savona i i...important: don’t position screw in roller groove position track across wall thickness...

5
SAVONA Installation Instructions Header, Ceiling, Soffit Mount VERTICALLY FASTENED TOP TRACK - PLAN 11 SYSTEM PARTS SHEET: JOB #: DRAWN BY: DATE: CHECKED BY: OPTIONAL PARTS PROJECT: ARCHITECT: 2 X 2 X FINISHED OPENING WIDTH (F/O) A SIDELITE SHOE DUAL TOP TRACK SAVONA Sx-QCF Dual Double Track - Wall Mount - Flush Floor Track DUAL FLUSH TRACK PLAN 11 ELEVATION A SECTION B JL DL CUSHION CAPTURE ROLLER ASSEMBLY (SHOWN WITH SINGLE TOP TRACK) BLACK ANODIZED FINISH TRACK STOP END CAP STANDARD INSERTS DIFFUSED WHITE LAMI GLASS CLEAR LAMINATED GLASS MIRROR PREFINISHED HARDBOARD MIRROR / HARDBOARD SPECIAL INSERTS POLAR WHITE GLASS BLACK GLASS CABANA LITE LAMI GLASS WHITE SAND LAMI GLASS CUSTOMER SUPPLIED INSERT DIVISION BARS PLEASE NOTE: “x” in the product code refers to the stile options - Standard = “T” ; = “214” 07/22/17 STANDARD STILE LOCK EDGE PULL 2-1/4” WIDE STILE

Upload: others

Post on 24-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAVONA I I...IMPORTANT: DON’T POSITION SCREW IN ROLLER GROOVE Position track across wall thickness keeping in mind the desired backset of fascia. Fasten track vertically to header,

SAVONA Installation InstructionsHeader, Ceiling, Soffit Mount

VERTICALLY FASTENED TOP TRACK - PLAN 11

SYSTEM PARTS

SHEET: JOB #: DRAWN BY: DATE: CHECKED BY:

OPTIONAL PARTS

PROJECT:

ARCHITECT:

2 X

2 X

FINISHED OPENING WIDTH (F/O)

A

SIDELITE SHOE

DUAL TOP TRACK

SAVONA Sx-QCFDual Double Track - Wall Mount - Flush Floor Track

DUAL FLUSH TRACK

PLAN 11

ELEVATION A

SECTION B

JL DL

CUSHION CAPTURE ROLLER ASSEMBLY(SHOWN WITH SINGLE TOP TRACK)

BLACK ANODIZED FINISH

❒ ❒

TRACK STOP

END CAP

STANDARD INSERTS

❒ DIFFUSED WHITE LAMI GLASS

❒ CLEAR LAMINATED GLASS

❒ MIRROR

❒ PREFINISHED HARDBOARD

❒ MIRROR / HARDBOARD

SPECIAL INSERTS

❒ POLAR WHITE GLASS

❒ BLACK GLASS

❒ CABANA LITE LAMI GLASS

❒ WHITE SAND LAMI GLASS

❒ CUSTOMER SUPPLIED INSERT

❒ DIVISION BARS

❒ ❒

PLEASE NOTE: “x” in the product code refers to the stile options - Standard = “T” ; = “214”

07/22/17

STANDARD STILE

LOCK

EDGE PULL

2-1/4” WIDE STILE

Page 2: SAVONA I I...IMPORTANT: DON’T POSITION SCREW IN ROLLER GROOVE Position track across wall thickness keeping in mind the desired backset of fascia. Fasten track vertically to header,
Page 3: SAVONA I I...IMPORTANT: DON’T POSITION SCREW IN ROLLER GROOVE Position track across wall thickness keeping in mind the desired backset of fascia. Fasten track vertically to header,

Install Top Track

Measure track and trim top track to length as required.

Mark drill locations to the side of the top roller grooves spaced at approximately 24" centres alternating down the track length and at each track end point. Drill holes to match screws provided. Screws MUST be located into solid backing.

IMPORTANT: DON’T POSITION SCREW IN ROLLER GROOVE

Position track across wall thickness keeping in mind the desired backset of fascia. Fasten track vertically to header, soffit or ceiling.

3

4

1

A

2

Screw LocationsNot In Roller Groove

Quad Track Ceiling Mount Shown

Solid BackingFraming

3

SURFACE Floor TrackSavona Floor Tracks are designed for concealed fastening. It is NOT recommended that they be drilled and screwed down. For a cleaner look follow these instructions:

Measure track and trim bottom track to length as required.

Top and bottom tracks are NOT the same width, therefore use the following method for proper vertical alignment. Using plumb-bob trial position track in place by aligning top and bottom track roller grooves. Lightly mark the outside edges at each end of floor track on floor with pencil.

Apply two sided carpet full length on the track underside on the flat surface that will contact floor. Apply dabs of construction adhesive along the underside of track and position track referencing pencil marks. Carpet tape will hold track in place while adhesive sets.

Determine if you have SURFACE floor track or FLUSH floor track.

B

5

6

7

2x DUAL SURFACE TRACK

1

SAVONA Installation InstructionsHeader, Ceiling, Soffit Mount

VERTICALLY FASTENED TOP TRACK - PLAN 11

IMPORTANT: Read these instructions completely before beginning any installation. Once the product is at the opening site and tools and parts are set up and ready to go, each panel should be able to be installed in 20 - 30 minutes.

T:F: 604.501.1608

604.501.2588

Page 4: SAVONA I I...IMPORTANT: DON’T POSITION SCREW IN ROLLER GROOVE Position track across wall thickness keeping in mind the desired backset of fascia. Fasten track vertically to header,

Ensure the pre-installed “Spring Rollers” are at the top of the panel.

Lift the panel up into the guide channel and engage the top rollers into the top track groove. Set the bottom roller into the corresponding floor track groove.

Adjust floor clearance and vertically wall alignment with wall edge by temporarily shimming the panels between the bottom rail and floor track to take the weight off the bottom rollers. Access the vertical adjustment bolt through the port in each bottom rail cap using a #3 Philips screwdriver.MANUAL TOOLS SHOULD BE USED FOR THIS PROCESS.

SPECIAL NOTE: To achieve a panel positioning along the track push panel locator ramps into the top roller groove and position such that the top roller comes to rest in the centre of the ramp. Secure in place with a dab of silicone.

Install the PanelC10

11

12

Panel with RollerSitting in Ramp

N

11

Panel Locator RampsGo in Roller Groove

Quad Track Ceiling Mount Shown

FLUSH Floor TrackSavona Floor Tracks are designed for concealed fastening. It is NOT recommended that they be drilled and screwed down. For a cleaner look follow these instructions:

Shim subfloor to 5/16" below finished floor surface.

Measure track and trim to length as required.

Using plumb-bob trial position track in place by aligning top and bottom track roller grooves. Mark the edges at each end of floor track on shim.

Apply two sided carpet full length on the underside flat surface that will contact shim. Apply dabs of construction adhesive along the underside of track and position track referencing shim marks. Carpet tape will hold track in place while adhesive sets.

Finish flooring up to track edges.

B

5

6

7

8

9

2x DUAL BOTTOM TRACK

2

SAVONA Installation Instructions cont. VERTICALLY FASTENED TOP TRACK - PLAN 11

Page 5: SAVONA I I...IMPORTANT: DON’T POSITION SCREW IN ROLLER GROOVE Position track across wall thickness keeping in mind the desired backset of fascia. Fasten track vertically to header,