SATORP INTERVIEW QUESTIONNARE (PIPING)
1) What are the JERES specs for hydro testing?
JERES-A-004 – General Requirements of Pressure Testing
JERES-A-007 - Hydrostatic testing fluids and Lay up procedure
JERES-L-150 - Pressure testing of plant piping & pipelines.
2) What is a dead leg?
Dead Legs: Piping sections that are potential for internal corrosion due to
flow stagnation.
Dead legs are created mainly by flow stagnation enhanced with presence ofsettled water and solid deposits.
When the length of the section or branch , for 2 inch pipes and larger, is
longer than three times its pipe diameter, or 1.22 m (4 ft) in length, thelength of the dead leg is the distance measured from the outside diameter
of the header (or run) to the near end of the branch valve.
For branch connections of 1-½ inch NPS and smaller, the length of the
dead leg is the distance measured from the end of the boss to the near
end of the valve.
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 2/11
SATORP INTERVIEW QUESTIONNARE (PIPING)
3) What is the different ASME 31 code for pressure piping? A. ASME B31.1 - Power piping.
B. ASME B31.2 - Fuel Gas Piping.
C. ASME B31.3 - Process piping.
D. ASME B31.4 - Pipeline Transportation system for liquid
hydrocarbon & other liquid.
E. ASME B31.5 - Refrigeration Piping.
F. ASME B31.8 - Gas transmission & distribution piping system.
G. ASME B31.9 - Building services piping.
H. ASME B31.11 - Slurry transportation piping system.
4) What are the factors in a mill test certificate?
Chemical composition
Mechanical properties ( hardness, tensile strength, yield strength,
elongation, reduction of area)
Heat number
5) Which is the rope used for lifting the external coated pipe?
Nylon
6) What is the minimum clearance b/w a pipe and a structure?
50mm
7) What is the hydrotest holding time for A/G piping?
30 min
8) What are the important activities to be checked during flange alignment fit up?
Misalignment
Flange face
Rotation of flanges (±2.4 mm) Tilt of the flange ( shall not exceed 1.6 mm from the square position)
Flange face thickness, gasket thickness ± 1.6 mm
Combination of vertical, horizontal and rotational offset ± 3.2 mm
9) What are the piping inspector responsibilities?
Material receiving inspection
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 3/11
SATORP INTERVIEW QUESTIONNARE (PIPING)
Ensure that approved procedure and ITP are used by construction.
Pipe fit up activities
Retention of QC reports and records.
Line checking Hydro test activities
Reinstatement activities
10) How can you identify an ISO in a P&ID?
Line number, service, instrument, equipment, and slope.
11) What is an insulation kit?
To isolate between above ground and under ground. 12) What is insulation gasket?
Isolation of dissimilar metal flanged joints ( electrical insulation)
Insulating joints for cathodic protection.
Eg. PIKOTEK GASKETS.
13) What are PIKOTEK Gaskets and what are their limitations?
It is non metallic gaskets made of self energized Teflon seal supported by
glass reinforced epoxy laminated to 316 stainless steel core. The minimum required gap shall be 3.2 mm.
It shall not be used services with temp. 154‟C or higher
It shall not be used in hydrocarbon gas service in which flange rating is
300 or higher.
It shall not be used in Chemical incompatibility of non metallic component
with the service media.
14) What are the general points to be checked prior to hydro test?( pre-pressure
checklist)
Seal weld threaded nipples from headers to 1st block of valve
(hydrocarbon service) per JERES-L-110
Guides are in direct contact with piping horizontal run at 3 locations
(6mm gap required). Relocate guides per drawing. These are welded to
the pressure boundary.
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 4/11
SATORP INTERVIEW QUESTIONNARE (PIPING)
Check valve is oriented in the wrong direction (flow arrow). Reverse
check valve to assure correct flow direction. Reposition valve & restore
internals immediately after test, COMPANY to witness.
Piping clearance to structural bracing is (50 mm spacing required). Install permanent gaskets at flange sets 1, 4, 5, 6 on ISO dwgs per
approved torque tables and install spectacle blinds oriented as per
approved P&ID.
Completely remove all water and debris from low point/valve cavity for
the in-line Valves with SS 400 trim, do so immediately after test. Clean
with dry compressed air and relubricate sealing surfaces with approved
lubricant in preparation for "ambient" lay-up specified in test package.
