    School Board Update

    Auburn Campus ImprovementsSeptember 21, 2010

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    2/12

    Project Status

    1. We are in the early phases of design

    2. Design Decisions Move from Big toSmall

    3. At this phase, input is first needed at themacro level

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    3/12

    Master Plan Programming Goals

    High School : Grades 9-12 Middle School: Grades 6-8Initial Capacity: 600 Initial Capacity 480

    Future Capacity: 800 Future Capacity: 600

    Core Classrooms: 37/47 Core Classrooms: 24/30

    Other Major Building Amenities1200-seat GymnasiumFull-Size Auxiliary GymField-House for Home/Visitor

    2 P.E. / 2 Team Locker Rooms800-seat AuditoriumDining Area for Enrollment

    Other Major Building Amenities600-seat Gymnasium2P.E. / 2 Team Locker Rooms250 to 300-seat Auditorium

    Dining Area for 1/3 Enrollment

    Will Follow Planning Standards Adopted by the School Board in

    2000

    For the Building

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    4/12

    Master Plan Programming Goals

    High School : Grades9-12

    Middle School: Grades6-8

    Auto Parking: 515 Auto Parking: 120

    Football Stadium / Track(Existing)

    Competition BaseballField

    Competition SoftballField

    - -

    For Site Amenities

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    5/12

    Comparing Old and New

    Existing High School Existing Middle School

    Main Building Area: 77,600 SF Main Building Area: 30,500 SF

    Out-Buildings: 14,400 SF Out-Buildings:

    Temporary Buildings: 1800 SF Temporary Buildings: 7300 SFTotal Existing : 93,800 SF(Existing Enrollment: Approx.394)

    Total Existing: 37,800 SF(Existing Enrollment: Approx.280)

    Estimated Area for New HS:212,000 SF (Enrollment of 800)

    Estimated Area for New MS:125,300 SF (Enrollment of 600)

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    6/12

    Aerial Photo

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    7/12

    Aerial Photograph of Site

    BASEBALL

    SOFTBALL

    STADIUM

    NEW HIGHSCHOOL

    RENOVATEDMIDDLESCHOOL

    MP #1

    MP #2

    MP #3

    ELEMENTARYSCHOOL COMPLEX

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    8/12

    Note that theExisting MiddleSchool isDemolished inthese Scenarios

    BASEBALL

    SOFT-BALL

    STADIUM

    NEWMIDDLESCHOOL

    RENOVATEDHIGHSCHOOL

    MP #1MP #2

    MP #3

    ELEMENTARYSCHOOL COMPLEX

    MP #4

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    9/12

    Key Planning Criteria / Assumptions

    All Facilities on Site

    Separate Buildings for MS and HS

    Shared Site Amenities (Parking and Athletic Fields)

    Cabin / Cannery Are Not Accommodated at Existing Location

    Masterplan Driven v. Funding Driven

    Re-Use What Makes Sense to Re-Use (Maximize Investment)

    Existing Middle School Will Be Demolished

    Awkward Location

    Poor Programmatic Fit, One Story

    Excess Vehicular Entrances

    Limited Land Area

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    10/12

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    11/12

    New High School Site Plan

    r-------l/11 I... " I I I/ ' I I 1/ I I I

    ' I I I/ :: :j i = ~ ~ ; ~ ~ ~ ~ -' , , ,I I I II I I II I I II I I II I I II I I II I I II I I .JI ~ L __ _ _C _-- __1' 1_ """""-=

  • 8/7/2019 SB Update on Auburn Power Point) September 21 2010 (2)

    12/12

    New Middle School Site Plan

    -,-- ,- ,/ ,, ,, ,, ,' ,' ,' ," ,, ,, ,, ,, ,, ,r-- - - - - - i, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,, ,I J

    L _____ ~ = L_______ ..J