40.00°

Collar OrientationDetail

(Note: ONLY vertical cable collars should be turned away from netting)

OpenEyebolt Collar

Detail

CleatDetail

10

89

89

6

7

1

EyeboltDetail

3

4

5

Installation Notes:Lower Collars: From bottom1.of pole slide the lower verticalcable collar, lower horizontalcollar and and debris ring(optional) into position. Toallow proper insertion intoground sleeve, lower mostcollar should be 42" from endof post. Before securing collars into place make sure to rotate the lower vertical collar approx 40°. (refer to diagram)

Cleat: Is to be installed so that2.it is on backside of post,opposite net. Screws will beinserted through cleat and postand secured on net side usingflat washers, Nylock hex-nutsand cap nuts. (refer to diagram)

Mid Collar: Note orientation of3.collar on post. From top of poleslide the open eyebolt collarinto position (refer to diagram) and secure intoplace.

Eyebolt: Pulley system comes4.preassembled to eyebolt.Install washer onto eyeboltthen insert eyebolt with washerthrough front side of hole attop of post. From oppositeside secure eyebolt into placeusing a flatwasher and self-locking hex-nut. (refer to diagram)

Upper Collar: From top of5.pole slide the upper verticalcable collar into position (collarshould rest on eyeboltwashers). Before securing intoplace make sure to rotate thecollar approx 40°. (refer to diagram)

Make sure warning labels are6.present on goal posts.

Note:Post assembly should be done with post laying down on flat level surface.

SBS-25Assembly InstructionLeft End Post

7 of 12

Page 8: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

3'-6"42"

(REF)

Debris Ring(Optional)

If not presentMake sure

lower collarsare positioned

accordingly.

Net Pulley System

RightView

Post Cappre-installed

Lower Horizontal Cable Collarw/ Pear Clip

FrontView

CleatDetail

1

6

7

8

10

8

9

9

Eyebolt Detail

5

4

3

Collar OrientationDetail

Installation Notes:Lower Collars: From bottom1.of pole slide the lower horizontal collar and and debris ring (optional) into position. To allow proper insertion into ground sleeve, lower most collar should be 42" from end of post. Before securing collars into place verify correct orientation. (refer to diagram)

Cleat: Is to be installed so that2.it is on backside of post,opposite net. Screws will beinserted through cleat and postand secured on net side usingflat washers, self locking hex-nuts and cap nuts. (refer to diagram)

Eyebolt: Pulley system comes3.preassembled to eyebolt.Install washer onto eyeboltthen insert eyebolt with washerthrough front side of hole attop of post. From oppositeside secure eyebolt into placeusing a flatwasher and self-locking hex-nut. (refer to diagram)

Upper Collar: From top of4.pole slide the upper verticalcable collar into position (collarshould rest on eyeboltwashers). Before securing collars into place verify correct orientation. (refer to diagram)

Make sure warning labels are5.present on goal posts.

Note:Post assembly should be done with post laying down on flat level surface.

SBS-25Assembly InstructionInner Post

8 of 12

Page 9: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

3'-6"42"

10'-0"120"

15'-6"186"

Lower Horizontal Cable Collarw/ Anchor Shackle for Crimped End Loop

Lower VerticalCable Collarw/ Tensioner

Assembly(see collar orientation

detail)

Upper VerticalCable Collar

Assembly (see collar orientation

detail)

FrontView

Debris Ring(Optional)

If not presentMake sure

lower collarsare positioned

accordingly.

LeftView

Post Cappre-installed

Net Pulley System

40.00°

Collar OrientationDetail

(Note: ONLY vertical cable collars should be turned

away from netting, this aids in tensioning the net)

EyeboltDetail

3

4

5

CleatDetail

10

8

8

6

7

9

9

1

OpenEyebolt Collar

Detail

Installation Notes:Lower Collars: From bottom1.of pole slide the lower verticalcable collar, lower horizontalcollar and and debris ring(optional) into position. Toallow proper insertion intoground sleeve, lower mostcollar should be 42" from endof post. Before securing collars into place make sure to rotate the lower vertical collar approx 40°. (refer to diagram)

Cleat: Is to be installed so2.that it is on backside of post,opposite net. Screws will beinserted through cleat andpost and secured on net sideusing flat washers, selflocking hex-nuts and capnuts. (refer to diagram)

Mid Collar: Note orientation3.of collar on post. From top ofpole slide the open eyeboltcollar into position, refer todimension provided andsecure into place.