Indicate “No Punch items. “as applicable
QA is reviewed/initialed/dated prior to package certification to verify
completeness.
15) What is NCR, CAR, DR?
NCR: (Non Conformity report): A record reporting the variation from the
specified requirements.
CAR: Corrective action report: A record reporting the action taken to
eliminate the effect and causes of an existing non –conformity, defect or other
undesirable situation in order to prevent recurrence.
DR: Deviation report: A record of the concessions granted by client or ownerto certain deviation from project specification.
16) What are specifications? Specifications (Specs) are guideline details for construction requirements to
assure minimum quality standards are listed and met.
17) What is an SIS?
Safety Instruction Sheet that gives full design details related to a piping
system or line.
18)What is Schedule „Q‟?
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 5/11
SATORP INTERVIEW QUESTIONNARE (PIPING)
Schedule Q stands for Owner‟s minimum quality requirements forContractor/Subcontractor quality system.
19) What are the points to be checked before pipe fit up?
Oil, moisture, rust, scale, sand, paint, metallic coatings (e.g., zinc), or other
foreign matter shall be removed from the weld surface and at least 25 mm (1
in) of adjacent base metal prior to welding, including any such coatings on
temporary attachments or supports.
Pipes and Fittings for fit-up will be placed on temporary pipe bed and will make
sure that supports are secured properly.
After end preparation, the alignment, fit-up and tack weld activities shall be
carried out for the purpose of exact pipe spool fabrication.
Line No, Component Heat No., Joint No., Fit-up inspection signature, Welder
No., Visual inspection signature and date of welding will be marked near to the
joint with metal paint marker.
Use markers with free lead, sulfur, and water soluble chloride not more than
50ppm for SS and other alloy materials.
20) There is damage in the received material, what will you do?
All damage material shall be placed in quarantine area with visible
identification. Material Over, Short and Damage report O.S&D shall be
issued. A Non-Conformance Report shall be raised for materials withsevere damages.
QC inspector shall monitor all the O.S & D and NCR issued and their
corrective and Preventive action taken.
Non conforming materials shall be clearly marked, segregated and
controlled so that their unauthorized or inadvertent use is prevented and
their final disposition formally documented and recorded.
21) How will you store the material in the storage area? All materials shall be handled with care during fabrication and installation
to prevent damage.
End protectors on pipes, flanges, weld bevels, threads, and socket ends
shall be firmly attached.
Pipe shall not be rolled or dropped off trucks.
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 6/11
SATORP INTERVIEW QUESTIONNARE (PIPING)
End bevel protectors shall remain on pipes and fittings while in storage,
protectors shall not damage internal or external coating.
Flange face and threads shall be protected from rust by applying suitable
rust preventives.
After completion of pre-fabrication, the spool shall be cleaned and free
from weld spatters, arc strikes and foreign materials on outside and inside
of pipes.
Lined and coated pipes and fittings shall be lifted with wide fabric or
rubber-covered slings and padding shall be used to prevent damage to
lining or coating. Wire rope slings shall not be used.
SS materials shall be covered and protected from water splash and other
contamination during storage
24) What are the ASME codes for Flanges?
ASME B16.5 PIPE FLANGES AND FLANGED FITTINGS (UPTO 24”)
ASME B16.47 LARGE DIAMETER FLANGES (ABOVE 24”)
25) What is the colour code for the material?( standard)
PFI ES 22( PIPING FABRICATION INSTITUTE)
26) What is the code for PMI (JERES)? JERES-A-206- POSITIVE MATERIAL INSPECTION
27) How you inspect the flush grinding?
Any distortion resulting from the butt weld shall be removed and ground
flush with the inside diameter of the pipe, PT shall be done.
The inside surface of welded joints at orifice flanges shall be ground or
machined smooth.
28) What things are found in a Piping Isometric drawing?
Line conditions, references to drawings, materials of construction(Bill Of
Materials), continuations, orientation, piping and drawing details and
notes, revision control and approval status.
28) What kind of inspection required during gasket installation?
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 7/11
SATORP INTERVIEW QUESTIONNARE (PIPING)
QC Piping Inspector will ensure the cleanliness of the gasket surfaces of
the flanges and the condition of the gasket. Care shall be taken during this
operation to prevent entering of debris in the pipe or equipment.
