saxum engineered solutionssaxuming.net/wp-content/uploads/2014/05/mining_complete.pdfsaxum is a...
TRANSCRIPT
Mining
SAXUM is a mul�disciplinary engineering company with extensive experience in assistance services to the Mining Industry. Our capabili�es include full Engineering services as well as Procurement and Construc�on Management por�olio.
Through its company in the USA, Brazil and Argen�na, SAXUM is a�ending the technical needs of the mining industry in South America during the last eighteen years and con�nues to strive to advance further.
Our clients are the most important mines and mining producers in the region. This is the best demonstra�on of our experience and recogni�on.
SAXUM ENGINEERED SOLUTIONS
[email protected] www.saxum.us
A flexible, tailor-made service for all your engineering and construc�on management needs in the mineral processing industries. Our professionals are specialists in their disciplines and our goal is to bring our quality engineering services to the mining industries as we have been doing for years.
Full engineering services including civil/structural engineering, mechanical and piping engineering, electrical engineering, instrumenta�on and control, as well as process engineering. Our services include feasibility studies, trade-off evalua�ons, conceptual, basic and detailed engineering, and value engineering.
SAXUM has also Project and Construc�on Management experience in the framework of EPCM services. We manage projects achieving high quality standards within the planned schedule and budget
WE OFFER
[email protected] www.saxum.us
Pan American Silver – Argentina – Manantial Espejo
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 250 M.
SAXUM scope of work: Detailed mechanical, electrical and
civil/structural engineering as well as construc�on management
assistance Gold and silver extrac�on. 2000 tpd processing plant
comprising primary crushing, grinding, gravity concentra�on and
leaching, CCD and Merrill Crowe.
Intrepid Mines Ltd. – Argentina – Casposo Project
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 83 M
SAXUM scope of work: EP & CM services, star�ng from basic
engineering. Our services include metallurgic project,
mechanical, civil/structural, electrical, instrumenta�on and
control engineering, as well as procurement and construc�on
management.
FMC Lithium – Argentina – Salar del Hombre Muerto
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 25 M.
SAXUM scope of work: Complete conceptual and basic
engineering for low sodium lithium chloride brine plant. Process.
C i v i l & S t r u c t u ra l , M e c h a n i ca l & P i p i n g , E l e c t r i ca l ,
Instrumenta�on & Control Engineering.
Project related to the extension of the salts and lithium
produc�on in the FMC plant in Salar del Hombre Muerto, Salta
province, Argen�na.
Eramet Ingenierie – Argentina – Salinas Grandes
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 160 M.
SAXUM scope of work: Complete conceptual and basic
e n g i n e e r i n g ( i n c l u d i n g p r o c e s s , c i v i l / s t r u c t u r a l ,
mechanical/piping, and electrical, I/C) for CapEx and OpEx
evalua�on.
Lithium carbonate and potassium chloride plants in the province
of Salta, Argen�na.
Xstrata Copper – Argentina – Minera Alumbrera
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 48 M.
SAXUM scope of work: Complete conceptual, basic and detailed
engineering as well as CapEx analysis.
Project related to the new cleaning cells in Minera Alumbrera Ltd.
Catamarca Province, Argen�na.
Gold mine project in the province of San Juan, Argen�na.
Xstrata Copper – Argentina – Minera Alumbrera
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 8 M.
SAXUM scope of work: Tecnhical/economic analysis for different
layout and equipments arrangement alterna�ves, Conceptual
and detailed engineering
Tailings dam water recovery system at Minera Alumbrera Ltd.
Province of Catamarca, Argen�na.
Gold mine project in the province of San Juan, Argen�na.
Xstrata Copper – Argentina – Minera Alumbrera
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 12 M
SAXUM scope of work: Conceptual and detailed mechanical and
structural engineering.
Pebbles crushing plant expansion at Minera Alumbrera Ltd.
Province of Catamarca, Argen�na.
BARRICK – Argentina – Veladero Mine
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 1.8 BM.
SAXUM scope of work: Detailed mechanical and structural
engineering for primary and secondary crushing system.
Veladero green field project of Barrick in the province of San Juan,
Argen�na.
CODELCO – Chile – Chuquicamata
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US $24 M.
SAXUM scope of work: Detailed engineering and construc�on
assistance.
Value recovery from fresh tails generated in the Chuquicamata
Concentrate Plant. Chile
Minera IRL – Argentina – Don Nicolás project
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 87 M
SAXUM scope of work: Pre-Feasibility and Feasibility studies.
Preliminary process design criteria, plot plan and facili�es layout.
Tailings management design, Hydrological campaign/Water
development campaign. CapEx devolpment featuring all
engineering disciplines.
Green field project related to a Gold Mine. Santa Cruz province,
Argen�na.
AngloGold Ashanti – Argentina – Cerro Vanguardia
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 8 M.
SAXUM scope of work: Basic and detailed engineering as well as
construc�on assistance services.
Crushing/agglomera�ng plant and heap leach pumping sta�on.