Eyebolt: Pulley system4.comes preassembled toeyebolt. Install washer ontoeyebolt then insert eyeboltwith washer through frontside of hole at top of post.From opposite side secureeyebolt into place using aflatwasher and Nylock hex-nut. (refer to diagram)

Upper Collar: From top of5.pole slide the upper verticalcable collar into position(collar should rest on eyeboltwashers). Before securinginto place make sure to rotatethe collar approx 40°. (refer to diagram)

Make sure warning labels are6.present on goal posts.

Note:Post assembly should be done with post laying down on flat level surface.

SBS-25Assembly InstructionRight End Post

9 of 12

Page 10: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

Left End Post

Inner Post

Inner Post

Right End Post

Cleet:Orientation(all posts) away from field of play

Net Hoist:Orientation(all posts) towards field of play

Lower Collars:Orientation(all posts) towards field of play (refer to post assembly pages)

Post / GroundsleeveInstallation (fully seated)

Postwill stop

once it restson stop bolt

After posts have been lowered into place, secure the lower collar(s) into place.

Post / GroundsleeveInstallation

Installation Notes:View above is from net side of post (field 1.of play).

Caution, slowly lower posts into sleeves.2.Dropping post into sleeve may result indamage to the stop bolt.

Make sure all posts are orientated3.correctly. Pulley system towards field ofplay and cleet away from field of play. Alllower horizontal cable collars should facefield of play.

Once posts are correctly orientated, make4.sure the lower collars are properlyorientated and secure them into place.

View from field of Play

Note: Height & number of inner posts may vary from what is shown.

SBS-25Assembly InstructionPosts to Groundsleeve

10 of 12

Page 11: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

View from field of Play

Left End Post(Clamped Loop End)

Inner Post(Pear Clip Collar Assembly)

Pear Clip

Right End Post(Crimped Loop End)

CrimpedCable End

(pre-assembled)

Clamped Loop EndDetail

Thimble(must be present)

Cable Clamp Loopmust be on cut end

of cable

After Cable has been fully tensioned trim cut end and

wrap with electrical tape

Support Cable Vinyl Sleeve must be stripped from cable loop end prior to installing clamps

Support Cable Vinyl Jacket

Installation Notes:Refer to collar assembly diagram for 1.further detail on collar and cable assembly.

Install Crimped Cable End to Right End2.Post collar using an anchor shackle.

Route cable to Left End Post. Snap cable3.into Pear Clips of the Inner Posts alongthe way

Before assembling Clamped Cable Loop4.End, fully open the turnbuckle.

With anchor shackle and thimble inplace5.run cable thru the shackle as shown. Pullslack out of cable and mark vinyl sleeveapproximately 4" from thimble end. Stripvinyl from mark location towards cableloop end.

With the slack still being pulled out of6.cable install and secure the cable clamps.The first clamp should butt upto thethimble, the second should be spacedapprox. 1" on center from the first. Cableclamps must be gripping bare cable toensure proper seating/grip.

SBS-25Assembly InstructionLower Horizontal Support Cable

11 of 12

Page 12: SBS-25 25' High Soccer BallStopper System Specification · Cleat Hardware (Stainless Steel) Pear Clip (Stainless Steel) DETAIL D Tensioner Kit (Galvanized Steel) DETAIL B Open Eyebolt

®Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468 Toll Free: (800) 523-5471 Fax: (610) 825-2378

www.AAEsports.com

A Note: When raising net, it must be done in increments across the entire span

Hoist SystemDetail B

Pear ClipB

Net to End Post Vertical Support Cable

Detail C

Pear ClipsSpaced approx. every 12", entire length of vertical cable (Left and Right End Posts Only)23

22

Brass RingDetail A

B

B

BrassRingTop of net

is bound to a steel

cable

CableClamp

Installation Notes:Lay net on ground across span of posts.1.Make sure net is centered accross span of posts.

Using a Pear Clip Secure upper net2.corners to End Post Vertical SupportCables (as shown in Detail C)

Secure Brass Rings to top of net using3.Cable Clamp (as shown in Detail A).One ring and clamp per post and theyshould be centered as close as possibleto its coinciding post.

After Brass Rings have been secured to4.net, clip ring into it's posts hoist systemPear Clip (as shown in Detail B).

As net is being raised make sure to5.secure net sides to the vertical supportcables using provided Pear Clips (refer to Detail C). Pear Clips should bespaced approx. 12" or 4 net squares.

Once net has been completed raised tie6.hoist ropes onto cleat.

Note: Hardware denoted with "B" is included in item

#3 "Hoist Rope"

SBS-25Assembly InstructionNet Attachment

12 of 12