QC piping Inspector shall verify on site, prior to installation, each gaskethas the proper material size and rating according to drawings and line
class. Gaskets will have an individual painted mark, which will identify the
rating number.
For gaskets 24” and less, colours code on the gaskets shall be applied on
the outside surface, Mark shall be an approximately 1 inch in length
circumferentially.
For Gaskets 24” and above, will be market in two locat ions each.
Spiral wound gaskets should have three colours, which identify the
particular material spec, rating and gasket with inner ring respectively.
During reinstatement, QC Piping Inspector shall verify that bolting is
tightened according JERES-L-351.
QC Inspectors shall inspect, before hydro test and during lines
reinstallation that all permanent gasket are installed accordingly.
29) What is the difference b/w toquing of CS & SS bolting?
Yield strength of CS is greater than SS.
30) Explain spectacle plate?
Blind flange is used to isolate equipment or other piping during the leaktest, need not be leak tested.
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 8/11
SATORP INTERVIEW QUESTIONNARE (PIPING)
31) How many threads can be visible after seal welding threaded joints?
Zero
32) What is the basic difference between Pipe specification A106 Gr.A / Gr.B/ Gr.C.?
Difference is due to the Carbon content.
% of carbon content in : -
I. ASTM A106 Gr. A – 0.25 %
II. ASTM A106 Gr. B – 0.30 %
II ASTM A106 Gr. C – 0.35 %.
34) What is WPS?
A document providing the required welding variables for a specificapplication to assure repeatability by properly trained welders and welding
operators.
35) What is PQR?
A record of welding variables used to produce an acceptable test
weldment and the results of tests conducted on the weldment to qualify a
welding procedure specification.
36) What is PMI?
Verification that the nominal chemical composition of an alloy material isas specified and ordered.
37) What are the gauges used for fit up?
Bridge cam, High Low gauge
38) What material used for drinking water service?
Galvanized steel materials
39) What are the types of bolts and spec? A193 B7, A320 B8, JERES-L-109
40) What is color coding?
Marking of piping bulk materials to identify the Material.
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 9/11
SATORP INTERVIEW QUESTIONNARE (PIPING)
41) What are the different types of JER documents?
JEREP- Jubail Export Refinery Engineering Procedures
Uniform method of assembling directions to accomplish various engineering
activites.
JERES-Jubail Export Refinery Engineering Standard
Minimum requirements for the selection, design, construction, test,
maintenance and repair of equipment & related facilities.
JERMS-Jubail Export Refinery Material Specifications
To establish minimum engineering, design, fabrication and testing
requirements for the procurement of material and equipment.
JERSD- Jubail Engineering Refinery Standard Drawing
Engineering drawing that is pre approved by JER Management for through out
the company.
JERITP-Jubail Export Refinery Inspection And Test Plan
Minimum requirements set by the company to conduct inspection
JEREF- Jubail Export Refinery Engineering Forms
JER developed forms that shall be used as a tool for Design, Construction and
Pre-commissioning.
42) What are the different sections of ASME code? Where these sections are
referred? A. ASME section I : - Rules for construction of power boiler.
B. ASME Section II : - Materials.
Part A – Ferrous materials.
Part B – Non-Ferrous materials.
Part C – Specification for electrodes & filler wire.
Part D – Properties.
C. ASME Section IV : - Rules for construction of Heating Boiler.
D. ASME Section V : - Non- destructive Examination.
E. ASME Section VI : - Recommended rules for care & operation of
heating boiler.
F. ASME Section VII : - Recommended guidelines for care of power
boiler.
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 10/11
8/13/2019 Satorp Interview Questionnare1
http://slidepdf.com/reader/full/satorp-interview-questionnare1 11/11
SATORP INTERVIEW QUESTIONNARE (PIPING)
48) What are the acceptable branch connections and fittings? Also mention the limitations?
Branch connections on any fittings are not allowed
Branch connection is not a dead leg with any internal corrosion
concerns.
Branch connections 4 inch and smaller (drain and vent valves and drip
legs of all sizes excluding dummy legs) are spaced a minimum
horizontal distance of 24 inches from fixed supports/obstructions.