Cerro Vanguardia plant of AngloGold Ashan�. Santa Cruz
province, Argen�na.
Xstrata Copper Peru – Antapaccay Project
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$124 M .
SAXUM scope of work: Review and verifica�on analysis of the
Stacker design made by Thyssen-Krupp and design of its
founda�on system.
Tintaya Copper Mine, Expansion Antapaccay, Glencore (ex
Xstrata Copper), Peru.
Xstrata Copper Peru – Antapaccay Project
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 2.2 B.
SAXUM scope of work: Op�miza�on of the design of the primary
crusher and of the secondary crushing system (ball and SAG
mills).
Tintaya Copper Mine, expansion Antapaccay, of Glencore (ex
Xstrata Copper), Peru.
Goldrock Mines Corp. - Argentina - Lindero Project
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 160 M
SAXUM scope of work: Lindero greenfield project. Conceptual
and basic engineering, in mechanical, piping, civil/structural,
electrical and automa�on disciplines, for the en�re project. Costs
analysis. Bid packages.
Sales de Jujuy S.A. - Argentina - Olaroz Project
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
Project Budget: US$ 240 M
SAXUM scope of work:
DEVELOPMENT OF CONCEPTUAL AND DETAILED ENGINEERING
FOR CO2 RECOVERY: Complete engineering for gas recovery and re-
injec�on. Dimensioning of all involved equipment. Evalua�on of gas
consump�on.
STEAM SYSTEM OPTIMIZATION: Defini�on of the thermal energy
balance. Evalua�on of the most appropriate procedure for
incorpora�ng the new steam generator to the system.
PHB Wesserhütte US - USA - Gowest Voestalpine Project
E n g i n e e r e d S o l u t i o n s
PROJECTS
[email protected] www.saxum.us
SAXUM scope of work: PE STAMP ELECTRICAL DRAWINGS.
Internal checking, US codes verifica�on and sign and seal of all
electrical engineering documents by a Texas Registered Professional
Engineer.
E n g i n e e r e d S o l u t i o n s
Most Relevant Projects
[email protected] www.saxum.us
COMPANY OBJECTIVES LOCATION PERIOD BUDGET
B a s i c a n d d e t a i l e d engineering for New Line production in Arcos Plant. M/H Saxum = 66.700hs
CSN - Compania Siderurgica Nacional
Brasil
Arcos, MG - Brasil 2013/2015 560 MM USD
Production Expansion Project Plant Sales in Salar del Hombre Muerto. M/H Saxum = 14.300 hs
FMC - Minera del Altiplano. Argentina.
Salar del Hombre Muerto. Salta-
Argentina
2004/2005 25 MM USD
Pre-Feasibility Study for Upgrade of Black Farallon plant. CapEx and OpEx Studies. Trade off studies for alternative production . Design of the new renery .M/H Saxum = 15,000 hs
YMAD - Yacimientos Minerales Aguas de
dionsio
CatamarcaArgentina
2012/2014 75 MM USD
B a s i c a n d d e t a i l e d engineering and construction supervision. New Grinding System ( Mills # 2 and # 3). Arcos plant . M / H Saxum = 43,500 hs
Arcos MG - Brasil 2011/2014 73 MM USDCSN - Compania Siderurgica Nacional
Brasil
Don Nicolas Gold -Silver Project. Pre -Feasibility Phase : Process Eng ineer ing , Mechanical , Civ i l and Electrical .CapEx and OpEx Studies. Feasibility phase : Design of Infrastructure. M/H Saxum = 21,000 hs
Santa CruzArgentina
2010/2013 75 MM USDMinera IRL Patagonia S. A. Gold-Silver
Mining Plant
Lithium Project Salar de Cauchar i . Engineer ing Services and Procurement .Feasibility phase : Revision of Basic Engineering .M / H Saxum = 3,500 hs
JujuyArgentina
2011/2012 250 MM USDMinera EXAR S. A.
Detailed engineering and i n t e g r a t i o n f o r n e w production line . Plant Salto de Pirapora . San Pablo . Brasil . M/ H Saxum = 16,600 hs
Sao Pablo - Brasil 2010/2011 340 MM USDVotorantim Brasil
E n g i n e e r e d S o l u t i o n s
Most Relevant Projects
[email protected] www.saxum.us
COMPANY OBJECTIVES LOCATION PERIOD BUDGET
Casposo Gold -Silver Project.E PCM con t r a c t . Ba s i c Engineering ; CapEx / OpEx Studies; Environmental impact ; Procurement (1st phase); Field supervision (1st phase).M/ H Saxum = 35,000 hs
Intrepid Mines Ltd. San Juan - Argentina 2008/2010 83 MM USD
Manantial Espejo project .B a s i c a n d d e t a i l e d Engineering in all specialties.M/ H Saxum = 83,000 hs
Panamerican Silver Corporation
Santa Cruz Argentina
2005/2007 250 MM USD
Gas Management Project and Environment in Ilo plant , Southern Peru Copper , Moquegua , Peru.M/ H Saxum = 8,600 hs
Southern Peru Copper
Ilo, MoqueguaPeru
2009/2010 67 MM USD
Detailed engineering Moliendas Elementary and Secondary Truck Shop. Plant Tintaya Antapaccay expansion , Peru.M/H Saxum = 8,900 hs
Xstrata Copper Chile
TintayaPeru
2009/2010 950 MM USD
Engineering for New Provision of Water Pipes DCP recovery .M/H Saxum = 5,200 hs
Minera Alumbrera Ltd.
CatamarcaArgentina
2010/2010 9,5 MM USD
Basic Engineering for Evaluation CapEx and OpEx of new lithium carbonate plant - Salinas Grandes .M/H Saxum = 9,400 hs
Eramet Ingenierie SaltaArgentina
2012/2012 160 MM USD
Engineering for wastewater treatment plant underground mine Eureka.M/H Saxum = 9,400 hs
Oroplata S.A. Santa CruzArgentina
2010/2010 7 MM USD
Engineering and project supervision for Heap Leach and grinding for 285 tph .M/H Saxum = 17,600 hs
Cerro Vanguardia Ltd Santa CruzArgentina
2011/2012 26 MM USD
E n g i n e e r e d S o l u t i o n s
Most Relevant Projects
[email protected] www.saxum.us
COMPANY OBJECTIVES LOCATION PERIOD BUDGET
Feasibility study for a Lithium Carbonate and a Potassium Chloride Plant.M/ H Saxum = 35,000 hs
Eramet Ingenierie Salta - Argentina 2011/2011 165 MM USD
Rougher feeding cells .M/ H Saxum = 7,300 hs
Minera Alumbrera Ltd.
CatamarcaArgentina
2010/2011 4,2 MM USD
New clinker and cement lime. Santa Cruz de la Sierra , Bolivia .M/ H Saxum = 24,300 hs
Itacamba Cemento S.A., Bolivia
Santa CruzBolivia
2014/2015 160 MM USD
Feasibility studies and detailed engineering for a lithium evaporation pilot plant.M/ H Saxum = 4,600 hs
Bolera Minera SRL Salta - Argentina 2011/2012 2,3 MM USD
Feasib i l i t y s tudies and engineering for building roofs mill and otation area .M/ H Saxum = 4,600 hs
Xstrata Copper Peru Tintaya - Peru 2012/2012 28 MM USD
CLIENTS
[email protected] www.saxum.us
MINERA TRITON S.A. Argentina (Pan American Silver).
MINERA AGUILAR S.A. Argentina.
BARRICK-GOLD Argentina.
BARRICK GOLD Chile.
CERRO VANGUARDIA SA. Argentina (Anglo Gold Ashanti).
SOUTHERN PERU COPPER CORP. Peru.
MINAS BUENAVENTURA. Peru.
MINERA ALUMBRERA LTD. Argentina (Glencore, ex Xstrata Copper)
MINA PIRQUITAS. Argentina (Silver Standard)
MINERA IRL. Don Nicolas, Argentina.
GLENCORE Chile (ex Xstrata Copper).
MINA DISPUTADA DE LOS CONDE. Chile (Anglo American)
ANGLO AMERICAN Perú (Quellaveco Project)
MINA SIERRAS BAYAS Chile (Glencore, ex Xstrata Copper)
MINA CERRO MATOSO Colombia (BHP Billiton)
CSN – Compania Siderurgica Nacional – Brazil
INTREPID MINES LTD. Canada
FMC Argentina
MINERA EXAR LITHIUM AMERICAS S.A. Argentina
ERAMET Ingenierie, Francia
BOLERA MINERA S.R.L. Argentina
GALAXY RESOURCES Ltd.
YAMANA GOLD Argentina
EXTORRE Gold Mine Ltd
CONTACT
CONTACT US
REFERENCES
David Keough, Chief Opera�ng Officer
Mansfield Minerals Inc.
Pablo D’Agnillo, Project Manager
Glencore Argen�na
Eng. Cassio Mortari, Engineering Manager
Companhia Siderúrgica Nacional, Brazil
Raul Mentz, Plant Manager
Minera Alumbrera Ltd. Glencore Argen�na
[email protected] www.saxum.us
+1 9727173331
+1 9727173332
+1 972 7173137
Office:
Fax:
Mob: +1 9728760584
Chris Hayman (General Manager)
North America
Office:
Mob: +55 11976489327
Mateus Braga Pena (Office Manager)
South America
Brasil
Argen�na
+54 381 4226151
+54 11 43721815
Office:
Mob: +54 911 58831583
Antonela Bergese (Commercial & BD)
+55 3133094578
Mob: +1 9723753577
Kevin Blankenship (Project Director & VP Technology)
CONTACT US
Max Combes, Construc�on Manager Quellaveco
., Chile and PeruAnglo American Ltd
Eng. Barry Borges, Project Manager
Anglo Gold North America
Eng. Marcelo Cabral, Engineering Manager
Las Bambas. Peru. MMG Limited –